Loading...
HomeMy WebLinkAboutRES 032624-5.O - Home Repair ProgramRESOLUTION NO. Q3Z&21J —5 0 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF GEORGETOWN, TEXAS AMENDING THE BUILDING PERMITS AND INSPECTIONS FEE SCHEDULE TO INLCUDE LIMITED EXEMPTIONS FOR THE CITY'S HOME REPAIR PROGRAM PROJECTS. WHEREAS, it is the intent of the City of Georgetown, Texas (the "City") to protect the public health, safety, and welfare; WHEREAS, the City established a Home Repair Program in 2008 to provide home repairs, including exterior upgrades, weatherization, energy efficiency, accessibility, and safety improvements, to homeowners who are residents of the City and have limited resources; WHEREAS, the City desires to protect the public health, safety, and welfare by exempting projects completed pursuant to the City's Home Repair Program from certain permit fees; WHEREAS, the City the Building Permit and Inspections Fee Schedule contains certain permit fees adopted in accordance to UDC Section 3.02.020.13; and WHEREAS, the City Council has determined that it would be in the best interest of the community to amend the Building Permits and Inspections Fee Schedule in order to exempt projects completed pursuant to the City's Home Repair Program from certain fees; NOW THEREFORE BE IT RESOLVED: SECTION 1. The facts and recitations contained in the preamble of this resolution are hereby found and declared to be true and correct and are incorporated by reference herein and expressly made a part hereof, as if copied verbatim. SECTION 2. The City Council hereby adopts Building Permits and Inspections Fee Schedule, as amended, attached as Exhibit A. SECTION 4. If any provision of this Resolution or application thereof to any person or circumstance, shall be held invalid, such invalidity shall not affect the other provisions, or application thereof, of this Resolution which can be given effect without the invalid provision or application, and to this end the provisions of this Resolution are hereby declared to be severable. SECTION 3. The Mayor is hereby authorized to sign this Resolution and the City Secretary to attest. SECTION 4. This Resolution shall become effective upon its adoption. Resolution No. • V Page 1 of 2 Homc Rcpair Pro�g$ram Fcc Excm tions Date Approwd 1�- e��i 2 D24 PASSED AND APPROVED on the Zb day of 2024. ATTEST: CITY OF GMRGETOWN, TEXAS By: Robyn De smore City Secretary APPROVED AS TO FORM: S ass n City Attorney Resolution No. Page 2 of 2 Home Repair Pro ram Fee Exemptions Date ApprovedMe--1, uo. zpz=� EXHIBIT A Building Inspections City of Georgetown Includes: Building Permits and Inspections Fee Schedule City of Georgetown Utility - Water and Wastewater Impact Fees City of Georgetown Utility - Water and Wastewater Connection & Engineering Fees City of Georgetown Electric Engineering Fees City of Georgetown Fire Inspection Fees (�k GEOI�GETOWN T E X A S more than welcome BUILDING PERMIT FEES New Residential New Residential Single Family Per Resolution RES 092722-D **Square feet includes: and patios App Fee Permit Fee I Tech Fee $125.00 plus $0.50 per $125.00 sq ft** $25.00 Miscellaneous Residential* App Fee Permit Fee Tech Fee $60.00plus $0.50 per Remodel, repair, alteration, addition, sunroom, enclosure, accessory/storage building, patio, wood deck, patio cover, pergola, driveway extension (does not include new approach/driveway), flatwork (walkway, side walk), carport, garage. ** Additional permits will be required if electrical, mechanical, or plumbing is indicated. $60.00** sq ft $50.00 $10.00 Fences, water softeners, lawn irrigation N/A $10.00 Re -roof (no change in pitch), water heater, solar tubes, solar attic fans, foundation repair N/A $50.00 $10.00 N/A $100.00 $10.00 Demolition - per story, per structure N/A N/A $100.00 $110.00 $10.00 $10.00 Swimming pool - in ground, above ground, spa/hot tub New approach, curb cut, 2nd driveway * The City's Home Repair Program -approved projects are exempt from Miscellaneous Residential application, permit, and tech fees. New Commercial App Fee Permit Fee Tech Fee New Commercial *Note: Building permit fees are based on building valuation determined by the total square feet of the structure which excludes: parking lot, driveway and sidewalk multiplied by the amount found on the ICC (International Code Council) BVD (Building Valuation Data) Table according to Occupancy Type and Construction Type. Click here for most recent Building Valuation Data Table $150.00 *See note $50.00 Total Valuation Per Sa Ft Base Cost of additional $1000 In Valuation Up to $50,000 $250 $5.00 From/to $50,001 to $100,000 $350 $4.00 From/to $100,001 to $500,000 $460 $3.00 Over $500,000 $1660 $2.00 Multi Family: Additional Charge Multi Family Per Unit $300.00 per unit Plan Review Fees For all plans of new residential buildings, no more than two stories high and four living units, no fees will be charged. For Residential buildings three stories in height and more than four living units, the plans review fee shall be one-half of the building permit fee payable at the time of issuance of the building permit. For all plans of new commercial buildings, as classified by the building code as commercial occupancy types and remodels, additions or alterations, the plan review fee shall be one-half of the total building permit fee, plus a Fire Services review fee which is determined by fire department. All other buildings, including residential structures and more than four stories high, commercial building three stories and higher, schools and all other buildings are subject to forwarding to the International Code Council, Inc. (ICC), for plans review at the discretion of the Building Official. For those plans forwarded to ICC for review, the fees as determined by ICC at the time of submittal, shall be paid directly to ICC by the applicant and be nonrefundable. Revised 3.26.2024 Miscellaneous Commercial App Fee Permit Fee Tech Fee Commercial Remodel, alteration, addition, tenant finish out * + .50 per sq ft $0.50 per $200.00 sq ft $15.00 Certificate of Occupancy (New construction, change of name, change owner of business, change of name and owner of business, Lease space expansion) Demolition Commercial per story - per structure Temp use permit (job trailer, sales trailer, seasonal sales) _ Swimming pool and or spa - Commercial N/A J N/A N/A $100.00 $10.00 $150.00 $10.00 $150.00 $10.00 N/A $150.00 $10.00 Signs - Permanent (wall, hanging, monument, pole) N/A $100.00 $10.00 Signs (temporary - banners) Good for 45 calendar days from date of issuance N/A $100.00 $10.00 Signs (temporary - events only) *$5.00 additional over 5 signs N/A *$50.00 $10.00 Miscellaneous Permits App Fee Permit Fee Tech Fee Individual trade/sub-contractor permits Electrical, hvac mechanical and plumbing Note: Trade permits for NEW construction from ground up are included with building permit however validation is required. N/A *$50.00 $10.00 Individual trade/sub-contractor permits in the ETJ (Extra Territorial Jurisdiction): Electrical, hvac, mechanical and plumbing for NEW residential and commercial construction N/A $200.00 $10.00 $150.00 $10.00 Flood Plain Review N/A Noise waiver N/A $100.00 $10.00 Moving a building - *per building N/A *$100.00 $10.00 Building Standards Commission: Variance or appeal to the Building Code N/A $500.00 $10.00 Temp tenant property owner/landlord: Residential & commercial (*only required for residential w/electric not in service 6mon or more) N/A $50.00 $10.00 Re -Inspection/ Trip Charge Fees Residential 1st time $50.00 Residential 2nd time $100.00 Residential 3rd time *After 3rd time, 2 day hold on inspections *$150.00 Trip charge fee per trip for Parkside & Highlands at Mayfield subdivisions only $50.00 Commercial (new, remodel etc) 1st time $75.00 Commercial (new, remodel etc) 2nd time $150.00 Commercial 3rd time *After 3rd time, 2 day hold on inspections *$300.00 Certificate of Occupancy $100.00 Commercial Construction Plan Review of Revisions or Plan Review Comments 1st and 2nd receipt of plan corrections by applicant No charge 3rd receipt of plan corrections by applicant $75.00 4th receipt of plan corrections by applicant $100.00 5th receipt of plan corrections by applicant $150.00 Revised 3.26.2024 Utility Application Fees (Applies to New Utility Connections Outside of the Citv Limits) I Utility Connect Application Fee (includes ETJ - Extra Territorial Jurisdiction and Western District Areas) * Fire Permit Fees Please contact Fire Department for Fee Schedule at (512) 930-3473 or visit website at http fire.georgetown. Application Fee I Tech Fee $100.00 1 $10.00 Georgetown Power Electric Utility Connect Fees Electric Temporary Meter Fees per Ordinance 13.04.210 $215.00 $120.00 per site visit Trip Fees as needed per Ordinance 13.04.210 Single Phase 0-400 amps $200.00 meter connect fee Greater than 400 amps *Actual cost of materials and labor Three Phase 0-200 amps 201-400 amps Greater than 400 amps *Actual cost of materials and labor *PLEASE CONTACT ELECTRICAL ENGINEERING FOR ELECTRICAL CONNECTION FEES at electricenaineerinaC@aeoraetown.ora* Or complete a line extension at https://permits. georgeto wn. org/georgeto wn-energy-services-electric-engineering-construction-information/ Revised 3.26.2024 CITY OF GEORGETOWN UTILITY FEES Per Code of Ordinances Chapter 13.04 Utiiity Service Rates & Charges Water Meter Connections Residential and Commercial (based on Water meter size) Inside City Limits Outside City Limits 3/4" Water Meter $350.00 $500.00 1" Meter $500.00 $650.00 1 1/2" Meter $650.00 $800.00 2" Meter $950.00 $1,100.00 Greater than 2" Meter *$50.00 *$200.00 ** Fee plus meter and actual cost of materials and labor Water Engineering and Inspection Fee Single Family - Per dwelling unit $500.00 Multi Family (2 or more units) - Per dwelling unit $250.00 Commercial $.20/Sq ft area Waste Water Connections Residential and Commercial (based on wastewater line) Inside City Limits Outside City Limits 41' $300.00 $450.00 611 $450.00 $600.00 8" $650.00 $800.00 Greater than 8" **$50.00 **$50.00 Liberty Hill with Western District (Formally Chisholm Trail) $600.00 ** Meter plus actual cost of materials and labor Waste Water Engineering and Inspection Fee Single Family - Per dwelling unit $500.00 Multi Family (2 or more units) - Per dwelling unit $250.00 Liberty Hill with Western District Water (Formally Chisholm Trail) $60.00 Commercial $.06/Sq ft area Industrial $.10/Sq ft area Revised 3.26.2024 CITY OF GEORGETOWN WATER AND WASTEWATER IMPACT FEES PER CITY ORDINANCE CHAPTER 13.32 WATER AND WASTEATER IMPACT FEES: Sec. 13.32.070. - Assessment of impact fees: A. The approval of any subdivision of land or of any new development within the impact fee service area shall include as a condition of development the assessment of the impact fee applicable to such development. B. Assessment of the water and wastewater impact fees for any new development shall be made as follows: 1. For a development which is submitted for approval pursuant to the City's subdivision regulations following the effective date of the ordinance codified in this chapter, assessment shall be at the time a preliminary plat is approved by City Council and shall be in the amount of the assessed fee per service unit then in effect as set forth in Exhibit B, attached to the ordinance codified in this chapter, on record in the office of the City Secretary, except as provided in subsections B.2., 3., and 4. of this section; 2. For a development for which no plat is required or issued, assessment shall occur at the time of building permit application. For development for which no building permit is issued, assessment shall be at the time of utility connect permit application; 3. For a development for which a preliminary plat was approved, but which has expired, assessment shall occur at the time a new preliminary plat approval is sought; 4. For septic tank cutovers, assessment shall be at the time of utility connect permit application. C. Following assessment of the impact fee hereunder, the amount of the impact fee per service unit may not be increased above the assessed fee unless the owner redevelops or seeks approval of new plan required as a result of an approved development plan expiration. D. An application for an amended plat made pursuant to Texas Local Government Code Section 212.016 (Vernon) or the City's subdivision rules is not subject to a reassessment of the impact fee. (Ord. No. 2005-61, § 6; Ord. No. 2003-39, §§ 2, 3(Exh. A); Ord. 96-1 § 2 (Att. A) (part)) *Note: Use of 5/8" meter for limited application to small residential units (<1,200 square feet of air conditioned/heated space) where no automatic landscape irrigation system will be installed. Other potential applications are public facilities such as restrooms in parks. Pre October 2003 Impact Fees Meter Size Multiplier Residential Water Residential Wastewater Non Residential Water Non Residential Waste -water 5/8"* 0.667 $825 $600 $1,325 $1,098 3/4" 1 $825 $600 $1,325 $1,098 1" 1.667 $1,375 $1,000 $2,209 $1,830 1.5" 3.333 $2,750 $2,000 $4,416 $3,660 2" 6.667 $5,500 $4,000 $8,834 $7,320 3" 16 $13,200 $9,600 $21,200 $17,568 October 2003 Impact Fees Meter Size Multiplier Water Waste Water 5/8"* 0.667 $1,530 $1,247 3/4" 1 $2,295 $1,869 1" 1.667 $3,826 $3,116 1.5" 3.333 $7,649 $6,229 2" 6.667 $15,301 $12,461 3" 16 $36,720 $29,904 4" 28 $42,840 $34,916 October 2005 Impact Fees Meter Size Multiplier Water Waste Water South Fork Waste Water 5/8"* 0.667 $1,530 $1,255 $2,077 3/4" 1 $3,324 $1,881 $3,114 1" 1.667 $5,541 $3,136 $5,191 1.5" 3.333 $11,079 $6,269 $10,379 2" 6.667 $22,161 $12,541 $20,761 3" 16 $53,184 $30,096 $49,824 Revised 3.26.2024 November 2010 Impact Fees Meter Size Multiplier Water Waste Water South Fork Waste Water 5/8" * 0.667 $2,342 $1,130 $1,952 3/4" 1 $3,511 $1,694 $2,927 1" 1.667 $5,853 $2,824 $4,579 1.5" 3.333 $11,702 $5,646 $9,756 2" 6.667 $23,408 $11,294 $19,514 3" 16 $56,176 $27,104 $46,832 October 2015 Impact Fees Meter Size Multiplier Water Waste Water South Fork Waste Water 5/8" * 0.667 $5,139 $2,997 $4,452 3/4" 1 $5,139 $2,997 $4,452 1" 1.667 $8,566.71 $4,996 $7421.48 1.5" 3.333 $17,128.29 $9,989 $14,838.52 2" 6.667 $34,261.71 $19,981 $29,681.48 3" 16 $82,224.00 $47,952 $71,232 4" 28 $143,892.00 $83916.00 $124,656.00 6" 61.333 $315,190.29 $183,815.00 $273,054.52 8" 106.667 $548,161.71 $319,681.00 $474,881.48 October 2016 Impact Fees Meter Size Multiplier Water Waste Water South Fork Waste Water 5/8"* 0.667 $6,139 $2,997 $4,452 3/4" 1 $6,139 $2,997 $4,452 1" 1.667 $10,233.71 $4,996 $7421.48 1.5" 3.333 $20,461.29 $9,989 $14,838.52 2" 6.667 $40,928.71 $19,981 $29,681.48 3" 16 $98,224.00 $47,952 $71,232 4" 28 $171,892.00 $83916.00 $124,656.00 6" 61.333 $375,523.29 $183,815.00 $273,054.52 8" 106.667 $654,828.71 $319,681.00 $474,881.48 October 2017 Impact Fees Meter Size Multiplier Water Waste Water South Fork Waste Water 5/8"* 0.667 $7,039.00 $2,997 $4,452 3/4" 1 $7,039.00 $2,997 $4,452 1" 1.667 $11,734.01 $4,996 $7421.48 1.5" 3.333 $23,460.99 $9,989 $14,838.52 2" 6.667 $46,929.01 $19,981 $29,681.48 3" 16 $112,624.00 $47,952 $71,232 4" 28 $197,092.00 $83916.00 $124,656.00 6" 61.33 $431,722.99 $183,815.00 $273,054.52 8" 106.667 $750,829.01 $319,681.00 $474,881.48 October 2018 Impact Fees Meter Size Multiplier Water Waste Water South Fork Waste Water 5/8"* 0.667 $4,616.31 $2,077.71 $2,900.12 3/4" 1 $6,921.00 $3,115.00 $4,348.00 1" 1.667 $11,537.31 $5,192.71 $7,248.12 1.5" 3.333 $23,067.69 $10,382.30 $14,491.88 2" 6.667 $46,142.31 $20,767.71 $28,988.12 3" 16 $110,736.00 $49,840.00 $69,568.00 4" 28 $193,788.00 $87,220.00 $121,744.00 6" 61.333 $424,485.69 $191,052.30 $266,675.88 8" 106.667 $738,242.31 $332,267.71 $462,788.12 Revised 3.26.2024 October 2023 Impact Fees Meter Size Multiplier Water Waste Water 5/8"* 0.667 $7337.00 $4,088.04 3/4" 1 $11,000.00 $6,129.00 1" 1.667 $18,337.00 $10,217.04 1.5" 3.333 $36,663.00 $20,427.96 2" 6.667 $73,337.00 $40,862.64 3" 16 $176,000.00 $98.064.00 4" 28 $308,000.00 $171,612.00 6" 61.333 $674,663.00 $375,909.96 8" 106.667 $1,173,337.00 $653,762.04 10" 166.667 $1,833,337.00 $1,021,502.04 MF(Apartment) "= 0.667x Units)" "=7,337 x Unit Count" "=4088.04xUnit Count"