Loading...
HomeMy WebLinkAbout0049_0002City of Georgetown if the approach main and/or on site lines have excess capacity, according to subdivision service requirements as determined by the City Engineers. Repayment for oversizing costs shall be financed as provided for in this section. For the purposes of this ordinance, water and wastewater lines 12" in diameter and smaller will in no case be considered over-sized. H. Subsequent User Payments. Subdividers who use utility capacity made available as a result of an oversized water and/or waste water approach main or on site line paid for under this ordinance shall reimburse the City, at the time the plat is recorded, an amount equal to the subdivider's pro rata share thereof, Such reimbursement will be based upon the number of living unit equivalents to be served or, in the absence of livin g units, on lineal front footage or other reasonable basis. If water or wastewater service is required for an individual lot or lots to be used for commercial, industrial or multi-family residential purposes, an additional subsequent user payment shall also be required. Such additional payment shall be required if the original pro rata share payment did not include an actual living unit equivalent demand. However, no such payments shall be required for subdivisions containing two (2) or less living unit equivalents. I. Calculating Oversize Cost Payments. All utility construction bids will be submitted in two ways: pipe size and fittings for oversize line as specified by the City and 12" line. City will pay difference in low bid for pipe and fittings only. Payments will be paid following completion and acceptance of all water, wastewater, drainage and street installations by the City and recording of the associated subdivision plat. PART 2. That all ordinances, resolutions and orders heretofore passed, adopted and made, or any part of the same, affecting approach mains, which are in conflict with this Ordinance, shall be and the same are hereby in all ways repealed.