Loading...
HomeMy WebLinkAbout0209_207(e) Plan -Checking Fees 09 When the valuation of the proposed construction exceeds $1,000.00 and a plan is required to be submitted by Section105.3, a plan -checking fee shall be paid to the Building Official at the time of submitting plans and specifications for checking. Said plan -checking fee shall be equal to one-half of the building permit fee as set forthin Section 107.4. Part II Schedule for Plumbing Permit Fees For issuing each permit In addition For each Plumbing Fixture, Floor Drain or Trap (including Water & Drainage Piping) For Each House Sewer For Each Building Sewer Replaced or Repaired For Each Septic Tank and Seepage Pit or Drain Field For Each Water Heater and/or Vent Gas Piping System 1-4 outlets Each Additional outlet For Installation., Alteration or Repair of Water Piping System For Installation, Alteration or Repair of Water Treating Equipment Cr For Repair or Alteration of Drainage or Vent Piping For Vacuum Breaker, etc (1-5) Each Additional Part I II Schedule for Mechanical Permit Fees For issuing each permit First $1,000.00 valuation Each additional $1,000.00 or fraction thereof Part IV Schedule for Electrical Permit Fees Electrical Permit Fees Service Equipment Single Phase Three Phase Sub Panel (10) Sub Panel (30) Dwelling Units Receptacles Swi tches Light Fixtures Commercial Buildings Receptacles Swi tches Light Fixtures Sign Rough $5.00 1.25 2.00 2.00 2.00 1.25 1.50 .50 1.25 2.00 1.25 1.00 .20 $5.00 10.00 2.00 Wiring Method Copper Aluminum 2.00 2.00 3.00 3.00 1.50 1.50 2.00 2.00 .15 .30 .15 .30 .15 .30 .25 .50 .25 .50 .25 .50 .20 .50