HomeMy WebLinkAbout0321_319Sec. - 72. Permits required.
(a) No person shall commence the erection, construction, alteration or change
of any electrical installation, machinery, apparatus, work or wiring in the city
until a permit has been issued by the city electrical inspector covering each install-
atiop to be made. When a service of one hundred ten 010) amperes demand or more
is required, a wiring diagram showing feeder details may be required by the city
electrical inspector and approved by him, before a permit will be granted.
(b) When any wiring or apparatus is installed in such a =Wanner that the same
could be used for electric light or power purposes, it shall be deemed that the
wiring or apparatus is used for such purposes and permit shall be required and
inspection made as provided for such.
(c) It shall be unlawful for the city electrical departmel# to do any wiring of
any nature in or on any building, except power houses and substations of electric
light, heat and power companies operating under a franchise granted by the city,
for which a permit has not been issued, or to make any electrical connections to
any building or electrical wiring or apparatus until a certificate of inspection or
written statement authorizing connection has been issued by the city electrical
inspector. All persons operating under a regular franchise granted by the city,
shall upon written notice by the city electrical inspector, disconnect any circuit,
main service wires, branch feeder wires, or distribution system, as designated
by such notice; and shall not reconnect such installation except upon written per-
rpission from the city electrical inspector.
(d) No permit will be required for the installation of wires to operate telephone,
telegraph or district messenger services.
Sec. - 73. To whom permits shall be issued.
The permit required by the provisions of this article shall be issued only to
those persons who have secured a license under the provisions of this ordinance
or to a person who is to perform the electrical work with his own hands in a home
occupied by him.
Sec. - 74. Permit fees.
The following fees shall be paid to the city for the issuance of electrical
Work permits:
(a) Installation of services:
(1) Up to 100 amps $ 2.00
(2) 101 to 200 amps 3.00
(3) 201 to 400 amps 5.00
(4) Over 400 amps 10.00
(b) Installation of outlets in dwelling units:
Copper
Aluminum
(1)
Receptacles
$ .15
$ .30
(2)
Switches
.15
.30
(3)
Light Fixtures
..15
.30
(4)
Fixed Appliance
.35
.70
(5)
Resistant Duct Heater per 5 kw
.50
.50
(c) Installation of outlets in commercial work:
(1)
Receptacles
$ . 25
$ .50
(2)
Switches
.25
.50
(3)
Light Fixtures
.25
.50
(4)
Fixed Appliances
.35
.70
(5)
Resistant Duct Heater per 5 kw
.50
.50
(d) Motors:
(1)
1/2 H. P. but less than 2 H. P.
$ 1.00
(2)
2 H. P. but less than 5 H. P.
1.50
(3)
5 H. P. but less than 10 H. P.
2.00
(4)
10 H. P. but less than 20 H. P.
3.00
(5)
20 H. P. but less than 50 H. P.
4.00
(6)
50 H. P. and over
5.00
(e) Equipment:
(1) Motion picture machine, each $ 5.00
(2) X-ray machine, each 4.00
(3) Welding machine, each 2.00
(4) Elevators, each 5.00