WHEREAS, the City of Georgetown recognizes the importance for constructing the East
Frontage Road on 1-35 from Highway 29 to FM 2338 (Williams Drive) ("Frontage Road"); an?.
WHEREAS, construction of the Frontage Road will improve traffic safety for the citizera
of the community by reducing the amount of traffic entering 1-35 at Highway 29 and exiting
FM 2338 by providing an alternate route to travel between Highway 29 and FM 2338;
WHEREAS, construction of the Frontage Road will greatly improve access to abutting
properties; and
WHEREAS, the City of Georgetown, with broad support of the Georgetown Community,
requested the Texas Transportation Commission to construct said Frontage Road-, and
WHEREAS, the Texas Department of Transportation prepared a cost estimate for
construction of the Frontage Road in the amount of $3,682,000.00; and
I
WHEREAS, the City of Georgetown proposed to contribute a portion of the fundirim
towards construction of the Frontage Road, which the City would recover from assessments up
the adjacent property; and I
WHEREAS, on June 29, 1993, the Texas Transportation Commission issued Minute Order
102420 authorizing construction of the Frontage Road; and
WHEREAS, said Minute Order required the City to provide $1,000,000.00 towards
construction of said Frontage Road; and
WHEREAS, the City Council has determined that it is in the best interest of the City and
of special benefit to the adjacent properties that the Frontage Road be constructed;
WHEREAS, the City Council has determined that it is in the best interest of the City that
the City comply with Article 1105b of the Texas Revised Civil Statutes and assess the adjacent
properties to the maximum allowable benefit received by the property due to the construction of
,0% Off oCP
d*" " . AAM
Frontage Road Amended Ren solutioNo. 707 -Y A. 01"
Page 1 of
WHEREAS, the City of Georgetown has 90 days from the issuance of the Commission's
Minute Order to accept the Commission's offer;
NOW, THEREFORE9 BE IT RESOLVED BY THE CITY COUNCIL OF TH
CITY OF GEORGETOWN, that: i
SECTION 1. The facts and recitations contained in the preamble of this resolution are
hereby found and declared to be true and correct, and are incorporated by reference herein and
expressly made a part hereof, as if copied verbatim. The City Council hereby finds that this
resolution implements the following policies of the Century Plan - Development Plan Element:
1. Transportation Policy 15, which states: "The City will encourage a transportation
system that provides for the safe and efficient movement of traffic, promotes the
economic interests of the community, and adequately serves the personal needs of
individuals;"
and further finds that the adoption of this resolution is not inconsistent or in conflict with any
other Century Plan Policies, as required by Section 2.03 of the Administrative Chapter of the
Policy Plan.
SECTION 2. The City Council adopts the cost estimate prepared by the Texas
Department of Transportation in the amount of $3,682,000.00 (attached as Exhibit for the
construction of the northbound frontage road from State Highway 29 to F.M. 2338 (Williams
Drive), and authorizes the City staff to initiate the process for assessments against adjacent
properties in compliance with Article 1105b of the Texas Revised Civil Statutes in order to
recover the maximum amount of the City's funds that will be invested in this project as described
in Section 3. It is the City's intent to recover the highest allowable amount from the adjacent
property owners, not to exceed the special benefits received by the properties as may be
determined in accordance with State law.
SECTION 3. 'Me City of Georgetown accepts the Texas Transportation Commission
Minute Order 102420 of June 29, 1993 and agrees to provide a fixed sum in the amount
$1,000,000.00. 1
SECTION 4. This resolution shall take the place of Resolution No. 930914 -CC adopted
by the City Council on September 14, 1993. This Resolution shall become effective immediate y
or adoption. Any resolution or part of a resolution in conflict with this resolution is hereby
repealed and is no longer of any force or effect.
o!?Tj�d?26— AMA2
Frntage Road on o
Amended ResolutiN.
Page 2 of 3
RESOLVED this 28th day of September, 1993.
ATTEST: TBE CITY OF GEORGETO
Elizabeth Gray r y: LEO- WOOD
City Secretary Mayor
Marianne Landers Banks
City Attorney
73 0 472jt, A!IA2
F
r n -
I r °'t,a Amended Resolution
FE PRE L I M I kj'av'r ESTIMATE
COUNTY WILLIAMSON HWY lH 35 CONTROL 0015 SECTION 08 JOB
LIMITS FROM: SH 29 LENGTH 7,251 FT.
TO: RM 2338 LENGTH 1.373 mi.
EXISTING CONDITION: NONE
"1 NTAGE ROAD, STRUCTURE, AND NEW
AQUIFER RECHARGE ZONE
ROSCOE MEMBER RB.PEST35GII
II E III # DESCRIPTION UNIT C
QUAN'TITY
PRICE
AMOUNT
1-28 30-32 A
35-44
47-55
100
PREP ROW
STA
72.5
$
1500.00
108750.
249
FLEX BASE
CY
13593.0
$
16.00
$
217488.
314
EMUL (MS -1)
GAL
7794.0
$
1.20
$
9353.
340
HMAC (TY C-PV35 MIN)
TON
2974.0
$
26.00
$
77324.
416
DRILLED SHAFT (30 IN)
LF
84.0
$
90.00
$
7560.
416
DRILLED SHAFT (36 IN)
LF
72.0
$
100.00
$
7200.
416
DRILLED SHAFT (42 IN
LF
534.0
$
120.00
$
64080.
421
CLASS C CONCRETE(BENT)
CY
955.1
$
310.00
$
296081.
421
CLASS C CONCRETE(ABUT)
CY
43.4
$
380.00
$
16492.
422
REINFORCED CONCRETE SLAB,
SF
44880.0
$
6.00
$
269280.
425
PREST CONC BEAM (TY C)
LF
5073.6
$
46.00
$
233385.
428
CONC SURF TRTMNT
SY
4666.0
$
00.70
$
3266.
432
RIPRAP (CONC)(CL 8)
CY
700.0
$
170.00
$
119000.
432
DRY RIPRAP (TY C)
CY
290.0
$
100-00
$
29000.
450
PED RAIL (TY PR)
LF
1038.7
$
37.00
$
38432.
450
RAIL (TY T-501)
LF
1040.0
$
29.00
$
30160.
450
RAIL (TY T-502)
LF
1020.0
$
30.00
$
30600.
462
CONC BOX CULV (10'XIO')
LF
100.0
$
450.00
$
45000.
465
RCP SEW (D-LOAD)(24 IN)
LF
8200.0
$
35.00
$
287000.
465
RCP SEW (D-LOAD)(48 IN)
LF
120.0
$
80.00
$
9600.
475
INLET (DROP)(TY I)
EA
6.0
$
3400.00
$
20400.
475
INLET (CURB)(TY II)(10')
EA
24.0
$
3400.00
$
81600.
475
CULV HEADWALL (48" RCP)
EA
1.0
$
20000.00
$
20000.
481
PVC 121N
LF
1200.0
$
14.00
$
16800.
530
CONC C &G (TY II)
LF
14462.0
$
9.00
$
130158.
618
CONDUIT(PVC SCH 40 21N)
LF
2104.0
$
4.00
$
8416.
11.28
EXCAVATION
CY
37694.0
$
8.00
$
301552.
1129
EMBANKMENT
CY
67850.0
$
6.00
$
407100.
4006
SEALED EXPANS JOINT 41N
LF
221.0
$
60.00
$
13260.
0000
EROSN,SEED,ETC.
LS
1.0
$
50000.00
$
50000.
0000
HAZ MAIL TRAP
LS
4.0
$
30000.00
$
120000.
SUB
TOTAL
3068337.
PLUS
MOBILIZATION (10%)
$
306834.
PLUS
TRAFFIC HANDLING
(10%)
$
306834.
PLUS
ENGR
AND CONTE
(0%)
$
000000.
TOTAL
ESTIMATE
$
3682000.
OG AC)v
106 AC 1 1,N,I >
r
O8t•tt AYLOR 1 uaf ,a;.1To
I
} QEIS F1
au ST.
I tEli
�ii1
T. 1
�-� s ALS =140C TAYLOR 0317
* 11
\\ I "'OI AC�fI
SANK
� - \". \ /�� �'`4?-�'``" ::ter+f---6,�-;'; fcl c?.-✓
1 1G18RA(,r ER SAYINGS ASSOC!AT10N
ns._s' 1664/81
�A
o u B is S,41vl
RETE roOL I
3 IOIq RE=r,R TO I j
1016
_' ✓ 1 L11 �1 ' {VjLI1 \ - _ CEMETE=" ) I
CITY OF
GEORGETOWN ! u
ACJ 2 nd ST.
• t z�:6�1 AC. P I ,��
of
(:311°� i 1'
CR!, TIAL
JuS
s
1I I
la!" 1-1, L.l- IPIZ, %OLZ
f~I Z
-UL5 C)L5 r''®L3 '% 61h STREET
(1 41Ac.), G ° IU I
C)L ��] w
In .
y.