WHEREAS, the City Manager of the City of Georgetown, Texas, has submitted to the
City Council a proposed Annual Operating Plan element ("Plan") of the Century Plan of the
revenues of said City and expenses of conducting the affairs thereof and providing a complete
financial plan for the ensuing fiscal year, beginning October 1, 1992, and ending September 30,
JE, . eel-:Ie&4&R&&! e
the several departments and offices of the City; and
WHEREAS, said Proposed Plan contains a "Proposal for Local Developm-
- r
evisions" which describes changes to the City's land development, utility connect, and
construction permit fees; and
WHEREAS, it is the intention of the City Council to revise the City's local development
fees; and
WHEREAS, the existing local development fees have been repealed by ordinance
approved on September 22, 1992.
NOW, THEREFORE9 BE IT RESOLVED BY THE CITY COUNCIL OF THE
CITY OF GEORGETOWN, I I
SECTION 1. The facts and recitations contained in the preamble of this resolution ar-
- -
ereby found and declared to be true and correct, and are incorporated by reference herein and
expressly made a part hereof, as if copied verbatim. The City Council hereby finds that this
resolution implements the following Policies of the Century Plan - P ment:
1. Economic Development Policy 5, which states: "The City will take the appropriate
steps to have a self-sustaining economy-" and
F. Finance Policy 1, which states: "The City will conduct all municipal operations in
an efficient business -like manner."
and further finds that the adoption of this resolution is not inconsistent or in conflict with any
other Century Plan Policies, as required by Section 2.03 of the Administrative C ter o t e
Policy Plan.
Adopt Development Fees Resolution No. V -z,011,50
Page 1 of 2
SECTION 2. The land development, utility connect, and construction permit fee
schedules included in Exhibit "A" are hereby adopted as the new fees for the City of
Georgetown.
i I 1111q; 1 1 1
RESOLVED this day of September, as
ATTEST' THE CITY OF GEORGETOWIS
Sandra D. Lee By; LEO WOOD
Deputy City Secretary Mayor
Marianne LandehsBanks
City Attorney
Adopt Development Fees Resolution No. Vao 215o
Page 2 of'2
0 1 M
Concept Plan
LI-reliminary Plat
Map Development
Subdivision Construction Plans
Final Plat
Mesubdivision
Amended Plat
Short Form Plat
Dedication Plat
Conveyance Plat
���,,�llig�����t1������ll��lll��llI W -
A 11•1 M 0 1 1
One to Four Family
Building Site Plan
Wetaile�g D` as Plan
ftezoning
Special Permits
of Zoning Regulations
10,44,1110
$350 + $10 per acre
$600 + $10 per acre or lot, whichever is greater
$100 + $5 per acre or lot, whichever is greater
$75 per acre, minimum of $75
$500 + $10 per acre or lot, whichever is greater
$200, $25 plat vacation fee may be waived is not
applicable
$75
$350
$25
$250
$50 - administrative variances
$75 - variances to Commission and Council
Set by County
No fee
$300 + $50 per acre over one acre
1.6
M.
303MMEMMI
Voluntary Annexation $500 + $10 per acre
Meter Size
5/81, or 3/41, meter
1 " meter
1. 5 to meter
2 11 meter
Greater than 2" meter
Inside City
$350
500
650
950
$50/meter + Actual
Cost of Material & Labor
Engineering Inspection Fee
Residential - $500 per Dwelling Unit
Commercial - $0.20IFe Heated Area
Industrial - $0.20IFe Heated Area
Sewer Size
4 " taps
611 taps
8 " taps
Greater than 8" taps
Inside City
$300
450
650
$50/meter + Actual
Cost of Material & Labor
Engin na InagggtLion Fee
Residential - $500 per Dwelling Unit
Commercial - ,i f• Heated Area
industrial - $0. 1 OlFe Heated Area
MT -1
0-200 Amps
201-400 Amps
0-200 Amps
201-400 Amps
5
9 •-
$500 -
$500
650
800
1,100
$200/meter + Actual
Cost of Material & Labor
Outside Q4
$450
600
800
$200/meter + Actual
Cost of Material & Labor
$11550
2,500
Actual Cost of
Material & Labor
OR
By Contract
CONSTRUCTION PERMIT FEES
Building Permit Fees
NEW CONSTRUCTION
- 1 and 2 Family Residential $250 + $.05/total square feet
(exclusive of townhouses)
- All Other Construction $250 + $.08/total square feet
REMODEL, REPAIR, ALTERATION, $ 75 + $.01/total square feet
FINISH OF SHELL BUILDING
Assessed only when the SBCCI or another consultant conducts the review. This is generally
applicable only to large construction projects and then the fee is set by the reviewer and
assessed directly to the client.
Ir:,LOODPLAIN REVIEW $50
Assessed only if an investigation is required to determine whether the proposed construction
is located within the floodplain.
FLOODPLAIN CONSTRUCTION $100
Assessed only when construction occurs in theiiiln.
Other Service Fees
MOVING A BUILDING
DEMOLITION
Residential
Commercial
SWIMMING POOL INSPECTION
Private
Public
GASOLINE TANK INSPECTION
GASOLINE PUMP INSPECTION
REINSPECTION FEE
Per Residential Inspection
Per Commercial Inspection
UTTLITY SERVICE REBUILD
(electric, water, sewer, gas replacement onl,
JOB=
$55
$95
$ 15 + $.01/gallon capacity
$ 45/pump
$30
$40
$ 25 per replacement