HomeMy WebLinkAbout0209_207(e) Plan -Checking Fees
09
When the valuation of the proposed construction exceeds $1,000.00 and a plan is required
to be submitted by Section105.3, a plan -checking fee shall be paid to the Building Official
at the time of submitting plans and specifications for checking. Said plan -checking fee
shall be equal to one-half of the building permit fee as set forthin Section 107.4.
Part II
Schedule for Plumbing Permit Fees
For issuing each permit
In addition
For each Plumbing Fixture, Floor Drain or Trap (including Water &
Drainage Piping)
For Each House Sewer
For Each Building Sewer Replaced or Repaired
For Each Septic Tank and Seepage Pit or Drain Field
For Each Water Heater and/or Vent
Gas Piping System 1-4 outlets
Each Additional outlet
For Installation., Alteration or Repair of Water Piping System
For Installation, Alteration or Repair of Water Treating Equipment
Cr For Repair or Alteration of Drainage or Vent Piping
For Vacuum Breaker, etc (1-5)
Each Additional
Part I II
Schedule for Mechanical Permit Fees
For issuing each permit
First $1,000.00 valuation
Each additional $1,000.00 or fraction thereof
Part IV
Schedule for Electrical Permit Fees
Electrical Permit Fees
Service Equipment
Single Phase
Three Phase
Sub Panel (10)
Sub Panel (30)
Dwelling Units
Receptacles
Swi tches
Light Fixtures
Commercial Buildings
Receptacles
Swi tches
Light Fixtures
Sign Rough
$5.00
1.25
2.00
2.00
2.00
1.25
1.50
.50
1.25
2.00
1.25
1.00
.20
$5.00
10.00
2.00
Wiring Method
Copper
Aluminum
2.00
2.00
3.00
3.00
1.50
1.50
2.00
2.00
.15
.30
.15
.30
.15
.30
.25
.50
.25
.50
.25
.50
.20
.50