Loading...
HomeMy WebLinkAboutTexas Aeronautics Commission 11.23.1982Jame, M. Johnson, Chairman Maxr/R. Grossenbacher. Viae Chairman Jack H. McCreary, Secretary James D. Abrams, Member George M. Underwood, Member Lucien Flournoy, Member C. A. (Clay) Willdna Executive Director P.O. Box 12607, Capitol Station 410 East Sth Street Austin, Texas 78711 (511) 476.9262 7e-xas 4Aeronaut # Comm 0 0 rL November 23, 1982 Mr. John C. Doerfler Mayor, City of Georgetown P.O. Box 409 Georgetown, Texas 78626 Dear Mayor Doerfler: RE: TAC Project No. 834-11 Georgetown Municipal Airport In response to your letter of November 12, 1982, to Mr. Clay Wilkins concerning the City's proposal to delay the grant for.the Runway 17/35 overlay project until September of 1983, this agency has no objection to such a delay. Because of our closed asphalt season during the fall/winter months, we would prefer that the engineering plans be prepared and bids taken in order that the actual construction would commence by early September, 1983. Otherwise, the project would not be initiated before the spring of 1984. Please, advise if such a schedule presents problems for the City of Georgetown. We note that the delay of this grant does present a problem in that when the current lighting project is underway, the edges of the 100' wide center section of the runway must be striped to delineate that the outer 25' paved sections are no longer part of the runway. It was originally planned to accomplish such striping following the overlay as striping is normally done after any paving and, the time interval between the two construction projects was expected to be relatively short. Thus, it will be necessary to stripe the edges of the 100' runway at least on a temporary basis (6" wide stripe, dashed if necessary to save paint) until better striping can be applied. Should you have any questions, please do not hesitate to contact us, Sincerel• , Max G. Ulrich Chief Engineer MGU:FGB:js cc: FAA, FTW 1636.1986 11