HomeMy WebLinkAboutRES 01.13.1986 - LCRA AgreementA RESOLUTION AUTHORIZING THE MAYOR OF THE CITY OF
GEORGETOWN TO EXECUTE AN AGREEMENT BETWEEN THE LOWER
COLORADO RIVER AUTHORITY AND THE CITY OF GEORGETOWN
WHEREAS; Heretofore the City of Georgetown and the Lower Colorado
River Authority have entered into a certain agreement dated June
25, 1974; and
WHEREAS; There are certain changes necessary and appropriate
related to the contract load (KW) year ending June 25, 1986 and
the estimated contract loads for the five-year period ending June
25, 1991, as reflected on the attached and annexed Exhibit A
attached hereto and made a part hereof for all purposes; and,
WHEREAS; these estimates effect the billing by said Authority to
the City of Georgetown and said Authority's responsibility to
provide adequate facilities to supply the load required by the
City of Georgetown at the various points of delivery set forth in
said contract; and
WHEREAS; the parties to said agreement, Lower Colorado River
Authority and the City of Georgetown, Texas have agreed to amend
the aforesaid contract dated June 25, 1974 by substituting the
Exhibit A attached to the contract dated June 25, 1974:
THEREFORE, BE IT RESOLVED that the Mayor of the City of
Georgetown is hereby authorized to execute the aforesaid
substituted Exhibit A so that the same shall be and becoiae a part
of the contract dated June 25, 1974.
Passed, read and adopted on first reading this 13th day of
January, 1986.
Mayor Jim Colbert
ATTEST:
Mr. Pat Caballero, City Secretary
Effective: June 25, 1986 Revised Sheet No.: 1 of 4
EXHIBIT A OF WHOLESALE POM AGREEMENT DATED JUNE -2S-,--74
Revisions of Sheet 1 and Total Maximum Demand Stated in Paragraph 1 of Sheet 2
POINTS OF EL E
TO
CITY OF GEORGETOWN
isri butor
Contract
Delivery
Load (KW)
Estimated Contract Load
(KW)
Voltage
Year Ending
Years Ending June 25
No.
Location
(Nominal)
Phase
6-25-87
1
LCRA
Georgetown Bank 1
12.5KV
3
8236
8295
8355 8414
8471
2
LCRA
Georgetown Bank 2
12.5KV
3
12970
14086
15348 16734
18363
3
LCRA
Gabriel 1 Sub.
12.5KV
3
12192
13097
14036 15060
12383
4
LCRA
Gabriel 2 Sub.
12.5KV
3
6856
7774
8672 9658
14674
5
LCRA
Serenda Sub.
12.5KV
3
0
0
0 0
0
TOTAL
40254
43252
46411 49866
53891
Note: Point 3 and 4 are based upon winter peak.
Paragraph 1, Page 2 of Exhibit A
Maximum Demand 53891 KW
LOWER COLORADO RIVER I CITY OF GEORGETOWN
AUTHORITY 1<
1'
ATTEST: By: - 1 ATTEST: By: �.,r,U -- �
r fbeneral manager
I`� _ Date: Date: - I 3-7