HomeMy WebLinkAbout0049_0002City of Georgetown if the approach main and/or on site lines have
excess capacity, according to subdivision service requirements as
determined by the City Engineers. Repayment for oversizing costs
shall be financed as provided for in this section. For the
purposes of this ordinance, water and wastewater lines 12" in
diameter and smaller will in no case be considered over-sized.
H. Subsequent User Payments. Subdividers who use utility
capacity made available as a result of an oversized water and/or
waste water approach main or on site line paid for under this
ordinance shall reimburse the City, at the time the plat is
recorded, an amount equal to the subdivider's pro rata share
thereof, Such reimbursement will be based upon the number of
living unit equivalents to be served or, in the absence of livin g
units, on lineal front footage or other reasonable basis. If
water or wastewater service is required for an individual lot or
lots to be used for commercial, industrial or multi-family
residential purposes, an additional subsequent user payment shall
also be required. Such additional payment shall be required if
the original pro rata share payment did not include an actual
living unit equivalent demand. However, no such payments shall
be required for subdivisions containing two (2) or less living
unit equivalents.
I. Calculating Oversize Cost Payments. All utility construction
bids will be submitted in two ways: pipe size and fittings for
oversize line as specified by the City and 12" line. City will
pay difference in low bid for pipe and fittings only. Payments
will be paid following completion and acceptance of all water,
wastewater, drainage and street installations by the City and
recording of the associated subdivision plat.
PART 2. That all ordinances, resolutions and orders heretofore
passed, adopted and made, or any part of the same, affecting
approach mains, which are in conflict with this Ordinance, shall
be and the same are hereby in all ways repealed.