HomeMy WebLinkAbout0227_226upon which are located such easements, appurtenances, and
detention facilities shall maintain same and be responsible for
their upkeep. Notice of such duty to maintain shall be shown on
the plats.
Construction plans for streets and utility instalation
re wired by the City shall include drainage and storm sewer plans
prepared by a Registered Professional Engineer which shall be
reviewed and approved by the City Engineer and Director of Public
Works prior to such construction. City shall make such
inspections as are deemed necessary to assure proper installation.
Neither the review nor approval of such plans nor the inspection
of the completed work will create any liability on the part of
the City.
IV.
Plans for proposed drainage facilities shall be submitted to
the City Engineer for acceptance prior to construction. Further,
computations for all drainage related design shall be submitted
with the plans for review. Data submitted shall include a
drainage area map, a summary of methodology employed and
resulting data, land use and runoff coefficient assumptions and
other pertinent hydrologic and hydraulic data. Certification
shall be submitted by the design engineer that the plans and
computations are in compliance with the requirements of this
policy and the Drainage Criteria Manual, referred to above.
Following construction, but prior to acceptance of improvements
by the City, the design engineer shall furnish certification that
based upon his periodic inspection of the work all improvements,
including those covered by this Ordinance, have been constructed
in compliance wiht the City's requirements.
V.
Plans submitted for utility permits other than for those
projects already in compliance with this Ordinance shall include
a sit•i dr11n-ige lel -in sha w ins thi, necessary drai-naj- r-elate d