Loading...
HomeMy WebLinkAbout0010_9 (3) A RESOLUTION RESCINDING CURRENT BUILDING PERMIT AND ELECTRICAL PERMIT FEES AND ESTABLISHING NEW FEE RATES WHEREAS the City of Georgetown Texas has adopted by ordinance the Standard Building Code and the National Electrical Code and WHEREAS the Standard Building Code and National Electrical Code do not establish Permit Fee rates and WHEREAS each code requires issuance of permits inspection of work at various stages of completion and maintenance of inspection records and WHEREAS the currently established Building and Electrical Permit Fee rates are insufficient to meet inspection and administration costs BE IT RESOLVED that the rates reflected on Exhibit A shall be in full force and effect following the passage of this Resolution Said Exhibit A is hereby incorporated into this resolution to the same and full extent as if copied herein at length word for word All resol utions in conflict herewith are hereby repealed and rescinded PASSED on this the 8th day of September 1975 ATTEST City Secretary 12 EXHIBIT A SCHEDULE OF BUILDING PERMIT FEES (a) TOTAL VALUATION SCHEDULE $100 00 or less No fee unless inspection required in which case a $2 50 fee for each inspection shall be charged $101 00 to $1 000 00 $3 00 per thousand or fraction thereof $1 001 00 to $15 000 00 $3 00 for the first $1 000 00 plus $1 75 for each additional thousand or fraction thereof to and including $15 000 00 $15 001 00 to $50 000 00 $27 50 for the first $15 000 00 plus $1 25 for each additional thousand or fraction thereof to and including $50 000 00 $50 001 00 to $100 000 00 $71 25 for the first $50 000 00 plus $0 75 for each additional thousand or fraction thereof to and including $100 000 00 $100 001 00 to $500 000 00 $108 75 for the first $100 000 00 plus $0 50 for each additional thousand or fraction thereof to and including $500 000 00 $500 001 00 to $1 000 000 00 $308 75 for the first $500 000 00 plus $0 40 for each additional thousand or fraction thereof $1 000 001 00 and up $508 75 for the first $1 000 000 00 plus $0 30 for each additional thousand or fraction thereof (b) Moving of Building or Structure Building under 15 feet in height -T25 00 Building over 15 feet in height - $50 00 plus time and materials (c) Demolitin of Building or Structure No Fee (d) Where work for which a permit is required by this Code is started or proceeded with prior to obtaining said permit the fees herein specified shall be doubled but the payment of such double fee shall not relieve any persons from fully complying with the requirements of this Code in the execution of the work nor from any other penalities prescribed herein (e) Plan -Checking Fees When the valuation of the proposed construction exceeds $1 000 00 and a plan is required to be submitted by Section 105 3 a plan -checking fee shall be paid to the Building Official at the time of submitting plans and specifications for checking Said plan -checking fee shall be equal to one half of the permit fee as set forth in Section 107 4 ELECTRICAL PERMIT FEES Service Eauiament Single Phase 2 00 Three Phase 300 Sub Panel (1 1 50 Sub Panel (3 200 Dwelling Units Receptacles 10 Swi tches 15 Light Fixtures 15 Commercial Buildings Receptacles 20 Swi tches 20 Light Fixtures 20 Sign Rough 20 Mechanical Equipment Resistant Duct Heater Per 5 kw 50 Motor and Control per HP 1 00 (1200 BTU=1 HP) Water Heater per 5 kw 50 Special Appliance or Equipment 35 Construction Power Temporary Power Pole 1 25 Permanent Construction Service 1 00 (Loop Inspection) Non City Installation Inspection Surcharge 250 13