Loading...
HomeMy WebLinkAbout0068_6161. AGREEMENT FOIL CONSTRUCTION AND/OR MAINTENANCE AND/OIt OPERATION OF SAFETY LIGHTING SYSTEM WITIIIN MUNICIPALITY THE STATE OF TEXAS COUNTY OF WILLIAMSON This agreement made this 13th day of February, 1967, by and between the State of Texas, hereinafter referred to as the "State", party of the first part, and the City of Georgetown, Williamson County, Texas, acting by and through its duly authorized officers under a resolution passed the 12th day of December 1966, hereinafter called the "City", party of the second part. WITNESSETH WHEREAS, the City has requested the State to finance the construction and/or maintenance and/or operation of the safety lighting system on I.11. 35 at U.S. 81 (North) R.M. 2338, S.H. 29, K.M. 2243 and U.S. 81 (South) the route of Highway No. I. II. 35, and hereinafter referred to as the "safety lighting system", and •� WHEREAS, the State Highway Engineer, acting for and in behalf of the O State Highway COmmission, has made it known to the City that the State will construct and/or maintain and/or operate the'safety lighting system, or construct the safety lighting system and reimburse the City for the City's cost of maintenance and/or operateion of said system, subject to the conditions and provisions stated herein, as provided for in Highway Commission Minute Order No. 58464. AGREEMENT NOW THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the parties hereto to be by them respectively kept and performed as hereinafter set forth, it is agreed as follows: A. Project Authorization The City has requested and consented to the construction, maintenance and/or operation of the safety lighting system, and the State in financing the construction, operation and maintenance work does so at the special instance and request of the City. B. Construction Responsibilities The State will prepare or provide for the plans and specifications, advertise for bids, and let the construction contract, or otherwise pro- vide for the construction, and will supervise the construction, recon- struction or betterment work as required by said plans. As the project is developed to the construction stage, the State will secure the City's approval of the construction plans prior to award of contract. All cost of constructing the safety lighting system including such items as conduits, lamp standards, mast arms, reflector units, lamps, bowls, electrical conductors, wiring, etc. will be borne by the State. C. Maintenance and Operation Responsibilities 1.The State hereby agrees to reimburse the City for the cost of the electrical energy used in operating the safety lighting system. The amount of electrical energy used shall be determined by multiplying the sum of the manufacturer's rated input wattage by the number of hours the lamps are energized divided by 1000. The number of hours the lamps are energized shall be mutually accepted as 4000 hours per year. An alternate and mutually acceptable means of determining the quantity of electrical energy used will be measurement by means of a meter installed to serve the safety lighting system exclusively. The State's payment for the electrical energy shall be based on the minimum unit rate charged the City under the City's contract with the power agency supplying electrical energy to the City. In the event the