COVENANTS
SECTION 7
If the funds herein or a portion thereof, are granted, Applicant agrees
to the following conditions:
1. The airport or air navigational facility will remain under
Applicant's control for at least twenty (20) years.
2. The project must be adequately planned. The Commission will
insist that the proposed project conform to the approved Air-
port Layout Plan and that the specific project be designed in
accordance with TAC design manuals and specifications.
3. The funds applied for by the applicant may only be used for
the establishment, construction, reconstruction, enlargement
or repair of airports, airstrips or air navigational facilities.
4. At least ten (10) percent of the total project cost will be
provided from sources other than the State of Texas.
5. That Applicant has the ability to finance and operate the
airport or air navigational facility.
6. Applicant shall adopt and enforce an airport hazard zoning
ordinance/order.
7. The last ten (10) percent of the grant contract or load
will be paid only after the staff has inspected and approved
the completed project and the sponsor has completed hazard
and compatible land use zoning of the airport.
IN WITNESS WHEREOF, the City has caused this application to be duly
executed in its name, this 10th day of November, 1981.