WHEREAS, the City of Georgetown has inadequate sewer
capacity to handle the existing platted wastewater flows in Reata
Drainage Basin;and
WHEREAS-, past studies have shown that the construction of
the Pecan Branch Interceptor would alleviate the capacity
problems; and
WHEREAS, the Reata Lift Station is currently being upgraded
to meet currentdevelopment.
NOW, THEREFORE, BE M D BY THE CITY COUNCILOF THE
CITY OF GEORGETOWN,
MK*k #hl
The recitals stated above are true and correct.
M M n*'@
The City Manager . .. instructed . develop a fundingplan
for the construction of the Pecan Branch Interceptor to
facilitate future development fs
PASSED, APPROVED AND ADOPTED on this the 28th day of November,
1989.