Loading...
HomeMy WebLinkAboutRES 890070 - Agmt Rock St Transmit LineRESOLUTION NO. kc A RESOLUTION APPROVING AN AGREEMENT BETWEEN THE CITY CIE GEORGETOWN, TEXAS AND D I J CONSTRUCTION COMPANY. AUTHORIZING CONSIDERATION OF APPROVAL OF CHANGER ORDE #3 TO THE ROCK STREET TRANSMISSION LINE PROJECT AND AUTHORIZING THE MAYOR TO EXECUTE THE SAME. I WHEREAS, the City of Georgetown, Texas is the major distributor of water within its corporate limits; and WHEREAS, the City Council finds that safe and efficient distribution of water is essential to the operation of the City's Public Utilities Department; and WHEREAS, D I J Construction Company desire to enter into an agreement for construction services related to water system improvements of the Rock Street Transmission Main, in accordance to Change Order #3 and authorizing the Mayor to execute the same; WHEREAS, the City,Council has found that this action implements (Utilities/Energy Policy 3) of the Century Plan - Policy Plan Element, and is not found to be inconsistent or in conflict with any other Century Plan Policies, as required by Section 2.03 of the Administrative Chapter of the Policy Plan. NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GEORGETOWN, TEXAS; Section I. That the City finds the recitals set forth above are true and correct and are incorporated herein. Section II. That the City Council approves Change Order #3 in the amount of $16,067.75 to the Rock Street Transmission Main Project No. 00435, for completion of the downtown well conversion, and all backup information is attached hereto and incorporated herein as if fully set forth at length. Section III. That the Mayor is hereby authorized to execute the change order documents and City Secretary to attest. PASSED AND APPROVED this Afth day of I a jai 1989. J MAYOf� 99 �10 R Order No. Three Date: February 21, 1989 Agreement Date: October 25, 1988 NAME OF PROJECT Rock Street Transmission Main OWNER: — City of Georgetown, Texas CONTRACTOR: D.I.J. Construction, Inc. The following changes are hereby made to the CONTRACT DOCUMENTS: (See Attached Summary) Justification: Additional work as requested by City Change to CONTRACT PRICE: Original CONTRACT PRICE $ 159,200.80 Current CONTRACT PRICE adjusted by previous CHANGE ORDER $ 159,990.80 The CONTRACT PRICE due to this CHANGE ORDER will be increased by $ 16,067.75. The new CONTRACT PRICE including this CHANGE ORDER will be $ 176,058.55 Change to CONTRACT TIME: The CONTRACT TIME will be increased by 30 calendar days. The date for completion of all work will be aril 11, 1989 (Date). k C F i I hmu Requested by: WIAA &Y 01f, A- getown, Texas Recommended by: Steger & Bizzeli--,,--IInc. Accepted by: I J T..' -J - D.I.J. C66truction,) Inc. 1081/E-13234.003 APPROVED: ATTEST: MAYOR CITY SECRETARY Summary, Change Order No. 3 Item Unit Total No. Description Qty. Unit Price Amount 1. 12" PVC C-900 Waterline, 62 L.F. $ 22.00 $ 1,364.00 2. 8" PVC C-900 Waterline, 45 L.F. 12.75 573.75 7. 81' Gate Valve with Valve Box, etc. 1 Each 530.00 530.00 12. Cast Iron Fittings 2 Tons 2,050.00 4,100.00 22. Air Gap, All necessary appurtenances 12 Each 500.00 6,000.00 27. Excavate existing water meter, verify existing condition, fill and compact to existing grade, repair existing pavement, comp. in place Lump Sum 200.00 200.00 28. Remove existing valve vault, relocate existing 12" fill control valve, construct new concrete valve vault with access hatch, comp. in place Lump Sum 3,300.00 3,300.00 Total Amount Increase Change Order 3 $16,067.75 108J/E-13234.SUM