Loading...
HomeMy WebLinkAboutRES 032712-O - Update Dev & App Fees UDCRESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GEORGETOWN, TEXAS, UPDATING THE DEVELOPMENT PROCESSING AND APPLICATION FEES PURSUANT TO CHAPTER 3.02.020 OF THE UNIFIED DEVELOPMENT CODE. WHEREAS, as part of the 2011-2012 Annual Unified Development Code (UDC) review process there are new application review processes that are being created for which there are no existing fees identified: Minor Site Plan, Site Plan Extension, Site Plan Reinstatement, Plat Extension, Plat Reinstatement, Vacation of Recorded Plat, Special Use Permit Fxtension Unified Development Code Text Amendment (individual), and Waiver of Building Permit Delay, pursuant to UDC Section 3.13.010 D 4; and WHEREAS, Section 3.02.020 of the Unified Development Code provides that City Council shall establish the application fees; and WHEREAS, the City Council has determined that the Planning and Development fees are not required to reflect a full recovery of staff review time spent for each individual application, however; they should seek to recover the cost of application processing; and WHEREAS, the City Council has determined that the Development Processing and Application Fees should be reviewed on a three-year cycle to ensure that the fees are appropriate and reasonable and instructs City staff to develop a fee review process that will be followed every third year. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GEORGETOWN, TEXAS, THAT: SECTION 1. The City Council of the City of Georgetown hereby updates and adopts the development processing and applications fees as shown in Exhibit A to this Resolution. RESOLVED this 1 day of March, 2012. ATTEST: By: THE CITY OF GEORGETOWN: sica Brettle Geor Garver y Secretary Mayor APPROVED AS TO FORM:, 1 Bridget Ch$pman ¢ i Acting City Attorney Resolution No. Page 1 of 1 )(HI Application Fee Schedule The following is a summary of the City of Georgetown's land development processing fees. For questions or verification of the total fees for your project, please contact Planning and Development at 512-930-3575. All application fees include the initial notification fees. However, subsequent notifications will be charged to the applicant pnor to making each additional notice at the rate of $75 per notice. For large scale projects with over 50 mailed notices, an additional fee of $1.00 per letter shall be charged for each mailing over 50 pieces. All calculations will be based on fractions of an acre charged as a full acre. Some applications may require additional companion applications, such as a Comprehensive Plan Amendment that will likely require a Georgetown Utility Systems Utility Evaluation. Access Point Connection Exemption Administrative Exception/ Determination Annexation (Voluntary).._ Appeal (100% refunded if appeal is granted) Certificate of Design Compliance: $350 $300 $1,000 $250 Administrative / DeMinimis Projects (Exterior signage, paint color, fencing and other minor improvements) Minor Projects: (Remodel of structures less than 5,000 sq. ft. in size; landscape/ hardscape installation; alternative parking plans; demolition and/ or removal of structures) Major Projects: (Remodel of structures greater than 5,000 sq. ft. in size, infill/ new construction) Certificate of Occupancy (billed with Inspections/ Permitting, if applicable) Comprehensive Plan Amendment Construction/ Infrastructure Plans (submitted alone, no site plan) Construction/ Infrastructure Plans - minor amendment / revision Construction / Infrastructure Plans- major revision Development Agreement / MUD / Special District Development Agreement Amendment $25 $150 $250 $50 per inspection $700 $300 base + $100 per acre acre/ lot, after first, whichever is greater $300 Full fee for area subject to revision $3,000 (includes 5 hrs Staff meetings) + Staff time @ rate to be determined + related Legal Fees @ $225 hour. Rate will be higher if billed at higher rate. $1,500 (includes 5 hrs Staff meetings) + Staff time. @ rate to be determined + related Legal Fees @$225 hour Rate will be higher if billed at higher rate. 1 Driveway Permit Agricultural Residential Non -Residential Letters of Regulatory Compliance License to Encroach Master Sign Plan Parkland Dedication Resubmissions received more than 45 days after comments sent or i after 3rd submission: Plats, Construction/ Infrastructure Plans & Site i Plans Revision - Minor - Administrative (plats, site plan or other����. administratively approved application) $50 $100 per site + $250 if TIA required, see also TIA fees Revision - Minor to Board or City Council Revision - Major Rezoning - (0 - 5 acres) Each additional 5 acres Rezoning _ PUD or Mixed Use District (3-5 acres) $100.00 per driveway + $250 if TIA required, see also TIA fees $50 $200 $75 per sign $250 per LUE $250 50% of current application fee Current application fee $75 $1,000 Each additional 5 acres Sign Permit Sign Permit, Open House / Model Home Sign Permit, temporary event Site Plan Site Plan w/ Construction Plan Combo - must be part of Site Plan Site Plar. e Piar Extension to Plan Reir s tern ent Special Exception or Variance Special Use Permit��__ Stormwater Permit 3,333 $100 $75 per sign $25 (1 sign) + $5 per additional sign $25 for up to 5 signs then $5 per sign $650 + $75 per acre over 1 acre $750 + $175 per acre over 1 acre $150 $250 $350 $500 2 Subdivision: Administrative ..or Ariiending Plat Preliminary Plat or Replat Preliminary Plat and Final Plat combined, if option available Final Plat Plat Waiver Plat Notice, if required $300 $900 + $20 per acre or lot whichever is greater $400 + $12.50 per acre or lot whichever is greater $800 + $25 per acre or lot whichever is greater $100 Plat Recording Fees, set by Williamson County and subject to $61 1st pg, $50 ea. add'l pg. 2 sets, change oaf Record t d P?at Temporary Use Permit Traffic Impact Analysis Tree Protection Priority Utility Evaluation Variance Waiver without a Plat $5 ea. add'I set $100 $500 + Engineer Review Fees @ $150 per hr., rate will be higher if City billed at higher rate $300 if stand alone, otherwise included: in companion application fee $400 $300 + Engineer Review Fees @ $150 per hour. Each request will be charged separately. Engineer fee will be higher if City billed at higher rate. $350 $250