Loading...
HomeMy WebLinkAboutRES 07.12.1983 - Brazos River Authority487 A RESOLUTION REQUESTING THE BRAZOS RIVER AUTHORITY TO CONSIDER THE CITY OF GEORGE- TOWN AS A PARTICIPANT IN THE DEVELOPMENT AND CONSTRUCTION OF A DAM AND RESERVIOR IN THE BRAZOS RIVER BASIN. WHEREAS, an assured source of adequate water supplies is necessary for the future growth of commerce, agriculture and industry in Williamson County; and WHEREAS, meeting this need requires that additional sources of surface water be developed in the Brazos River Basin, of which Williamson County is a part, and WHEREAS, developing and making the surface water resources of the Brazos. River Basin available for beneficial use is a responsibility of the Brazos River Authority. NOW THEREFORE BE IT RESOLVED BY THE City of Georgetown THAT the Brazos River Authority is hereby requested to consider the 00 City of Georgetown as a prospective contractual participant in the development and co construction of a new dam and water supply reservoir in the Brazos Basin and that the City of Georgetown with this resolution, submits the attached Future Water Iq Requirements Assessment Sheet as the future surface water needs for the City of 0 Georgetwown; and a Q THAT the Brazos River Authority is hereby requested to conduct investi- gations and perform feasibility studies on behalf of the City of Georgetown and others in Williamson County and related areas of the Brazos Basin willing to share the costs thereof (the "Participants") for the establishment and management of a centralized water treatment facility and treated water distribution system ("System"); and THAT it is understood that pro -rata shares of the costs of the feasibility and preliminary engineering studies associated with the System will be allocated to the Participants, including the City of Georgetown as a Participant, but that the City of Georgetown by this resolution makes no commitment to pay any sum of money, and THAT it is understood that the Brazos River Authority, should it accept responsibility as System Project Coordinator, will calculate the pro -rata costs of carrying out the Project studies and submit an agreement for approval and execution by the City of Georgetown for acceptance of financial obligation for the City of Georgetown's pro -rata share of the costs of the studies before the study is to proceed; and THAT it is understood the costs of the Project feasibility and preliminary engineering studies will be reimbursed to those Participants that continue with subsequent project construction, should the project prove to be feasible. PASSED this 12th day of July, 1983, by the City Council of Georgetown, Texas. U_ Ld � - c_ JOHN C. DO FLER, MAYOR ATTEST: JIM COLBERT, CITY SECRETARY aA4 Brazos River Authority Future Water Reduirements Assessment Sheet i. B,►ckgruund Inforn►ati.ol► A. lint i t:y name and address : City of Georgetown P. 0. Box 409 Georgetown, Texas 78626 B, Itep►•esentative's tame/title/phone number: Leo Wood, City Manager, (512) 863-5533 t:. I:nti.ty's li►►gineer (firm, co►►tact person, address acid phone number): Mr. George Human Freese and Nichols, Inc. 314 Highland Mall Blvd. Suite 560 Austin, TX. 7875 1). 1)esCrtl)t. ►.or► o juri.sdicti.or►al area (attach m,►p ul' jurisdictions) boundaries and/boundari.es of otlier entities served) Area within city limits plus outlying development. Eventually plan to serve area shon on the attached map. li. Other 111titics served (name and address) F. Other Entities co►►s:idered ill following projections: Includes area served by Georgetown outside city limits. ll. Current Uevelupe►ent A. 1'opit lat1oil : 13,694 in service area (estimates) 12,038 in city B. Avl,. annual water use: 2.92 cigd, average 1980-1982 3.21 mgd in 1982 C:. Peak water use: Peak daily use, 8.10 mgd, in August, 1981 1). IVell capacity: 3 mgd average under normal conditions. Uncertain in drouth. li. Pump capacity: 9.6 MGD (estimated) F. Storage capacity: Ground Storage - 5,500,000 Gallons Elevated Storage - 1,000,000 Gallons G. Estimated .Future groundwater use is 2.7 mgd through 2900 _• "X") Fu Lura Needs : (A1.1 water use 1n MGD) A. 1'i.ojOct ions 489 Residential Industrial Total Ivatel Year hoI)ulation Connections Commercial Use Needs 1990 16, ion 3.711U(I __... 2000 _ 25,000 -2418-2005 35,000 7.3 mgd u- (.11, :Ipplicable, indicate the build-out Year and population: B. SUrCace Nater Needs - To establish future surface water re- quirements the projected "groundwater use" should be substracted from the "total water use" Total Water Needs Met with Surface Ivatel. Year Needs Groundwater Needs 1.9 9 t) 3.7 nigd._ 1.9 mad 1. d mqd _ CO 2000 5.4 mad 2.7 mad 2.7 mud-_ CD 7.3 pled 3.8 .a3.5 ]gd mud a "X") QJ� x4\41 0 1 L E G N D p SINGL�rt4MI�Y �_ �Q�LIMIN� I MULTIFAMILYCO�WtZCALf .: :3 !�*MTN 54uO0L5 j PAAKR L$.:ANVIL L. WY$4 ASSOCIATIS i OTHER fU6LIC �:. Sr7 City of Georgetown, Texas INNSTI-14 ::N.:'..�........,�...M�: