HomeMy WebLinkAbout0243_241� k
'fie e Pt 1 rvVr' �o
AN ORDINANCE PROVIDING FOR PROCEDURE FOR WATER AND SEWM2_ �A Vie, j �3
LINE EXTENSION PROVIDING THAT THE CITY MAY, AT ITS OPTION, ,o. .,
ENTIM INTO CONTRACTS WITH SUBDIVIDERS FOR REFUND ON IM- D � r ' m A
PRO=NTS OF WATER AND SENER LINES OF GEORGET04N, FIXING
THE EFFECTIVE DATE THEREOF, AND DECLARING AN EMERGENCY.
RE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF GEORG72OVIN, T?MASs f 1
' r
J
Section 1. Within new subdivisions, the Water and Sewer Department
may extend water and sanitary sewer mains in the streets and alleys or ease-
ments within the limits of the City of Georgetown, in order to permit connection
by persons desiring and seeking water service and sanitary sewer service upon
the hereinafter set out terms and eonditibnas
(1) The developer, according to his schedule of operation,
shall submit to the City tanager a porpoaed layout of water and sewer main ex-
tensions prepared on standard plan -profile paper in accordance with good
engineering practice.
(2) The proposed layout may be for the subdivision in its
entirety or may be for any portion of the subdivision as desired by the
developer, irregardless of size or number of lots served.
(3) The layout may be rejected by the City Manager and re-
turned to the developer as having been rejected if the City Manager finds the
same not to be in accordance with good engineering practice.
(4) After the layout is approved by the City Kanager if the
same is approved, the developer shall make the necessary arrangements for the
installation of water and sewer mains in whatever increments that he miCht desire
with inspection and final acceptance being furnished by the City.
(5) After acceptance of the mains by the City, the developer
may present to the City Manager necessary contracts and figures for the installa-
tion of the mains and an agreement may be reached as to the cost of installation
and a refund contract may be signed by the developer and the City of Georgetown.
Engineering costs not exceeding a total of 3% of the water main construction and
5% of the sewer main construction shall be considered as a portion of the refund-
able cost.
(6) Refund to the developer for water and sewer mains will be
made once each year in the amount of 40% of the revenue received from the water
and sewer connections in the subdivision for B period of seven (7) years after
the date of approval of the final Plat by the City Council or until the amount
of 907 of the original cost as provided in said contract is refunded*
V) i10 refund shall be made after seven (7) years after the
date of the contract..
(8) Re -subdivisions which change the loacation of any street
or alley, shall be handled is the same manner as new subdivisions.
(9) The City will bear the cost of all fire hydrants, and the
excess cost of all mains over the size of six (6) inch Water main and six(6)
inch flower main.
Section 21 To new subdivisions, the Water and Sewer Department may
extend water and sanitary sewer mains in the streets and alleys or easements
within the limits of the City of Georgetown, in order to permit connection by
persons desiring and seeking water service and sanitary sewer service, upon the
hereinafter set out terms and oonditionss
(1) The City of Georgetown will establish on a Mastdr Plan the
approximate location of all mains larger than six (6) inch water and si: (6) inch
sewer and designate which shall be installed at City expense.