HomeMy WebLinkAboutRES 10.08.1985 - LCRA AgmtA RESOLUTION AUTHORIZING THE MAYOR OF THE CI?Y OF
GEORGETOWN TO EXECUTE AN AGREEMENT BETWEEN THE LOWER
COLORADO RIVER AUTHORITY AND THE CITY OF GEORGETOWN
WHEREAS; Heretofore the City of Georgetown and the Lower Colorado
River Authority have entered into a certain agreement dated June
25, 1984; and
WHEREAS; There are certain changes necessary and aFpropriate
related to the contract load (KW) year ending June June 25, 1986
and the estimated contract loads for the estimated contract loads
for the five-year period ending June 25, 1990, as reflected on
the attached and annexed Exhibit A attached hereto and made a
part hereof for all purposes; and,
WHEREAS; these estimates effect the billing by said Authority to
the City of Georgetown and said Authority's responsibility to
provide adequate facilities to supply the loan required by the
City of Georgetown at the various points of delivery set forth in
said contract; and
WHEREAS; the parties to said agreement, Lower Colorado River
Authority and the City of Georgetown, Texas have agreed to amend
the aforesaid contract dated June 25, 1974 by substituting the
Exhibit A attached to the contract dated June 24, 1974:
THEREFORE, BE IT RESOLVED that the Mayor of the City of
Georgetown is hereby authorized to execute the aforesaid
substituted Exhibit A sot that the same shall be and become a
part of the contract dated June 25, 1974.
Passed, read and
October, 1985.
ATTEST:
adopted on first reading this 8th day of
Carl Doering, 161or
r. -Pat Cabal ervj City Secretary
Effective: June 25, 1985 Revised Sheet No.: 1 of 4
EXHIBIT A OF WFTdCESAtE70M AGREEMENT DATED JUNE 25, 1 74
Revisions of Sheet 1 and Total Maximum Demand Stated in Paragraph 1 of Sheet 2
POINTS OF DELIVERY
TO
CITY OF GEORGETOWN
i s ri u or
r
Note: Point 3 is based upon winter peak.
Paragraph 1, Page 2 of Exhibit A
Maximum Demand 55684 KW
LOWER COLORADO RIVER CITY OF GEORGETOWN
AUTHORITY
t
ATTEST: By: 4 ATTEST: By'
General Manager 11
Is 2
n;ito• IN n-�-_
Contract
Delivery
Load (KW)
Estimated Contract Load
(KW)
No.
Location
Voltage
(Nominal)
Phase
Year Ending
6-25-86
i981
Years Ending June 25
-19mm 1989 --
1990
' 1
LCRA Georgetown Bank 1
12.5KV -
3
8327
8721
9134 9565
10018
2
LCRA Georgetown Bank 2
12.5KV
3
12869
14155
15571 17128
18842
3
LCRA Gabriel Sub.
12.5KV
3
17042
19111
21413 23975
26824
TOTAL
38238
41987
46118 50668
55684
r
Note: Point 3 is based upon winter peak.
Paragraph 1, Page 2 of Exhibit A
Maximum Demand 55684 KW
LOWER COLORADO RIVER CITY OF GEORGETOWN
AUTHORITY
t
ATTEST: By: 4 ATTEST: By'
General Manager 11
Is 2
n;ito• IN n-�-_