Loading...
HomeMy WebLinkAboutRES 10.08.1985 - LCRA AgmtA RESOLUTION AUTHORIZING THE MAYOR OF THE CI?Y OF GEORGETOWN TO EXECUTE AN AGREEMENT BETWEEN THE LOWER COLORADO RIVER AUTHORITY AND THE CITY OF GEORGETOWN WHEREAS; Heretofore the City of Georgetown and the Lower Colorado River Authority have entered into a certain agreement dated June 25, 1984; and WHEREAS; There are certain changes necessary and aFpropriate related to the contract load (KW) year ending June June 25, 1986 and the estimated contract loads for the estimated contract loads for the five-year period ending June 25, 1990, as reflected on the attached and annexed Exhibit A attached hereto and made a part hereof for all purposes; and, WHEREAS; these estimates effect the billing by said Authority to the City of Georgetown and said Authority's responsibility to provide adequate facilities to supply the loan required by the City of Georgetown at the various points of delivery set forth in said contract; and WHEREAS; the parties to said agreement, Lower Colorado River Authority and the City of Georgetown, Texas have agreed to amend the aforesaid contract dated June 25, 1974 by substituting the Exhibit A attached to the contract dated June 24, 1974: THEREFORE, BE IT RESOLVED that the Mayor of the City of Georgetown is hereby authorized to execute the aforesaid substituted Exhibit A sot that the same shall be and become a part of the contract dated June 25, 1974. Passed, read and October, 1985. ATTEST: adopted on first reading this 8th day of Carl Doering, 161or r. -Pat Cabal ervj City Secretary Effective: June 25, 1985 Revised Sheet No.: 1 of 4 EXHIBIT A OF WFTdCESAtE70M AGREEMENT DATED JUNE 25, 1 74 Revisions of Sheet 1 and Total Maximum Demand Stated in Paragraph 1 of Sheet 2 POINTS OF DELIVERY TO CITY OF GEORGETOWN i s ri u or r Note: Point 3 is based upon winter peak. Paragraph 1, Page 2 of Exhibit A Maximum Demand 55684 KW LOWER COLORADO RIVER CITY OF GEORGETOWN AUTHORITY t ATTEST: By: 4 ATTEST: By' General Manager 11 Is 2 n;ito• IN n-�-_ Contract Delivery Load (KW) Estimated Contract Load (KW) No. Location Voltage (Nominal) Phase Year Ending 6-25-86 i981 Years Ending June 25 -19mm 1989 -- 1990 ' 1 LCRA Georgetown Bank 1 12.5KV - 3 8327 8721 9134 9565 10018 2 LCRA Georgetown Bank 2 12.5KV 3 12869 14155 15571 17128 18842 3 LCRA Gabriel Sub. 12.5KV 3 17042 19111 21413 23975 26824 TOTAL 38238 41987 46118 50668 55684 r Note: Point 3 is based upon winter peak. Paragraph 1, Page 2 of Exhibit A Maximum Demand 55684 KW LOWER COLORADO RIVER CITY OF GEORGETOWN AUTHORITY t ATTEST: By: 4 ATTEST: By' General Manager 11 Is 2 n;ito• IN n-�-_