HomeMy WebLinkAbout0060_0001Effective: June 25, 1985 Revised Sheet No.: 1 of 4
EXHIBIT A OF WFTdCESAtE70M AGREEMENT DATED JUNE 25, 1 74
Revisions of Sheet 1 and Total Maximum Demand Stated in Paragraph 1 of Sheet 2
POINTS OF DELIVERY
TO
CITY OF GEORGETOWN
i s ri u or
r
Note: Point 3 is based upon winter peak.
Paragraph 1, Page 2 of Exhibit A
Maximum Demand 55684 KW
LOWER COLORADO RIVER CITY OF GEORGETOWN
AUTHORITY
t
ATTEST: By: 4 ATTEST: By'
General Manager 11
Is 2
n;ito• IN n-�-_
Contract
Delivery
Load (KW)
Estimated Contract Load
(KW)
No.
Location
Voltage
(Nominal)
Phase
Year Ending
6-25-86
i981
Years Ending June 25
-19mm 1989 --
1990
' 1
LCRA Georgetown Bank 1
12.5KV -
3
8327
8721
9134 9565
10018
2
LCRA Georgetown Bank 2
12.5KV
3
12869
14155
15571 17128
18842
3
LCRA Gabriel Sub.
12.5KV
3
17042
19111
21413 23975
26824
TOTAL
38238
41987
46118 50668
55684
r
Note: Point 3 is based upon winter peak.
Paragraph 1, Page 2 of Exhibit A
Maximum Demand 55684 KW
LOWER COLORADO RIVER CITY OF GEORGETOWN
AUTHORITY
t
ATTEST: By: 4 ATTEST: By'
General Manager 11
Is 2
n;ito• IN n-�-_