Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
TOT
AIRPORT MASTER PLAN UPDATE GEORGETOWN MUNICIPAL AIRPORT TABLE OF TABLES GEORGETOWN, TEXAS PAGE SECTION ONE – INVENTORY Table 1.1 – Existing Airfield Facilities............................................................................................1.10 Table 1.2 – Airport Services.........................................................................................................1.18 SECTION TWO – ACTIVITY FORECASTS Table 2.1 – Summary of Survey Results (Facilities, Activities or Capabilities Essential to the Airport to Provide)............................................................................2.3 Table 2.2 – Summary of Survey Results (Maximum Distance to an Airport).....................................2.4 Table 2.3 – Historical Population (1994-2003)................................................................................2.6 Table 2.4 – Population Projection (2004-2024)..............................................................................2.6 Table 2.5 – Historical Employment (1) (1997-2003)..........................................................................2.7 Table 2.6 – Historical Per Capita Income (1) (1990-2001)...............................................................2.8 Table 2.7 – Historical Total Registered Aircraft for Eight Counties (1994-2003)............................2.11 Table 2.8 – Registered Aircraft Projections for Eight Counties (2003-2024)...................................2.11 Table 2.9 – Historical Record of Based Aircraft (1994-2003)........................................................2.12 Table 2.10 – Projection of Based Aircraft (2003-2024).................................................................2.13 Table 2.11 – Projection of Based Aircraft Fleet Mix Distribution (2003-2024)..............................2.15 Table 2.12 – Total Annual Aircraft Operations (2003-2024).........................................................2.15 Table 2.13 – Projection of Fleet Mix (2003-2024)........................................................................2.16 Table 2.14 – Local/itinerant Annual Operation Forecasts (2003-2024).........................................2.17 Table 2.15 – Peak Traffic Forecasts (2003-2024)..........................................................................2.20 Table 2.16 – Annual Business Operations (2003-2024)................................................................2.21 Table 2.17 – Annual Airport Visitor Projections (2003-2024)........................................................2.23 Table 2.18 – Automobile Parking Projections (1) (2003-2024).......................................................2.24 Table 2.19 – Vehicular Activity Projection (1) (2003-2024)............................................................2.25 Table 2.20 – Forecast Summary - W/NCTA ................................................................................2.26 Table 2.21 – Forecast Summary W/O NCTA................................................................................2.27 SECTION THREE – FUTURE FACILITY REQUIREMENTS Table 3.1 – Airport Design Standards (Approach Visibility Minimums Not Lower Than 1 Statute Mile)...........................................................................................................3.3 Table 3.2 – Runway Length Requirements .....................................................................................3.4 Table 3.3 – Examples of Airplanes’ Payload and/or Fuel Reduction at GTU.....................................3.5 Table 3.4 – Incremental Growth of Based Aircraft........................................................................3.14 Table 3.5 – Total Incremental Demands for Additional Hangar and Tie-Down for Based Aircraft...................................................................................................3.15 Table 3.6 – Total Incremental Demand for Additional Hangar Area (1)..........................................3.16 City of Georgetown TOT-1 Airport Master Plan Update TABLE OF TABLES (Continued) PAGE SECTION THREE – FUTURE FACILITY REQUIREMENTS (Continued) Table 3.7 – Demand on Itinerant Aircraft Tie-Down Spaces (1).....................................................3.17 Table 3.8 – Incremental Demands for Additional Apron Area (1)...................................................3.18 Table 3.9 – Incremental Demands for Additional Office and Storage Spaces (1)............................3.18 Table 3.10 – Incremental Demands for Additional Automobile Parking Spaces (1).........................3.19 Table 3.11 – Incremental Demands for Additional Automobile Parking Area (1)............................3.20 SECTION FOUR – AIRPORT DEVELOPMENT PLANS Table 4.1 – Project Development Cost – Short-Term (0-5 Years) (1)..................................................4.5 Table 4.2 – Project Development Cost – Intermediate-Term (5-10 Years) (1)....................................4.7 Table 4.3 – Project Development Cost – Long-Term (10-20 Years) (1)..............................................4.9 Table 4.4 – Project Development Cost – Other Projects with No Current Plans to be Implemented.....................................................................................4.10 Table 4.5 – Project Development Cost – Projects to Provide Aircraft Storage, Maintenance to And Parking to be Implemented with Private Funds.............................................4.11 SECTION FIVE – AIRPORT PLANS AND ALTERNATIVES No Tables in this Section. SECTION SIX – NOISE STRATEGIES Table 6.1 – List of Representative Aircraft.......................................................................................6.2 Table 6.2 – Runway Utilization.......................................................................................................6.3 Table 6.3 – Average Daily Operations.............................................................................................6.4 Table 6.4 – Runway Utilization Reallocation – Alternative 1.........................................................6.18 Table 6.5 – Runway Utilization Reallocation – Alternative 2.........................................................6.24 Table 6.6 – Runway Utilization Reallocation – Alternative 3.........................................................6.29 City of Georgetown TOT-2 Airport Master Plan Update