A RESOLUTION RESCINDING CURRENT BUILDING PERMIT
AND ELECTRICAL PERMIT FEES AND ESTABLISHING NEW
FEE RATES
WHEREAS the City of Georgetown Texas has adopted by ordinance the Standard Building
Code and the National Electrical Code and
WHEREAS the Standard Building Code and National Electrical Code do not establish
Permit Fee rates and
WHEREAS each code requires issuance of permits inspection of work at various stages
of completion and maintenance of inspection records and
WHEREAS the currently established Building and Electrical Permit Fee rates are insufficient
to meet inspection and administration costs
BE IT RESOLVED that the rates reflected on Exhibit A shall be in full force and effect
following the passage of this Resolution Said Exhibit A is hereby incorporated into this
resolution to the same and full extent as if copied herein at length word for word All resol
utions in conflict herewith are hereby repealed and rescinded
PASSED on this the 8th day of September 1975
ATTEST
City Secretary
12
EXHIBIT A
SCHEDULE OF BUILDING PERMIT FEES
(a) TOTAL VALUATION
SCHEDULE
$100 00 or less No fee unless inspection required in which
case a $2 50 fee for each inspection shall be
charged
$101 00 to $1 000 00 $3 00 per thousand or fraction thereof
$1 001 00 to $15 000 00 $3 00 for the first $1 000 00 plus $1 75 for each
additional thousand or fraction thereof to and
including $15 000 00
$15 001 00 to $50 000 00 $27 50 for the first $15 000 00 plus $1 25 for
each additional thousand or fraction thereof to
and including $50 000 00
$50 001 00 to $100 000 00 $71 25 for the first $50 000 00 plus $0 75 for
each additional thousand or fraction thereof
to and including $100 000 00
$100 001 00 to $500 000 00 $108 75 for the first $100 000 00 plus $0 50 for each
additional thousand or fraction thereof to and
including $500 000 00
$500 001 00 to $1 000 000 00 $308 75 for the first $500 000 00 plus $0 40
for each additional thousand or fraction thereof
$1 000 001 00 and up $508 75 for the first $1 000 000 00 plus $0 30
for each additional thousand or fraction thereof
(b) Moving of Building or Structure
Building under 15 feet in height -T25 00
Building over 15 feet in height - $50 00 plus time and materials
(c) Demolitin of Building or Structure
No Fee
(d) Where work for which a permit is required by this Code is started or proceeded with prior
to obtaining said permit the fees herein specified shall be doubled but the payment of
such double fee shall not relieve any persons from fully complying with the requirements of
this Code in the execution of the work nor from any other penalities prescribed herein
(e) Plan -Checking Fees
When the valuation of the proposed construction exceeds $1 000 00 and a plan is required to be
submitted by Section 105 3 a plan -checking fee shall be paid to the Building Official at
the time of submitting plans and specifications for checking Said plan -checking fee shall
be equal to one half of the permit fee as set forth in Section 107 4
ELECTRICAL PERMIT FEES
Service Eauiament
Single Phase
2 00
Three Phase
300
Sub Panel (1
1 50
Sub Panel (3
200
Dwelling Units
Receptacles 10
Swi tches 15
Light Fixtures 15
Commercial Buildings
Receptacles 20
Swi tches 20
Light Fixtures 20
Sign Rough 20
Mechanical Equipment
Resistant Duct Heater Per 5 kw 50
Motor and Control per HP 1 00
(1200 BTU=1 HP)
Water Heater per 5 kw 50
Special Appliance or Equipment 35
Construction Power
Temporary Power Pole 1 25
Permanent Construction Service 1 00
(Loop Inspection)
Non City Installation
Inspection Surcharge 250
13