Loading...
HomeMy WebLinkAbout0247_0001upon which are located such easements, appurtenances, and detention facilities shall maintain same and be responsible for . their upkeep. Notice of such duty to maintain shall be shown on the plats.' Construction plans for streets and utility instalation required by the City shall include drainage and storm sewer plans prepared by a Registered Professional Engineer which.shall be reviewed and approved by the City Engineer and Director of Public Works prior to such construction. City shall make such inspections as are deemed necessary to assure proper installation. Neither the review nor approval of such plans nor' the inspection of the completed work will create any liability on the part of the City. IV. Plans for proposed drainage facilities shall be submitted to the City Engineer for acceptance prior to construction. Further.. computations for, all drainage related design shall be submitted with the plans for review. Data submitted shall include a drainage area map, a summary of methodology employed and resulting data, land use and runoff coefficient assumptions and other pertinent hydrologic and hydraulic data, Certification shal.l.be submitted by the design engineer that'the plans and computations are in compliance with the requirements of this policy and the Drainage Criteria Manual, referred to above., Following construction, but prior to acceptance of improvements by the City, the design engineer shall furnish certification that ..based upon his periodic inspection of the work all improvements, including those covered by this Ordinance.. have been constructed in compliance wiht the City's requirements. V. Plans submitted for utility. permits other than for those projects already in compliance with this Ordinance shall include a site drainage plan showing the necessary drainage related IN