HomeMy WebLinkAbout05 - Community Owned UtilitiesTM -M MAMS Aw . Wastewater Page 84 COMMUNITY OWNED UTILITIES The Community Owned Utilities Division consists of Administration, Energy Services (Electric), Pump Maintenance, Transportation Services (Streets and Stormwater Drainage), Systems Engineering, Water Services (Wastewater Collection, Water Distribution and Wastewater and Water Treatment). This division constructs, maintains, and operates the City's utility infrastructure. The Division also coordinates contracts with the private sector. DIVISION FINANCIAL SUMbIARY: Employees - Full Time Equivalents 17.25 Electric 7.25 Pump Maintenanc 3.5 Stormwater Drainage 6.75 Water Distributi 12.75 Streets 5 Administration 6 Wastewater Collection terns Engineering 61.5 Total Employees COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 59 97/98 96/97 97/98 Projected 98/99 99/00 Actual Budget Actual Adopted Projected Base Administration 309,220 299,191 298,099 294,555 294,555 Electric 941,428 1,004,236 989,127 1,108,826 1,094,841 Electric Contracts 10,818,950 11,564,418 11,984,559 13,036,029 13,346,682 Pump Maintenance 328,265 359,814 331,234 359,569 359,569 Stormwater Drainage 232,112 300,097 298,416 378,518 379,110 Streets 856,052 963,127 936,700 1,046,427 1,040,827 Systems Engineering 159,218 171,584 166,529 163,159 163,159 Water Distribution 527,399 536,198 536,198 573,460 625,306 Water Treatment Facilities 611,332 793,480 793,480 815,690 794,440 Water Contracts 1,625,295 1,447,644 1,424,037 1,495,779 1,433,044 Wastewater Collection 328,712 385,642 371,519 417,356 435,856 Wastewater Treatment Facilities 586,212 753,643 753,643 739,082 701,332 Wastewater Contracts 1,090,037 1,328,003 1,364,442 851,314 853,761 TOTAL 18,414,232 19,907,077 20.247,983 21,279,764 21,522,482 Employees - Full Time Equivalents 17.25 Electric 7.25 Pump Maintenanc 3.5 Stormwater Drainage 6.75 Water Distributi 12.75 Streets 5 Administration 6 Wastewater Collection terns Engineering 61.5 Total Employees COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 59 ENDS & MEANS Economic Development Policy End 1. 0. Georgetown's economy is self-sustaining through diversified growth, a broad tax base with minimal impact from economic fluctuation, enhanced business opportunity and job creation. Means (97-99) Revitalize sidewalks and selected roadways in the downtown area for the Georgetown Sesquicentennial. (Energy Services, Systems Engineering, Transportation Services) Focus End 1.1. Existing undeveloped sites in Georgetown are put to beneficial use. Means (97-99) Construct a City parking _ lot on the Heritage Baptist Church property. (System_ s Engineering, Transportation Services) Focus End 1.2. Georgetown recruits small to mid-sized commercial/industrial firms from all areas of the production process (i.e., research and development, assembly, production, distribution, warehousing, and retailing). Means (96-03) Provide utility data base loading information to the Information Resources Division for the Geographic Information System (GIS). (All Departments) Means (98-02) Construct utility improvements needed for the entertainment facilities site, including the Williamson County Expo Center and proposed water park project. (Administration, Energy Services, Systems Engineering, Transportation, Water Services) Environmental & Resource Conservation Policy End 3.0. The physical qualities that make Georgetown attractive are protected. Focus End 3.1. Georgetown's water resources system provides a sufficient water supply of high quality to meet future City needs, to meet economic development and recreational requirements, and to conserve wildlife. Means (96-03) Expand the use of effluent water sources to irrigate City parks, open spaces, and area golf courses, and to reduce removal of water from the Edward's Aquifer. (Administration, Pump Maintenance, Systems Engineering, Water Services) Means (97-00) Establish and expand a cooperative partnership with Chisholm Trail Special Utility District (CTSUD); including modifying service area boundaries, and providing wastewater services. (Administration, Water Services) Facilities & Services Policy End 4.0. The City provides for the safety of its citizens and supports the responsive delivery of coordinated services by the City and other public agencies. Means (96-99) Work with the Development Process Team to enhance the design review and approval process. (Administration, Systems Engineering, Development Services) COMMUNITY OWNED UTILITIES 60 ANNUAL OPERATING PLAN ELEMENT 1998/99 D J u Focus End 4.1. The City centralizes and co -locates services on existing City -owned property whenever possible. Means (98-99) Identify satellite staging areas for utility operations. (Transportation Services, Water Services, Energy Services) Focus End 4.6. The City provides appropriate, well managed information technology and services that support city operations and citizen access to information. Means (96-01) Support Development Services and Information Resources divisions in preparing and implementing a comprehensive strategy to address the Geographic Information System (GIS) needs of the City. (Administration, Energy Services, Systems Engineering) Means (96-03) Become a BETA test site (in cooperation with C3 Communications) to evaluate broadband services as an on-going strategy to maintain competitiveness in a deregulated electric market. (Administration, Energy Services) Focus End 4.10. Georgetown is prepared to respond to large scale natural and technological emergencies. Means (97-99) Work with the Police Services Division, Fire Services Division and C3 Communications to develop and implement a City-wide outdoor early warning system. (Administration, Energy Services) Finance Policy End 5.0. All municipal operations are conducted in an efficient business -like manner and sufficient financial resources for both current and future needs are provided. Focus End 5.1. Each utility system is a self -supported operation that provides a desirable and affordable level of service. Means (97-99) Review the City's impact fee structure, in cooperation with Development Services. (Administration, Energy Services, Water Services) Governmental Affairs Policy End 6.0 A high level of cooperation and involvement exists among Georgetown's citizens and governmental organizations. Means (97-03) Maintain positive working relationships with the Texas Natural Resources Conservation Commission and Texas Department of Transportation. (Administration, Systems Engineering, Transportation Services, Water Services) Focus End 6.2. The City develops and coordinates service delivery policies with Williamson County, the Georgetown Independent School District and other organizations that provide services to Georgetown. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 61 Focus End 6.3. The City is a strong and visible participant in developing comprehensive solutions to issues of concern on a regional level. Means (97-03) Cooperate and coordinate with the Williamson County Unified Road District to provide an organized transportation roadway system. (Administration, Systems Engineering, Transportation Services) Means (97-03) Cooperate and coordinate with State agencies and other utilities and entities as an active participant in issues and solutions related to regional water supply and electric deregulation. (Administration, Energy Services, Water Services) Means (97-03) Through comprehensive efforts with Georgetown Independent School District (GISD), find solutions to various utility conservation efforts; assist in utility and traffic flow issues related to the location of new school sites; and other utility and conservation efforts as. necessary. (Administration, Energy Services, Systems Engineering, Transportation Services, Water Services) Housing Policy End 10.0. The City cooperates with builders, developers and property owners to provide safe and adequate housing opportunities for all citizens. Means (97-99) Create an energy code, and incorporate it into the existing building codes, that will replace the current "Good Cents" program. (Administration, Energy Services) Means (98-02) Work with Legal Services, the Building Standards Commission and Fire Services for the enforcement of nuisance codes and ordinances through Inspection Services for the removal of sub -standard structures. (Streets) Recreation & Cultural Affairs Policy End 11.0. All citizens actively participate in community -wide social, cultural, and recreational activities. Focus End 11.3 Georgetown has an attractive and coordinated system of hike and bike trails. Means (97-01) Assist the Parks, Library & Recreation Division in the construction of the River Corridor Hike & Bike trails and assist in the construction of a softball complex. (All Departments) Transportation Policy End 12.0. Georgetown's transportation system provides for the safe and efficient movement of traffic, promotes the economic interests of the community, and adequately serves the needs of individuals. Means (97-00) Complete the following traffic improvements: (Systems Engineering, Transportation Services) • Improve traffic for Annie Purl School from Olive to Maple. • Construct a roadway to connect College and Holly Streets. • Reconstruct 7th and 8th Streets, between Maple Street and the IOOF Cemetery. • Improve the traffic island at the intersection of San Jose Street and Holly Street. • Resurface Power Road. COMMUNITY OWNED UTILITIES 62 ANNUAL OPERATING PLAN ELEMENT 1998/99 Focus End 12.1. The City maintains a Transportation Functional Plan that includes all modes of transportation. Means (96-01) Establish database information for an Urban Roadway Management System. (Systems Engineering, Transportation Services) Means (97-02) Identify, jointly with Police and Fire Services, traffic flows and emergency vehicle access to reduce accidents and improve traffic movement. (Systems Engineering, Transportation Services) Focus End 12.2. The City supports an area -wide transportation effort through coordination with other public and private organizations. Means (98-00) Arrange early coordination with the Texas Department of Transportation to: (Systems Engineering, Transportation Services) • Widen Austin Avenue, including the two bridges spanning the North and South San Gabriel Rivers. • Widen Williams Drive, from Cedar Breaks Road to Sun City. • Extend Leander Road (FM 2243) to FM 1460. • Widen and reverse the direction of entrance/exit ramps on Interstate Highway 35. • Install traffic signal at the intersection of Austin Avenue and Highway 971. • Install traffic signal at Highway 29 and the HEB entrance. Means (97-01) Cooperate with Williamson County and Development Support to upgrade D.B. Wood Road between State Highway 29 and Williams Drive (FM 2338) including bridge crossings to improve traffic flow west of IH -35. (Administration, Systems Engineering, Transportation Services) Means (00-03) Arrange early coordination with the Texas Department of Transportation to: (Systems Engineering, Transportation Services) • Widen 0.75 miles on Leander Road, west of Georgetown Independent School District property. • Widen Highway 971 east of Business 35 to County Road 1105. • Install traffic signal at Austin Avenue and Morrow Street. Focus End 12.3. The City has sidewalks and crosswalks throughout the City, especially around and between schools and parks. Means (98-00) Engineer and construct an underground stormdrain extension and sidewalks to connect the downtown square to the hike and bike trail at Second Street and Main Street. (Administration, Stormwater Drainage, Systems Engineering, Transportation Services) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 63 Utilities / Energy Policy End 14.0. Georgetown's utility systems provide safe and reliable service which meets the needs of all citizens and promotes the economic health of the community. Means (96-99) Complete the installation of the Customer Choice & Control System. (Administration, Customer Service, Energy Services, Water Services) Means (96-00) Work with Georgetown Independent School District (GISD), Williamson County Cablevision, and General Telephone (GTE), and the Information Resources Division to develop a telecommunications infrastructure throughout the City. (Administration, Energy Services) Means (97-00) Expand the wastewater collection system to provide wastewater service opportunities to residents in the Booty's Road area (including: Turtle Bend and Oakcrest Subdivisions) (Administration, Systems Engineering, Water Services) Means (98-99) Develop a process that would ensure prompt notification with information to residents in the event of any planned utility interruption. (Administration) Means (98-99) Perform a feasibility study on implementing a mobile restroom facility for outdoor functions and events using focus groups. (Administration, Water Services) Means (98-99) Continue to_ be actively involved in a Ion,-,-ran,-:,,,e water supply strategies with the Lower Colorado River Authority, Brazos River Authority, Trans -Texas and Senate Bill 1. (Administration, Water Services) Focus End 14.1. Customers of the City's electric utility have a range of choices with respect to rates, service levels and power supply options. Means (97-03) Extend Georgetown's electric utility services to all, new and existing, customers in Georgetown's single and dual certified areas. (Administration, Customer Service, Energy Services) Means (97-03) Work with the City Manager's office and the Finance & Administration Division to create a marketing strategy for the City, which will maintain our market share within the electric industry, prior to and after implementation of electric deregulation. (Administration, Customer Service, Energy Services) Focus End 14.2. Water and wastewater services exceed state and federal standards and are provided to all certified areas. Means (95-00) Obtain a permit for the Pecan Branch Wastewater Treatment Plant and complete construction of the facility. (Administration, Systems Engineering, Water Services) Means (96-00) Work with other water suppliers to ensure a Regional Water Supply System with the City of Round Rock and the Jonah Special Utility District. (Administration, Water Services) Focus End 14.3. The stormwater drainage system efficiently and effectively protects the health and safety of Georgetown's residents and minimizes the negative effects of standing water and urban runoff. COMMUNITY OWNED UTILITIES 64 ANNUAL OPERATING PLAN ELEMENT 1998/99 - Means (96-99) Reduce stormwater runoff impact on the San Gabriel River by constructing detention and retention ponds and filter beds, installing and replacing curbs and gutters in the Old Town area, and construction of drainage facilities. (Systems Engineering, Transportation Services, Water Services) • Railroad Street and Leander Street areas • Gabriel View/Power Road • TXDOT Retaining Wall • Churchill Farms Ditch • Thousand Oaks/Storm Box • Wagon Wheel/Westem Trail • San Gabriel Overlook • 4th and Ash Street • Smith Branch Clean Out • 501 Ridgecrest • Gabriel View Drainage • 708 Golden Oaks • Berry Creek Drainage • Elm Street and 9th Street Means (98-99) Create a Drainage Policy and Manual, and formulate a Regional Stormwater Management Plan consistent with State and Federal guidelines. (Administration, Systems Engineering, Transportation Services) Focus End 14.5 The City's utility policies and practices promote and encourage the protection and conservation of Georgetown's environment and natural resources. Means (96-00) Extend the scope of the Water Resource Management Plan to reduce peak water demands, through public education and incentives, and to encourage the practice of good conservation methods. (Administration, Water Services) Means (96-03) Promote and provide public education and information regarding utility issues and programs through: • The distribution of educational book covers, signs and posters to local schools during Public Power Week. (Energy Services) • The promotion of a community -wide program for National "Water Week." (Pump Maintenance, Water Services) • The coordination of utility information booths at various local festivals. (Administration, Energy Services, Pump Maintenance, Water Services) • The continued use of safety programs at Georgetown schools which provides information regarding high voltage lines. (Energy Services) • The promotion of the Safe Place Program at Georgetown schools to educate students that assistance is available to them. (All Departments) • The broadcast of the City's Water Conservation Video to establish public awareness and compliance with water conservation principles. (Administration, Water Services) Means (96-03) Plan for and establish wastewater system facilities in the Serenada Subdivision. (Administration, Systems Engineering, Water Services) Means (98-99) Work with Development Services to implement and enforce the Cross -Connection Control Regulations (backflow installation and inspection) for water quality through plumbing codes and ordinances. (Administration) For an explanation of the Ends & Means, see pages one and two in the City Summary section. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 65 WHAT WE DO: The Community Owned Utilities Administration Department manages financial operations and personnel services for all departments in the division. The Department also provides administrative support, including customer relations, reception, record keeping, and secretarial services, to all departments within the division. Long-term system planning is coordinated by this department. Administration is responsible for coordination and operation of the Utilities during Emergency Management situations. WHAT WE ACCOMPLISHED IN 1997/98: • Initiated the development of a Transportation Master Plan for the City. • Coordinated the completion of revisions to the City Construction Standards and Specifications for street, drainage, electric, water and wastewater tD improvements. • Initiated the process of revising and formalizing internal operating procedures, and completed six procedures. • Assisted the Georgetown Independent School District (GISD) in recommending solutions to utility conservation efforts, assisted in utility and traffic flow needs at the new Village Elementary site, the new Ninth Grade Center, and athletic facilities at Georgetown High School. • Worked with Fire Services to develop and implement an effective emergency outdoor early warning system for the City. • Established and implemented a partnership with Drug Awareness Resistance Education (DARE), the Georgetown Project and Georgetown Independent School District (GISD) to create a safe vehicle program for children (Safe Place Program). 66 WHAT WE PLAN TO ACCOMPLISH IIT 1998/99: • Shift the Community Owned Utilities management culture to a "Team" management culture, with the focus on managing to the future and emphasis on human resources. • Implement the Community Owned Utilities Master Facilities Plan expansion. • Find location and develop utility satellite staging areas in order to reduce crews' transit times and to expedite material restocking. • Complete the process of revising and formalizing internal operating procedures. • Work with the Georgetown Independent School District (GISD) to recommend solutions to various utility conservation efforts, assist in solving utility and traffic flow needs, and in developing school sites. • Expand the Safe Place Program through screening and training of new employees, and employees in other divisions (in partnership with Drug Awareness Resistance Education (DARE)), the Georgetown Project, and Georgetown Independent School District (GISD). COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 CITIZEN SURVEY 5) Percentage of citizens satisfied or better with reliability. of City water & electricity. N/A N/A 80% 80% 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: ACTUAL BUDGETED PROJECTED PROPOSED ACTIVITY INDICATORS FY 96/97 FY 1 8 FY 97/98 FY 98/99 1) Work orders completed 12,678 14,472 14,400 15,000 2) Phone calls handled 33,897 36,457 35,396 36,000 3) Contracts negotiated 22 36 31 33 4) Agenda items processed 42 48 42 44 CITIZEN SURVEY 5) Percentage of citizens satisfied or better with reliability. of City water & electricity. N/A N/A 80% 80% 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: 98/99 99/00 97/98 Projected Base 96/97 97/98 Projected Actual Budget Actual 203,416 (0.0%) 5/0 5/0 5/0 # Employees 181,783 192,358 192,046 Personnel 114,537 106,833 106,053 Operations 12,900 0 0 Capital 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 5/0 5/0 203,416 (5.9%) 203,416 (0.0%) 91,139 (-14.1%) 91,139 (0.0%) 0 (NIA) 0 (N/A) 309,220 299,191 298,099 294,555 (-1.2%) 294,555 (0.0%) Employees: full time / part time * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted SIGNIFICANT CHANGES: Increasing emphasis on environmental issues has created the need to keep abreast of changing regulations. Wastewater regulation is now moving toward control of Non -Point Source Pollution contained in stormwater runoff. Changes in State and Federal regulations, along with expanded service areas, will continue to force cost of service delivery upward. Management control and innovative operational methods must be implemented in order to keep future utility costs within a reasonable range. Beginning October 1, 1998, the Customer Service department, and its four positions, will be transferred to the Utility Office department. Prior years' budget numbers have been restated in that department for comparison purposes. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 67 WHAT WE DO: The Electric Department constructs and maintains a complete system of electric conductors, switches, lines and transformers used for the distribution of electricity purchased wholesale from the Lower Colorado River Authority (LCRA). In addition, the Electric Department reviews plans for construction of new lines (overhead and underground), and develops design specifications that meet all safety and construction requirements. The Electric Department installs and maintains street lights. The department administers a tree trimming maintenance program to prevent damage to electric distribution equipment and lines. The department promotes public education and provides information through safety and conservation programs. This department develops, coordinates, implements, markets, and directs City electric Conservation and Load Management (CLM) programs. WHAT WE ACCOMPLISHED IN 1997/98: • Mapped and inventoried one-half of the electric system in order to meet deregulation with a Federal Energy Regulatory Commission (FERC) valued system. • Added two electric feeders from the new Glasscock Substation to serve Sun City and Shell Ranch. • Reinsulated GB -70 three-phase circuit and converted the primary voltage from 7.2 KV to 14.4 KV from San Gabriel Substation to Serenada to serve the area more reliably and efficiently. • Designed and incorporated a Residential Energy Code into the City Subdivision Standards. • Implemented a Right of Way (ROW) maintenance program (tree trimming) to improve system reliability. • Completed Supervisory Control and Data Acquisition (SCADA) portion of the Automatic Meter Reading Program. • Negotiated and scheduled 10% Power Purchase Option with Texas -New Mexico Power. • Assisted the Georgetown Independent School District to find solutions to utility conservation efforts at the new Village Elementary site and the Ninth Grade Center and athletic facility at Georgetown High School. • Worked with Fire Services and C3 Communications to implement an effective emergency outdoor early warning system for the City as a whole. WHAT WE PLANT TO ACCOMPLISH IN 1998/99: • Map and inventory remainder of the electric system in order to meet deregulation with a Federal Energy Regulatory Commission (FERC) valued system. • Install underground electric services for new residents at Sun City (425), Berry Creek Reserve (125), Georgetown Village (80), Katy Crossing (65), and Crystal Knoll (50). • Upgrade conductor size on Gabriel Substation Feeder (GB -90), Georgetown Substation Feeders (GT -50 and GT -30), and Chief Brady Substation Feeder (CB -50) in order to serve the additional electric services being added to the area. • Install additional lighting in San Gabriel Park and other neighborhood parks to assist Police Services in reducing crime. • Work with the Georgetown Independent School District to recommend solutions to various utility issues and conservation efforts at the new sites. • Install hooded street light fixtures in Katy Crossing Subdivision as a part of the Dark Sky Program. This program promotes lighting of streets and prevents residual light from diluting star light. • Develop partnerships with GTE, Texas Utilities, Pedernales Electric Cooperative and Williamson County Cablevision to bury overhead utility lines in high visibility areas. COMMUNITY OWNED UTILITIES 68 ANNUAL OPERATING PLAN ELEMENT 1998/99 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: ACTUAL BUDGETED PROJECTED PROPOSED ACTIVITY INDICATORS FY 96/97 FY 97/98 FY 97/98 FY 98/99 1) Temporary Power Connections 373 500 591 550 2) Permanent Power Connections 371 450 492 450 3) Street Light Repairs 291 260 350 400 4) Underground Locates 479 450 500 550 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: 98/99 97/98 96/97 97/98 Projected Actual Budget Actual 15/0.25 16/0.25 15.75/0.25 # Employees 544,273 641,534 626,425 Personnel 397,155 362,702 362,702 Operations 0 0 0 Capital 941,428 1,004,236 989,127 Employees: full time / part time 1,094,841 (-1.3%) * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99100 Projected Base from 98/99 Adopted 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 17/0.25 17/.025 679,876 (8.5%) 685,391 (0.8%) 415,450 (14.5%) 409,450 (-1.4%) 13,500 (N/A) 0 (-100.0%) 1,108,826 (12.1%) 1,094,841 (-1.3%) SIGNIFICANT CHANGES: The Customer Choice & Control (CCC) System is substantially complete and will be utilized for faster detection of power outages and Load Management. The Electric Department will be able to monitor real time electric system performance from the substation to the individual customer. A System Operator will be hired to operate the CCC System. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 69 ELECTRIC CONTRACTS The Electric Fund transfers to the General Fund and Streets Special Revenue Fund two percent of its gross billings for utility services. This transfer has been viewed as a payment of franchise fees which would have been payable to the General Fund from a non -City provider of such services. This department also accounts for the contractual obligations not specific to an individual department of the fund, such as purchased power costs paid to the City's wholesale provider. The City maintains 185 miles of electric distribution lines and has a 100 megawatt capacity. 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: ACTUAL BUDGETED PROJECTED PROPOSED ACTIVITY INDICATORS FY 96/97 FY 97/98 FY 97/98 FY 98/99 1) Electric Utility Customers 10,827 11,534 11,800 12,580 2) mWh sold 233,530 255,190 256,100 275,430 3) System Load Factor 43.98% 49% 46% 48% 4) Percent Compliance with 95% N/A 100% 92.6% 100% Power Factor Goal Special Svcs,Mrktg. (N/A) 70,000 70,000 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted 70 98/99 97/98 96/97 97/98 Projected Actual Budget Actual 7,822 156,000 156,000 Lease & Contracts 0 40,000 20,000 Spec. Svc / Legal 9,558,977 9,691,856 10,133,550 Purchased Power 611,931 751,985 751,985 Admin Allocations (N/A) 145,000 145,000 Special Svcs,Mrktg. (N/A) 70,000 70,000 SpecSvcs-Gtwn Proj (N/A) 25,000 23,447 Dues/Memberships 280,639 327,627 327,627 Joint Svc Allocations 16,157 0 0 Council Contingency 0 0 0 Capital Projects 311,319 336,950 336,950 Franchise Fees 32,105 20,000 20,000 Public Education 10,818,950 11,564,418 11,984,559 * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted 70 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 140,000 (-10.3%) 140,000 (0.0%) 30,000 (50.0%) 30,000 (0.0%) 10,826,446 (6.8%) 11,488,567 (6.1%) 402,581 (46.5%) 402,581 (0.0%) 76,025 (47.6%) 51,750 (-31.9%) 80,000 (14.3%) 70,000 (42.5%) 22,000 (-6.2%) 22,000 (0.0%) 706,585 (115.7%) 706,585 (0.0%) 0 (N/A) 0 (N/A) 369,350 30,625 358,042 (6.3%) 379,574 (6.0%) 25,000 (25.0%) 25,000 (0.0%r 13,036,029 (8.8%) 13,346,682 (2.4%] COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 This page intentionally left blank. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 71 EJ WHAT WE D O : The Pump Maintenance Department maintains booster and lift stations; city swimming pool pumps, motors, valves, and chlorine control systems; public water supply wells; water and wastewater service equipment. The department also performs video camera work on wastewater lines in the system, and tests and rebuilds water meters. The Department provides scheduled preventive maintenance of all system facilities, as well as expanded facilities. The Maintenance shop is equipped with a computer system to assist in Operations & Maintenance activities. The Department shares workload with the Water/Wastewater Department during peak times. Operators are on-call 24 hours a day to provide quality service. The Pump Maintenance Department participates with the Safety Manager to provide safety training workshops. The Department also offers tours of facilities and demonstrations to students, instructors, scout troops and other groups to promote safety and conservation awareness. WHAT WE ACCOMPLISHED IN 1997/98: • Reconstructed control building for the Williams Drive Lift Station. • Rebuilt Well No. 2 to ensure adequate water supply from this source. • Assisted in the installation of the remote Supervisory Control and Data Acquisition (SCADA) system. • Started up Supervisory Control and Data Acquisition SCADA system for monitoring lift stations water and wastewater facilities. • Brought No. 4 Booster on line at Sequoia Spur to provide adequate water pressure to Sun City and Berry Creek. • Rebuilt motors 1, 2 and 3 at Sequoia Booster. 72 • Installed new lift station on 20th Street. WHAT WE PLAN TO ACCOMPLISH IN 1998/99: • Install more reliable pumping capacity at Rabbit Hill Booster station. • Replace a pump control valve at the Southside Booster station. • Replace bypass valve at the Southside Booster station. • Reroute well piping on Wells No. 7 and No. 8 to flow directly into the Airport storage tank for non -potable irrigation. • Install transfer switches on all major lift stations. • Rebuild Well No. 8. • Rebuild high service pump No. 1 at Southside Booster Station. • Install and program a computer aided maintenance package. • Participate in the expansion of the Safe Place Program through screening and training of new employees, and employees in other divisions. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 ACTIVITY INDICATORS 1) Linear feet of wastewater lines inspected by camera 2) Motor rebuilds & rewinds 3) Pump rehabilitations 4) Lift and booster station physical inspections ACTUAL BUDGETED PROJECTED PROPOSED FY 96/97 FY 97/98 FY 97/98 FY 98/99 216,875 225,172 42,240 26,400 28,000 28,000 19 20 23 15 16 18 25 20 10,415 10,415 9,500 7,000 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: 98/99 97/98 96/97 97/98 Projected Actual Budget Actual 6/0.25 7/0.25 7/0.25 # Employees 216,875 225,172 201,292 Personnel 111,390 134,642 129,942 Operations 328,265 359,814 331,234 Employees: full time / part time 359,569 (o.o%) * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 7/0.25 7/0.25 226,959 (12.8%) 226,959 (o.00io) 132,610 (2.1%) 132,610 (o.o%) 359,569 (8.6%) 359,569 (o.o%) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 73 WHAT WE DO: The Systems Engineering Department manages and maintains utility system models for departments within the Community Owned Utilities Division: including Water, Electric, Stormwater Drainage, Streets and Wastewater. The department provides engineering services related to grant applications for the Georgetown Industrial Foundation in their recruitment of new firms. This department also coordinates and administers Capital Improvements Projects with outside engineering firms, and handles easement and right-of-way negotiations and acquisitions. Systems Engineering supports the review of approximately 150 development plans and reviews annually. WHAT WE ACCOMPLISHED IN 1997/98: • Completed revision of narrative to City Construction Standards and Specifications for street, drainage, electric, water and wastewater improvements. • Acquired digital Right-of-way Management System (RMS) software that is mutually compatible with our systems software. • Completed adjustments to the City's digital systems maps (streets, water, wastewater, City base map) to match true horizontal and vertical coordinates for future input into a city-wide Geographical Information System (GIS). • Coordinated and managed the construction of Northwest Boulevard, 15th Street, Country Club Road, Railroad Street, Haven Lane, Lakeway Drive, McCoy/Park Lane, and McCoy Bus Lane Street and Drainage Projects, and San Gabriel Overlook, Gabriel View, Dunman, and Thousand Oaks Drainage Projects. • Coordinated and managed the construction of Williams Drive, North 81, Logan Road and Berry Creek Wastewater Projects and West Loop/Oakcrest Connect, Logan Road and Sun City Elevated Water Tank Water Projects. 74 • Completed the landscaping and irrigation of the Park Lane Right-of-way at McCoy School and the partnership with the Georgetown Independent School District (GISD) for maintenance. • Developed and assisted Georgetown Independent School District to implement solutions to traffic flow issues at Frost, McCoy and Katy Schools. WHAT WE PIAN TO ACCOMPLISH IN 1998/99 • Implement a city-wide digital Transportation Model to better identify Capital Improvement Projects. • Develop a Regional Stormwater Drainage & Detention Policy and a City of Georgetown Stormwater Drainage Manual. • Implement a city-wide digital Right-of-way Management System (RMS) for improved cost- effective maintenance and inventory of pavements, curbs, drainage structures, sidewalks, valves, manhole, signs, trees, water lines, wastewater lines, power poles, etc. • Continue maintenance of infrastructure maps that are tied to true horizontal and vertical coordinates for future input into a citywide Geographical Information System (GIS). • Develop a more customer friendly process of project coordination by adding a customer - focused project coordinator position. • Support the development and implementation of work teams within the Community Owned Utilities Division. • Engineer an underground stormdrain extension and sidewalks to connect the downtown square to the hike and bike trail at Second Street and Main Street COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 * Improved tracking method FY 97/98 ** New indicator in FY 97/98 1998/99 ADOPTED AND 1999/00 PROJECTED BUDGET: ACTUAL BUDGETED PROJECTED PROPOSED ACTIVITY INDICATORS FY 96/27 FY 97/98 FY 97/98 FY 98/99 1) Information requests processed* 312. 321 1,200 1,400 2) Easement/right-of-way acquisitions 20 21 20 21 3) Infrastructure field inspections and 134,577 Personnel 136,576 (1.5%) 136,576 (0.0%) 38,372 32,902 project coordination 16 17 20 30 4) Computer mapping/modelinghours** N/A N/A 204 244 * Improved tracking method FY 97/98 ** New indicator in FY 97/98 1998/99 ADOPTED AND 1999/00 PROJECTED BUDGET: Employees: full time / part time * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 75 97/98 98/99 99/00 96/97 97/98 Projected Adopted Projected Base Actual Budget Actual (% Change *) (% Change **) 2.5/0 3/0 3/0 # Employees 3/0 3/0 120,846 138,682 134,577 Personnel 136,576 (1.5%) 136,576 (0.0%) 38,372 32,902 31,952 Operations 26,583 (-16.8%) 26,583 (0.0%) 159,218 171,584 166,529 163,159 (-2.o%) 163,159 (0.0%) Employees: full time / part time * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 75 WHAT WE DO: The Stormwater Drainage Utility addresses environmental concerns over in -stream water quality, regulatory demands related to stormwater run-off controls, infrastructure operation and maintenance, and drainage/flood control related capital project needs. Other duties include assisting Police and Fire Services on Code Enforcement issues. WHAT WE ACCOMPLISHED IN 1997/98: • Installed approximately 18,500 linear feet of curb and gutter. This included: • 21 st Street and Leander Street • Park Lane • Haven Lane • 15th Street • 9th Street at Williamson County Tax Appraisal Offices • Corrected drainage issues on Dunman Drive. • Completed design and began construction to correct inadequate drainage in the Thousand Oaks area. • Implemented a program to control weeds and unsightly vegetation in drainage ways. • Purchased an additional street sweeper, and upgraded the part-time street sweeper position to a full-time position. • Enhanced drainage operations in the 15th Street area in conjunction with street rehabilitation. WHAT WE PLAN TO ACCOMPLISH IN 1998/99: • Install approximately 2,500 linear feet of curb and gutter on the north end of College Street and Walnut Street. • Correct excessive erosion damage on Norwood West and flooding near 708 Golden Oaks. 76 • Install curb and gutter on Power Road in conjunction with a Transportation overlay project. • Correct drainage to relieve flooding problems in the Berry Creek Subdivision. • Replace deteriorated stormdrain at 9th Street and Elm Street to correct flooding of homes on Elm. • Correct flooding problem on Highview Drive. • Initiate structural analysis of Blue Hole Dam, Imhoff Dam and the San Gabriel Park retaining wall in order to implement corrective procedures to maintain structural integrity. • Correct drainage issues along Gabriel View Drive. • Complete construction to correct drainage problems on San Gabriel Overlook. • Construct drainage improvements as a part of the Northwest Boulevard Street Project. • Correct drainage issues on Country Club Road in conjunction with street rehabilitation. • Complete West 22nd Street drainage extension at the Georgetown hospital. • Correct inadequate drainage at IH35 and River Oaks Drive. • Support and implement a work "Team" culture within the Division. • Expand the Safe Place Program by screening and training new employees, and employees in other divisions. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: ACTUAL BUDGETED PROJECTED PROPOSED ACTIVITY INDICATORS FY 96/97 FY 97/98 FY 97/98 FY 98/99 1) Number of storm drains cleaned 4 4 9 6 2) Miles of public right-of-way mowed * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted and cleaned 20.5 20.5 20.5 20.5 3) Hours of street sweeper operation 340 1,820 1,200 1,820 4) Linear feet of curb and gutter installed/replaced City wide: a) Old Town construction N/A 16,800 16,800 13,500 b) Other replacement N/A 1,700 1,700 5,000 c) Annual curb & gutter installation/construction 3,200 2,500 2,500 2,500 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 98/99 97/98 96/97 97/98 Projected Actual Budget Actual 2/1 2.75/0.5 2.75/0.5 # Employees 70,686 88,689 87,103 Personnel 161,426 211,408 211,313 Operations 232,112 300,097 298,416 Employees: full time / part time 379,110 (0.2%) * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 98/99 99/00 Adopted Projected Base (% Change*) (% Change **) 3/0.5 3/0.5 104,032 (19.4%) 104,032 (0.0%) 274,486 (29.9%) 275,078 (0.2%) 378,518 (26.8%) 379,110 (0.2%) 77 WHAT WE DO: • Seal Coat 2 miles of roadway and overlay 3 miles in Old Town. Overlays to include: The Street Department manages, maintains and repairs City streets and is dedicated to the highest quality • Maple Street from 7th to 15th. workmanship at the lowest cost. Other responsibilities • Paige, Main, and Brushy Streets include traffic control, emergency operations, special • Holly Street from 3rd Street to 7th Street. events, and participation in code enforcement. Daily, • Pine Street from 2nd Street to 7th Street the department inspects roadways for sign repair, • Railroad Street from 10th Street to pavement management, and visible obstructions. University Avenue. • Martin Luther King, Jr. Street from 10th The Street Department participates with the Safety Street to University Avenue. Manager to provide safety training workshops. 19th Street from Church Street to Brushy Street. WHAT WE ACCOMPLISHED IN 1997/98: • Microsurface approximately 8 miles of roadway in the following areas: • Seal coated approximately 2 miles of roadway and overlay in Old Town: • Park View Estates • Selected areas of San Gabriel Heights • Scenic Drive from Leander Road to Railroad Street. • Extend Holly Street to connect with College • College Street from San Gabriel Park low Street. water bridge to 2nd Street. • Construct 16th Street from Olive Street to Maple • Reconstructed Leander Street at 21st Street and Street. 22nd Street as part of a city economic development project. • Overlay Power Road in conjunction with replacing curb and gutter. • Overlayed Airport Road from Lakeway to Vortac. • Assist in the development of a Transportation • Constructed Northwest Boulevard extension from Model in coordination with Systems Engineering. Lakeway Drive to Serenada Drive. • Complete the construction of Railroad Street. • Constructed Park Lane through McCoy School to F.M. 2338 and the McCoy School Bus Lane. • Construct a parking lot at 6th and Main Streets. • Completed construction projects on Country Club • Work with Inspection Services and Fire Services Drive, Haven Lane, 15th Street and Lakeway on code enforcement process including the Drive. removal of substandard structures. • Assisted Georgetown Independent School District • Support and implement a work "Team" culture in implementing solutions to traffic flow issues at within the Division. Frost, McCoy and Katy Schools. • Participate in the expansion of the Safe Place Program. WHAT WE PIAN TO ACCOMPLISH IN 1998/99: • Overlay and install ribbon curb on 7th and 8th Streets from Maple to IOOF cemetery. COMMUNITY OWNED UTILITIES 78 ANNUAL OPERATING PLAN ELEMENT 1998/99 ACTIVITY INDICATORS 1) Lane miles of sealcoat, overlay or microsurfacing 2) Square feet of roadway patching 3) Traffic signs repaired/installed 4) Lane miles of streets maintenanced* CITIZEN SURVEY 5) Percentage of citizens satisfied or better with: a) Safe movement of vehicles b) Local street maintenance c) Sidewalks d) Streets & traffic overall *New indicator in FY 97/98 ACTUAL BUDGETED PROJECTED PROPOSED FY 96/97 EY 97/98 FY 97/98 FY 98/99 N/A N/A 20 20 12 13 58,700 35,000 35,000 30,000 140 200 140 200 N/A N/A 325 335 N/A N/A 55% 55% N/A N/A 77% 75% N/A N/A 74% 75% N/A N/A 68% 70% 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: 98/99 97/98 96/97 97/98 Projected Actual Budget Actual 11/0.75 11/0.75 11/0.75 # Employees 330,000 361,000 350,698 Personnel 526,052 596,607 580,482 Operations 0 5,520 5,520 Capital 856,052 963,127 936,700 Employees: full time / part time * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 12/0.75 12/0.75 449,721 (28.2%) 449,721 (0.0%) 591,106 (1.8%) 591,106 (o.o°io) 5,600 (1.4%) 0 (-100.0%) 1,046,427 (11.7%) 1,040,827 (-0.5"10) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 79 L I=I The Water Distribution Department is responsible for routine inspection of water distribution lines; installation of new water taps and meters; rehabilitation and replacement of damaged or inefficient water lines, meters, fire hydrants and valves. The Department performs water utility locations and inspections for proper materials/methods. Staff advise customers of non -City water problems, when discovered. Staff are on-call to respond to emergency problems 24 hours a day. The Water Distribution Department takes routine water samples to test the safety and efficiency of the system. The Department will continue maintaining water system lines and equipment as well as continue recognizing, following, and meeting all Environmental Protection Agency and Safe Drinking Water Act regulations. The Water Department participates with the Safety Manager to provide safety training workshops, and with the Inspection Services to ensure water system protection. WHAT WE ACCOMPLISHED IN 1997/98: • Relocated water line on Park Lane. • Commenced operation of the expanded Lake Water Plant. • Implemented the Safe Place Program to provide assistance to community youth. • Conducted a pilot study to evaluate the Park Water Plant for possible upgrade. • Completed the following Water Capital Improvement Projects: 80 • Constructed an elevated water storage facility (Del Webb) to maintain adequate water pressure for fire flows and power outages. • Constructed the Logan Road Water Line to provide City water services to new customers. • Replaced deteriorated water line on 15th Street. Replaced a deteriorated water line, along Austin Avenue, between 12th and 17th Streets. WHAT WE PLAN TO ACCOMPLISH IN 1998/99: • Complete the following Water Capital Improvement Projects: • Construct a portion of the West Loop 20 -inch water line, to improve water supply and provide transmission routes to other parts of the system. • Implement the Customer Choice & Control (CCC) system to save meter reading expenses and provide expanded service to customers. • Install new water meter registers on all meters replaced in 1997/98 to allow remote readings. • Replace an 8 -inch water line with a 12 -inch line to increase flows to Berry Creek. • Upgrade the chemical feed system at the Park Water Treatment Plant to reduce chemical needed for treatment and in drinking water. • Construct new restrooms at the Playscape, using donations and labor from volunteers. • Implement Team Leader management to allow for employee problem solving and empowerment. • Work with the Georgetown Independent School District to recommend solutions to various utility issues at the new Katy School site. • Expand the Safe Place Program by screening and training new employees, and employees in other divisions. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: 97/98 ACTUAL BUDGETED PROJECTED PROPOSED ACTIVITY INDICATORS FY 96/97 FY 97/98 FY 97/98 FY 98/99 1) Water leaks repaired 744 230 230 225 2) Water taps installed 720 450 450 450 3) Line locations completed 597 530 525 530 4) Fire hydrant meters installed 143 100 100 95 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 6.75/0 9/0 237,482 (25.6%) 294,328 (23.9%) 335,978 (1.2%) 330,978 (-1.5%) 0 (-100.0%) 0 (N/A) 573,460 (6.9%) 625,306 (9.0%) 81 97/98 96/97 97/98 Projected Actual Budget Actual 7/0 7/0 6/0 # Employees 203,000 189,072 189,072 Personnel 324,399 332,126 332,126 Operations 0 15,000 15,000 Capital 527,399 536,198 536,198 Employees: full time / part time * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 6.75/0 9/0 237,482 (25.6%) 294,328 (23.9%) 335,978 (1.2%) 330,978 (-1.5%) 0 (-100.0%) 0 (N/A) 573,460 (6.9%) 625,306 (9.0%) 81 WATER TREATMEi\rr FACILITIES The City of Georgetown operates three water treatment plants: the Lake Water Treatment Facility, rated at 7.5 million gallons per day (MGD); the San Gabriel Water Treatment Facility, rated at 5.45 MGD; and the Berry Creek Water Treatment Facility, rated at 0.5 MGD. The Lake Water Treatment Plant was upgraded this year to increase its water treatment capacity from 6.0 MGD to 7.5 MGD. This additional capacity will provide high quality water, in compliance with applicable State Laws and Federal standards, to meet the demands of the Georgetown service area. The City of Georgetown retains ownership of these plants and contracts for their operation with a private contractor. CITIZEN SURVEY 3) Percentage of citizens satisfied or better with quality of city drinking water. N/A N/A 80% 90% 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: 97/98 96/97 97/98 Projected Actual Budget Actual 611,332 793,480 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 793,480 Operations 815,690 (2.8%) 794,440 (-2.6%) 611,332 793,480 793,480 * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted 82 815,690 (2.8%) 794,440 (-2.6%) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 ACTUAL BUDGETED PROJECTED PROPOSED ACTIVITY INDICATORS FY 96/97 FY 97/98 FY 97/98 FY 98/99 1) Water Utility Customers 10,264 10,650 11,075 11,850 2) Water Usage (MGD): Average Flow 5.15 4.95 5.30 5.50 Peak Flow 12.09 11.75 12.20 12.50 Total Flow (MG) 1,880.00 1,804.00 1,870.00 1,895.00 CITIZEN SURVEY 3) Percentage of citizens satisfied or better with quality of city drinking water. N/A N/A 80% 90% 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: 97/98 96/97 97/98 Projected Actual Budget Actual 611,332 793,480 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 793,480 Operations 815,690 (2.8%) 794,440 (-2.6%) 611,332 793,480 793,480 * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted 82 815,690 (2.8%) 794,440 (-2.6%) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 WATER CONTRACTS The Water Utility transfers two percent of its gross billings to the General Fund and Street Special Revenue Fund. This transfer is a payment of franchise fees which would have been payable to the General Fund from a non -City provider of such services. This department is also used to account for the contractual obligations not specific to any individual department of the fund. The City makes annual payments to the Brazos River Authority for the City's surface water supply. The City has water rights to 6,720 acre feet in Lake Georgetown and 15,488 acre feet in Lake Stillhouse Hollow. These water rights, in conjunction with existing ground water wells, are expected to meet Georgetown's needs through 2040. 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 98/99 97/98 96/97 97/98 Projected (% Change *) Actual Budget Actual 156,294 461,621 447,568 447,568 Admin Allocations 210,100 23,604 0 Lease & Contracts 367,913 387,000 387,000 BRA - Water Purchases 61,370 100,000 100,000 Council Contingency 129,704 141,149 141,146 Franchise Fee 288,146 328,323 328,323 Joint Svc Allocations 60,294 0 0 Special Services / Legal 9,591 0 0 Programs & Projects 36,556 20,000 20,000 Water Conservation 1,495,779 (5.o%) 1,433,044 1.625.295 1,447,644 1,424,037 * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 156,294 (-65.1%) 156,294 (0.0%) 0 (N/A) 0 (N/A) 400,000 (3.4%) 410,000 (2.5%) 175,000 (75.0%) 100,000 (42.9%) 143,447 (1.6%) 150,712 (5.1%) 596,038 (91.5%) 596,038 (0.0%) 5,000 (NIA) 0 (-100.0%) 0 (N/A) 0 (N/A) 20,000 (0.0%) 20,000 (0.0%) 1,495,779 (5.o%) 1,433,044 (4.2%) 83 WHAT WE DO: The Wastewater Collection Department maintains and rehabilitates the wastewater collection system, through routine inspections of system facilities and restoration of broken or collapsed mains. The Department provides maintenance services including: the installation of wastewater taps, the clearing, jet cleaning and camera inspection of lines, the troubleshooting of customer problems and the locating City wastewater lines. In addition, the Department performs preventive maintenance functions of the expanded collection system. This department coordinates with Building Inspection to ensure a safe and functioning wastewater system WHAT WE ACCOMPLISHED IN 1997/98: • Rehabilitated 15th Street wastewater line to replace deteriorated line from Church Street to Hutto Road. • Constructed the Logan Road Wastewater Line to provide City wastewater services to new customers. • Extended wastewater service to North Austin Avenue, Booty's Road, and Indian Creek. • Installed lift station on 20th Street. • Lowered manholes at Leander and 21st Street. • Worked in cooperation with Texas Wildlife Commission and the Texas Natural Resource Conservation Commission (TNRCC) to mitigate the closure of the cave site on Tamara Drive. • Implemented the Safe Place Program to provide assistance to community youth. WHAT WE PLAN TO ACCOMPLISH IN 1998/99: • Wastewater Capital Improvements to be completed in 1998/99: 84 • Complete the design of the Pecan Branch Wastewater Treatment Plant. • Complete engineering drawings and obtain easements for the second phase of the Pecan Branch Wastewater Line, to extend gravity sewer, from County Road 152 to FM 971, for flow into Pecan Branch. • Begin construction of the Pecan Branch Wastewater Treatment Plant. • Construct the Second Phase of the Smith Branch Interceptor. • Construct the Smith Branch Feeder to divert wastewater from 15th Street, and to reduce load from the San Gabriel Wastewater Treatment Plant. • Construct the Williams Drive wastewater line from Country Club lift station to Booty's Road to provide for commercial growth. • Expand the Safe Place Program by screening and training new employees, and employees in other divisions. COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: 97/98 96/97 97/98 Projected Actual Budget Actual 3/1 5/1 5/1 # Employees 106,743 166,911 157,688 Personnel 215,041 218,731 213,831 Operations 6,928 0 0 Capital 328,712 385,642 371,519 Employees: full time / part time * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted 98/99 ACTUAL BUDGETED PROJECTED PROPOSED ACTIVITY INDICATORS FY 96/97 FY 97/98 FY 97/98 FY 98/99 1) Sewer blockages cleared 239 165 165 165 2) Manholes repaired 39 6 6 6 3) Line locations completed 45 50 50 50 4) Wastewater taps installed 324 300 300 300 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: 97/98 96/97 97/98 Projected Actual Budget Actual 3/1 5/1 5/1 # Employees 106,743 166,911 157,688 Personnel 215,041 218,731 213,831 Operations 6,928 0 0 Capital 328,712 385,642 371,519 Employees: full time / part time * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 5/1 5/1 170,064 (7.8%) 170,064 (o.o%) 247,292 (15.6%) 265,792 (7.5%) 0 (N/A) 0 (N/A) 417,356 (12.3%) 435,856 (4.40/.) COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 85 WASTEWATER TREATMENT FACILITIES The City of Georgetown operates three wastewater treatment plants: the Dove Springs Wastewater Treatment Facility, rated at of 1.25 million gallons per day (MGD); the San Gabriel Wastewater Treatment Facility, rated at of 2.5 MGD; and the Berry Creek Wastewater Treatment Facility, rated at 100,000 gallons per day (purchased in 1995). These award winning plants treat domestic and industrial effluent according to statutory regulations, and provide environmentally safe disposal of wastewater materials. The City of Georgetown contracts with a private contractor to provide for the operation of the wastewater plants. The private contractor conducts routine wastewater bio -monitoring, nitrogen removal and dechlorination. The City continues to closely monitor and evaluate these operations and retains ownership of the plants. During 1996/97 the City began the permitting process for the Pecan Branch Wastewater Treatment Plant, planned to open in 2000/01. The permitting process will be completed and engineering and design will commence during 1998/99. This plant will provide additional system capacity and service for Sun City. ACTUAL ACTIVITY INDICATORS FY 96/97 1) Wastewater Utility Customers 8,065 2) Average Daily Flow (MGD) 2.56 3) Peak Daily Flow (MGD) 9.8 4) Million gallons treated 932 BUDGETED PROJECTED PROPOSED FY 97/98 FY 97/98 FY 98/99 8,700 8,798 9,500 2.92 3.0 3.2 5.00 6.0 8.0 1,065 1,200 1,300 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: 97/98 96/97 97/98 Projected Actual Budget Actual 586,212 753,643 753,643 Operations 586,212 753,643 753,643 * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 739,082 (-1.9°io) 701,332 (-5.1%) 739,082 (-1.9°ro) 701,332 (-5.1%) COMMUNITY OWNED UTILITIES 86 ANNUAL OPERATING PLAN ELEMENT 1998/99 WASTEWATER CONTRACTS The Wastewater Utility transfers two percent of its gross billings to the General Fund and Street Special Revenue Fund. This transfer is a payment of franchise fees which would have been payable to the General Fund from a non - City provider of such services. This department is also used to account for the contractual obligations not specific to an individual department of the fund. 1998/99 ADOPTED BUDGET AND 1999/00 PROJECTED BUDGET: * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 98/99 97/98 96/97 97/98 Projected (% Change *) Actual Budget Actual 800 0 800 800 Dues & Memberships 77,798 80,102 80,102 Franchise Fees 252,953 352,986 352,986 General Fund Allocations 343,210 4102554 410,554 Joint Svc Allocations 392,851 0 0 Programs & Projects 23,225 483,561 520,000 Spec. Svc / Legal (-37.6%) 1.090.037 1,328,003 1,364,442 * Percent change of 98/99 Adopted from 97/98 Projected Actual ** Percent change of 99/00 Projected Base from 98/99 Adopted COMMUNITY OWNED UTILITIES ANNUAL OPERATING PLAN ELEMENT 1998/99 98/99 99/00 Adopted Projected Base (% Change *) (% Change **) 800 (0.0%) 800 (0.0%) 84,259 (5.2i) 86,706 (2.9%) 101,376 (-71.3%) 101,376 (0.0i) 644,879 (57.1%) 644,879 (0.0%) 0 (N/A) 0 (N/A) 20,000 (-96.2i) 20,000 (0.0%) 851,314 (-37.6%) 853,761 (0.3%) 87 This page intentionally left blank. COMMUNITY OWNED UTILITIES 88 ANNUAL OPERATING PLAN ELEMENT 1998/99