HomeMy WebLinkAbout0097_0007COMMENTS: I. Plat approval conditioned upon:
A. Plat meeting ordinance requirements.
B. Drainage requirements being met.
C. Utilities being adequate (water avail-
ability note shall apply).
D. Water Pollution Abatement Plan is re-
quired by T D W R..
II. Pedestrian access to the open detention area
from Caladium Court should be provided.
III. Lots backing up to County roads 151 and 152
shall have suitable buffering.
IV. The final Site Plan shall indicate the maxi-
mum floor area for structures, area of both
common and private open space, percent of im-
pervious cover, and rough finished contours.
V. Landscaping and improvements to open space/
detention areas, and the water facilities
area should be required and indicated in the
construction plans.
VI. The final landscape plan shall indicate. the
number of required trees and shrubs= number,
size and type of proposed trees, shrubs and
ground cover= and include both detention areas,
water facilities lot, and street parkways.
VII. The following variances have been requested.
A. Lots at right angles - Lots 9, 1 3, 2 3, i 24
Block 11.
B. Parking - allow reduction of off-street
parking requirements for three bedroom
units from 2h spaces to 2 spaces per unit
C. Street center line radius - allow reduction
of radius from 300 feet to 150 feet.
D. Area - allow the area of duplex lots to
be reduced from 7000 square feet to 6,788
square feet.
(Staff has no objection conditional upon the
applicants demonstration that minimum private
open space and common open space requirements
are met and that the common open space/deten-
tion_areas are improved so as to provide use-
able recreational areas.]
VIII. Building permits for this subdivision shall
not be issued until 50• of off-site utility
construction is complete, and all other
City policies met.
IX. Improvements to County Roads are needed.
RECOMl=DATION: Pi Z (S -Q)
Approval of Plat and Site Plan conditioned upon the
above comments being met and a revised site plan and
landscape plan being submitted for staff review with
construction plans.