Loading...
HomeMy WebLinkAboutAgenda_GVPID_10.13.2014Page 1 of 5 GEORGETOWN VILLAGE PUBLIC IMPROVEMENT DISTRICT #1 ADVISORY BOARD MEETING Monday, October 13, 2014 Meeting time 6:00 PM @ Georgetown Public Library, Classroom 211, 402 W. 8th St., Georgetown, TX. http://government.georgetown.org/georgetown-village-public-improvement-district-gvpid/ Mail address: Georgetown Village PID #1, P.O. Box 3000 #34, Georgetown, TX. 78627 AGENDA 1. Call to order. 2. Financial Report (Alex Hayes, Treasurer) A. Financial status reports provided by La’Mar Kemp, City of Georgetown B. Corrections to July financials, to include consideration and possible action to approve the corrections. C. Corrections to August financials, to include consideration and possible action to approve the corrections. D. Recap of approved expenditures 1.) Alex Hayes, $19.05 - Reimbursement of photo copy expenses 2.) Jill Fussell, $336.37 – Reimbursement of photo copy expenses 3.) SunTerra Landscape Svcs, $6,284.14 – September 2014 Monthly Maintenance Billing 4.) Holcomb Electric Inc, $850.00 – At gazebo, install new service pole, replace 4 outlets with weatherproof lockable covers, disconnect broken motion detector, re-install light switch with lockable cover 5.) SunTerra Landscape Svcs, $650.00 – urgent irrigation repairs of leaks per September Irrigation Inspection Report 6.) Ink Images, $675.80 – Georgetown Village PID October 2014 brochure 3. Consideration and possible action to approve Minutes of Georgetown Village Public Improvement District #1 meetings held on September 8, 2014. 4. Consideration and possible action to renew the landscaping contract with SunTerra Landscape Services for the second year of a five-year contract of, per contract price of $75,497.62 annually, effective August 1, 2014 through July 31, 2015. 5. Landscaping / Irrigation Report – Matt Saulsgiver, Sunterra representative Page 2 of 5 A. Report on pending work orders previously approved: 1. Wildflower meadow proposal for 3 areas along Shell Rd , WO 42275, ($ corrected from Minutes of September 8, 2014 notation) $ 975.00 2. Remove old grasses, plant coreopsis at Bedford Park, $ 275.88 B. Update on replacement of dead plant material in pocket parks 1. Dead sod in in Bedford Park 2. Dying grass and plant material in Hanover Park 3. Irrigation adjustment in xeriscaped area of Bedford Park 6. Consideration and possible action on following proposals from SunTerra: A. Planting of two 3-gal red yuccas in front of “Georgetown Village” stone wall signs, including mulch in front of signs (to include removal of overgrown yucca at Sycamore entrance wall?), WO 45504 $431.49 B. Remove 3 holly trees located under crepe myrtles in the middle of entrance round-about on Village Commons Blvd, WO 45503 $191.67 C. At Westbury entrance the extending of the dry river rock bed from the south side of Westbury over to the north side of the road, including flaring out of existing rock be and bringing it down to the curb line of the road, and taking the same river rock to the north side of Westbury and filling in the spot between the sidewalk and the curb line (area where new electrical box is located), WO 45494 $2,176.70 D. At Westbury entrance extending the decomposed granite path that is on the south side of the road to continue on the north side of the road, terminating in a circle area where a future bench could be installed (bench not included), including prepping area, installing edging and decomposed granite, compacting decomposed granite and making irrigation adjustments, WO 45490 $1,858.64 E. Additional non-urgent irrigation repairs as a result of September 2014 Irrigation Inspection, WO 45536 $ 815.76 F. Replanting of entrance round-about on Village Commons Blvd, to include irrigation adjustments, replanting of 20 salvia greggi and 50 new gold lantana, mulching the entire bed, WO 45502 $2,305.85 Page 3 of 5 G. Installation of river rock (same rock as Westbury) in middle of turf area at entrance round-about on Village commons Blvd, including irrigation adjustments, installation of weed barrier, and moving large boulders from the construction site (KB Home) into the river rock area, WO 45499 $2,888.31 H. Consideration and possible action to engage Landscape Architectural Services for the replanting of the Gazebo area, the entrance traffic round- around and other areas to incorporate xeriscape design and water conservation. WO 45842 $4,400.00 plus reimbursable expenses 7. Consideration and possible action for this fiscal year to allow any officer, acting alone, to authorize the approval of spending on behalf of the PID of an amount not to exceed $1,000.00 per project. (see Governing Rules of Georgetown Village Public Improvement District No. 1, Article V, Section 5.07 –Other Authority and Limitations of Officers) 8. Consideration and possible action to change Article V, Section 5.07 noted above to read: “5.07 – Other Authority and Limitations of Officers. Any officer, acting alone, is authorized to approve the spending on behalf of the PID of an amount not to exceed [$1,000.00] per project.” 9. Update on Mr. Handyman (Mr. Dent) removing lock and chain as well as adding steel mesh under grate then re-securing grate over sink-hole in Cedar Elm Park. (Steve Goodman) 10. Update on Green Builders Inc. necessitated documents in conjunction with conveyance of Water Quality Facility located on Rosedale. 11. Consideration and possible action on election of new PID Board Member officers, with new officers becoming effective with December 8, 2014 meeting. 12. Consideration and possible action to purchase a recording device to record the monthly PID meetings to facilitate preparing the Minutes of the meetings. 13. Consideration and possible action to approve purchase of playground equipment for Cedar Elm Park and possible other parks in Georgetown Village. 14. Discuss formation of a Communications Committee, to include trifold, website, member solicitation, etc. and volunteers to be on such a committee. 15. Committee Reports A. Landscape Committee (Jill Fussell, Phillip Hardy, Michael Mullenix) Page 4 of 5 Update on Request for Quote for mulch at entrances, along Shell Rd, and at two round-abouts (pocket parks were done with replanting) Update on replacement of ornamental fencing at gazebo, which has deteriorated beyond repainting Update on repainting of gazebo, which has faded B. Park Amenities Committee (Melinda Marler, Mark Booras, Alex Hayes) Update on installation of Village Commons Pool Message Board. Update on enhancement of 4-foot empty square in the middle of Fairfield Park sitting area Update on playground equipment for parks C. Budget / 5-Year-Plan Committee (Alex Hayes, Jill Fussell, Steve Goodman) Update D. Ponds Committee (Jill Fussell, Vincent Uthoff, Mark Booras) Update E. Governing Rules Committee (Alex Hayes, Phillip Hardy, Steve Goodman) Update F. Executive Committee (Jill Fussell, Alex Hayes, VP vacancy) Update on PID Board insurance coverage. G. Alley Paving and Upkeep Committee (Mark Booras, Jill Fussell, Bill Weber) The Alley Paving committee has received a list of contractors from David Pierce, Street Dept Foreman, City of Georgetown, that the City uses for pavement projects for the type of work the PID needs done in the alleys, although no bids have been let: Contractors Asphalt:512-388-9968 / 512-917-5608 / 512-848-2093 Hinds Paving: 512-756-6859 Bill Hinds Asphalt Construction: 512-756-8112 Page 5 of 5 16. Discussion on PID Board Member/Alternates and Committee Training Session to be held October 27, 2014. 17. Update on Georgetown Village PID October 2014 trifold brochure. 18. Update on solicitation of additional board members and distribution of new October 2014 PID brochure to occur in October 2014. 19. New Business A. Next year’s PID meeting dates & times B. City of Georgetown’s evaluation of sidewalks for ADA compatibility: Nathaniel Waggoner, Transportation Services Analyst, 512-930-8171 20. Opportunity for residents to address the PID Board 21. Motion to Adjourn