HomeMy WebLinkAboutRES 112823-5.O - Fire Service FeesRESOLUTION NO. 114043-5. 0
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
GEORGETOWN, TEXAS APPROVING THE FIRE
DEPARTMENT'S FEE SCHEDULE FOR FIRE DEPARTMENT
OPERATION SERVICE FEES AND FIRE AND LIFE SAFETY
SERVICE FEES.
WHEREAS, pursuant to City Code Section 2.28.150, the Fire Chief shall present and
recommended Fire Department Operations Service Fees and Fire & Life Safety Service Fees and related
policies to the City Council for approval; and
WHEREAS, the Fire Chief has prepared recommended fee schedule and related policies,
attached as Exhibit A, and presented his recommendation to City Council on November 28, 2023; and
WHEREAS, the City Council has reviewed the recommended fee schedule and related policies
attached to this Resolution as Exhibit A; and
NOW THEREFORE BE IT RESOLVED:
SECTION ONE. The facts and recitations contained in the preamble of this resolution are hereby
found and declared to be true and correct and are incorporated by reference herein and expressly made a
part hereof, as if copied verbatim.
SECTION TWO. The City Council hereby adopts the Fire Department Operations Service Fees and
Fire and Life Safety Services Fees and related policies attached as Exhibit A.
SECTION THREE. The Mayor is hereby authorized to sign this Resolution and the City Secretary to
attest.
SECTION FOUR This Resolution shall become effective upon its adoption.
Resolution No. 23 Page 1 of 4
Fire Service Fees Approv I
Date Approvedp
ATTEST:
PASSED AND APPROVED on the L day of A),ow4,JW 2023.
CIT'
<-7By:
Robyn De more
City Secretary
APPROVED AS TO FORM:
S,:v" asson
City Attorney
Resolution No. Page 2 of 4
Fire Service Fees Approval
Date ApprovedL)&;lemb k-4, 28i =13
Exhibit A
FIRE & LIFE SAFETY SERVICE FEE SCHEDULE
GEORGETO WN F/RE DEPARTMENT
Are Code Compliance Fees
a. Are Code Permits
PermIt
Rate
Note
Site
$1000
Includes all reviews and inspections
Subdivision
$500
Per section/Per Phase (incl review & inspection)
New Building Plan
$150+
$150+$0.10/SQFT
Building (shell only)
$150+
$150+$0.05/SQFT
Remodel & Tenant Finish Out
$150+
$150+$0_05/SQFT
Commercial or Other Sprinkler
S150
13. 13R. 13D
Residential Sprinkler -Voluntary
Free
Sprinkler System Modification
$150
Fire Pump
$150
Commercial Alarms
$200+
$150+$0.50/device (includes CO2 systems)
Fire Alarm & Detection Modification
S150 +
S150 for 1-10 devices. S250 for 11+ devices
Alternative Auto Extinguishing System
S250
S250 new systeml$100 modification
Other IFC Permits (Special Projects)
S150
Fire Apparatus Access
$150
FD Access Gate
Expedited Plan Review
Variable
3009b of regular permit fee
Underground Fire Line
S150
Fireworks
S300
Includes inspections
Hazardous Materials
$100/hr
Includes HMMP, 2hr min, Revisions 1hr min
Fuel Underground - Tanks/Lines
$200
+$100 for each additional tank
Above Ground Fuel Tanks
$200
Resubmittal Plan Fee
$75
Assessed after two reviews
Pre-submittal/Code Consultation
$150
After first hour
Above Ground Water Storage Tank
$150
Tents. Stages, and Membranes
S150 +
S150 for first tent + S50 for each additional
Mobile Food Vendor
S125
Annual Permit
Blasting & Explosives
S200
Permit valid for 30 consecutive days
Open Buming- Controlled Burn
$25
Open Burning - Bonfire
$75
Open Burning - Commercial
S100
Open Burning - Prescribed Burn
Variable
Cost of apparatus and staff
Firefighter Air Replenishing System
(FARS) Waiver - In -Lieu of Fee
Variable
$0.25/sgft or the lesser of 3 bids
Firefighter Air Replenishing System
Variable
S275.00 per riser
Emergency Responder Radio Coverage
Variable
S275.00 Per riser
Industrial Racking/High piled
combustible plan review fee.
$150.00
Warehouse racking or high pile storage review
fee.
Resolution No. Page 3 of 4
Fire Service Fees Approval p
Date Approved IJo� 4n)w Z D 1 ZW
b. Inspections
Sprinkler System — Partial Visuals
$75/hr72hrminimurn
assessed per building
fire Final
$75/hr
assessed per building / Failed Reinsp is $300
Standpipe Final
$75/hr
assessed per building }Failed Reinsp is $300
Outside Normal Hours
$150/hr
Inspection No-show
$150
Violation Fee assessed after 30-minute delay
Commercial Acceptance & Fire Final
$75/hr
1s` Annual Re -inspection
Annual Inspections
$0
1"Annual Re -inspection
$0
21° Annual Re -inspection
$150
To Annual Re -inspection
$300
41 Annual Re -inspection
$500
Inspection to restore business operations
Fire Standby/Event — Fire Watch
$75/hr
2hr minimum
Day/Foster/Group Home Inspection
$75
Hospital/Nursing Home/Asst Living
575/hr
Fee assessed per building / Failed Reinsp is S300
Request for License Insp —Gout Req
$75/hr
Fee assessed per building / Failed Reinsp is $300
License Re -Inspections
$75/hr
Fee assessed per building / Failed Reinsp is $300
Burning or Hazardous Operations
$500
Conducted without permit
Commercial Fire Sprinkler
$75/hr
Fee assessed per building/ Failed Reinsp is $300
Voluntary Residential Sprinklers
$0
Fire Pump
$75/hr
Fee assessed per building/ Failed Reinsp is $300
Commercial Alarm
$75/hr
Fee assessed per building / Failed Reinsp is $300
Fire Suppression Systems (Hoods/Booth)
$75/hr
Fee assessed per building / Failed Reinsp is $300
Fuel Tank — New Install
$75/hr
Fee assessed per building / Failed Reinsp is $300
Thrust Block
$75/hr
Fee assessed per building / Failed Reinsp is $300
Hydro: Sprinkler/FDC/Fire Line
$75/hr
Fee assessed per building / Failed Reinsp is $300
Sprinkler Systems — Acceptance Test
$75/hr
Fee assessed per building / Failed Reinsp is $300
Standpipe System Acceptance
$75/hr
Fee assessed per building / Failed Reinsp is S300
Fire Alarm Acceptance Test
$75/hr
Fee assessed per building / Failed Reinsp is S300
Certificate of Occupancy
$75/hr
Fee assessed per building / Failed Reinsp is $300
Fire Watch
$75/hr
2hr minimum
-Fire Wall Inspection
$75/hr
Fee assessed per building / Failed Reinsp is S300
Working without Permit
Variable
5009b of regular permit fee
c. Violations
Permft
False Fire Alarm
Rate
$0
Note
Less than 3 per year
False Fire Alarm - Excessive
$150 +
More than 3 per year
Intentional False Alarm
$200+
$200/incident+ Municipal court costs
Misadventure and/or Deliberate Risk
$200+
$200/incident+ Municipal court costs
Failure to Respond to Lawful Warning
$200+
$200/incident+ Municipal court costs
Failure to Notify FD of Alarm Activation
$150+
$150/incident
Injure to Fire Personnel— Deliberate Act
Varied
Refer to Sec 2.28.170
I
-Damage to Fire Apparatus. Equi., Property
Varied
Replacement cost of the item
Resolution No. u
Fire Service Fees
Date Approved r
Page 4 of 4