Loading...
HomeMy WebLinkAboutRES 072721-W - Electric Line & MeteringRESOLUTION NO. 0-1 2-7 21- W A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GEORGETOWN, TEXAS, AMENDING THE ELECITRIC LINE EXTENSION AND ELECTRIC METERING POLICY; REPEALING CONFLICTING RESOLUTIONS; INCLUDING A SEVERABILITY CLAUSE; AND ESTABLISHING AN EFFECTIVE DATE. WHEREAS, the City's policy is to collect 100% of costs for electric line extensions and electric metering costs as a result of requests for new service; and WHEREAS, the City previously approved an Electric Line Extension and Electric Metering Policy ensuring the City's costs for said extensions are collected and enhance the City's ability to provide economic and reliable service to its customers; and WHEREAS, the City finds it necessary to amend the Electric Line Extension as a result of recent increases in electric distribution materials in order to continue to collect 100% of the costs for electric line extensions. NOW THEREFORE BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF GEORGETOWN TEXAS: SECTION 1. The facts and recitations contained in the preamble of this Resolution are hereby found and declared to be true and correct and are incorporated by reference herein and expressly made a part hereof, as if copied verbatim. SECTION 2. The Electric Line Extension and Electric Metering Policy is hereby updated as shown in Exhibit A. attest. SECTION 3. The Mayor is hereby authorized to sign this Resolution and the City Secretary to SECTION 4. This Resolution shall become effective and be in full force and effect upon its execution PASSED AND APPROVED on the 2IV7d. 2021. ATTEST: CITY OGETOWN, TEXAS Z" By: Robyn EMnsmore, City Secretary o h Schroeder or APPROVED AS TO FORM: kye M son, dity Attorney Resolution No. W 7-:12. 1 -- V+ Page 1 of 1 Subject: Updated Electric Line Extension Policy Date Approved J Z. Electric Line Extension and Electric Meter Connect Policy It is the City's electric utility's policy to collect all costs for line extensions and infrastructure additions, upgrades and retirements required to serve based on a service application. This Electric Line Extension and Electric Metering Policy shall be applicable to the entire City of Georgetown electric service territory as defined by the Public Utility Commission of Texas (PUCT) approved Certificate of Convenience and Necessity (CCN). The City of Georgetown will design, procure materials and install electric distribution infrastructure based on a service request. The electric infrastructure design and installation shall follow the electric utility's engineering and construction standards, Unified Development Code of City of Georgetown and the latest edition of the National Electric Safety Code (NESC) and National Electric Code (NEC). The line extension fees and the electrical connect fees for all the electric service requests shall be based on the following 4 step process: Stepl: Line Extension Application Applicants shall submit a Line Extension application provided by the City of Georgetown along with the required line extension application fee of $510. The application fee is non-refundable. A Line Extension application shall be submitted on the required form and include the site development plan, construction plan and additional detailed electric load data (if required). It is the applicant's responsibility to make sure that the site development plan, construction plan and electric load data submitted are accurate and up to date as any subsequent changes will result in additional engineering costs and line extension fees to the applicant. Upon receipt of the application, the application fee, and the required information, the electric utility shall complete a detailed engineering analysis and design of the electric distribution infrastructure which forms the basis for the Line Extension Fees. Additional costs listed below are included in the line extension fees if applicable. Detailed breakdown of the line extension fees is provided in the Cost Estimate letter. The Cost Estimate letter and the line extension fees will be valid for a period of 90 days from the date of issue of the letter. Any changes to the site development plan, construction plan and electric load data after the cost estimate letter is issued will result in additional engineering costs and potential changes in the line extension fees that the applicant is responsible for. Single Family Residential including Detached Multi -family and Duplexes Fee Per Dwelling Unit 1 $2600—* $3,375 *The Fee Per Dwelling Unit includes the applicable labor, material and engineering costs required to provide standard electric distribution infrastructure at the service location. This includes the conductor, transformers and metering equipment associated with the electric service. The additional costs (if applicable) are outlined below. The electric meter connect fees are separate and are not included in the line extension fees. The beeper dwell ill-' unit shall be rcviewed_adeast annually to o adjust for changes in_ labor, iaterial and engineering costs required to orovide standard electric distribution infrastructure at the service location. Aiiy proposed increases greater than 5% from the existing fee shall be approved by the City of Georgetown's City Council. Residential Multi -Family Development (Apartments) Fee per Multi -Family unit $900 *-$ I.000 * The fee per multi family unit includes the applicable labor, material and engineering costs required to provide standard electric distribution infrastructure at the service location. This includes the conductor, transformers and metering equipment associated with the electric service. The additional costs (if applicable) are outlined below. The electric meter connect fees are separate and are not included in the line extension fees. The fee per multi family unit shall be reviewed atleast annual!y to adjust for changes in labor, material and engineering costs required to provide standard electric distribution infrastructure at the service location. Aiiy proposed increases greater than 5% from the existhig fee shall be approved by the City of Georgetown's C ity Council. All Other Requests Line Extension fees for all other requests shall be calculated based upon the detailed engineering analysis and design of electric distribution infrastructure and will include the applicable labor, material and engineering costs required to provide standard electric distribution infrastructure at the service location. This includes but is not limited to the conductor, transformers, metering equipment and all other equipment associated with the electric service. The additional costs are outlined below. Additional Costs: The following costs, if required, will be included in the line extension fees and are the responsibility of the Applicant: 1. The extension and/or upgrade of three-phase electric power lines to serve new load. 2. The relocation and/or upgrade of any existing underground or overhead electric facilities. 3. The retirement of existing electric infrastructure. 4. Installations that require temporary power. 5. Additional permits required to serve the service location. (TxDOT, Railroad, environmental etc.) 6. System protection devices necessitated by the developer/service request and/or required to meet the utility design guidelines and NESC. 7. Advanced Metering lnfirastructure Costs. &-&.Civil infi-as MOLIM Installation (,ins(alled by developer/customer) inspection costs. -7-.9.Specialized power quality/power factor devices required by the developer/service request and/or required to meet the utility design guidelines and NESC. 8-. 10. Dual feeds required by the developer/service request. In the case of a dual/redundant feed, the customer shall be required to pay the applicable monthly stand by rate as negotiated in the service contract. 9-.1 1. Any requirements needed to comply with the electric utility's engineering and construction standards and Unified Development Code of City of Georgetown 12. Costs associated with auxiliary service locations such as serving club houses, pumping loads, pools, signage, mail kiosks etc. -1 -Y 13. Any non-standard casts necessitated by the customer's/developer's service_ Mggst. For all line extension requests the following applies: • The Applicant is responsible for the complete installation and associated cost for necessary civil infrastructure designed to support, protect or convey electric equipment, such as, but not limited to, material and installation of conduit, transformer pads, and meter pedestal pads. The cost for Civil Infrastructure is not included in the Line Extension Fee and is an obligation of the applicant. • The City of Georgetown's point of interconnection/point of delivery for residential services is the meter pedestal. • The City of Georgetown's standard transformer and meter pedestal installation is front lot line. • The electric infrastructure shall be designed, installed and maintained in accordance with the Section 13.06 of the Unified Development Code of City of Georgetown. Step 2: Issuance of Electric Utility Services Availability Letter Within 90 days of issuing The Cost Estimate letter the electric utility requires the payment of 50% of the line extension fees prior to issuing the "Electric Utility Services Availability letter" that is required by the City of Georgetown's Planning department for the approval of the construction plans/site development plans. Meter Connect Fees for multifamily developments_ and commercial developments shall be billed and collected along with the line extension fees. Any design changes requested by the applicant after the issuance of the "Electric Utility Services Availability letter" shall result in additional engineering costs and potential changes in the line extension fees. The applicant is required to pay the actual engineering costs incurred due to the changes and the updated line extension fees. Step 3: Payment of All Outstanding Line Extension Fees and Engineering Costs All outstanding line extension fees and any additional engineering costs (if applicable) shall be paid in full prior to the electric utility installing the electric distribution infrastructure. No material procurement or construction scheduling shall occur until all outstanding Line Extension fees and Additional Costs if any are paid in full. Due to the long lead times associated with electric distribution equipment (transformers, conductors, poles, specialized protective equipment etc.) it is recommended to pay all outstanding line extension fees well in advance of the scheduled electric infrastructure installation date. Step 4: Electric Meter Connect Fees. (Per Meter) The following electric meter connect fees are applicable to all new services, service relocations, re -builds, upgrades, additions of Distributed Energy Resources (DER), and conversions from overhead to underground and shall be paid by applicant when requesting the electric service to be energized. The Electrical Connect Fee is based on the City of Georgetown's cost to provide the meter, the labor to install the meter, the initial inspection of the meter and related metering and engineering system updates. ■ 1. Single Phase Power: Fee assessed and payment due prior to any Building Permit being issued. $200 Meter Connect Fee 0-400 amps 0 Di tr:,_. ted Enef ., b. .,...., nuree (nr._R Z MeteF Foe Greater than 400 amps Actual Cost 2. Commercial Three -Phase: Fee assessed and payment due prior to any Building Permit being issued. Meter Connect Fee - Actual Cost Commercial Three -Phase D all=ibc,`crre Generardon Ir ee AELk,aj Cost Meter Connect Fees for multifamily developmients and commercial developments shall be billed and collected along wills the I ine extension fees.