HomeMy WebLinkAboutRES 960109-Y - Adopt Permit FeesRESOLUTION #,
RESOLUTION OF ! OF OF
GEORGETOWN,NG RESOLUTION NO.920450
ESTABLISHING LAND DEVELOPMENT, UTILITY CONNECT AND
CONSTRUCTION PERMIT 1 ESTABLISHING
W
WHEREAS, it is the intention of the City Council to revise the City's local development
fees; and
WHEREAS, the City Council has determined that revising the development fees is in the
best interest of the citizens and the businesses in the City of Georgetown;
NOW, #' RESOLVED BY THE CITY COUNCILOF
CITY OF !' #
SECTION 1. The facts and recitations contained in the preamble of this resolution are
hereby found and declared to be true and correct, and are incorporated by reference herein and
expressly made a part hereof, as if copied verbatim. The City Council hereby finds that this
resolution implements Economic Development Policy 5 of the Century Plan - Policy Plan
Element, which states: "The City will take appropriate steps to have a self-sustaining economy"
and Finance Policy 1 of the Century Plan - Policy Plan Element, which states "The City will
conduct all municipal. operations in an efficient business -like manner"; and further finds that the
adoption of this resolution is not inconsistent or in conflict with any other Century Plan Policies,
as required by Section 2.03 of the Administrative Chapter of the Policy Plan.
SECTION 2. The land development, utility connect, and construction permit fee
schedules included in Exhibit "A" are hereby adopted as the new fees for the City of
Georgetown.
SECTION 3. This resolution shall be effective immediately upon adoption.
RESOLVED this 9th day of January, 1996.
ATTEST:
4j ej
Sandra D. Lee
City Secretary
A-PP,ROVED AS TO FORM:
Marianne Landers Banks
City Attorney
THE CITY OF GEORGETOWN:
By: LEO W-06
Mayor
"'ONSTRUCTION PERMIT FEES
NEW CONSTRUCTION Application Fee Permit Fee
Single Family Detached $100.00 $150.00 + .05/Sq. Ft.
Other 100.00 150.00 + .08/Sq. Ft.
ill 11TTI-19. _TFW_M11
11
F—ArereflUM210MINK01511 -
Accessory Buildings over 144 Sq. Ft.
$25.00
$50.00 + .01/Sq. Ft.
*Plus individual trade permits as required and listed below
Accessory Buildings under 144 Sq. Ft.
10.00
15.00
Re -Roofing
10.00
15.00
Fences
10.00
15.00
Back Flow Preventor Inspection
10.00
15.00
Signs
10.00
15.00
Fire Suppression Systems & Alarms
10.00
15.00
Certificate of Occupancy for
-
30.00
existing buildings
INDIVIDUAL TRADE PERMITS
Inside City Outside City
*Electrical
$25.00
$50.00
*Plumbing
25.00
50.00
*Mechanical
25.00
50.00
New construction permit fees include individual trade permit fees. Individual Trade
Permits are required for utility service rebuilds & appliance replacements.
PLAN REVIEW FEE
Typically assessed only when SBCCI, outside consultant, or City staff specialists
conducts the review. This is generally applicable only to large construction projects
and then the fee is set by the reviewer and assessed directly to the client.
FLOODPLAIN REVIEW $50.00
Assessed only if an investigation is required to determine whether the proposed
construction is located within the floodplain.
, UVAIDOXV21101re"T
SWIMMING POOL INSPECTION
Private
Public
pa-Je-
,.i ii W
LM
I
Ley A I
Alt�
REINSPECTION FEE
Per Residential Inspection
Per Commercial Inspection
Water Meter Connections
31411
ill
1 1/2"
2"
Greater than 2"
$15.00 "Gallon capacity
$45.00/Pump
M291011WOE'Ano EREQ100,11011
Siam
$350.00
500.00
650.00
950.00
50.00/Meter +
actual cost of
$500.00
650.00
800.00
1100.00
200.00/Meter +
materials & labor
PLUS
Engineering and Inspection Fee
Residential: Single Family $500.00/Dwelling unit
Multi -Family (2 or more units) $250.00/Dwelling unit
Non Residential $.20/Sq. Ft. area
Sewer Tao Connections
411 $300.00 $450.00
611 450.00 600.00
811 650.00 800.00
Greater than 8" 50.00/Meter + 200.00/Meter +
actual cost of materials & labor
PLUS
Engineering and Inspection Fee
Residential: Single Family $500.00/Dwelling unit
Multi -Family (2 or more units) $250.00/Dwelling unit
Commercial $.06/Sq. Ft. area
Industrial $.10/Sq. Ft. area
Electrical Connections
Single Phase Power
0-200 Amps
201-400 Amps
Greater than 400 Amps
Three Phase Power
0-200 Amps
201-400 Amps
Greater than 400 Amps
$400.00
600.00
Actual cost of materials & labor
$1550.00
2500.00