FY2016 Annual Budget
UTILITY SERVICE
FUNDS
Spinning Spur 3
111
FY2016 Annual Budget
UTILITY SERVICE FUNDS
Electric Fund Summary ............................ 113
Electric Admin & Energy Services ......... 116
Electric Engineering .............................. 118
Resource Management ........................ 120
System Operations ............................... 122
Technical Services ................................ 124
Water Services Fund Summary ................ 126
Water Admin & Water Services............ 128
Wastewater Services ............................ 130
Irrigation ............................................... 132
Utility Fund Five-Year Projections ............ 134
NEW POSITIONS FY2016
Electric Fund
Safety & Training Specialist ....................... 1
Electric Crew ............................................. 4
Electric Scheduler/Planner ........................ 1
Electric Project Coordinator ...................... 1
System Operations .................................... 3
Water Services Fund
Water Services ....................................... 6.5
Wastewater Services ............................. 8.5
TOTAL NEW POSITIONS FY2016 ........................ 25
112
FY2016 Annual Budget
ELECTRIC FUND
The Electric Fund is used to account for the revenues and expenses relating to the City’s electric services. This
includes the electric departments, purchased power costs, debt payments, and capital projects. The fund also
makes a transfer to the General Fund for the City’s return on investment (ROI).
FISCAL YEAR 2015
Total revenues are projected to be $70,321,924, 2.95% lower than the current budget. The lower than expected
revenue is primarily the result lower than projected sales due to the abnormally cool and wet weather during early
summer.
Total expenditures are projected to be $72,674,742, 3.84% less than the current budget. Most departments are
expected to finish the current fiscal year within budget. The elimination of the solar farm CIP item originally
budgeted in FY2015 is the primary factor for the decrease.
Total fund balance is projected to be $8,231,940 as of September 30, 2015, which is equal to 12.74% of operating
expenditures. A 2013 rate study established a fund balance goal of $14M. Based on current projection, it is
expected the City will achieve this goal by the end of FY2017.
FISCAL YEAR 2016
Budgeted revenues total $66,699,775. Revenues are
projected to decline by 5.15%, due to less bond
proceeds. Overall, primary sales are expected to grow
by $3.17M. The chart to the right identifies the fund’s
revenues by source.
Budgeted expenses total $65,346,407 and are
expected to decrease by 10.08% from FY15
projections.
The decreases result from less CIP expense in 2016
and lower purchased power costs. The utility begins
operating the Spinning Spur 3 wind farm as early as
October of 2015.
Recommended enhancements include 10 new FTE’s to
address system growth and operational needs,
including an electric services scheduler and project
manager to assist in providing reduced coverage to
critical service needs. An additional safety training
position is also added to manage on-going training and
safety needs.
The utility is expected to review rates over the next 2
years to continue ensuring cost of service based
funding.
Electric
Revenue
92%
Electric
Revenue -
RR
5%
Other
3%
FY2016 Electric Revenue
System
Expenses
28%
Purchased
Power
61%
Other
Expenses
1%
Transfer
Out
10%
FY2016 Electric Expenses
113
FY2016 Annual Budget
ELECTRIC FUND INCOME STATEMENT
FY2014
Actual
FY2015
Budget
FY2015
Proj. Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Beginning Fund Balance 11,950,561 19,852,487 10,584,758 8,231,940 8,231,940
Operating Revenue
Electric Revenues 58,017,664 62,318,107 60,229,896 63,400,000 - 63,400,000
Interest 21,280 26,000 16,928 17,425 - 17,425
Other Revenue 2,301,570 2,090,000 1,794,255 1,782,350 - 1,782,350
Interfund Transfers/Shared Svcs - 2,305,917 2,557,845 - - -
Total Operating Revenue 60,340,514 66,740,024 64,598,924 65,199,775 - 65,199,775
Operating Expense
Georgetown Utility Systems 12,033,524 15,237,776 15,164,109 14,878,764 773,414 15,652,178
Operating Capital Improvements 1,663,555 1,148,000 1,364,000 108,000 43,000 151,000
Purchased Power 38,384,323 37,073,038 37,073,038 34,000,000 - 34,000,000
CRR Credits - - - - - -
AMI Implementation 187,150 50,000 50,000 50,000 84,000 134,000
Transfer Out - GCP 4,592,769 4,722,934 4,950,896 5,263,949 347,817 5,611,766
Total Operating Expense 56,861,321 58,231,748 58,602,043 54,300,713 1,248,231 55,548,944
Available Fund Balance 15,429,754 28,360,763 16,581,639 19,131,001 17,882,770
Policy Compliance (Operating Revenues - Operating Expenses)10,899,062 9,650,831
Non-Operating Revenue
Bond Proceeds 5,765,000 5,723,000 5,723,000 1,500,000 - 1,500,000
Total Non-Operating Revenue 5,765,000 5,723,000 5,723,000 1,500,000 - 1,500,000
Non-Operating Expenses
One-Time Programs - - - - - -
Capital Improvements 8,265,239 13,683,000 10,413,000 5,998,000 100,000 6,098,000
AMI/FIS System - - - - - -
Rollforward CIP - - - - - -
Debt Payments 2,839,637 3,573,771 3,573,771 3,470,507 - 3,470,507
Debt Payments - New Debt -
Debt Issuance Costs 69,540 85,928 85,928 16,800 - 16,800
Total Non-Operating Expense 11,174,416 17,342,699 14,072,699 9,485,307 100,000 9,585,307
Ending Fund Balance 10,020,338 16,741,064 8,231,940 11,145,694 9,797,463
Adjustment and Reservations
CAFR Adjustment 564,420 - - - -
Rate Stabilization/Credit Reserve 4,492,324 3,000,000 1,940,118 5,000,000 - 5,000,000
Contingency 2,650,000 6,215,000 6,215,000 4,775,000 4,775,000
Available Fund Balance 3,442,434 7,526,064 76,821 1,370,694 22,463
Debt Compliance
Coverage Compliance 9,719,939
CY Debt Service Requirement 3,470,507
Debt Coverage Ratio 2.80
114
FY2016 Annual Budget
Turbine Row Spinning Spur 3
Spinning Spur 3 at Dusk
115
FY2016 Annual Budget
ELECTRIC ADMINISTRATION & ENERGY SERVICES
GEORGETOWN UTILITY SYSTEM ELECTRIC ADMINISTRATION
ENERGY SERVICES
35.5 FTES
51.08 % OF FTE’S WITHIN
THIS FUND
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FY2015
Updated the electric system mapping information to approximately an
85% level of accuracy.
Continued the implementation of an Asset Management and
Preventative Maintenance program.
Established a formal maintenance program.
Updated Lineman training program.
MAJOR DEPARTMENT GOALS & STRATEGIES FOR FY2016
Ensure appropriate Energy Reliability Council of Texas (ERCOT) and Public
Utility Commission of Texas (PUCT) standards for electric service.
Operate and maintain the electric distribution system in a cost efficient and
safe manner to deliver proper return on investments while offering the
lowest possible rates to the community.
Provide competitive service delivery and rates for customers located within
areas serviced by other distribution providers.
Participate in industry conferences associated with electric distribution for
new process implementations.
Increase staffing to allow the department to continue to offer superior
customer service to the City’s customers, vendors and employees.
Implement initiatives to meet regulatory and customer demands while
improving reliability and quality of service.
Continue to improve Lineman training and safety program to maintain
technical expertise and high safety standards.
PRIMARY COUNCIL
STRATEGIC GOALS
Notable Budget Items
Electric Operations
Maintenance Crew (4 FTE’s)
Electric Scheduler/Planner
(1 FTE)
Electric Project Coordinator
(1 FTE)
Emergency Radio System
$43,000
DEPARTMENT DESCRIPTION
The Electric Administration &
Energy Services Departments
operate, maintain, and constructs
an energy delivery system
comprised of overhead and
underground feeders, and their
branch circuits for over 23,000
electric customers. These
Departments manage all major
assets related to the distribution of
electric services. The PUCT (Public
Utility Commission of Texas), ERCOT
(Energy Reliability Council of Texas),
and NERC (North American Electric
Reliability Corporation) regulate
these services.
116
FY2016 Annual Budget
DEPARTMENTAL BUDGET
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Electric Admin
Personnel 158,533 265,525 167,451 206,993 76,895 283,888
Operations 1,604,722 1,300,025 1,390,740 1,201,331 19,774 1,221,105
Additional Ops Expenses*6,262,528 6,924,387 7,215,638 6,584,313 - 6,584,313
Capital - - - - - -
Energy Services Sub-total 8,025,783 8,489,937 8,773,829 7,992,637 96,669 8,089,306
Energy Services
Personnel 4,360,361 2,362,061 2,407,461 2,544,658 212,304 2,756,962
Operations 38,012,615 1,186,631 1,160,121 1,183,190 18,494 1,201,684
Capital 1,682,644 216,000 216,000 - 43,000 43,000
Energy Services Sub-total 44,055,620 3,764,692 3,783,582 3,727,848 273,798 4,001,646
Temporary AMI
Personnel 53 - - - - -
Operations 187,150 50,000 50,000 50,000 84,000 134,000
Capital - - - - - -
Temporary AMI Sub-total 187,203 50,000 50,000 50,000 84,000 134,000
Total Dept Budget 52,268,606$ 12,304,629$ 12,607,411$ 11,770,485$ 454,467$ 12,224,952$
* Additional Ops Expenses includes: General Fund Allocations, ISF Allocations, Franchise Fees, and Special Projects & Services
DEPARTMENTAL PERFORMANCE MEASURES
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Workload Measures
1. Electric service customers 22,550 23,000 24,500 24,500 1,500 26,000
2. Annual electric sales (GWh)565 582 582 582 20 602
3. Work orders completed NA 6,000 7,000 7,000 500 7,500
Performance Measures
1. Safety KPI - % (Meetings,
Field Observations)93%90%95%90%0%90%
2. Service Quality KPI - % (ASIA,
SAFI, SADI, CADI)NA NA 90%90%0%90%
3. Operations KPI - %
(Outages, on time completion)NA 90%90%90%0%90%
4. Maintenance KPI - %
(Maint. Aging, on time completion)NA 90%92% 90%0%90%
117
FY2016 Annual Budget
ELECTRIC ENGINEERING
GEORGETOWN UTILITY SYSTEM ELECTRIC ENGINEERING
7 FTES
10.07% OF FTE’S WITHIN
THIS FUND
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FY2015
Oversee the deployment of the initial phase of EAM for Electric projects
and material acquisition.
Continued correction of the electric distribution system modeling and
mapping to ensure a high level of accuracy.
Effectively managed a departmental reorganization, and the creation
the electric engineering and electric operations departments.
Maintained the systems performance and ERCOT power factor
requirements.
Successfully launched the engineering and design tool into production
with integration with EAM.
Evaluated and assessed the needs for the new department moving
forward with a long range staffing plan.
MAJOR DEPARTMENT GOALS & STRATEGIES FOR FY2016
Update the Utility Master Plans for the Electric Distribution, Substation
Systems, and City Fiber Network.
Integrate the engineering design software with the material
management side of EAM.
Continue to enhance design methods for lower costs to the City and
Utility Customers.
Set standards for the maintenance of the electric distribution assets
once integrated into EAM.
Utilize proventive maintenance report data to develop maintenance
strategies and asset replacement or rehabilitation schedules.
Finalize and launch Electric Service Guidelines and Specifications to the
public.
Complete revisions and enhancements to the Electric Distribution
Construction Standards.
Maintain unit tables and material information in the engineering design
software.
Develop standardized material listings for the warehouse.
Evaluate the City’s extension policies for electric service delivery.
PRIMARY COUNCIL
STRATEGIC GOALS
Notable Budget Items
Project Coordinator (1FTE)
Phase Identification Tool
$13,920
Holdover Pickup Truck
$34,587
DEPARTMENT DESCRIPTION
The Electric Engineering
Department is responsible for
overall project coordination, design,
and construction of projects for the
City’s electric distribution and
substation systems, as well as the
Fiber network. The Department is
also responsible for inter-
departmental coordination of
seamless customer service,
management, and forecasting of the
five-year CIP budget, and system
master planning and performance.
118
FY2016 Annual Budget
DEPARTMENTAL BUDGET
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Personnel - 695,085 570,418 635,394 98,557 733,951
Operations - 67,796 67,916 85,272 23,530 108,802
Capital - 1,040,000 1,040,000 - - -
Total Departmental Budget -$ 1,802,881$ 1,678,334$ 720,666$ 122,087$ 842,753$
DEPARTMENTAL PERFORMANCE MEASURES
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Workload Measures
1. SD Designs to Construction 88 100 110 100 30 130
2. # CIP Projects Managed 17 16 19 16 2 18
3. # New Locations Served 23,000 23,500 24,300 23,500 3,300 26,800
4. # Pre-Apps Attended 208 312 400 312 100 412
Performance Measures
1. On-time service delivery 90%90%92%95%5%100%
2. Construction labor managed 1,580,000$ 2,900,000$ 3,200,000$ 2,900,000$ 300,000$ 3,200,000$
3. Consultant engineering managed 1,200,000$ 1,300,000$ 1,300,000$ 1,300,000$ 200,000$ 1,500,000$
3. Safety meetings attended 52 26 26 26 -26
On-time Service Delivery is the most important
measure because meeting customers’ needs and
wants helps ensure customer satisfaction and quality
customer service. This is a goal set by the Department
as a best practice standard that benefits the Council
and the City as a whole, through increased Economic
Development and Electric Fund Revenues.
90%
92%
100%
80%
84%
88%
92%
96%
100%
FY2014 FY2015*FY2016*
On-time Service Delivery * Projected
119
FY2016 Annual Budget
RESOURCE MANAGEMENT
GEORGETOWN UTILITY SYSTEM RESOURCE MANAGEMENT
2 FTES
2.88% OF FTE’S WITHIN
THIS FUND
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FY2015
Executed a long term Power Purchase Agreement with SunEdison Inc. to
provide 150 MW of solar power for 25 years beginning in 2017.
Established the Georgetown Utility Systems as a 100% renewable
energy utility beginning in 2017.
Completed an update to the Water and Wastewater Utility Impact Fees.
Provided financial analysis and support in restoring the Airport to fiscal
stability.
Provided financial analysis and support for numerous agreements in
several major development negotiations.
Provided financial analysis and support for the launch of the new EMS
program under the Fire Department.
MAJOR DEPARTMENT GOALS & STRATEGIES FOR FY2016
Develop and execute new supply strategy for managing around the
variability of renewable energy supply sources.
Establish Key Account relations.
Create automated budgetary/operations reports.
Cultivate marketing partners for wholesale power sales, and for
leveraging demand response technology.
Conduct comprehensive review of wastewater rates in relation to newly
adopted impact fees and impending CIP changes.
Review and support related to costs of MS4 permits on stormwater
rates and requirements.
PRIMARY COUNCIL
STRATEGIC GOALS
DEPARTMENT DESCRIPTION
Resource Management is
responsible for resource planning,
procurement, hedging, and
settlements for the Electric and
Water Utilities. The Department
engages in retail electric load and
water demand forecasting and
commodity market tracking.
Additionally, the Department
manages the wholesale power and
raw water contracts, purchases,
hedges, and settlements.
Resource Management also
provides rate analysis in support of
setting utility and transportation
rates, as well as impact fees.
120
FY2016 Annual Budget
DEPARTMENTAL BUDGET
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Personnel - 330,264 252,598 248,487 - 248,487
Operations - 66,110 (14,203) 66,110 - 66,110
Purchased Power - 37,073,038 37,073,038 34,000,000 - 34,000,000
Capital - - - - - -
Total Department Budget -$ 37,469,412$ 37,311,433$ 34,314,597$ -$ 34,314,597$
AWARDS/ACCREDITATIONS
Public Service Innovation Team Award from the CenTex Chapter of the American Society of Public Administration in
recognition of the City’s contracts to move to 100 percent renewable energy in 2017.
121
FY2016 Annual Budget
ELECTRIC SYSTEM OPERATIONS
GEORGETOWN UTILITY SYSTEM ELECTRIC SYSTEM OPERATIONS
13 FTES
18.71% OF FTE’S WITHIN
THIS FUND
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FY2015
Became the clearing house for Infor tickets generated by Customer
Care.
Established operating procedures for the seamless merger Chisolm Trail
Special Utility District.
Increased operating control of the Utility.
MAJOR DEPARTMENT GOALS & STRATEGIES FOR FY2016
Improve operational procedures as needed for the Utility.
Add personnel to accommodate increased operational hours and to
enhance service quality during normal and emergency operations.
PRIMARY COUNCIL
STRATEGIC GOALS
Notable Budget Item
System Control Center
Staffing (3 FTE’s)
DEPARTMENT DESCRIPTION
System Operations is the Control
Center for GUS. Using SCADA and
specialized programs, this
Department monitors and operates
the Utility systems on a 24/7 basis.
The Department receives all work
requests and either dispatches on-
call field staff in Electric or Water
Operations or passes lower priority
work to operations
planner/schedulers. After normal
business hours, this Department
takes on the role of Customer Care
to resolve equipment issues
reported by customers. In addition,
this Department conducts all
infrastructure locates required as
part of the One-call system.
122
FY2016 Annual Budget
DEPARTMENTAL BUDGET
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Personnel - 754,873 754,873 779,477 313,650 1,093,127
Operations - 26,115 51,375 51,375 10,210 61,585
Capital - - - - - -
Total Departmental Budget -$ 780,988$ 806,248$ 830,852$ 323,860$ 1,154,712$
DEPARTMENTAL PERFORMANCE MEASURES
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Workload Measures
1. Utility Service Customers 48,000 49,500 50,000 50,000 3,000 53,000
2. Radio Calls 20,000 22,000 22,000 22,000 1,000 23,000
3. Utility Locates 9,600 12,000 14,000 14,000 2,000 16,000
4. Work Orders Completed (Pri 1)NA 2,000 2,500 2,500 500 3,000
Performance Measures
1. Safety KPI - % (Utility
operations orders)NA 90%95%90%0%90%
2. Service Quality KPI - %
(Utility combined)NA 90%90%90%0%90%
3. Operations KPI - %
(Locates, on time completion)98%90%95% 90%0%90%
123
FY2016 Annual Budget
ELECTRIC TECHNICAL SERVICES
GEORGETOWN UTILITY SYSTEM ELECTRIC TECHNICAL SERVICES
12 FTES
17.27% OF FTE’S WITHIN
THIS FUND
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FY2015
Expanded the fiber optic data and utility networks to connect City-
owned facilities and metering network.
Completed the installation of the Utility Advanced Metering
Infrastructure (AMI) System.
Continued the replacement of older wireless communication system
with broadband capable wireless system.
MAJOR DEPARTMENT GOALS & STRATEGIES FOR FY2016
Maintain required levels of NERC, ERCOT, PUCT, AWWA, and TCEQ
standards for utility service to the community and maintain appropriate
levels of service to the customer.
Provide systems to allow the Utility system to be operated in a cost
effective manner.
Support utility and transportation field operations staff to achieve their
department goals.
Grow the fiber optic data and utility networks to connect additional city-
owned facilities per the Fiber Master Plan, and monitor and control city-
operated traffic signal lights.
Enhance the control functions of the SCADA system.
Continue the implementation/revisions of the SCADA system as
prescribed in the master plan.
Expand the installation of broadband capable wireless system.
PRIMARY COUNCIL
STRATEGIC GOALS
DEPARTMENT DESCRIPTION
Technical Services is comprised of
Metering and Supervisory Control
and Data Acquisition (SCADA). This
Department is responsible for the
operation and maintenance of the
SCADA system, fiber and radio
networks, the Advanced Metering
Infrastructure (AMI), and individual
meter service points. The system is
in control of electric substations,
water treatment plants, wastewater
treatment plants, lift stations,
elevated storage tanks, pump
stations, and individual customer
meters.
124
FY2016 Annual Budget
DEPARTMENTAL BUDGET
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Personnel - 974,712 861,889 1,014,334 - 1,014,334
Operations - 284,192 277,832 277,832 - 277,832
Capital - (108,000) 108,000 108,000 - 108,000
Total Departmental Budget -$ 1,150,904$ 1,247,721$ 1,400,166$ -$ 1,400,166$
DEPARTMENTAL PERFORMANCE MEASURES
FY2014
Actual*
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Workload Measures
1. Utility service customers N/A 49,500 50,000 50,000 3,000 53,000
2. SCADA remotes N/A 89 90 90 2 92
3. Work orders completed (Metering
and SCADA)N/A 20,000 25,000 25,000 5,000 30,000
Performance Measures
1. Safety KPI - %
(Meetings, Field observations)N/A 90.0%90%90%0%90%
2. Service quality KPI - %
(On time completion, read accuracy)N/A 90%90%90%0%90%
3. Maintenance KPI - %
(Maint. Aging, on time completion)N/A 90%90%90%0%90%
* the Electric Technical Services department did not exist in FY2014, it was created as part of the GUS reorg that happened in FY2015.
125
FY2016 Annual Budget
WATER SERVICES FUND
The Water Services Fund is used to account for the revenues generated from operating and maintenance activities
related to the Water, Wastewater, and Irrigation utilities. Each of these utility services is tracked separately within
this fund to ensure the rate and rate design will fully recover the cost of providing each service.
Expenses include debt service payments, capital costs, and the transfers out to the General Fund per the City’s
return on investment (ROI) policy.
FISCAL YEAR 2015
Total revenues are projected to be $49,900,803, 6.82% higher than the current budget. The higher than expected
revenue is primarily the result of higher than expected impact fees. Two developments that are outside the City
paid their impact fees in a lump sum at the time of platting.
Total expenditures are projected to be $53,166,810, 2.86% less than the current budget. Most departments are
expected to finish the current fiscal year within budget.
Total fund balance is projected to be $34,385,214 as of
September 30, 2015, which is equal to 118% of operating
expenditures. This is greater than the policy requirements of
25% or $7,086,012, but includes reserved debt funds not yet
expensed. Fund balance over the policy required
contingency is available to fund non-recurring expenditures
and is expected to be used to cash fund CIP projects in
FY2016.
FISCAL YEAR 2016
Budgeted revenues total $48,461,160. Overall, revenues are
projected to decline by 2.89%. The decline is a result of
lower bond proceeds and less impact fee revenue, as
prepaid impact fees are not budgeted. Base revenue
growth, of approximately 6%, is still expected as new
customers are added. The chart to the right identifies Water
Services Fund revenues by source.
Budgeted expenses total $63,353,367, which represents an
increase of 19.15% over FY2015 projections.
The increase is primarily due to new CIP projects, as well as
recommended enhancements for FY2016. The largest
change to the fund this fiscal year is to bring the Water and
Wastewater treatment plant operations and maintenance
in-house. It is expected this move will result in a savings of
over $5M in operating costs over the next 5 years. In-house
operations include the addition of 15 FTE’s. The other
major enhancement in FY2016 is the selection and
implementation of a new billing system (CIS).
126
FY2016 Annual Budget
WATER FUND INCOME STATEMENT
FY2014
Actual
FY2015
Budget
FY2015
Proj. Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Beginning Fund Balance 22,516,039 27,729,235 37,651,221 34,385,214 - 34,385,214
Operating Revenue
Capital Recovery Fees 4,127,394 3,994,600 5,628,570 5,945,574 - 5,945,574
Water Utility Revenues 17,310,379 21,323,646 21,974,230 22,640,000 - 22,640,000
Wastewater Utility Revenues 8,678,320 8,899,988 9,125,625 9,399,394 - 9,399,394
Irrigation Utility Revenues 209,415 575,000 198,474 204,428 - 204,428
Transfer In 167,704 169,108 169,108 169,108 - 169,108
Interest 72,289 75,100 119,107 119,232 - 119,232
Other Revenue 2,564,675 3,031,960 4,069,831 3,341,051 - 3,341,051
Total Operating Revenues 33,130,176 38,069,402 41,284,945 41,818,787 - 41,818,787
Operating Expense
Water Administration 9,146,593 12,199,425 11,696,433 15,735,574 58,540 15,794,114
Water Distribution 1,986,647 3,943,569 4,258,808 4,069,276 - 4,069,276
Water Plant Management 2,308,754 2,703,855 2,370,774 2,773,728 (55,988) 2,632,741
Sub-total Water Costs 13,441,994 18,846,849 18,326,015 22,578,578 2,553 22,496,131
Wastewater Distribution 1,598,118 1,819,573 1,798,281 1,891,090 - 1,891,090
Wastewater Plant Management 2,143,676 2,592,481 2,570,659 2,670,631 62,475 2,733,106
Sub-total Wastewater Costs 3,741,794 4,412,054 4,368,940 4,561,721 62,475 4,624,196
Irrigation 184,379 297,896 299,325 308,386 - 308,386
Sub-total Irrigation Costs 184,379 297,896 299,325 308,386 - 308,386
Transfers Out 3,025,113 5,427,152 5,370,916 3,490,703 522,824 4,013,527
Total Operating Expense 20,393,280 28,983,951 28,365,196 30,939,388 587,851 31,442,239
Available Fund Balance 35,252,935 36,814,686 50,570,970 45,264,612 44,761,761
Policy Compliance (Op Revs - Op Exps)9,085,451 12,919,749 10,879,399 10,376,548
Non-Operating Revenue
Bond Proceeds 12,585,000 7,990,000 7,990,000 6,000,000 - 6,000,000
Special Improvement Fees 734,443 654,250 625,858 642,373 - 642,373
Total Non-Operating Revenue 13,319,443 8,644,250 8,615,858 6,642,373 - 6,642,373
Non-Operating Expense
AMI System 315,242 - - - - -
Water CIP 8,349,463 10,807,800 10,854,550 13,238,000 - 13,238,000
Water Rollforward CIP
Wastewater CIP 3,246,320 9,338,000 9,338,000 12,519,000 - 12,519,000
Wastewater Rollforward CIP
Irrigation CIP
Sub-total CIP 11,911,025 20,145,800 20,192,550 25,757,000 - 25,757,000
Water Debt Svc 1,800,360 2,507,663 2,566,555 2,792,746 - 2,792,746
Wastewater Debt Svc 1,887,177 1,807,220 1,807,220 1,652,636 - 1,652,636
Irrigation Debt Svc 145,456 129,733 129,733 129,652 - 129,652
Debt Service, New
Bond Issuance Costs 71,277 117,500 105,556 60,000 - 60,000
Sub-total Debt Service 3,904,270 4,562,116 4,609,064 4,635,034 - 4,635,034
Total Non-Operating Expense 15,815,295 24,707,916 24,801,614 30,392,034 - 30,392,034
Ending Fund Balance 32,757,083 20,751,020 34,385,214 21,514,951 21,012,100
Adjustments & Reservations
CAFR Adjustment (PY PO Release)4,894,138 - - - - -
Reserved for Capital (Debt Proceeds) 12,585,000 10,000,000 20,000,000 10,500,000 10,500,000
Contingency 7,325,000 4,565,000 4,565,000 9,180,000 - 9,180,000
Available Fund Balance 17,741,221 6,186,020 9,820,214 1,834,951 1,332,100
Debt Compliance
Coverage Compliance 14,370,102 14,390,075
CY Debt Service Requirement 4,635,034 4,635,034
Debt Coverage Ratio 3.10 3.10
127
FY2016 Annual Budget
WATER ADMINISTRATION & WATER SERVICES
GEORGETOWN UTILITY SYSTEM WATER ADMINISTRATION
WATER SERVICES
36 FTES
60.5% OF FTE’S WITHIN
THIS FUND
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FY2015
Negotiated amendment to Operations and Maintenance agreements
with Water contract operations.
Integrated Chisholm Trail Special Utility District (CTSUD) personnel and
operations into Georgetown Utility System (GUS).
Incorporated water main upgrades with street projects to improve
service and minimize damage to new streets.
Updated the Water Services Qualifications manual to refine training
requirements for staff advancement.
Continued implementation of standardized procedure format and
created procedures for essential activities.
Completed implementation of Computerized Maintenance
Management System (CMMS-Infor EAM).
Evaluated in-sourcing of Plant Operations.
Negotiated and executed Jonah Water Resource Exchange.
MAJOR DEPARTMENT GOALS & STRATEGIES FOR FY2016
Maintain an adequate supply of water to allow for future growth of the
community.
Meet or exceed EPA and TCEQ standards for water service (pressure,
flow, and water quality).
Expand the water system to provide water service throughout our
franchise area.
Operate and maintain the system in a cost efficient manner to provide
the lowest possible service rates to our customers.
Continued leak detection program to reduce water loss.
Develop plant operator training and progression.
Transition Plant Operations from contracted operations to internal
operations.
Refine preventative maintenance program to reduce equipment
failures.
PRIMARY COUNCIL
STRATEGIC GOALS
Notable Budget Item(s)
Water Plant O&M
(6.5 FTE’s)
DEPARTMENT DESCRIPTION
The Water Administration and
Water Services Departments are
responsible for the operation and
maintenance of the infrastructure
that provides potable water for over
33,000 customers in a 450 square
mile area. The water infrastructure
includes treatment plants, storage
tanks, pumping stations, water
distribution piping, valves, fire
hydrants, and meters. Department
activities are regulated by the Texas
Commission on Environmental
Quality (TCEQ), Public Utility
Commission (PUC), and the
Environmental Protection Agency
(EPA).
128
FY2016 Annual Budget
DEPARTMENTAL BUDGET
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Water Administration
Personnel 96,191 682,320 485,822 227,131 - 227,131
Operations 9,100,124 12,366,676 11,960,322 15,973,635 58,540 16,032,175
Capital - - - - - -
Water Admin Sub-Total 9,196,315 13,048,996 12,446,144 16,200,766 58,540 16,259,306
Water Distribution
Personnel 1,249,669 1,999,711 1,913,944 2,045,144 - 2,045,144
Operations 686,511 1,059,287 1,339,731 1,303,839 - 1,303,839
Capital 833 35,000 255,422 255,101 - 255,101
Water Distribution Sub-Total 1,937,013 3,093,998 3,509,097 3,604,084 (55,988) 3,604,084
Water Plant Management
Personnel - - - - 402,951 402,951
Operations 2,308,754 2,638,855 2,305,774 2,686,229 (543,939) 2,142,290
Capital - 65,000 65,000 87,500 - 87,500
Water Plant Mgmt Sub-Total 2,308,754 2,703,855 2,370,774 2,773,729 (55,988) 2,632,741
Total Departmental Budget 13,442,082$ 18,846,849$ 18,326,015$ 22,578,579$ (53,436)$ 22,496,131$
DEPARTMENTAL PERFORMANCE MEASURES
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Workload Measures
1. Water service customers 21,900 22,400 33,500 33,500 1,800 35,300
2. Annual production (MG)6,000 6,100 4,870 6,100 -300 5,800
3. Work orders completed 2,500 3,000 3,355 3,000 180 3,180
Performance Measures
1. Safety KPI - %
(Meetings, Field Observations)93%90%95%90%0%90%
2. Service Quality KPI - %
(Pressure, Water Quality)N/A N/A 99%90%0%90%
3. Operations KPI - %
(Water Loss, Outages)86%90%89%90%0%90%
4. Maintenance KPI - %
(Maint Aging, On-time
completion)
N/A 90%75%90%0%90%
129
FY2016 Annual Budget
WASTEWATER SERVICES
GEORGETOWN UTILITY SYSTEM WASTEWATER SERVICES
22.5 FTES
37.82% OF FTE’S WITHIN
THIS FUND
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FY2015
Incorporated wastewater main repairs with street projects to improve
service and minimize damage to new streets.
Created a website to educate customers about the effects of fats, oil,
and grease being introduced into the collection system.
Evaluated the option of bringing plant operations and maintenance in
house.
Submitted the Sanitary Sewer Overflow Initiative Annual Report for
TCEQ approval.
Troubleshooting and resolution of long term mercury issue at Dove
Springs.
Northlands plant permit renewal.
MAJOR DEPARTMENT GOALS & STRATEGIES FOR FY2016
Maintain or exceed all regulatory standards for wastewater service
(discharge limits, system integrity).
Operate and maintain the system in a cost efficient manner to provide
for the lowest possible service rates for our customers.
Expand the wastewater system to provide service and minimize the
proliferation of septic systems.
Continue lift station upgrades per the Sanitary Sewer Overflow (SSO)
agreement with the TCEQ.
Implement Industrial Pretreatment Program when required by TCEQ.
Continue data collection for implementation of EARZ within the asset
management program.
Develop plant operator training and progression.
Transition Plant Operations to City staff.
Refine preventative maintenance program to reduce equipment
failures.
PRIMARY COUNCIL
STRATEGIC GOALS
Notable Budget Item(s)
Wastewater Plant O&M
(8.5 FTE’s)
DEPARTMENT DESCRIPTION
The Wastewater Department is
responsible for the operation and
maintenance of the infrastructure
that provides wastewater for over
24,000 customers. The wastewater
infrastructure includes treatment
plants, pumping stations, manholes,
and wastewater collection mains.
This Department’s activities are
regulated by the Texas Commission
on Environmental Quality (TCEQ)
and the Environmental Protection
Agency (EPA).
130
FY2016 Annual Budget
DEPARTMENTAL BUDGET
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Wastewater Operations
Personnel 1,042,429 1,151,543 1,125,332 1,213,741 - 1,213,741
Operations 521,145 618,030 622,949 627,349 - 627,349
Capital 34,544 50,000 50,000 50,000 - 50,000
WW Ops Sub-Total 1,598,118 1,819,573 1,798,281 1,891,090 - 1,891,090
Wastewater Plant Management
Personnel - - - - 505,461 505,461
Operations 2,143,676 2,567,481 2,545,659 2,620,632 (492,987) 2,127,645
Capital - 25,000 25,000 100,000 - 100,000
WW Plant Mgmt Sub-Total 2,143,676 2,592,481 2,570,659 2,720,632 12,474 2,733,106
Total Departmental Budget 3,741,794$ 4,412,054$ 4,368,940$ 4,611,722$ 12,474$ 4,624,196$
DEPARTMENTAL PERFORMANCE MEASURES
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Workload Measures
1. Wastewater service customers 21,000 22,500 24,500 24,500 1,000 25,500
2. Wastewater treated (MG)1,650 1,650 1,625 1,625 65 1,690
3. Work orders completed 1,300 2,000 3,600 3,600 145 3,745
Performance Measures
1. Safety KPI - %
(Meetings, Field Observations)93%90%95%90%0%90%
2. Service Quality KPI - % (Chokes,
Odor)N/A N/A 99%90%0%90%
3. Operations KPI - %
(SSOs, I&I)N/A N/A 89%90%0%90%
4. Maintenance KPI - %
(Maint Aging, On-time completion)N/A 90% 75% 90%0%90%
131
FY2016 Annual Budget
REUSE IRRIGATION
GEORGETOWN UTILITY SYSTEM REUSE IRRIGATION
1 FTE
1.68% OF FTE’S WITHIN
THIS FUND
MAJOR DEPARTMENT ACCOMPLISHMENTS FOR FY2015
Completed leak detection and repaired the distribution line.
Finished valve maintenance at the Irrigation pump stations.
Developed customer contact operating procedure.
MAJOR DEPARTMENT GOALS & STRATEGIES FOR FY2016
Meet or exceed TCEQ standards for Reuse Irrigation service (water
quality).
Operate and maintain the system in a cost effectivet manner to provide
for the lowest possible service rates for our customers.
Evaluate equipment operating history and make upgrades to lower costs
and improve performance.
Continue to work with reuse customers to move towards the utilization
of reuse water in the common areas which are currently being served
with potable water.
Investigate bulk water delivery stations to utilize reuse water for
construction.
Review reuse rates and make recommendations as needed.
PRIMARY COUNCIL
STRATEGIC GOALS
DEPARTMENT DESCRIPTION
The Reuse/Irrigation Department is
responsible for the operation and
maintenance of infrastructure that
distributes reuse irrigation water to
five major irrigation customers.
Reuse Irrigation infrastructure
includes storage tanks, pumping
stations, piping, and valves. The
Department activities are regulated
by the Texas Commission on
Environmental Quality (TCEQ) and
the Environmental Protection
Agency (EPA).
132
FY2016 Annual Budget
DEPARTMENTAL BUDGET
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Personnel 66,554 69,852 71,250 74,811 - 74,811
Operations 117,825 228,044 228,075 233,575 - 233,575
Capital - - - - - -
Total Departmental Budget 184,379$ 297,896$ 299,325$ 308,386$ -$ 308,386$
DEPARTMENTAL PERFORMANCE MEASURES
Measures
FY2014
Actual
FY2015
Budget
FY2015
Proj Actual
FY2016
Base
FY2016
Changes
FY2016
Budget
Workload Measures
1. Annual production (MG)300 325 325 325 0 325
Performance Measures
1. Safety KPI - %
(Meetings, Field Observations)93% 90% 95% 90%0%90%
2. Operations KPI - %
(Outages)N/A N/A 95% 90%0%90%
133
FY2016 Annual Budget
FIVE-YEAR FUND PROJECTIONS
Electric and Water Revenues:
Calculated on a five-year rolling average of per capita consumption in order to hedge against variations in
weather conditions.
Growth estimates are based upon building permits, expected build out of subdivisions and other planning
and development activity.
Assumes a 3% peak load growth for Electric through the next five years, as the City’s southern electric
service area continues to develop.
Assumes a 1 - 2% customer growth for Water for the next five years.
ELECTRIC FUND
FY2017
Proj. Budget
FY2018
Proj. Budget
FY2019
Proj. Budget
FY2020
Proj. Budget
FY2021
Proj. Budget
Beginning Fund Balance 9,797,463 16,640,425 24,216,689 31,831,625 40,961,709
Operating Revenue
Electric Revenues 65,970,000 68,278,950 70,668,713 73,142,118 75,702,092
Interest 17,925 17,925 17,925 17,925 17,925
Other Revenue 1,732,350 1,800,000 1,800,000 1,800,000 1,800,000
Interfund Transfers/Shared Svcs - - - - -
Total Operating Revenue 67,720,275 70,096,875 72,486,638 74,960,043 77,520,017
Operating Expense
Georgetown Utility Systems 16,039,771 16,601,163 17,182,204 17,783,581 18,406,006
Operating Capital Improvements 108,000 108,000 108,000 108,000 108,000
Purchased Power 32,000,000 32,000,000 33,120,000 34,279,200 35,478,972
CRR Credits - - - - -
AMI Implementation 134,000 - - - -
Transfer Out - GCP 5,310,446 5,490,490 5,676,836 5,869,704 6,069,322
Total Operating Expense 53,592,217 54,199,653 56,087,040 58,040,485 60,062,300
Available Fund Balance 23,925,521 32,537,647 40,616,287 48,751,183 58,419,426
Policy Compliance (Operating Revenues - Operating Expenses)14,128,058 15,897,222 16,399,598 16,919,558 17,457,717
Non-Operating Revenue
Bond Proceeds 1,500,000 - - - -
Total Non-Operating Revenue 1,500,000 - - - -
Non-Operating Expenses
One-Time Programs - - - - -
Capital Improvements 5,296,000 4,608,000 5,268,000 4,673,000 5,000,000
AMI/FIS System - - - - -
Rollforward CIP - - - - -
Debt Payments 3,472,296 3,712,959 3,516,662 3,116,474 2,901,427
Debt Payments - New Debt
Debt Issuance Costs 16,800 - - - -
Total Non-Operating Expense 8,785,096 8,320,959 8,784,662 7,789,474 7,901,427
Ending Fund Balance 16,640,425 24,216,689 31,831,625 40,961,709 50,517,999
Adjustment and Reservations
CAFR Adjustment -
Rate Stabilization/Credit Reserve 6,000,000 12,000,000 20,000,000 24,000,000 24,000,000
Contingency 6,215,000 6,215,000 6,215,000 6,215,000 6,215,000
Available Fund Balance 4,425,425 6,001,689 5,616,625 10,746,709 20,302,999
Debt Compliance
Coverage Compliance 19,449,286 21,398,494 22,087,216 22,800,044 23,537,821
CY Debt Service Requirement 3,489,096 3,712,959 3,516,662 3,116,474 2,901,427
Debt Coverage Ratio 5.57 5.76 6.28 7.32 8.11
134
FY2016 Annual Budget
WATER FUND
FY2017
Proj. Budget
FY2018
Proj. Budget
FY2019
Proj. Budget
FY2020
Proj. Budget
FY2021
Proj. Budget
Beginning Fund Balance 21,012,100 13,172,049 12,233,826 18,355,150 21,601,471
Operating Revenue
Capital Recovery Fees 5,985,174 6,147,711 6,314,783 6,486,520 6,663,055
Water Utility Revenues 23,640,000 24,285,000 24,948,150 25,629,971 26,330,997
Wastewater Utility Revenues 9,681,376 9,971,817 10,270,972 10,579,101 10,896,474
Irrigation Utility Revenues 210,561 212,667 214,793 216,941 219,111
Transfer In 169,108 169,108 169,108 169,108 169,108
Interest 119,232 119,232 119,232 119,232 119,232
Other Revenue 3,358,961 3,402,568 3,446,812 3,491,702 3,537,250
Total Operating Revenues 43,164,412 44,308,103 45,483,850 46,692,575 47,935,227
Operating Expense
Water Administration 15,822,882 16,258,284 16,705,963 17,166,270 17,639,570
Water Distribution 4,059,914 4,163,691 4,270,221 4,379,579 4,491,843
Water Plant Management 2,281,203 2,349,639 2,420,128 2,492,732 2,567,514
Sub-total Water Costs 22,163,999 22,771,614 23,396,312 24,038,582 24,698,927
Wastewater Distribution 1,891,090 1,947,823 2,006,257 2,066,445 2,128,438
Wastewater Plant Management 2,416,274 2,488,762 2,563,425 2,640,328 2,719,538
Sub-total Wastewater Costs 4,307,364 4,436,585 4,569,682 4,706,773 4,847,976
Irrigation 308,386 317,638 327,167 336,982 347,091
Sub-total Irrigation Costs 308,386 317,638 327,167 336,982 347,091
Transfers Out 3,295,147 3,300,462 3,369,639 3,440,769 3,513,909
Total Operating Expense 30,074,896 30,826,299 31,662,800 32,523,105 33,407,903
Available Fund Balance 34,101,616 26,653,852 26,054,876 32,524,620 36,128,795
Policy Compliance (Op Revs - Op Exps)13,089,516 13,481,804 13,821,050 14,169,470 14,527,324
Non-Operating Revenue
Bond Proceeds 8,000,000 20,000,000 38,000,000 34,000,000 28,000,000
Special Improvement Fees 650,023 - - - -
Total Non-Operating Revenue 8,650,023 20,000,000 38,000,000 34,000,000 28,000,000
Non-Operating Expense
AMI System - - - - -
Water CIP 13,353,000 14,547,000 21,079,000 15,355,000 12,000,000
Water Rollforward CIP
Wastewater CIP 11,571,000 14,029,000 17,364,000 19,537,000 20,000,000
Wastewater Rollforward CIP
Irrigation CIP
Sub-total CIP 24,924,000 28,576,000 38,443,000 34,892,000 32,000,000
Water Debt Svc 2,708,242 3,190,804 3,914,032 5,564,229 6,065,733
Wastewater Debt Svc 1,737,862 2,324,246 2,833,869 3,998,160 5,869,261
Irrigation Debt Svc 129,486 128,977 128,825 128,760 128,899
Debt Service, New
Bond Issuance Costs 80,000 200,000 380,000 340,000 280,000
Sub-total Debt Service 4,655,590 5,844,026 7,256,726 10,031,149 12,343,893
Total Non-Operating Expense 29,579,590 34,420,026 45,699,726 44,923,149 44,343,893
Ending Fund Balance 13,172,049 12,233,826 18,355,150 21,601,471 19,784,903
Adjustments & Reservations
CAFR Adjustment (PY PO Release)- - - - -
Reserved for Capital (Debt Proceeds)- - - - -
Contingency 5,905,000 4,565,000 4,565,000 4,565,000 4,565,000
Available Fund Balance 7,267,049 7,668,826 13,790,150 17,036,471 15,219,903
Debt Compliance
Coverage Compliance 16,384,663 16,782,266 17,190,689 17,610,239 18,041,233
CY Debt Service Requirement 4,655,590 5,844,026 7,256,726 10,031,149 12,343,893
Debt Coverage Ratio 3.52 2.87 2.37 1.76 1.46
135
FY2016 Annual Budget
THIS PAGE INTENTIONALLY LEFT BLANK.
136