Loading...
HomeMy WebLinkAbout0060_0001Effective: June 25, 1985 Revised Sheet No.: 1 of 4 EXHIBIT A OF WFTdCESAtE70M AGREEMENT DATED JUNE 25, 1 74 Revisions of Sheet 1 and Total Maximum Demand Stated in Paragraph 1 of Sheet 2 POINTS OF DELIVERY TO CITY OF GEORGETOWN i s ri u or r Note: Point 3 is based upon winter peak. Paragraph 1, Page 2 of Exhibit A Maximum Demand 55684 KW LOWER COLORADO RIVER CITY OF GEORGETOWN AUTHORITY t ATTEST: By: 4 ATTEST: By' General Manager 11 Is 2 n;ito• IN n-�-_ Contract Delivery Load (KW) Estimated Contract Load (KW) No. Location Voltage (Nominal) Phase Year Ending 6-25-86 i981 Years Ending June 25 -19mm 1989 -- 1990 ' 1 LCRA Georgetown Bank 1 12.5KV - 3 8327 8721 9134 9565 10018 2 LCRA Georgetown Bank 2 12.5KV 3 12869 14155 15571 17128 18842 3 LCRA Gabriel Sub. 12.5KV 3 17042 19111 21413 23975 26824 TOTAL 38238 41987 46118 50668 55684 r Note: Point 3 is based upon winter peak. Paragraph 1, Page 2 of Exhibit A Maximum Demand 55684 KW LOWER COLORADO RIVER CITY OF GEORGETOWN AUTHORITY t ATTEST: By: 4 ATTEST: By' General Manager 11 Is 2 n;ito• IN n-�-_