Loading...
HomeMy WebLinkAboutMinutes_PAREB_12.10.2015Minutes of the Meeting of tripe Parks and Recreation Advisory Board City of Georgetown, Texas December 10, 201:5 The Parks and Recreation Advisory Board met Thursday, December 10, 2015 at 6:00 pm at 1101 N. College. Street, Georgetown, TX 78626. Rcgulap Session —'T« be14in no earlier than 6:00 pin. Parks and Recreation Board may,, at any time, recess the Regular Session to convene an Executive Session: at the request of the Robert Johnson for any purpose authorized by the Open Meetings Act, Texas Government Code Chapter 551.) Regular Session A Call to Order The meeting was called to order by Keith Fruge at 6:00 pm. B Roll Call Keith Fruge, Bob Palko, Jason Shurley, Glenn Holzer, Chuck Bridges; and Katherine Kainer Bob Johnson was absent. Staff. Kimberly Garrett, Eric Nuner, Jill Kellum C update from the Friends of Georgetown Parks and Recreation The Friends of Georgetown Parks and Recreation did not have a December meeting. Kimberly Garrett stated the sand table will be installed this week and plaque will be installed as well. Legislative Regular Agenda D Consideration and possible action to recommend approval of the parkland dedication and park improvements for Williamson County MUD 34, known as Riverview Kimberly Garrett presented information on the Riverview MUD and Joe Straub and Cheryl Allen were present to answer any questions. Riverview is a proposed MUD located west of Georgetown on Hwy 29. There are 591 units planned in the subdivision. They are proposing to dedicate 22 acres of land along the South San Gabriel River. As a MUD development, the developer is required to exceed the UDC parkland requirements and address parkland improvements. The developer is proposing to build a 10' wide concrete trail that will tie to the City's regional trail plan. The trail will also meet ADA Accessibility Guidelines. In addition there is also a proposed parking lot for trail access. Motion made by Bob Palko, second by Glenn Holzer to recommend approval of the parkland +. t E Consideration and possible action to recommend approval of Choice Builders, LLC of Temple, Texas for construction of the San Gabriel River bank stabilization wall in San Gabriel Park in the amount of $454,739. Eric Nuner presented an overview of information on the construction and introduced Trey Sutton an engineer with KPA. Over the years, the riverbank in San Gabriel Park has been eroding due to flooding that occurs in the park downstream where the North and South San Gabriel Rivers converge. Bank stabilization was identified in 2013 as a priority project through the capital improvement plan to protect additional parkland from eroding. The Parks and Recreation Advisory Board and City Council approved a Page 12 of 14 task order with Kasberg,Patrick and Associates (KPA)Vocpnop|ateengineehnQdedgn,surveying and envinunn)enta|dmarancasinJanuary ZO14. Sincethat time KP8and their consultants have secured the appropriate federal and state permits required to complete the bank stabilization project. These included permits from United States Army Corp of Engineers, United States Fish and Wildlife Services, and Texas Historical Commission. After permitting was received, the project was publicly bid. The City received sealed bids from four bidders on Thursday December 3, 2015. Choice Builders was the low bidder responding and has previously completed related parks projects for the City. Additionally, KPA has used them with satisfactory results and is recommending contract approval. Estimated Completion of the project is spring of 2016. Funds for San Gabriel Park Bank Stabilization are budgeted in account 120-9-0280-90-037. Funds for this project will be paid for out of the 2008 Park Bonds that were issued in May 2O13and designated for improvements toSan Gabriel Park. Motion made hy Bob Palkm/second by Chuck Bridges, tmrecommend approval ofChoice Builders, LLC of Temple, Texas for construction afthe San Gabriel River bank stabilization wall /oSan Gabriel Park |a the amount mf$454,73g. Approved 6~Q F Consideration and possible action to approve a construction contract with Progressive Commercial Aquatics mfManor, TXfor renovations and repairs toWilliams Drive Pool. Eric Nuner presented a conceptual drawing of the pool and presented information on the drawing. Through the Buy Board, the City will contract with Progressive Commercial Aquatics to perform renovations and repairs tnWilliams Drive Pool, Renovations otthe existing buildings and grounds will be completed to update them, as well as ensure ADA accessibility. Additional parking is included as well. Maintenance items include plaster, pool lights, coping, and lane lines. The total requested amount will bepresented atthe meeting. The proposed amount is $810/000� Motion made byGlenn Holzer, second byKatherine Kainertoapprove oconstruction contract with Progressive Commercial Aquatics of Manor, TX for renovations and repairs to Williams Drive Pool ay presented inthe amount of$81Q,Q8O^ Approved 6~Q G Discussion and possible action %oapprove the minutes from the November 12,2U15Parks and Recreation Board meeting. Motion made byJason Shur|aV,second by Chuck Bridges twapprove the minutes frommthe November 12,201SParks and Recreation Board meeting. Approved 6 —Q Motion made by Keith Fruge,second bvBob Pa|kotorecess the regular meeting mfthe 'Parks and Recreation Advisory Board togminto Executive Session, Approved 6-Q Regular meeting recessed Executive Session incompliance with the Open Meetings Act, Chapter 6G1,Government Code, Vernon's Texas Codes, Annotated, the items listed below will be discussed in closed session and are subject to action in the regular session. Page Dof14 The Meeting adjourned at 7:24 pm TITAIMM UP Recreation Advisory Board. Approved 6 — 0 The meeting reconvened at 725 pm i Q INNI Axecutive session. ,1, Jill 11 111111 ll!! Katherine Kainer, Secretary Jill Kell uni, Board,Lialson Page 14 of 14