Loading...
HomeMy WebLinkAboutHwy RM 2243 Water Line Permit 14-62-1APPROVAL PERMIT NO, 14-62-1 _ Control 2 103 3ectipn 1 Hwy, No. RIA 2243 Williamson County To City of Georgetown Date January 2, 1962 1. 0. Box 409 Georgetown, 'Texas The State Highway Department offers no objection to the location on the right-of-way of your proposed 811 Wa tar line as shown by accompanying drawings and notice dated December 28, 1961 except as noted below. It is expressly understood that the State Highway Department does not purport, here- by) to grant any right, claim, title, or easement in or upon this highway; and it is further understood that the State Highway Department may require the owner to re- locate this line, subject to provisions of governing laws, by giving thirty (30) days written notice. All work on the highway right-of-way shall be performed in accordance with Highway Department instructions. The installation shall not damage any part of the highway and adequate provisions must be made to cause minimum inconvenience to traffic and adjacent property owners. Special specifications for placing this pipe line are as follows: h L sfd 59�+oi Lq �- l.edndC✓ RM22¢3 u b pro posad to "c i tNd/erMan (D E ntdsvd Rv%wj_,"c 7o RoWd"1G CO k Q Please notify Eric* F Bartz Sr. Ltnna-1`nremanforty-eight (48) hours prior to starting construction of the line, in order that we may have a representative present. TTEEX'ASS�. HIGHWAY DEPARTMENT %j By District Engineer -D �No.L� r�`t"vV Form 1032 NOTICE OF PROPOSED INSTALLATION PIPE LINES Date December 28, 1961 TO THE TEXAS STATE HIGHWAY COMMISSION C/o DISTRICT ENGINEER TEXAS HIGHWAY DEPARTMENT Austin , TEXAS Formal notice is hereby given that The City of Georgetown Texas water Company, proposes to place a six inch water pipe line within the right-of- Road way of Ranch No. 2243 in Williamson County, Texas as follows: Cross Highway at Station # 591 � 01 Please grant permission to out across roadway for this installation. The location and description of the proposed line and appurtenances is more fully shown by Three copies of drawings attached to this notice. The line will be constructed and maintained on the highway right-of-way as directed by the State Highway Department in accordance with governing laws. Construction of this line will begin on or after the 8th, day of January 19fi2. Firm— Title.City Manager Address P. 0. Box 409 GePrgetown. Texas Form 1033 STATE HIGHWAY DEPARTMENT Specifications for placing water, sewer, gas and oil lines and conduit within the Rights-of-way or crossing State and U..S: Highways 1. All excavations within the right-of-way and not under surfacing shall be backfilled by tamping in 6" horizontal layers or by ponding.All surplus material shall be removed from the right-of-way and the excavation finished flush with surrounding natural ground. 2. Where sodding is disturbed by excavation or backfilling operationa, such areas shall be replaced by mulch sodding on all slopes of 2% or less._, All slopes over 2% shall be replaced by block sodding.. 3.- -Highway crossing under surfaced roads and under surfaced cross roads --within the right-of-way shall be placed by boring. Boring shall extend from crown line to crown line. All lines under highways carrying pressure shall be enclosed in satisfactory casing extending from right-of-way line to right- of-way line.- Gravity flow sewer lines under highways shall be cast iron :. pipe. 4. Where evidence is presented indicating the impracticability of boring or tunnelling, the District Engineer of the Highway Department may grant per- mission to cut the surfacing. In the event a 'cut is permitted the following conditions will govern: (a) Backfill material: All backfill material shall be stabilized with Fort - land Cement and mixed in a concrete mixer or transit mix equipmentj If soil is used it shall be sandy material free from lumps or clods, Qnd shall be stabilized with two sacks of cement per cubic yard of soil. 'If sand and gravel are used, pit run material will be allowed, and it shall be stabilized with one sack of cement per cubic yard.: Backfill may be mechanically tamped in a moist condition or water added to provide a free flowing mixture. (b) WHERE PAVEMENT IS FLEXIBLE BASE AND ASPHALT SURFACE ASPHALT SURFACE FLEXIBLE BASE 77 - OPEN TRENCH TO MINIMUM BACKFILL TRENCH TO SUR- REMOVE SURPLUS BACKFILL, WIDTH NECESSARY FACE LEVEL, PENDING PLAC- PLACE BASE AND SURFACE ING OF BASE AND SURFACE. SAME AS OR EQUAL TO ORIG- INAL BASE AND SURFACE. (c) WHERE PAVEMENT IS CONCRETE OR CONCRETE BASE WITH OTHER SURFACE REINFORCING SW..FT. OPEN TRENCH TO BACKFILL TRENCH REMOVE SURPLUS MINIMUM WIDTH NECES- TO SURFACE LEVEL BACKFILL. RE- SARY. CUT STEEL PENDING PLACING MOVE AN EXTRA BARS ON ALTERNATE OF CONCRETE. 1 FT. STRIP OF SIDES. CONCRETE ON EACH SIDE. PLACE 5 SACK CONCRETE PATCH. KEEP WET AND BARRICADED FOR 48. HOURS . 5. Operations along highways shall be performed in such manner that all excavated material be kept off the pavements at all times, as well as all operating equipment. 6. Barricades and warning signs and flagmen when necessary shall be provided by the contractor or owner. 7. One half of the traveled portion of the road must be open to traffic at all times. 1 t N