WHEREAS, the City of Georgetown, Te., -,,as, is the major
distributor and producer of treated potable water within its
corporate limits; and
WHEREAS» thp* City Council finds that safe and efficien�
distribution of treated potable water is/ essential to the
operation of the Cities Public": Works Department and Fire
Departm:-,nt; and
WHEREAS, Rueter Construction Company has been qualified as a
professional in utility construction and has shown competency in
completion of construction projects in the City of Georgetown;
and
WHEREASv Rueter Construction Cc-mpany and tbe City of
Georgetown desire to enter 1ntq an agreement for construction
contract for water line construction,
NOW BE IT RESOLVr-,:D BY THE CITY COUNCIL OF THE CITY OF
GEORGETOWN, TEXAS:
Section I. That the City Council �find the recitals set
Section II. That the City Council approves the agreement
betwee^n the City of Georgetown and Rueter Construction Company
for for City project no. 00329 which is
attached hereto and incorporated herein, as if fully set forth at
lengtb.
Gec:tion III. That the Mayor is hereby authorized to sign
the agreements and provide back-up document�tiqn°
PASSED AND APPROVED this _ day of_
____v 19�8.
APPROVED: r
ATTEST:
q
Leta 1. Willoughby—,City S�e�r—efa-ry
THE STATE OF TEXAS
COUNTY OF WILLIAMSON
CITY OF GEORGETOWN
I, , being the current City Secretary of the
City of Georgetown, Texas do hereby certify that the attached is
a true and correct copy of Resolution No. , I passed and
approved by the City Council of the City of Georgetown, Texas on
the — day of 1 19 ,and such resolution was
duly adopted at a meeting open to the public and notice of said
meeting, giving the data, plate, and subject thereof, was posted
as prescribed by Article -6252-17, Section 3A, VATCS4
Witness by hand and seal of office this day 'Of
19
City Secretary
(City Seal)
ry 6/2/88
JB/dh
PUBLIC INFORMATION
Reference: Water Line Contract, Project 00329
A resolution approving an agreement between the City of
Georgetown, Texas and Rueter Construction Company for
construction contract to construct City project no. 00329 along
Seventh Street at Maple.
BID TABULATION FOR WATER IMPROVEMENTS
CITY OF GEORGETOWN - PROJECT NO. 003CO19
JUNE 14, 1988
CONTRACTOR: Rueter Construction, Inc.
DESCRIPTION OF BID ITEMS Unit Total
1.
1377
L.F.
12" PVC Water Main
20.50
28228.50
2.
1380
L.F.
8" PVC Water Main
12.50
17250,00
3.
1587
L.F.
Sawcut, repair and
replace
pavement
9.00
14283.00
4.
(2)
ea. -
12" gate valve w/box
760.00
1520.00
5.
(5)
ea. -
8" gate valve w/box
450.00
2250.00
6.
(6)
ea. -
6" gate valve w/box
350.00
2100.00
7,
(5)
ea. -
5 1/4" fire hydrant
900.00
4500.00
8.
(13)
1" -
long single service
250.00
3250.00
9.
(4)
1" -
short single service
180.00
720.00
10.
(1)
2" -
short single service
450.00
450.00
11.
2.15
tons
- cast iron fittings
2000.00
4300.00
Total
Bid
for
Water Imp. Project
$78851.50
J.R. "Jack" Flanagan Const. Co., Inc. $83168.50
Parker and Rogers Construction Comp. 88063.00
D.I.J. Construction, Inc. 88497.00
Austin Engineering Co., Inc. 88520.00
Ram Excavating Company 106648.00
Triple V Construction Company 106882.00
J.C. Evans Company, Inc. 107147.80
Robert Hurst Company, Inc. 130300.50
CITY OF GEORGETOWN
DATEn June 20, 19B8
TOt: Mayor and City Council
City Manager
SUBOECT; Seventh Street Water Line
Project No. 00329
In July of 1987v the City of Georgetown and G.W. Schmidt and
Company entered into a contract agreement for engineering
services on various water and wastewater projects" This work was
to include needed improvements to water and wastewater system to
further expand the transmission capabilities of water and
wastewater in the old section of town" A part of this work was
the Seventh Street Water Line Improvements Project.
On June 14, 1988,)bids were received for the Seventh Street Water
Line Project and Rueter Construction was the apparent to low ^
bidder. After reviews of the bids and tabulation, Rueter
Construction was still the low bidder with a low bid of
$78,851,50" This particular contract was bid as per unit
contract and all units were carefully reviewed by City Staff and
the |Engineer as to accuracy. Nevertheless, an contracts of this
nature bid quantities and actual quantities will vary up or down
a minor percentage"
Therefore, City staff is recommending that the contract be
approved to Rueter Construction for the low bid of $78,851.50
with a project budget of $86,736.65. No other funds beyond the
project budget will be spent without Council approval.
Funding source for this project will be Water Bonds.
PROPOSED MOTION: See attached resolution