HomeMy WebLinkAboutRES 880141.23 - Study of Wastewater PlanA RESOLUTION AUTHORIZING THE CITY OF GEORGETOWN,
TEXAS AN AGREEMENT
WATER DEVELOPMENT BOARD TO STUDY A REGIONAL
WASTEWATERPLAN;•THOUSAND
DOLLARS FOR FUNDING FROM PRIVATE AND PUBLIC
SOURCESr* AUTHORIZING THE MAYOR TO' EXECUTE THE
AGREEMENT; CONDITIONALLY APPROVING THE AGREEMENT
BETWEEN WALLACE, • & RICE FOR ENGINEERING
SERVICES TO BE PROVIDED FORSTUDY
REGIONAL WASTEWATER PLAN; AND AUTHORIZING
MAYOR TO EXECUTE THAT AGREEMENT UPONAPPROVAL
THE TEXAS WATER DEVELOPMENT BOARD AND THE CITY
WHEREAS, the City of Georgetown, Texas, (City) finds there
is a need and desire to study a plan for a regional wastewater
system;
WHEREAS, the Texas Water Development Board (Board) has
available matching funds in the amount of lii./f for
studyof plan forregional
WHEREAS, the City desires to enter into a study with
matching funding from the Board to develop a regional wastewater
plan and further commits to providing $52,000 in funds for the
study;
WHEREAS, the engineering firm of Wallace, Winkler & Rice
(Engineer) desires to provide the engineering services as
required under the agreement for the study,;
WHEREAS, the City desires to retain Engineer to perform such
studies as required by its agreement with the Board for this
study; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
GEORGETOWN, TEXAS:
Section I.
That the City Council of - City of -. .- •wn approve
Agreement No. 8-483-615 between the Texas Water Development Boar
and City of Georgetownt Texas, attached hereto and incorporate
herein as if fully set forth at length and commits to providin
Fifty-two Thousand Dollars in funding from both private anil
public o
Section II.
That the Mayor be authorized to execute the agreement and
the City Secretary to attest thereto.
Section III.
The City Council conditionally approves the engineering agree-
ment between Wallace Winkler & Rice and the City, which is
attached hereto and incorporated by reference as if fully set
forth at length, such approval is subject to the approval by the
Texas Water Development Board and Georgetown City Attorney.
That the Mayor be authorized to execute the engineering agree-
ment and the City Secretary to attest thereto after approval by
the Texas Water Development Board and the City Attorney.
RESOLVED this _day of A4Yub 1988.
U
—1L D9L\-
Jim Colbert, Mayor
ATTEST: APPROVED:
le7
Leta Willoughby Diane Callander
City Secretary City Attorney
I , being the current City Secretary of the City of
Georgetown do hereby certify the above is a true and correct copy of a
resolution of the City Council of the City of Georgetown and such
resolution was duly adopted at a meeting open to the public and notice
of said meeting, giving the date, place, and subject thereof, was
posted as prescribed by,Article 6252-17, Section 3A, VATCS.
(City Seal)
City Secretary
7A7DB Contract No. 8-483-615
STATE OF TEXAS Texas Water Development Board
and
COUNTY OF TRAVIS City of Georgetown, Texas
WHEREAS, the City of Georgetown, Georgetown, Texas, hereinafter termed the
City, applied to the Texas Water Development Board, Austin, Texas, hereinafter
termed the Board, for a planning grant to develop a regional wastewater plan;
WHEREAS, the City has agreed to com-nit funds to pay for the local share
of the planning project;
WHEREAS, the City is the entity who will act as administrator of the
Board's planning grant and will be responsible for the execution of this
contract; and
WHEREAS, on January 21, 1988, the Board approved the application for
financial assistance;
NOW THEREFORE, the Board and the City, for the mutual consideration
stated, agree and understand as follows:
WITNESSETH:
Ili I 11A I
As a joint and cooperative undertaking with the Board, to be financed
jointly as hereinafter specified, the City will prepare a regional wastewater
plan for the Georgetown area.
Services and activities provided shall be in strict accordance with re-
quirements of the Texas Water Code, Chapter 15; associated rules of 31 Texas
Administrative Code, Chapter 355, Sections 355.10-355.19; Attachment A, the
original grant application, which is made a permanent part of this Contract;
and with the following procedures and project descriptions:
1. It shall be the responsibility of the City to establish formal and
direct liaison with the entities listed in Exhibit A; the directors of
utility districts within the service area that have notified the City
of their interest in the project; appropriate officials of the rIbwn of
Weir; officials of the Brazos River Authority; representatives of the
Capital Area Planning Council; and community leaders in the proposed
service area for the purpose of coordinating the work of the planning
project and to acquire available data pertinent to the planning
effort. Planning shall be coordinated with all existing wastewater
treatment studies and activities for the purpose of providing
information for the proposed project. As the organizing entity, the
City has the responsibility to solicit comments from the general
public as to the content of the planning project.
2. The project will produce a feasibility -level plan for a regional
wastewater system for a service area which is defined as the city
limits of Georgetown and its extra -territory jurisdiction (FTJ), the
incorporated limits and ETJ of the 'Ibwn of Weir, -the certified service
area of the Williamson County MUDs #5 and,#6, and approximately 1,500
acres of privately owned land and portions of major watersheds outside
the above referenced service areas to include the San Gabriel River,
Berry Creek, Pecan Branch, Smith Branch, Mankins Branch and Lake
Granger.
The City will conduct the planning study according to the following
tasks. Additional task detail is provided in Exhibit B.
Task I. Develop and collect data from the City of Georgetown, Thwn
11 of Weir, Williamson County MUD's #5 and #6, and private land
owners including existing treatment plants flows, effluent
quality and system capacities, lift system locations and
capacities, and current rate structures. Estimates of
potential users and/or developments with potential flows
M
will be developed; and current,, projected, and land use
population data for the proposed service area will be
developed. Potential flows will take into account water
savings incorporated in the water conservation plan prepared
in Task IV.
Task II. Identify and evaluate potential service areas based on
timing of potential developments, quantification of waste
loads, projection of sewer flows, and analysis and
determination of cost effective service boundaries.
Task III. Evaluate major interceptor and -treatment -alternatives
including:
A. Determine acceptable wasteloads on the San Gabriel
River and major watersheds in the planning area.
1. Establish watershed models for Berry Creek,
Pecan Branch, and San Gabriel River (Lake
Georgetown Dam to Lake Granger).
2. Develop discharge simulations on existing and
proposed capacity for the City of Georgetown,
Town of Weir, and Williamson County MUD's #5 and
#6.
3. Create Lake Granger model based on historical
conditions vs increased capacities for the City
of Georgetown, Town of Weir, and Williamson
County MUD's #5 and #6.
B. Investigate and analyze environmental concerns.
1. Establish geographic boundary of the Edwards
Aquifer Recharge Zone on -the -ground as it
relates to the location of a regional wastewater
treatment facility and discharge point.
-3-
2. Conduct archeological investigations in
relationship to wastewater treatment plant site
and discharge point.
3. Analyze biological parameters in relationship to
discharge point downstream to Lake Granger.
4. Evaluate geologic impact for the proposed
service area.
C. Define wastewater treatment facilities for the
,proposed planning area.
1. Establish effluent quality parameters.
2. Define treatment capacity.
3. Analyze and determine treatment process
required.
4. Determine treatment plant site location(s).
5. Evaluate treatment alternatives and staging of
wastewater treatmentprocessrequired.
6. Analyze and develop estimated costs for the
proposed wastewater treatment facilities.
D. Develop interceptor lines sizing and routes.
1. Prepare maps of proposed planning area.
2. Determine sizing of interceptor lines consistent
with proposed capacities and estimated flows.
3. Evaluate individual routes of proposed
interceptor lines.
4. Analyze and prepare cost estimates for proposed
lines on respective routes.
SM
E. Delineate construction sequence for proposed
wastewater treatment facilities and lines including
time intervals and associated costs.
Task IV. Prepare a water conservation plan for the proposed planning
area to promote efficient use of water supplies and manage-
ment of wastewater loadings. Water savings identified in
the water conservation plan will be incorporated in
projections of wastewater loadings developed in Task I.
Task V. Develop financial plan for proposed treatment plant facility
and lines for the planning area.
A. Estimate revenue potential for respective
construction stages.
B. Determine financial ability to implement and sustain
the proposed wastewater system.
C. Prepare rate study estimating costs to users in the
planning area.
D. Perform economic analyses of implementation costs
including capital costs, maintenance and operating
costs, and estimated revenues for respective stages.
E. Evaluate public and private funding sources to
determine financing options for the proposed
wastewater system.
Task VI. Develop final report summarizing methodology, evaluation of
alternatives,= and recommendation of system plan. The final
report will include the following items.
A. Facilities to be implemented.
B. Environmental engineering characteristics including
water quality objectives.
C. Water conservation plan recommendations.
-5-
D. Recommendations for wastewater treatment plant and
lines implementation including:
1. Desired discharges
2. Evaluation of treatment alternative(s)
3. Evaluation of treatment plant site(s)
4. Evaluation of interceptor route(s)
5. Phasing of facilities
6. Estimated costs associated with implementation
7. Estimated annual operation and maintenance costs.
E. Detailed capital costs for facilities to be
implemented.
F. Final recommendations and conclusions.
3. The project will include coordinating the wastewater system plan and
policies with existing plans and policies of entities listed in
Exhibit A, the county, and the state.
II. PROJECT SCHEDULE AND REPORTS
The City has 90 days, beginning January 21, 1988, to execute this Contract
and to provide written evidence acceptable to the Executive Administrator that
the City has available its 50 -percent ($52,000) matching grant share. The
Board's approval of a grant to the City will be rescinded on April 20, 1988,
if this Contract has not been signed by the City and acceptable evidence of
the availability of City matching funds has not been provided to the Executive
Administrator.
The term of'%this Contract shall begin and the City shall begin performing
its obligations hereunder on January 21, 1988. The City shall complete the
work program stated in Article I, above, not later than September 30, 1988,
unless such date is extended as provided below, at which time the City shall
I Mo
deliver a draft Final Report. After a 30 -day review period, the draft Final
Report together with review comments will be returned to the City. A Final
Report incorporating any required changes must be submitted to the Board by
December 31, 1988. Deadlines may be extended only in writing by the Board.
Twelve (12) copies of the Final Report shall be delivered to the Board.
Delivery of an acceptable Final Report prior to December 31, 1988, shall
constitute completion of the terms of the Contract.
Monthly progress work a• which suffnarize the work completed througT
Lhe period of the submitted State • Texas Purchase Voucher will be submitt-"-7
by the City to the Board by the 20th of the month following the period covered
by the Voucher. The work report will contain the following information.
1. Task names and descriptions.
2. Total cost of the individual tasks, including TWDB and City portions.
3. Percent of the tasks completed.
4. Dollar value of the percent of the tasks completed.
5. Total tasks completed, indicating the percent of and dollar value of
the project completed as reflected in totals of all State Vouchers
Coordination meetings will be held in April and July to discuss the status
of the study. Representatives of municipalities in Williamson County, the
City of Georgetown, and Town of Weir will be invited to the meetings.
The City will schedule the coordination meetings so that a narrative
status report on the project can be written by the City and submitted to the
I
Board according.,,to the following monthly schedule during the active life of
the Contract: May 31, 1988, and August 31, 1988. An interim status report
will not be required after the draft Final Report has been submitted for
review. The status report shall be in letter form and shall contain the
following information:
-7-
...... . .. .......
1. A brief statement of the overall progress made since the last status
2. A brief description of any problems that have been encountered during
the previous reporting period that will affect the study, delay the
timely completion of any portion of the Contract, or will inhibit the
completion of or cause a change in any of the project products or
objectives.
3. A description of actions the City or the contractor plans to take to
correct anv Problems described in item 2 above or change any schedule,
product, or objectives stated in the Contract.
If for any reason the City is unable to complete the work program called
for under the terms of this Contract on or before September 30, 1988, and is
unable toldeliver the Final Report on or before December 31, 1988, the City
and the Board hereby agree to consider negotiating an extension of the
Contract period; however, the Board will not be liable for more than $52,000
for the entire Contract. The Board must, however, be notified in writing ten
(10) working days prior to the date for completion of the work program or
thirty (30) days prior to the date for submittal of the Final Report that the
City will be requesting renegotiation.
The Board, for and in consideration of the obligations and responsibil-
ities undertaken by the City, hereby agrees to compensate and reimburse the
City, in a total amount not to exceed $52,000, upon the submission of invoices
and Purchase Vouchers representing costs incurred,by the City pursuant to
performance of this Contract. The City will contribute $52,lit ,representin,•
fifty (50) percent of the total project cost, in the form of cash.
".4
A. Reimbursement to the City shall be made in accordance with the
following budget, with the Board contributing fifty (50) percent of the total
project cost in the form of cash.
BUDGET
Regional
Wastewater Services
Contract
Plan
for the City of
Georgetown
Subcontract
Sub -Subcontract
Category
Tbtal Budget
Services-
Services
A.
Salaries and Wages**
-0-
$26,000
$ 7,800
B.
Fringe**
-0-
6,900
2,310
C.
Travel
-6-
900
350
D.
Expendable Supplies
-0-
1,000
300
E.
Subcontract Services
104,000
29,080
7,920*
F.
Technical/Computer Services -0-
-0-
1,600
G.
Communications
-0-
500
150
H.
Reproduction
-0-
2,500
300
I.
Overhead**
-0-
27,840
5,500
J.
Profit
-0-
9,280
2,850
$104,000
$104,000
$29,080
Three subcontracts: archeologist - $3,360;
biologist -
$2,160; geologist -
$2,400.
TASK BUDGET
Regional Wastewater Services Contract
Plan for the City of Georgetown
Fffffip�
I. Develop and Collect Data $ 8,700
II. Define Service Areas 5,000
III. Evaluation of Major Interceptors 58,000
and Treatment Alternatives
IV. Prepare Water Conservation Plan 3,800
V. Develop Financial Plan 4,000
VI. Prepare Final Report 24,500
TOTAL $104,000
Em
"Definition of Contract Budget Terms
1. Salary Cost is defined as the cost of salaries of engineers, draftsmen,
stenographers, surveymen, clerks, laborers, etc., for time directly
chargeable to the project.
2. Fringe Costs are defined to include social security contributions,
unemployment excise and payroll taxes, Employment compensation insurance,
retirement benefits, medical and insurance benefits, sick leave, vacation,
and holiday pay applicable thereto.
3. Overhead Costs are those costs incurred by the prime • and sub-
contractors in maintaining a place of business and performing professional
services similar to those specified in this contract project description.
These expenses shall include the following:
o Indirect salaries, including that portion of the salary of prin-
cipals and executives that is allocable to general supervision
o Indirect salary fringe benefits
o Accounting and legal services related to normal management and
business operations
a Travel costs incurred in the normal course of overall administra-
tion of the business
o Equipment Rental
o Depreciation of furniture, fixtures, equipment, and vehicles
a Dues, subscriptions, and fees associated with trade, business,
technical, and professional organizations
o Other insurance
o Rent and.utilities
o Repairs and maintenance of furniture, fixtures, and equipment
Monthly invoices and State Purchase Vouchers supplied by the Board for
work performed shall be submitted for reimbursement. Said invoices and
vouchers shall be supported by sufficient detail to substantiate billings by
the City, said detail to include the following:
(1) For direct expenses incurred by the City for outside consulting
services --copies of invoices to the City showing the tasks that were
performed; the percent and cost of each task completed; a total cost
figure for each direct expense category including labor, fringe,
overhead, travel, communication and postage, technical and computer
services, expendable supplies, printing and reproduction; and the
total dollar amount due to the consultant.
(2) For travel and subsistence expenses, including such expenses for sub-
contractors --names, date, work location, time period at work
location, itemization of subsistence expenses of each Employee,
limited, however, to travel.expense authorized for state Employees by
General Appropriation Act, 1987 Tex. Sess. Law Serv., 2nd Called
Sess., Ch. 78, Art. V, Sections 13 and 14, at 515 or as amended; and
(3) Other transportation costs --copies of invoices covering tickets for
transportation or, if not available, names, dates, and points of
travel of individuals; and
(4) All other reimbursable expenses --invoices or purchase vouchers
showing reason for expense with receipts to evidence the amount
B. The Board shall reimburse the City only upon receipt of an invoice and
a Purchase Voucher; provided, however, the Board shall only pay up to ninety
(90%) percent of the Board's share of each invoice pending the City's
performance, completion of the report, and acceptance and approval of said
report by the Board. At the time of said performance, completion, and
approval of the report by the Board, the Board shall pay the remaining ten
(10%) percent to the City.
C. The City and the subcontractors shall maintain satisfactory financial
accounting documents and records and shall make them available for examination
and audit by the Board. Accounting by the City and the subcontractors shall
be in a manner consistent with generally accepted accounting principles.
W. EUBLICATION AND SUBCONTRACTING M
The Board shall have unlimited rights to technical or other data resulting
directly from the performance of services to the Board under this Contract.
It is agreed that the wastewater facility planning materials developed by
the City pursuant to this Contract shall become the joint property of the City
and the Board in which the Board retains the right to establish copyrights.
Any wastewater facility planning materials subject to a Board copyright and
produced by the City or Board pursuant to this Contract may be printed by the
City or Board at their own cost and distributed by either at their discretion
within the State of Texas. The City may otherwise utilize such material
provided under this Contract as it deems necessary and appropriate, including
the right to publish and distribute the materials or any parts thereof under
its own name within the State of Texas, provided that any Board copyright is
appropriately noted on the printed materials.
The City agrees to acknowledge the Board in any news releases or other
publications relating to the work performed under this Contract.
Nb work herein called for by the City shall be subcontracted or assigned
without prior written approval of the Executive Administrator of the Board for
such subcontract. The subcontract shall include a detailed budget estimate
with specific cost details for each item of the Work to be performed by the
subcontractor and for each category of reimbursable expenses or, if approved
by the Executive Administrator, evidence that the fees charged are fair and
reasonable. The subcontracts shall conform to the terms of the Contract and
include provisions which require subcontractor compliance with Board rules.
The Board's approval of a $52,000 grant to the City will be rescinded on
April 20,1988, if this Contract has not been signed by the City and acceptable
evidence of the availability of the City's matching funds has not been
This Contract may be altered or amended only by mutual written consent and
may be terminated by the Board at any time by written notice to the City.
Upon receipt of such notice, the City shall, unless the notice directs
otherwise, immediately discontinue all work in connection with the performance
of this Contract and shall proceed to cancel promptly all existing orders
insofar as such orders are chargeable to this Contract. The City shall submit
a statement showing in detail the work performed under this Contract to the
date of termination. The Board shall then pay the City promptly that
proportion of the prescribed fee which applied to the work actually performed
under this Contract, less all payments that have been previously made.
Thereupon, copies of all completed work accomplished under this Contract shall
be delivered to the Board.
The Board may issue a Stop Work order to the City at any time. Upon
receipt of such order, the City is to discontinue all work under this Contract
and cancel all orders pursuant to the Contract, unless the order directs
otherwise. If the Board does not issue a Restart Order within 60 days after
receipt by the City of the Stop Work order, the City shall regard this
Contract terminated in accordance with the foregoing provisions.
VI. NO DEBT AGAINST THE STATE
This Contract and Agreement shall not be construed as creating any debt by
or on behalf of the State of Texas and for the Texas Water Development Board,
and all obligations of the State of Texas are subject to the availability of
IIEM�.M
For the purpose of this Contract, the City will be considered an
I
independent contractor and therefore solely responsible for liability
resulting from negligent acts or omissions. The City shall obtain all
necessary insurance in the judgment of the City, to protect itself, the Board,
1. Carson Hoge
General Manager
Brazos River Authority
P. 0. Box 7555
Waco, Texas 76714-7555
2. The Honorable Mervin Walker
Mayor
City of Weir
P. 0. Box 264
Weir, Texas 78674
3. The Honorable is Wilson
Judge
Williamson County Courthouse
Georgetown, Texas 78626
4. The Honorable Dollie Hajda
Mayor
City of Granger
212 E. Davilla
Granger, Texas 76530
5. The Honorable Clark Jackson
Mayor
City of Taylor
400 Porter Street
Taylor, Texas 76574
6. Carl Liddel
Manager
Jonah Water Supply Corporation
Rt. 1, Box 112 B
Georgetown, Texas 79626
7. Mark DeBruler
Manager
Williamson County MUD #2
330 Cornerwood, Dr.
Austin, Texas 78717
8. The Honorable Mike Robinson
Mayor
City of Pound Rock
City Hall
Round Rock, Texas 78664
Beck
Chisholm Trail W.S.C.
Florence, Texas 76527
and Employees and officials of the Board from liability arising out of the
Contract. The City shall indemnify and bold the Board and the State of Texas
harmless, to the extent that the City may do so in accordance with State Law,
from any and all losses, damages, liability, or claims therefore, on account
of personal injury, death, or property damage of any nature whatsoever caused
by the City, arising out of the activities under this Contract.
The City shall be solely and entirely responsible for procuring all
authority for the City to perform the subject work.
Should any one or more provisions of this Contract,be held to be null,
void, voidable, or for any reason whatsoever, of no force and effect, such
provision(s) shall be construed as severable from the remainder of this
Contract and shall not affectthevalidity of all other provisions of this
Contract which shall remain of full force and effect.
I Ws a
All correspondence between the parties shall be made to the following
addresses:
Flor the Board:
Texas Water Development Board
P. 0. Box 13231, Capitol Station
Austin, Texas 78711-3231
Attn: Executive Administrator
im
For the City of Georgetown:
Mayor
P. 0. Box 409
Georgetown, Texas 78627-0409
Attn: Jim Colbert
In WITNESS WHEREOF the parties hereto cause this Contract and Agreement to be
duly executed in triplicate.
09
By'. 4tq lw--
M. ReginaId Arnold II
Executive Administrator
THE CIT,� OF GEORGE
By„.'
Jim Colbert
Mayor
Date: ss
-15-
10. R. B. Moth -
ab
bit Hill W.S.C.
828 Sidney Baker
Kerrville, Texas 78028
11. James Clarno
Manager
Brushy Creek VQCID #1
102 Old Bowan Rd.
Round Rock, Texas 78664
12. Bobby Stanton
Williamson County MUD's # 5 and #6
301 Toledo Trail
Georgetown, Texas 78626
13. Steger & Bizzell
Pecan Branch (Creek P1.) Util. Dist.
1978 Austin Avenue
Georgetown, Texas 78626
14. Steger & Bizzell
Dove Springs Utility District
1978 Austin Avenue
Georgetown, Texas 78626
15. Dan Mize
President
Lake Granger W.S.C.
P. 0. Box 810
Taylor, Texas 76574
16. The Honorable Edmund Schmidt
Mayor
P. 0. Box 266
Hutto, Texas 78634
17. Wayne Bell
S.W. Milum Water Supply
P. 0. Box 232
Rockdale, Texas 76567
18. The Honorable A.J. Lel-man
Mayor
City of Thorndale
P. 0. Box 308
Thorndale, Texas 76577
19. The Honorable James Dvorek
Mayor
City of Thrall
Thrall, Texas 76578
20. Ralpb Bachmeyer
Nowac Water Supply
P. 0. Box 297
Thrall, Texas 76578
21. The Honorable Bobby Hill
Mayor
City of Bartlett
Drawer H
Bartlett, Texas 76511
22. Don Stence
Executive Director
Capital Area Planning Council
2520 IH -35 South
Austin, Texas 78704
23. Charlie Steger
Steger & Bizzell
1978 Austin Avenue
Georgetown, Texas 78626
24. Don Bizzell
Steger & Bizzell
1978 Austin Avenue
Georgetown, Texas 78626
REGIONAL WASTE -RATER & COLLECTION TREArIMENT STUDY
Scope of Plan for the Georgetown Area
The scope of services for the plan is defined as follows:
Task 1. Collect
Data
A.. City of Georgetown, Town of Weir, Williamson County MUD #5 and
#6
and Private Land Owners.
1.
Existing Collection System Maps
2.
Existing Treatment Plant Layouts
3.
Existing Plant Flows
4.
Existing Plant Effluent Quality
5.
Permit Requirements
6.
Prior Wastewater Studies
7.
City Map
8.
City Ordinances
9.
System Capacities
10.
Lift System Locations and Capacities
11.
Current Rate Structure
B. Potential Users and/or Developments
1.
Basin Map
2.
Available Property Maps
3.
Layout of Potential Developments
4. ,
Edwards Recharge Zone Map
5.
Existing Development Studies
6.
Potential Flows
C. Population
1. Current
2. Projections
3. Land Use
D. Service Area
.1. Meetings with Georgetown Officials
2. Meetings with Weir officials
3. Meetings with Developers and Utility Districts
4. Meetings with Industry
Task II. Potential Service Areas
A. Determine Timing of Potential Developments
B. Quantify Waste Loads
C. Project Sewer Flows
D. Define Cost Effective Service Boundaries
Task III. Evaluate Major Interceptor and Treatment Alternatives
A. Determine Acceptable Waste Loads on San Gabriel River and Major
Watersheds
1. Model Set-up and data check
2. Model Calibration
3. Model Validation
4. City of Georgetown Discharge Simulation
Town of Weir Simulation
Williamson County MUD #5 and #6 Simulation
a. Existing Capacity
b. Proposed Capacity
5. Lake Granger Simulation
a. Historical Conditions
b. With Georgetown Increased Capacity
c. With Weir Increased Capacity
d. With Williamson County MUD #5 and #6 Increased Capacity
B. Environmental Concerns
1. Treatment Plant Site Evaluation
a. BJwards Aquifer Recharge Zone
b. Archeological Significance
c. Biological Inventory
d. Geological IMpace Evaluations
2. Discharge Point Evaluation
a. B3wards Aquifer Recharge Zone
b. Archeological Significance
c. Receiving Stream Biological Impacts
d. Geological Impact Evaluations
3. Major Interceptor Evaluations
C. Define Wastewater Facilities
1. Establish Effluent Quality Parameters
2. Define Treatment Capacity
3. Determine Treatment Process Required
4. Evaluate Staging of Facilities
5. Estimate Costs
D. Develop Interceptor Sizing and Routes
1. Prepare Maps
Size Interceptor Lines
3. Evaluate Routes
4. Estimate Cbsts
E. Delineate Construction Sequence
F. Develop Water Conservation Plan
1. City of Georgetown
2. Tbwn of Weir
3. Williamson County MUD #5 and #6
Task IV. Develop Financial Plan
A. Estimate Revenue Potential
B. Determine Financial Ability
C. Prepare Rate Study
D. Perform Economic Analysis
E. Evaluate Financing Options
1. Public
2. Privatization
3. Investigate Funding Sources
A. Facility Planning
1. Summarize Methodology and Approach
2. Summarize and Evaluate Alternatives
3. Recommended Plan
B. Environmental Engineering
1. Water Quality Modeling - Watersheds
a. Berry Creek within defined planning area
b. Pe -can Branch within defined planning area
c. San Gabriel River within defined planning area
2. Water Quality Modeling - Lake Granger
3. Geological Ground Survey - Edwards Aquifer Recharge Zone in
the selected regional treatment plant area and discharge
point
4. Archeological Ground Survey - Potential Plant Site(s) and
Outfall Line(s) from existing Georgetown's STP to below
Mankins Branch confluence
5. Biological Investigation - Discharge point downstream to Lake
Granger
6. Review Existing and Proposed Water Quality Standards
7. Evaluation of Applicable Antidegradation Policies
8. Finalize Water Quality objectives
C. Reconmended Water Conservation Plan
D. Implementation Recomendations
1. Desired Discharges
a. Flow
b. Quality
c. Location
2. Evaluation of Treatment Alternative(s)
3. Evaluation of Plant Site(s)
4. Evaluation of Interceptor Route(s)
5. Phasing of Facilities
6. Estimate Costs Associated with Implementation
7. Estimate Yearly Operation & Maintenance Costs
E. Detailed Capital Costs
F. ReconTnendat ions
G. Conclusions
Wallace,
ENGINEERS
March 25, 1988
Si
Mr. Ed Barry, Director of Planning
City of Georgetown
P.O. Box 409
Georgetown, Texas 78627
RE: Engineering Contract
Winkler'uy, Rice, Inc.
PLANNERS • FURVEYORS
Transmitted herein is thre(' (3) executed copies of our Engineering Contract for the
Georgetown Regional Wastewater Planning Grant from the Texas Water Development
Board (TWDB).
We have taken the TWDB contract and made appropriate changes and additions. T"m
major addition is Section I - Basic Services of Engineer #4. We will prepare t
Georgetown Regional Wastewater Plan with the level of detail included n Task I
and EXHIBIT B, SCOPE OF SERVICES attached to the Engineering Contract. T
Regional Wastewater Plan will be formatted for the City of Georgetown to use toward
application which meets the requirements of the State Revolving Loan Fund Progra,
Draft Emergency Rules, Chapter 375, dated December 17, 1987.
We are confident that all of the planning grant effort will be usable in a regional
facility plan. We are reasonably confident that several items of work will completely
fulfill the State Revolving Fund requirements (such as service -planning planning areas, populations,
water quality - wasteload evaluations, and water conservation plan).
We look forward to reviewing this contract at an early date to resolve any questions
well in advance of the schedule needed to meet the April 20 TWDB deadline.
Yours truly,
R.E. Wallace, P.E.
President
Wallace, Winkler & Rice, Inc.
Enclosures
ik
Mailing Address: P.O. Box 22007 - Waco, Texas 76702
9.225 Central Park Drive Suite 100 * Waco, Texas 76710 - (817) 772-9272 - Telefax (817) 776-2924
This agreement made as of January 21, 1988 between the City of Georgetown, Williamson
County, Texas hereafter referred to as OWNER and Wallace, Winkler and Rice, Inc.
hereafter referred to as ENGINEER.
OWNER employs ENGINEER to perform professional engineering services and produce a
feas ibil ity- level plan for a regional wastewater system for the planning service area
• as the city limits of Georgetown and its ETJ, the Town of Weir and its ETJ, the
certified service area of the Williamson • MUD's #5 and #6 and approximately 1500
acres of privately owned land and portions • major watersheds outside the above
• areas • include the San Gabriel River, Berry Creek, •. Branch, Smith
Branch, Mankins Branch and Lake Georgetown.
1. Upon execution of Agreement and written authorization to proceed, ENGINEER shall
perform the following professional services:
It shall
•. the responsibility • the ENGINEER to establish formal and •
• with the entities listed in Exhibit A; the directors • utility •
that have notified the City • their interest in the project-, appropriate
officials of the Town • Weir; •: • the Brazos River Authority;
representatives of the Capital Area Planning Council; and community leaders in
the proposed service area for the purpose • coordinating the work of the
planning project and to • available • pertinent to the planning effort.
Planning shall be coordinated with all existing wastewater treatment studies
• activities for the purpose • providing information for the proposed
project. The ENGINEER has the responsibility to solicit comments from the
general public as to the • • the • project.
2. The ENGINEER will conduct the planning study according the the following tasks:
(Additional task detail is provided in Exhibit B.)
Task 1. Develop and collect data from the City of Georgetown, Town of Weir,
• • MUD's #5 and • and private land owners including
existing treatment plant flows, effluent • and system capacities, lift
system locations and capacities, and current rate structures. Estimates of
r• users and/or developments with •• flows will be
developed; and current, projected, and land use population data for the
proposed service area will be developed. Potential flows will take into
account water savings incorporated in the water conservation plan
prepared in Task IV.
Task 11, Identify and evaluate potential service areas based on timing of potential
developments, quantification • waste loads, projection of sewer flows,
and analysis and
• of cost effective service boundaries.
Task IV. Evaluate major interceptor and treatment alternatives including:
A. Determine acceptable wasteloads on the San Gabriel River and major
watersheds in the planning area.
1. Establish watershed models for Berry Creek, Pecan Branch, and
San Gabriel River (Lake Georgetown Dam to Lake Granger).
2. Develop discharge simulations on existing and..proposed capacity
for the City of Georgetown, Town of Weir, and Williamson
County MUD's #5 and #6.
3. Create Lake Granger model based on historical conditions vs.
increased capacities for the City of Georgetown, Town of Weir,
and Williamson County MUD's #5 and #6.
B. Investigate and analyze environmental concerns.
1. Establish geographic boundary of the Edwards Aquifer Recharge
Zone on -the -ground as it relates to the location of a regional
wastewater treatment facility and discharge point.
2. Conduct archeological investigations in relationship to
wastewater treatment plant site and discharge point.
3. Analyze biological parameters in relationship to discharge point
downstream to Lake Granger.
1, Evaluate geological impact for the proposed service area.
C. Define wastewater treatment facilities for the proposed planning
area.
1. Establish effluent quality parameters.
2. Define treatment capacity.
3. Analyze and determine treatment process required.
5. Evaluate treatment alternatives and staging of wastewater
treatment process required.
6. Analyze and develop estimated costs for the proposed
wastewater treatment facilities.
1. Prepare maps of proposed planning area.
1 Determine sizing of interceptor lines consistent with proposed
capacities and estimated flows.
4. Analyze and prepare cost estimates for proposed lines on
respective routes.
E, Delineate construction sequence for proposed wastewater treatment
facilities and lines including time intervals and associated costs.
Task IV. Prepare a I water conservation plan for the proposed planning area to
promote efficient use of water supplies and management of wastewater
loadings. Water savings identified in the water conservation plan will be
incorporated in projections of wastewater loadings developed in Task I.
Task V. Develop financial plan for proposed treatment plant facility and Knes for
the planning area.
A. Estimate revenue potential for respective construction steps.
B. Determine financial ability to implement and sustain the proposed
wastewater system.
C. Prepare rate study estimating costs to users in the planning area.
D. Perform -economic analyses of implementation costs including capital
costs, maintenance and operating costs, and estimated revenues for
respective stages.
E. Evaluate public and private funding sources to determine financing
options for the proposed wastewater system.
Task V1. Develop final report summarizing methodology, evaluation of alternatives,
and recommendation of system plan. The final report will include the
following items.
A. Facilities to be implemented
B. Environmental engineering characteristics including water quality
objectives.
C. Water conservation plan recommendations.
D. Recommendations for wastewater treatment plant and lines
implementation including:
1. Desired discharges
2. Evaluation of treatment alternative(s)
3. Evaluation of treatment plant site(s)
4. Evaluation of interceptor route(s)
5. Phasing of facilities
7. Estimated annual operation and maintenance costs.
E. Detailed capital costs for facilities to be implemented.
F. Final recommendations and conclusions.
3. The project will include coordinating the wastewater system plan- and policies with
existing plans and policies of entities listed in Exhibit A, the county, and the state.
4. ENGINEER will prepare the Georgetown Regional Wastewater Plan with the level of
detail included in the attached scope of services (EXHIBIT B) and described in Task
I through VI of this agreement. The Regional Wastewater Plan will be formatted
for the OWNER to use toward an application which meets the requirements of the
State Revolving Loan Fund Program Draft Emergency Rules, Chapter 375, dated
December 17, 1987.
The term of this agreement shall begin and the ENGINEER shall begin performing its
obligations hereunder on January 21, 1988. The ENGINEER shall complete the work
program stated in Section 1, above, not later than September 30, 1988, unless such date
is extended as provided below at which time the ENGINEER shall deliver a draft Final
Report. After a 30 -day review period, the draft Final Report together with review
comments will be returned to the ENGINEER. A Final Report incorporating any required
changes must be submitted to the OWNER by December 31, 1988. Deadlines may be
extended only in writing by the OWNER. Twelve (12) copies of the Final Report shall be
delivered to the OWNER. Delivery of an acceptable Final Report prior to December 31,
1988, shall constitute completion of the terms of the Contract.
Monthly progress reports and invoices which summarize the work completed through the
period of the submitted State of Texas Purchase Voucher will be submitted by ENGINEER
to the OWNER for submission to the Board by the 20th of the month following the
period covered by the Voucher. The work report will contain the following information.
Task names and descriptions
2. Total cost of the individual tasks, including TWDB and City portions.
3. Percent of the tasks completed.
Dollar value of the percent of tile tasks completed
Total tasks completed, indicating the percent of and dollar value of the project
completed as reflected in totals of all State Vouchers submitted.
Payments shall be made to ENGINEER within 30 days of submission of monthly work
reports and -invoices.
Coordination meetings will be held in April and July to discuss the status of the study.
Representatives of municipalities in Williamson County, the City of Georgetown, and Town
If Weir will be invited to the meetings.
The ENGINEER will schedule the coordination meetings so that a narrative status repo
on the project can be written by the ENGINEER and submitted to the OWNER and t
Board according to the following monthly schedule during the active life of the Contra
May 31, 1988, and August 31 1988. An interim status report will not be required aft
the draft Final Report has been submitted for review. The status %report shall be
letter form and shall contain the following information-. I
A brief statement of the overall progress made since the last status report.
2. A brief description of any problems that have been encountered during the
previous reporting period that will affect the study, delay the timely
completion of any portion of the Contract, or will inhibit the completion of or
cause a change in any of the project products or objectives.
3. A description of actions the ENGINEER plans to take to correct any problems
described in item 2 above or change any schedule, product, or objectives
stated in the Contract.
If for any reason the ENGINEER is unable to complete the work program called for
under the terms of this Contract on or before -September 30, 1988, and is unable to
deliver the Final Report on or before December 31, 1988, the ENGINEER and the OWNER
hereby agree to consider negotiating and extension of the Contract period; however, t e
OWNER will not be liable for more than $52,000.00 for the entire Contract and the Board
will not be liable for more than $52,000.00 for the entire Contract. The OWNER must,
however, be notified in writing ten (10) working days prior to the date for completion of
the work program or thirty (30) days prior to the date for submittal for the Final Report
that the ENGINEER will be requesting renegotiation wit , h the OWNER and the Boat .
The OWNER, for and in consideration of the obligations and responsibilities undertaken
by the ENGINEER, hereby agrees to compensate the ENGINEER in a total amount not to
exceed $104,000.00 upon the submission of monthly invoices and Purchase Vouchers
representing Costs incurred by the ENGINEER pursuant to performance of this Contract.
A. Reimbursement to the ENGINEER shall be made in accordance with the
following budget.
BUDGET
* Three subcontracts: archeoLogist - $3,360; biotogist - $2,160; geologist - $2,400.
TASK BUDGET
Regional Wastewater Services Contract
Plan for the City of Georgetown
TASK BUDGET
I. DEVELOP AND COLLECT DATA $ 8,700.00
11. DEFINE SERVICE AREAS 5,000.00
111. EVALUATION OF MAJOR INTERCEPTORS
AND TREATMENT ALTERNATIVE 58,000.00
IV. PREPARE WATER CONSERVATION PLAN 3,800.00
V. DEVELOP FINANCIAL PLAN 4,000.00
VI. PREPARE FINAL REPORT 24,500.00
um
"Definition of Contract Budget Term
a r, fit =1
1. Salary Cost is defined as the cost of salaries of engineers, draftsmen, stenographers,
surveymen, clerks, laborers, etc., for time directly chargeable to the project.
2. Fringe Costs are defined to • social security contributions, unemployment
excise and payroll taxes, employment compensation insurance, retirement benefits,
edical insurance r• sick leave, vacation, and holiday pay applicable thereto.
3. Overhead, Costs are those costs incurred by the prime contractor and sub-
contractors in maintaining a place of business and performing professional services
SUBCONTRACT
SUB -SUBCONTRACT
CATEGORY
TOTAL BUDGET
SERVICES
SERVICES
A.
SALARIES AND WAGES"
-0-
$26,000.00
$ 7,800.00
B..
FRINGE"
.0-
6,900.00
2,310.00
C.
TRAVEL
-0-
900.00
350.00
D.
EXPENDABLE SUPPLIES
-0-
1,000.00
300.00
E.
SUBCONTRACT SERVICES
104,000.00
29,080.00
7,920.00*
F.
TECHNICALICOMPUTER SERVICES
-0-
O-.
1,600.00
G.
COMMUNICATIONS
-0-
500.00
150.00
H.
REPRODUCTION
-0-
2,500.00
300.00
I.
OVERHEAD"
-0-
27,840.00
5,500.00
J.
PROFIT
-0-
9,280.0
2,850.00
$104,000.00
$104,000.00
$29,080.00
* Three subcontracts: archeoLogist - $3,360; biotogist - $2,160; geologist - $2,400.
TASK BUDGET
Regional Wastewater Services Contract
Plan for the City of Georgetown
TASK BUDGET
I. DEVELOP AND COLLECT DATA $ 8,700.00
11. DEFINE SERVICE AREAS 5,000.00
111. EVALUATION OF MAJOR INTERCEPTORS
AND TREATMENT ALTERNATIVE 58,000.00
IV. PREPARE WATER CONSERVATION PLAN 3,800.00
V. DEVELOP FINANCIAL PLAN 4,000.00
VI. PREPARE FINAL REPORT 24,500.00
um
"Definition of Contract Budget Term
a r, fit =1
1. Salary Cost is defined as the cost of salaries of engineers, draftsmen, stenographers,
surveymen, clerks, laborers, etc., for time directly chargeable to the project.
2. Fringe Costs are defined to • social security contributions, unemployment
excise and payroll taxes, employment compensation insurance, retirement benefits,
edical insurance r• sick leave, vacation, and holiday pay applicable thereto.
3. Overhead, Costs are those costs incurred by the prime contractor and sub-
contractors in maintaining a place of business and performing professional services
similar to those specified in this contract project description. These expenses shall
include the following:
Indirect salaries, including that portion of the salary of principals and
executives that is allocable to general supervision
Indirect salary fringe benefits
Accounting and legal services related to normal management and business
operations I
Travel costs incurred in the normal course of overalt, administration of
the business
Equipment Rental
Depreciation of furniture, fixtures, equipment, and vehicles
Dues, subscriptions, and fees associated with trade, business, technical,
and professional organizations
Other insurance
Rent and utilities
Repairs and maintenance of furniture, fixtures, and equipment
A. Monthly invoices submitted by the ENGINEER and State Purchase Vouchers
supplied by the Board for work performed shall be submitted for reimbursement
by the OWNER. Said invoices and vouchers shall be supported by sufficient
detail to substantiate billings by the OWNER, said detail to include the
following -
(1) For direct expenses incurred by the OWNER for outside consultir"-
services-- copies of invoices to the OWNER showing the tasks that we
performed; the percent and cost of each task completed; a total co
figure for each direct expense category including labor, fringe, overhea
travel, communication and postage, technical and computer service
expendable supplies, printing and reproduction-, and the total doll
amount due to the consultant.
(2) For travel and subsistence expenses, including such expenses for sub-
contractors --names, date, work location, time period at work location,
itemization of subsistence expenses of each employee, limited, however, to
travel expense authorized for state employees be General Appropriation
Act, 1986 Tex. Sess. Law Serv., Cn. 13, Art. V, see 13.1 at 587 or as
amended; and
(3) Other transportation costs --copies of invoices covering tickets foll
transportation or, if not available, names, dates, and points of travel•
r
individuals, and
(4) All other reimbursable expenses--invoicles or purchase vouchers showi
reason for expense with receipts to evidence the amount incurred.
B. The OWNER shall reimburse the ENGINEER only upon receipt of an invoice
and a Purchase Voucher- provided, however, the OWNER shall only pay up to
ninety-five percent (95%) of the OWNER's share of each invoice pending the
ENGINEER'S performance, completion of the report, and acceptance and
approval of said report by the OWNER. At the time of said performance,
completion, and approval of the report by the OWNER, the OWNER shall pay
the remaining five percent (50/0) to the ENGINEER.
The ENGINEER shall maintain satisfactory financial accounting documents and
records and shall make them available for examination and audit by the
OWNER. Accounting by the ENGINEER shall be in a manner consistent with
generally accepted principles.
211BAM -mum IMIJIM0121M
The OWNER shall have unlimited rights to technical or other data resulting directly from
performance of services to the OWNER under this contract.
It is, agreed that the wastewater facility planning materials developed by the ENGINEER
pursuant to this Contract shall become the joint property of the OWNER and the
ENGINEER in which the OWNER retains the right to establish copyrights. Any
wastewater facility planning materials subject to an OWNER copyright and produced by
the ENGINEER or OWNER pursuant to this Contract may be printed by the ENGINEER or
OWNER at their own cost and distributed by either at their discretion within the State
of Texas. The ENGINEER may otherwise utilize such material provided under this
Contract as deems necessary and appropriate, including the right to publish and distribute
the materials or any parts thereof under its own name within the State of Texas,
provided that any OWNER copyright is appropriately noted on the printed materials.
The ENGINEER agrees to -acknowledge the OWNER in any news releases or other
publications relating to the work performed under this Contract.
No work herein called for by the OWNER shall be subcontracted or assigned without
prior written approval of the Executive Administrator acting for the OWNER for such
subcontract. The subcontract shall include a detailed budget estimate with specific cost
details for each item of work to be performed by the subcontractor and for each
category of reimbursable expenses or, if approved by the Executive Administrator,
evidence that the fees charged are fair and reasonable. The subcontracts shall conform
to the terms of the Contract and include provisions which require subcontractor
compliance with OWNER rules.
This Contract may be altered or amended only by mutual written consent and may be
terminated by the OWNER at any time with a thirty (30) day written notice to the
ENGINEER.
Upon receipt of such -notice, the ENGINEER shall, unless the notice directs otherwise,
immediately discontinue all work in connection with the performance of this contract and
shall proceed to cancel promptly all existing orders insofar as such orders are chargeable
tothis Contract. The ENGINEER shall submit a statement showing in detail the work
performed under this Contract to the date of termination. The OWNER shall then pay
the ENGINEER promptly that proportion of the prescribed fee which applied to the work
actually performedunder this Contract, less * all payments that have been previously made.
Thereupon, copies of all completed work accomplished under this Contract shall be
delivered to the OWNER.
The OWNER may issue a written Stop Work Order to the ENGINEER at any time. Upon
receipt of such order, the ENGINEER is to discontinue all work under, this Contract and
cancel all orders pursuant to the Contract, unless the order directs otherwise. If the
OWNER does not issue a written Restart Order within 60 days after receipt by the
ENGINEER of the Stop Work Order, the ENGINEER shall regard this Contract terminated
in accordance with the foregoing provisions.
RIMUNMV1111
For the purpose of this Contract, the ENGINEER will be considered an independent
contractor and therefore solely responsible for liability resulting from negligent acts or
omissions. The ENGINEER shall obtain all necessary insurance in the judgement of the
Engineer, to protect itself, the OWNER and employees and officials of the owner from
liability arising out of the Contract. The ENGINEER shall indemnify and hold the
OWNER harmless, to the extent that the ENGINEER may do so in accordance with State
Law, from any and all losses, damages, liability, or claims therefore,* on account of
personal injury, death, or property damage of -any nature whatsoever caused by the
Engineer, arising out of the activities under this Contract.
The ENGINEER shall be solely and entirely responsible for procuring all appropriate
licenses and permits which may be required by any competent authority for the
ENGINEER to perform the subject work.
SECTION VII - SEVERANCE _PROVISION
Should any one or more provisions of this Contract be held to be null, void, voidable, or
for any reason whatsoever, of no force and effect, such provision(s) shall be construed
as severable from the remainder of this Contract and shall not affect the validity of all
other provisions of this Contract which shall remain of full force and effect.
All correspondence between the parties shall be made to the following addresses:
Mayor Jim Colbert
City of Georgetown
PD. Box 409
Georgetown, Texas 78627-041
Mr. R.E. Wallace, P.E.
President
Wallace, Winkler & Rice, Inc.
P.O. Box 22007
Waco, Texas 76702
In WITNESS WHEREOF the parties hereto cause this Contract and Agreement to be duly
executed in triplicate.
ATTEST: The City of Georgetown
City Secretary
ATTEST:
CAI- rvt
Corporate Secretary
By:
Jim Colbert
Mayor
Wallace, Winkler & Rice, Inc.
By:
R.E. Wallace, P.E.
President
Exhibit A
Political Subdivisions and Entities in the Planning Area
1. Mr. Carson Hoge
General Manager
Brazos River Authority
P.O. Box 7555
Waco, Texas 76714-7555
2, The Honorable Mervin Walker
Mayor
City of Weir
P.O. Box 264
Weir, Texas 78674
3. The Honorable Don Wilson
Judge
Williamson County Courthouse
Georgetown, Texas 78626
4. The Honorable Dollie Hajda
Mayor
City of Granger
212 E. Davilla
Granger, Texas 76530
5. The Honorable Clark Jackson
Mayor
City of Taylor
400 Porter Street
Taylor, Texas 76574
6. Mr. Carl Liddel
Manager
Jonah Water Supply Corporation
Rt. 1, Box 112 B
Georgetown, Texas 79626
7. Mr. Mark Debruler
Manager
Williamson County MUD #2
330 Corner wood Dr.
Austin, Texas 78717
8. The Honorable Mike Robinson
Mayor
City of Round Rock
City Hall
Round Rock, Texas 78664
9. Mr. B.M. Beck
Chisholm Trail W.S.C.
Florence, Texas 76527
10. Mr. R.B. Motherall
Rabbit Hill W.S.C.
828 Sidney Baker
Kerrville, Texas 7802-V
11. Mr. James Clarno
Manager
Brushy Creek WCID #1
102 Bowman Rd.
Round Rock, Texas 78664
12. Mr. Bobby Stanton
Williamson County MUD's #5 and #6
301 Toledo Trail
Georgetown, Texas 78626
13. Steger & Bizzell
Pecan Branch (Creek Pl.) Util. Dist.
1987 Austin Avenue
Georgetown, Texas 78626
14. Steger & Bizzell
Dove Springs Utility District
1978 Austin Avenue
Georgetown, Texas 78626
15. Mr. Dan Mize
President
Lake Granger W.S.C.
P.O. Box 810
Taylor, Texas 76574
16. The Honorable Edmund Schmidt
Mayor
P.O. Box 266
Hutto, Texas 78634
17. Mr. Wayne Bell
S.W. Milum Water Supply
P.O. Box 232
Rockdale, Texas
18. The Honorable A.J. Lehman
Mayor
City of Thorndale
P.O. Box 308
Thorn dale,' Texas 76577
19. The Honorable James Dvorek
Mayor
City of Thrall
Thrall, Texas 76878
20. Mr. Ralph Bachmeyer
Nowac Water Supply
P.O. Box 297
Thrall, Texas 76578
21. The Honorable Bobby Hill
Mayor
City of Bartlett
Drawer H
Bartlett, Texas 76511
22. Mr. Don Stence
Executive Director
Capital Area Planning Council
2520 IH -35 South
Austin, Texas 78704
23. Mr. Charlie Steger
Steger & Bizzell
1987 Austin Avenue
Georgetown, Texas 78626
24, Mr. Don Bizzell
Steger & Bizzell
1987 Austin Avenue
Georgetown, Texas 78624-,
� t
EXHIBIT B
REGIONAL WASTEWATER & COLLECTION TREATMENT STUDY
Scope of Plan for the Georgetown Area
The scope of services for the plan is defined as rollows:
A. City of Georgetown, Town of Weir, Williamson County MUD #5 and #6 and
Private Land Owners.
1. Existing Collection System Maps
2. Existing Treatment Plant Layouts
3. Existing Plant Flows
4. Existing Plant Effluent Quality
5. Permit Requirements
6. Prior Wastewater Studies
7. City Map
8, City Ordinances
9. System Capacities
10. Lift System Locations and Capacities
11. Current Rate Structure
a t. . 01
1. Basin Map
2. Available Property Maps
3. Layout of Potential Developments
4. Edwards Recharge Zone Map
5. Existing Development Studies
6. Potential Flows
C. Population
1. Current
2. Projections
3. Land Use
D. Service Area
1. Meetings with Georgetown Officials
2, Meetings with Weir Officials
3. Meetings with Developers and Utility Districts
4. Meetings with Industry
11. Potential Service Areas
A. Determine Timing of Potential Developments
B. Quantify Waste Loads
C. Project Sewer Flows
D. Define Cost Effective Service Boundaries
111. Evaluate Major Interceptor and Treatment Alternatives
A. Determine Acceptable Waste Loads on San Gabriel River and Major Watersheds
in the Planning Area,
1. Model Set-up and data check
2. Model Calibration
3. Model Validation
4. City of Georgetown Discharge Simulation
Town of Weir Simulation
Williamson County MUD #5 and #6 Simulation
a. Existing Capacity
b. Proposed Capacity
5. Lake Granger Simulation
a. Historical Conditions
b. With Georgetown Increased Capacity
C. With Weir Increased Capacity
d, With Williamson County MUD #5 and #6 Increased Capacity
B. Environmental Concerns
1. Treatment Plant Site Evaluation
a. Edwards Aquifer Recharge Zone
b. Archeological Significance
C. Biological Inventory
d. Geological Impact Evaluations
2. Discharge Point Evaluation
a. Edwards Aquifer Recharge Zone
b. Archeological Significance
C. Receiving Stream Biological Impacts
d. Geological Impact Evaluations
3. Major Interceptor Evaluations
C. Define Wastewater Facilities
1. Establish Effluent Quality Parameters
2. Define Treatment Capacity
3. Determine Treatment Process Required
4. Evaluate Staging of Facilities
5. Estimate Costs
D. Develop Interceptor Sizing and Routes
1. Prepare Maps
2. Size Interceptor Lines
3. Evaluate Routes
4. Estimate Costs
E. Delineate Construction Sequence
F. Develop Water Conservation Plan
1. City of Georgetown
2. Town of Weir
3. Williamson County MUDs #5 and #6
A, Estimate Revenue Potential
B. Determine Financial Ab'ility
C. Prepare Rate Study
D. Perform Economic Analysis
E. Evaluate Financing Options
I Public
2. Privatization
3. Investigate Funding Sources
V. Final Report
A. Facility Planning
1, Summarize Methodology and Approach
2. Summarize and Evaluate Alternatives
3. Recommended Plan
B. Environmental Engineering
1. Water Quality Modeling - Watersheds
a., Berry Creek within defined planning area
C. Pecan Branch within defined planning area
b. San Gabriel River within defined planning area
2. Water Quality Modeling - Lake Granger
3. Geological Ground Survey - Edwards Aquifer Recharge Zone in the
selected regional treatment plant area and discharge point
4. Archeological Ground Survey - Potential Plant Site(s) and Outfall Line(s)
from existing Georgetown's STP to below Mankins Branch confluence
5. Biological Investigation - Discharge point downstream to Lake Granger
6. Review Existing and Proposed Water Quality Standards
7. Evaluation of Applicable Antidegradation Policies
8. Finalize Water Quality Objectives
C. Recommended Water Conservation Plan
D. Implementation Recommendations
1, Desired Discharges
a. Flow
b. Quality
c. .. Location
2. Evaluation of Treatment Alternative(s)
3. Evaluation of Plant Site(s)
4. Evaluation of Interceptor Route(s)
5, Phasing of Facilities
6. Estimate Costs Associated With Implementation
7. Estimate Yearly Operation & Maintenance Costs
E. Detailed Capital Costs
F. Recommendations