HomeMy WebLinkAboutRES 990622-X - Contract Rivery Partnerse :�
+E • iN•.;
! • • !� •
WHEREAS, a contract with the Texas Department of Economic Development on
behalf of Rivery Partners, Ltd. was approved by the City Council on April 27, 1999; and
WHEREAS, more stringent drainage requirements from the Texas Natural Resource
Conservation Commission will result in increased drainage construction costs; and
WHEREAS, it has been determined that a four -lane road is not necessary to support
the project, so therefore, a two -lane road will be constructed; and
WHEREAS, the resulting savings will be applied to the drainage construction.
NOW, THEREFORE, • • OF
*F GEORGETOWN,
SECTION 1. The facts and recitations contained in the preamble of this resolution
are hereby found and declared to be true and correct, and are incorporated by reference
herein and expressly made a part hereof, as if copied verbatim. The City Council hereby
finds that this resolution implements the following policy or policies of the Century Plan -
Policy Plan Element:
1. Economic Development Policy End 1.0, which states: "Georgetown's
economy is self - sustaining through diversified growth, a broad tax base with
minimal impact from economic fluctuation, enhanced business opportunity
and job creation."
1. Economic Development Focus End 1.1, which states: "Existing undeveloped
sites in Georgetown are put to beneficial use."
SECTION 2. The Georgetown City Council has reviewed and approves the
following change by contract amendment to the original contract with the Texas
Department of Economic Development on behalf of Rivery Partners, Ltd.:
"Due to the increased drainage construction costs resulting from more stringent
drainage requirements, and due to the fact that a four -lane road is not necessary
to support the project, a two -lane road will be constructed, and the resulting savings
will be applied to the drainage construction."
Rivery Amendment Resolution No. 2
Page 1 of 2
SECTION 3. The Georgetown City Council hereby authorizes the Mayor to execute
the amendment and otherwise act on the City's behalf in all matters pertaining to the
submission of this contract amendment.
SECTION 4. The Mayor is hereby authorized to execute, and the City Secretary to
attest thereto this resolution on behalf of the City of Georgetown.
SECTION 5. This resolution shall be effective immediately upon adoption.
RESOLVED this 121 C day of
Ayes: Nays:
CITY OF GEORGETOWN:
f. MaryEllen Kersch
Mayor
FTAI
"i• 1090: 1 10 SWAN a I Lei •
Marianne Landers Banks
City Attorney
Rivery Amendment Resolution No. V!Fo & 2.2 -
Page 2 of 2
-j-
ct oe 1999.
Absent:
ATTEST:
Sandra D. Lee
City Secretary
Ur
Ai*ifR mus SEC. Fe---1
CAR. H 51.10r 231
•
r i!>ICHTON
- LAND
FArtat
ej G"-fm
f 9 4u-"Go
C 62511,
a • oe*so,w %% % I,-
R -
C 35.04,
cs
L v 949.9 . I'
m3rn,321c
C ® 049.59'
3S.117 ACKLES
ct
PARCEL '0'
TEX-f5 PARKS ARV
R(!CIIE-AT K)N Foumm.nom
DOC NO. 9"39297
a • oe*so,w %% % I,-
R -
C 35.04,
cs
L v 949.9 . I'
m3rn,321c
C ® 049.59'
08/27/98
BUDGET JUSTIFICATION FOR TWO LANE ROAD
COST REVISED TO REFLECT CURRENT CONSTRUCTION COST
Revlsecl 8t32199 to Show Bireak 'Down ot Grant Funds, Deve r Funds and Tblal Project Cbst
ACTIVITY I
UNIT
# OF
TOTAL
GRANT j
PRICE
UNITS
COST
FUNDS
MISCELLANEOUS:
j MOBILIZATION ;
$5,000.00
L.S.
$5,000.00
BONDS `
$7,004.00
L.S.
$7,000.00
i CLEAN -UP AND FINAL GRADING
$5,000.00
L.S.
$5,000.00
E
j SEEDING
$1,000.00
L.S.
$1,000.00
TOTAL MISCELLANEOUS j
S98,ti.6{Y'
IRiVERY BLVD. IMPROVEMENTS: j
EXCAVATION /EMBANKMENT
$7.00
18,400 S.Y.
$128,800.00
CURB & GUTTER
$12.50
4,800 L.F.
$60,000.00
i
SUBGRADE PREP.
$1.50
8,004 S.Y.
$12,000.00
j
22" COMPACTED BASE j
$16.00
8,000 S.Y.
$128,000.00
2 -1/7 HMAC
$5.50
7,500 S.Y.
$41,250.00
REFLECTIVE PVT. STRIPPING
$4.20
9,200 L.F.
$1,840.00
TOTAL RIVERY BLVD. IMPROV. j
$371 89040, j
DRAINAGE IMPROVEMENTS:
AREA INLET
$2,500.00
1 EA.
$2,500.00
1p' INLET
$4,000.00
6 EA.
$24,000.00
15' INLET
$5,000.00
1 EA.
$5,000.00
R.C.P. STORM SEWER PIPE I
$60.00
1,000 L.F.
$60,000.00
JUNCTION BOX / MANHOLE j
$3,500.00
4 EA.
$14,000.00
CONCRETE HEADWALL {
$3,004.00
3 EA.
$9,000.00
WATER QUALITY POND �
$35,000.00
3 EA.
$105,040.00
j
ENVIRONMENTAL (WPAP/TNRCC)
$5,000.00
L.S.
$5,000.00
( TOTAL DRAINAGE IMPROVEMENTS
4,5MOO:
!WATER IMPROVEMENTS: i
I 6" C -900 WATER LINE
$30.00
210 L.F.
$6,300.00
8" C -900 WATER LINE
$40.00
3,215.00
$128,600.00
6" GATE VALVE & BOX
$850.00
1 EA.
$850.00
v
8" GATE VALVE & BOX I
$1,000.00
10 EA.
$10,000.00
`
16" x 8" WET CONNECTION j
$6,500.00
L.S.
$6,500.00
( 5 -1/4" FIRE HYDRANT ASSEMBLY i
$2,500.00
16 EA.
$40,000.00
TOTAL WATER IMPROVEMENTS
W,OWOO,
$1.79,45O.M. j
i
j PROJEcfi COST SUBTOTAL (Grant Funds)'
$55t;34titlti
PROJECT COST SUBTOTAL (Pevefoper funds}
$255,300.0 i -
PROJECT COST S,Oi3t JTAL (Grant f E)eveicper Funds}
$8i�6,�t i,f70
* Opinion of probable costs for public improvements shown represent the minimum
necessary to provide service
to the project site.
* Costs shown reflect Davis -Bacon Wage Rates.
C:\ 123R5Ntiw4RK \RiVERYIRVERYRT4.WK4
_
i
�
BUDGET JUSTIFICATION FOR TWO LANE ROAD
COST REVISED TO REFLECT CURRENT CONSTRUCTION COST
08/27/98
Page 2 of 2
JI ACTIVITY UNIT
# OF TOTAL
L� PRICE
UNITS COST i
IWASTEWATER IMPROVEMENTS:
8" WASTEWATER LINE $50.00
1,450 L.F. $72,000.00
D. 4' DIA. MANHOLE $3,000.00
3 EA. $9,000.00
TOTAL WASTEWATER IMPROV.
'
ENGINEERING:
BASIC ENGINEERING
$72,000.00
SPECIAL SERVICES
$50,000.00
CONSTRUCTION INSPECTION
$26,660.00
TOTAL ENGINEERING
- — $146,660.00 °!
T
OJEC i COST: tsratt €Fun , s
$?t 3,00{?.t#0`
TdT'A# #
JeCT- ?COST�** FiAinds)
,SM300.00
TOTAL PROJECT Gt3S ,(Grans+ r und
i
f,
* Opinion of probable costs for public improvements shown represent the minimum necessary to provide service
to the project site.
* Costs shown reflect Davis -Bacon Wage Rates.
" ~)
Signature
�
Date
Ci123R5MWORKXRtVERY\RVERYRT4.W K4
E
rIq s *
OPINION OF PROBABLE COST FOR FOUR LANE ROAD
COSTS REFLECT CURRENT CONSTRUCTION COST
ACTIVITY
UNIT
# OF
TOTAL
PRICE
UNITS
COST J
MISCELLANEOUS:
MOBILIZATION
$10,000.00
L.S.
$10,000.00
BONDS
$14,000.00
L.S.
$14,000.00
CLEAN -UP AND FINAL GRADING
$10,000.00
L.S.
$10,000.00
SEEDING
$2,000.00
L.S.
$2,000.00
TOTAL MISCELLANEOUS
3S,i 00.00:
RIVERY BLVD. IMPROVEMENTS:
EXCAVATIONIEMBANKMENT
$7.00
18,400 S.Y.
$128,800.00
CURB & GUTTER
$12.50
8,800 L.F.
$110,000.00
SUBGRADE PREP.
$1.50
16,800 S.Y.
$25,200.00
22" COMPACTED BASE
$16.00
16,800 S.Y.
$268,800.00
2 -1/2" HMAC
$5.50
15,300 S.Y.
$84,150.00
REFLECTIVE PVT. STRIPPING
$0.20
19,000 L.F.
$3,800.00
TOTAL RIVERY BLVD. IMPROV. i
S2#1,7SU Ems:
!DRAINAGE IMPROVEMENTS:
I
I
AREA INLET
$2,500.00
1 EA.
$2,500.00
I
10' INLET
$4,000.00
6 EA.
$24,000.00
15' INLET
$5,000.00
1 EA.
$5,000.00
R.C.P. STORM SEWER PIPE
I
$60.00
1,000 L.F.
$60,000.00
JUNCTION BOX/ MANHOLE
I
$3,500.00
4 EA.
$14,000.00
CONCRETE HEADWALL
;
$3,000.00
3 EA.
$9,000.00
WATER QUALITY POND
$35,000.00
3 EA.
$105,000.00
C ENVIRONMENTAL (WPAP/TNRCC)
$5,000.00
L.S.
$5,000.00
TOTAL DRAINAGE IMPROVEMENTS
$224.5W.00 I
WATER IMPROVEMENTS:
^_-
6'C-900 WATER LINE
$30.00
210 L.F.
$6,300.00
8" C -900 WATER LINE
$40.00
3,215.00
$128,600.00
j 6" GATE VALVE & BOX
$850.00
1 EA.
$850.00
8" GATE VALVE & BOX
$1,000.00
10 EA.
$10,000.00
16!'x 8" WET CONNECTION
$6,500.00
L.S.
$6,500.00
5 -1/4" FIRE HYDRANT ASSEMBLY
$2,500.00
16 EA.
$40,000.00
TOTAL WATER IMPROVEMENTS
PROJECT COST 5116T0T L'(Page 1 of'2 })
$ -5W.00
* Opinion of probable costs for public improvements shown represent the minimum
necessary to provide service
to the project site.
* Costs shown reflect Davis -Bacon Wage Rates.
C: 5923R51MWCDRKIRNERYIRVERYRT5 .WK4