Loading...
HomeMy WebLinkAbout0076_0007Parkview Estates Section Nine (con.) locally at the expense of the utility availability for the general service area. This is particularly true of the water situation in light of the current City policy regarding water availablity. Therefore, in order to insure the uniform application of this policy staff recommends that the water availability restriction should apply to any increase in demand. The impact on wastewater capacity is less significant and should probably be worked out by simply ad3usting the Capital Recovery Fee Credits. Staff Recommendation: Approval of the vacating and resubdivision of Parkview Estates Section 9 for change of land use to Multi- family and approval of the site plan with the following condition: I. Resubdivision plat shall be revised to reflect change in land use only. II. Site grading and drainage plan shall be approved by City Engineer III. Utilities being adequate A. Approval shall not be given to any increase in the average -day demand for water supply over that which was previously approved for Parkview Estates. Acceptable trade-offs within the overall development shall be considered in lieu of reducing the number of permitable units for this project. B. The capital recovery fee formula shall be adjusted to reflect the increase in waste- water demand. IV. The 30 foot buffer zone shall be maintained with no construction allowed within. Contractor shall provide a fence during construction to insure that this area is left undisturbed, and structures along this area shifted west. .3 V. Per City Policy, building permits will not be issued until 100% of on-site and 50% of off-site improvements for Parkview Estates has been completed. VI. Residential density should be reduced to 15 dwelling units per acre. VII. Parking shall be removed from the front yard areas. P & Z Recommendation: (5-0) Approval is recommended by staff above, with the additional require- ment that buffering be provided between single family units to the north with the design to be subject to planning staff approval at the site plan level. In