Loading...
HomeMy WebLinkAboutTOT AIRPORT MASTER PLAN UPDATE GEORGETOWN MUNICIPAL AIRPORT TABLE OF TABLES GEORGETOWN, TEXAS PAGE SECTION ONE – INVENTORY Table 1.1 – Existing Airfield Facilities............................................................................................1.10 Table 1.2 – Airport Services.........................................................................................................1.18 SECTION TWO – ACTIVITY FORECASTS Table 2.1 – Summary of Survey Results (Facilities, Activities or Capabilities Essential to the Airport to Provide)............................................................................2.3 Table 2.2 – Summary of Survey Results (Maximum Distance to an Airport).....................................2.4 Table 2.3 – Historical Population (1994-2003)................................................................................2.6 Table 2.4 – Population Projection (2004-2024)..............................................................................2.6 Table 2.5 – Historical Employment (1) (1997-2003)..........................................................................2.7 Table 2.6 – Historical Per Capita Income (1) (1990-2001)...............................................................2.8 Table 2.7 – Historical Total Registered Aircraft for Eight Counties (1994-2003)............................2.11 Table 2.8 – Registered Aircraft Projections for Eight Counties (2003-2024)...................................2.11 Table 2.9 – Historical Record of Based Aircraft (1994-2003)........................................................2.12 Table 2.10 – Projection of Based Aircraft (2003-2024).................................................................2.13 Table 2.11 – Projection of Based Aircraft Fleet Mix Distribution (2003-2024)..............................2.15 Table 2.12 – Total Annual Aircraft Operations (2003-2024).........................................................2.15 Table 2.13 – Projection of Fleet Mix (2003-2024)........................................................................2.16 Table 2.14 – Local/itinerant Annual Operation Forecasts (2003-2024).........................................2.17 Table 2.15 – Peak Traffic Forecasts (2003-2024)..........................................................................2.20 Table 2.16 – Annual Business Operations (2003-2024)................................................................2.21 Table 2.17 – Annual Airport Visitor Projections (2003-2024)........................................................2.23 Table 2.18 – Automobile Parking Projections (1) (2003-2024).......................................................2.24 Table 2.19 – Vehicular Activity Projection (1) (2003-2024)............................................................2.25 Table 2.20 – Forecast Summary - W/NCTA ................................................................................2.26 Table 2.21 – Forecast Summary W/O NCTA................................................................................2.27 SECTION THREE – FUTURE FACILITY REQUIREMENTS Table 3.1 – Airport Design Standards (Approach Visibility Minimums Not Lower Than 1 Statute Mile)...........................................................................................................3.3 Table 3.2 – Runway Length Requirements .....................................................................................3.4 Table 3.3 – Examples of Airplanes’ Payload and/or Fuel Reduction at GTU.....................................3.5 Table 3.4 – Incremental Growth of Based Aircraft........................................................................3.14 Table 3.5 – Total Incremental Demands for Additional Hangar and Tie-Down for Based Aircraft...................................................................................................3.15 Table 3.6 – Total Incremental Demand for Additional Hangar Area (1)..........................................3.16 City of Georgetown TOT-1 Airport Master Plan Update TABLE OF TABLES (Continued) PAGE SECTION THREE – FUTURE FACILITY REQUIREMENTS (Continued) Table 3.7 – Demand on Itinerant Aircraft Tie-Down Spaces (1).....................................................3.17 Table 3.8 – Incremental Demands for Additional Apron Area (1)...................................................3.18 Table 3.9 – Incremental Demands for Additional Office and Storage Spaces (1)............................3.18 Table 3.10 – Incremental Demands for Additional Automobile Parking Spaces (1).........................3.19 Table 3.11 – Incremental Demands for Additional Automobile Parking Area (1)............................3.20 SECTION FOUR – AIRPORT DEVELOPMENT PLANS Table 4.1 – Project Development Cost – Short-Term (0-5 Years) (1)..................................................4.5 Table 4.2 – Project Development Cost – Intermediate-Term (5-10 Years) (1)....................................4.7 Table 4.3 – Project Development Cost – Long-Term (10-20 Years) (1)..............................................4.9 Table 4.4 – Project Development Cost – Other Projects with No Current Plans to be Implemented.....................................................................................4.10 Table 4.5 – Project Development Cost – Projects to Provide Aircraft Storage, Maintenance to And Parking to be Implemented with Private Funds.............................................4.11 SECTION FIVE – AIRPORT PLANS AND ALTERNATIVES No Tables in this Section. SECTION SIX – NOISE STRATEGIES Table 6.1 – List of Representative Aircraft.......................................................................................6.2 Table 6.2 – Runway Utilization.......................................................................................................6.3 Table 6.3 – Average Daily Operations.............................................................................................6.4 Table 6.4 – Runway Utilization Reallocation – Alternative 1.........................................................6.18 Table 6.5 – Runway Utilization Reallocation – Alternative 2.........................................................6.24 Table 6.6 – Runway Utilization Reallocation – Alternative 3.........................................................6.29 City of Georgetown TOT-2 Airport Master Plan Update