HomeMy WebLinkAboutAgenda_GTEU_07.16.2020Notice of Meeting for the
Georgetown Electric Utility B oard
of the City of Georgetown
July 16, 2020 at 4:00 P M
at Georgetown P ublic L ibrary, 402 W. 8th Street, Georgetown, T X 78626
T he C ity of G eorgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you
require as s is tance in partic ipating at a public meeting due to a disability, as defined under the ADA, reas onable
as s is tance, adaptations , or ac commodations will be provided upon request. P leas e c ontact the C ity S ec retary's
O ffic e, at leas t three (3) days prior to the sc heduled meeting date, at (512) 930-3652 or C ity Hall at 808 Martin
Luther King Jr. S treet, G eorgetown, T X 78626 for additional information; T T Y users route through R elay
Texas at 711.
P lease note that a quorum of the Ge orge town E lec tric Utility B oar d may not
all be pre se nt at the same physical loc ation. S ome me mber s may inste ad
participate in this mee ting fr om one or mor e r emote locations in an e ffort to
advance the public he alth goal of limiting fac e to face me etings and to contain
the spr ead of C O V I D-19. In addition, ther e may be occ asions when the
audio transmission may not be c le ar or may be inte rr upted. In those
instanc es, the me eting will c ontinue so long as a quor um is still pr esent.
With the M ayor’s O r de r, all City B uildings are following the se pr oce dure s:
• M asks ar e r equire d
• P hysic al distanc ing; 6 fe et betwee n you and anyone not in your
household
• P rac tic e good hygiene and wash your hands
• If any of these apply, do not visit: known c lose c ontac t with C O V I D-19
P e rson, fever gre ater or e qual to 100.0 degr ee s F ahre nheit, diffic ulty
bre athing or shortness of br eath, cough, loss of taste or smell, sore thr oat,
c hills, headache, diar rhea or musc le pain.
Regular Session
(T his R egular S es s ion may, at any time, be rec es s ed to c onvene an Exec utive S es s ion for any purpose
authorized by the O pen Meetings Act, Texas G overnment C ode 551.)
A C all to O rder - Bill S attler, Board C hairman
B Introduc tion of Visitors - Bill S attler, Board C hairman
C P ublic Wishing to Address the Board
O n a subject that is posted on this agenda: P leas e fill out a s peaker registration form which c an be found
Page 1 of 40
on the table at the entrance to the Board Meeting. C learly print your name and the letter of the item on
whic h you wis h to s peak and pres ent it to the S taff Liais on, prior to the start of the meeting. You will
be called forward to s peak when the Board c onsiders that item. O nly persons who have delivered the
speaker form prior to the meeting being called to order may speak.
O n a subject not posted on the agenda: P ers ons may add an item to a future R egular sc heduled Board
agenda by filing a written reques t with the S taff Liaison no later than one week prior to the Board
meeting. T he request mus t inc lude the speaker’s name and the spec ific topic to be addres s ed with
sufficient information to inform the board and the public. Only those persons who have submitted a
timely request will be allowed to speak. P lease contac t the Board Liaison to sign up to s peak at:
Laura.Wilkins@georgetown.org.
At the time of posting, no one had s igned up to speak to the Board.
D P resentation of the G eneral Manager's Monthly R eport - Daniel Bethapudi, G eneral Manager of the
Elec tric Utility
Regular Agenda
E C ons ideration and possible action to approve the Minutes of the June 18, 2020 Board Meeting. -- Laura
Wilkins - Executive As s is tant
F P resentation and pos s ible rec ommendation of the propos ed Elec tric C apital Improvement P rojects (C I P )
for 2020/2021. -- Mike Wes tbrook, Electric O perations Manager
G C ons ideration and possible recommendation of the Techline Just-In-Time (JI T ) contrac t. -- Mike
Wes tbrook, Electric O perations Manager
E xecutiv e Session
In c omplianc e with the O pen Meetings Ac t, C hapter 551, G overnment C ode, Vernon's Texas C odes,
Annotated, the items listed below will be dis cus s ed in c los ed session and are s ubjec t to action in the regular
s es s ion.
H S E C. 551.086 Competitive Matters
- P urchas ed P ower Update
- S ubs tation C apital Improvement P rojec ts (C I P )
I Action from Executive Session
Adjournment
Ce rtificate of Posting
I, R obyn Densmore, C ity S ecretary for the C ity of G eorgetown, Texas, do hereby c ertify that this Notic e of
Meeting was posted at C ity Hall, 808 Martin Luther King Jr. S treet, G eorgetown, T X 78626, a plac e readily
acc es s ible to the general public as required by law, on the _____ day of _________________, 2020, at
__________, and remained s o posted for at leas t 72 c ontinuous hours prec eding the s cheduled time of said
meeting.
Page 2 of 40
__________________________________
R obyn Dens more, C ity S ec retary
Page 3 of 40
City of Georgetown, Texas
Electric Utility Board
July 16, 2020
S UB J E C T:
P res entation of the G eneral Manager's Monthly R eport - Daniel Bethapudi, G eneral Manager of the
Electric Utility
IT E M S UMMARY:
Monthly F inancial R eport
Monthly O perations R eport
F IN AN C IAL IMPAC T:
NO NE
S UB MIT T E D B Y:
Daniel N. Bethapudi - G eneral Manager, Elec tric Utility (LJW )
Page 4 of 40
City of Georgetown, Texas
Electric Utility Board
July 16, 2020
S UB J E C T:
C onsideration and pos s ible ac tion to approve the Minutes of the June 18, 2020 Board Meeting. -- Laura
Wilkins - Exec utive Assistant
IT E M S UMMARY:
R eview of the minutes of the joint meeting of the G eorgetown Electric Utility Advis ory Board and the
G eorgetown Water Utility Advisory Board of T hursday, June 18, 2020
F IN AN C IAL IMPAC T:
NO NE
S UB MIT T E D B Y:
Laura Wilkins - Exec utive Assistant
AT TAC H ME N T S:
Description Type
Minutes of June 18, 2020 Backup Material
Page 5 of 40
Minutes of the Meeting for the
Georgetown Electric Utility Advisory Board
and the Georgetown Water Utility Board
Thursday, June 18, 2020 at 2:00 PM
at Georgetown Public Library, 402 W. 8th Street, Georgetown, TX, 78626
Board Members Present:
Electric: Bill Sattler – Board Chairman; Mike Triggs, Robert Case, Sam Jones, Rick Woodruff
Water: Thomas Glab – Board Chairman, Steve Fought, Stuart Garner, Michael Morrison, Scott
Macmurdo
Board Members Absent: NONE
Staff Present: David Morgan, Laurie Brewer, Skye Masson, Daniel Bethapudi, Glenn Dishong,
Leticia Zavala-Jones, Mike Westbrook, Michael Weisner, Chelsea Solomon, David Thomison,
Tina Davis, Michael Hallmark, Wesley Wright, Sheila Mitchell, Laura Wilkins
Others Present: Via Teleconference: Steve Moffitt, Schneider Engineering; Shams Siddiqi,
Crescent Power, Inc.
REGULAR SESSION:
A. Call to Order – Bill Sattler - Electric Board Chairman and Thomas Glab - Water Board
Chairman
Meeting of both Boards was called to crder at 2:00 PM by Sattler and Glab
B. Introduction of New Electric and Water Board Members – Bill Sattler - Electric Board
Chairman and Thomas Glab - Water Board Chairman
All Board Members were introduced and gave a brief statement about their background
and experience.
C. History and Overview of Board Creation. (Water and Electric Boards) – Daniel Bethapudi
– General Manager of the Electric Utility; and Glenn Dishong – Director of Water Utilities
Dishong started off with some background on the former GUS Board, and that the Council
determined it was a good idea to separate the boards to be more effective with a greater
level of expertise. Introduced water team. Bethapudi gave intro of electric team. Zavala-
Jones gave intro of herself and Customer Care team. Then she presented overview of
Customer Statistics. Brewer Introduced herself and her team. Brewer presented a basic
overview of electric and water funds. Westbrook presented Electric System statistics;
Performance Metrics; Lineman Program; Awards. Bethapudi discussed Purchased
Page 6 of 40
Georgetown Electric Utility Advisory Board and
the Georgetown Water Utility Board
Agenda for Thursday, June 18, 2020
Page 2 of 4
Power Outlook and challenges and opportunities. Brewer spoke about Water Fund
financials. Dishong presented Water System statistics, etc. Wright – introduced
Engineering staff and spoke about the engineering department functions as they relate to
electric and water (EARZ and Capital Projects).
D. Review Board Meeting Procedures – Laura Wilkins, Executive Assistant and Tina Davis,
Administrative Assistant
Bylaws
Quorum Requirements
Attendance Policy
Meeting Calendar
Info Sheet
Wilkins spoke briefly about the documents included in the agenda packet and gave a
reminder about Attorney General’s required online presentation/training, board
attendance, and quorum requirements for meetings.
E. Public Wishing to Address the Board regarding the Electric Board – Bill Sattler – Board
Chairman
No one requested to address the Board
F. Public Wishing to Address the Board regarding the Water Board – Thomas Glab – Board
Chairman
No one requested to address the Board
G. General Manager’s Report (Electric Utility Financial and Operations – Daniel Bethapudi –
General Manager of the Electric Utility
Bethapudi presented Financial and Operations Report. Some questions and general
discussion followed.
H. Director’s Report (Water Utility Financial and Operations – Glenn Dishong – Director of
Water Utilities
Dishong presented Financial and Operations Report. Some questions and general
discussion followed.
Page 7 of 40
Georgetown Electric Utility Advisory Board and
the Georgetown Water Utility Board
Agenda for Thursday, June 18, 2020
Page 3 of 4
LEGISLATIVE SESSION:
I. Nominations and election of Vice-Chair of the Electric Board. – Bill Sattler – Electric Board
Chairman MOTION by Sattler, second by Woodruff to nominate Robert Case as
Vice-Chairman of the Electric Board. APPROVED 5-0
J. Nominations and election of Secretary of the Electric Board. – Bill Sattler – Electric Board
Chairman MOTION by Woodruff, second by Sattler to nominate Sam Jones as
Secretary of the Electric Board. APPROVED 5-0
K. Nominations and election of Vice-Chair of the Water Board – Thomas Glab – Water Board
Chairman MOTION by Macmurdo, second by Morrison to nominate Stuart Garner as
Vice-Chairman of the Water Board. APPROVED 5-0
L. Nominations and election of Secretary of the Water Board – Thomas Glab – Water Board
Chairman MOTION by Garner, second by Fought to nominate Scott Macmurdo as
Secretary of the Water Board. APPROVED 5-0
M. Review and possible action related to the date and time of Electric Board meetings. – Bill
Sattler – Electric Board Chairman MOTION by Sattler, second by Jones to accept the
proposed date and time of Electric Utility Advisory Board meetings as the 3rd Thursday
of each month at 4:00 PM, at the Georgetown City Council Chambers. APPROVED 5-0
(NOTE: due to the COVID-19 situation, the meeting location may be adjusted to
accommodate social distancing requirements)
N. Review and possible action related to the date and time of Water Board meetings. –
Thomas Glab – Water Board Chairman MOTION by Glab, second by Macmurdo to
accept the proposed date and time of Water Utility Advisory Board meetings as the 2nd
Thursday of each month at 2:00 PM, at the Georgetown City Library. APPROVED 5-0
O. Consideration and possible action to approve and adopt the Bylaws of the Georgetown
Electric Utility Advisory Board. – Laura Wilkins, Executive Assistant MOTION by
Sattler, second by Case to approve and adopt the Bylaws of the Electric Board as
presented. APPROVED 5-0
P. Consideration and possible action to approve and adopt the Bylaws of the Georgetown
Water Utility Advisory Board. – Tina Davis, Administrative Assistant MOTION by
Glab, second by Macmurdo to approve and adopt the Bylaws of the Water Board as
presented. APPROVED 5-0
Page 8 of 40
Georgetown Electric Utility Advisory Board and
the Georgetown Water Utility Board
Agenda for Thursday, June 18, 2020
Page 4 of 4
|
Q. Old Business – Council Action
No old business to discuss
R. New Business - None
MOTION by Fought, second by Garner to Adjourn the Georgetown Water Utility Board
Meeting. APPROVED 5-0 Water Board Meeting Adjourned at: 3:47 PM.
S. EXECUTIVE SESSION: of the Georgetown Electric Advisory Board
Section 551.086: Competitive Matters
MOTION by Sattler, second by Case for the Georgetown Electric Utility Board go into
Executive Session. APPROVED 5-0 Electric Board went to Executive Session
at 3:47 PM
Executive Session called to order at: 3:55 PM by Sattler
MOTION by Sattler, second by Woodruff to adjourn Executive Session and reconvene in
Legislative Session. APPROVED 5-0
Legislative Session reconvened at 5:38 PM
T. Action from Executive Session: NO ACTION
ADJOURNMENT:
MOTION by Sattler, second by Woodruff to adjourn the Electric Board meeting. APPROVED 5-0
Electric Board Meeting Adjourned at: 5:40 PM
Page 9 of 40
City of Georgetown, Texas
Electric Utility Board
July 16, 2020
S UB J E C T:
P res entation and possible recommendation of the proposed Electric C apital Improvement P rojec ts (C I P )
for 2020/2021. -- Mike Westbrook, Elec tric O perations Manager
IT E M S UMMARY:
F IN AN C IAL IMPAC T:
P rojects will be recommended to be inc luded in the 2020/2021 Energy S ervices Budget
S UB MIT T E D B Y:
Mike Wes tbrook - Electric O perations Manager (ljw)
AT TAC H ME N T S:
Description Type
Electric CIP 2020-2021 Pres entation
Page 10 of 40
Electric
2021 CIP Plan
Page 11 of 40
Plan Objectives/Criteria
•Identify problems or
potential problems related
to
–System Reliability
–Power quality
–Line/Equipment
Capacity
–System Condition
•Nominal system voltage:
118 to 120 volts
•Feeder Power factor: 98%
to 100%
•Upgrade/replace
overloaded
lines/equipment
•Convert Downtown
Overhead to Underground
•Line Design Software
Upgrade
•System
Protection/Sectionalization
Page 12 of 40
2021 CIP Plan Key Points
•Rehabilitation projects based on field inspection
•Completion of feeder ties to improve backfeed capability
and reliability
•Upgrade of Underground installations to current standards
•Convert Downtown Electric overhead to underground
•Line Design Software Upgrade
•Power Transformer addition at Glasscock Substation
Page 13 of 40
Hwy 195 –Glasscock Feeder Exit
Vault Clean Up
Description:
•Installation of a second vault to separate the
feeders, clean up of the existing vault, it is
crowded and a safety hazard
Project Justification:
•Reliability and Safety
•Feeders are racked on top of each other
•Splice repair in the current vault could lead
extended outage time to customers
Project Statistics
Project Cost: $560,000
Miles of Line: 0
Customers Affected: 0
REG Step Down
REG
Retire
Step
Down
(Retire)
Breaker
(Replace)
Page 14 of 40
Ronald Reagan –Glasscock Feeder Extension
Hwy –195 and Ronald Reagan
Description:
•Phase 2 of the RR-Glasscock Feeder extension. Addition
of double circuit feeder to existing Somerset Hill Feeder
from Glasscock along Hwy 195 to tie into second feeder
along Ronald Reagan Blvd to provide additional
reliability to area. Circuit will also provide TCEQ required
redundancy to future Northlands Wastewater Treatment
Plant. Phase 2 will complete the top circuit up to CR 245.
30,000 ft. Used 60% of 3 phase construction cost of
$43/ft as many of the poles are in the ground and we
have approx. 50,000 ft of 336. Since this feeder is
supposed to be the primary feed for the Northlands
WWTP, Water agreed to fund 50% of the feeder cost.
W/WW to split the cost of the feeder extension from the
Glasscock substation to the proposed Northlands
WWTP.
The feeder extension to the WWTP site is approx. 8500
ft and 50% of the cost is approx.. $182,750.
Project Justification:
•Reliability
•Back feed
•Meet future load in the Sun City area
•Feeder to the future Northlands Wastewater Treatment
Plant
•Duty to provide quality power
Project Statistics
Project Cost: $591,250
Miles of line: 4.4
Customers Affected: 0
REG Step Down
(Retire)
REG
(Retire)
Step
Down
(Retire)
Breaker
(Replace)
Page 15 of 40
2021 CIP Plan Budget
ProjectName ProjectDescription FY2021
Consultant Engineer
This funding will be used for a consultant enginner. This posistion's work
includes CIP preparation, joint use studies, strategic planning, and non-
specific planning studies as required.150,000
Downtown Overhead Rehab
A 5-year plan to rehab deteriorated downtown overhead facilities. Convert
Downtown OH to URD 350,000
Line Design Software Upgrade Replace or upgrade Line Design Software system 150,000
Ronald Reagan- Glasscock Feeder
extension along HWY 195- Phase 1
Hwy 195 - Glasscock Feeder Exit Vault Clean up. Scope includes installation of
a new vault and clean up the existing vault as it is crowded and is a safety
hazard.560,000
Ronald Reagan- Glasscock Feeder
extension along HWY 195- Phase 2
Phase 2 of the RR-Glasscock Feeder extension.Addition of double circuit
feeder to existing Somerset Hill Feeder from Glasscock along Hwy 195 to tie
into second feeder along Ronald Reagan Blvd to provide additional reliability
to area. Circuit will also provide TCEQ required redundancy to future
Northlands Wastewater Treatment Plant. Phase 2 will complete the top
circuit upto CR 245. 30,000 ft. Used 60% of 3 ph const cost of $43/ft as many of
the poles are in the ground and we have approx 50,000 ft of 336. Since this
feeder is supposed to be the primary feed for the Northlands WWTP, Water
agreed to fund 50% of the feeder cost. W/WW to split the cost of the feeder
extension from the Glasscock substation to the proposed Northlands WWTP.
The feeder extension to the WWTP site is approx. 8500 ft and 50% of the cost
is approx.. $182,750.
591,250
New Development New development projects.2,400,000
Power Quality Imp
Capacitor installations and modifications as determined by system loading
issues.50,000
Sectionalization Imp
This funding will be used for sectionalization of equipment including manual
and automatic system switching.100,000
Tansformer Additions
Glasscock Substation Power Transformer Addition. Based on a contingency
study performed by McCord Engineering Inc. in October 2019, it was
determined that the Glasscock power transformer addition is required by the
summer of 2021. This power transformer addition is required to not only
meet the growth but also the contingency requirements. •Estimated Cost of
the Project: $1,500,000•Engineering and Design – Q2 FY 2020 •RFP
development and procurement of long lead items – Q3 FY 2020 1,000,000
5,661,250
Page 16 of 40
City of Georgetown, Texas
Electric Utility Board
July 16, 2020
S UB J E C T:
C onsideration and pos s ible rec ommendation of the Tec hline Jus t-In-Time (J I T ) c ontract. -- Mike
Westbrook, Elec tric O perations Manager
IT E M S UMMARY:
F IN AN C IAL IMPAC T:
NO NE
S UB MIT T E D B Y:
Mike Wes tbrook - Electric O perations Manager (ljw)
AT TAC H ME N T S:
Description Type
JIT Contract Backup Material
Page 17 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
ELECTRICAL JUST-IN-TIME SUPPLIER AGREEMENT
WITH THE CITY OF GEORGETOWN
This Electrical Just-in-Time Supplier Agreement (the “Agreement”) is entered into and
made effective on the ______ day of ___________, _________ by and between Techline,
Inc. (“Contractor”) and the City of Georgetown, Texas (“City”).
1. Scope of Services. Contractor agrees to provide such services as further described in
Exhibit A, which is attached and incorporated herein. Any request by the Contractor for
an increase in the Scope of Services and an increase in the amount listed in paragraph
four of this Agreement shall be made and approved by the City prior to the Contractor
providing such services. If there is a dispute between the Contractor and the City
respecting any service provided or to be provided hereunder by the Contractor, including
a dispute as to whether such service is additional to the Scope of Services included in this
Agreement, the Contractor agrees to continue providing on a timely basis all services to
be provided by the Contractor hereunder, including any service as to which there is a
dispute.
2. City Terms Prevail. In the event there is a conflict between a term in Exhibit A and a
term in this agreement, the terms of this agreement shall prevail.
3. Total Compensation and Pricing.
3.1. The total annual compensation paid by the City to the Contractor, including
expenses, under this agreement shall not exceed $2,500,000.00..
3.2. Pricing for Stock for a capital improvement project (“CIP”) shall match the
pricing provided for in the Goods Contract between LCRA and Techline, Inc.
dated July 29, 2013 as amended (the “LCRA Agreement”) with the volume
discounts provided for in Exhibit B-1 attached hereto and as further described in
Exhibit A attached hereto. Pricing for Emergency Stock shall be as shown on
Exhibit B-2 attached hereto and as further described in Exhibit A attached hereto.
3.3. Contractor shall invoice the City for Stock for CIP and Emergency stock after the
City has accepted delivery net of items returned pursuant to Exhibit A and the
City shall pay the invoices pursuant to Section 36 of this Agreement.
4. Term. The initial term of the Agreement shall become effective from date of acceptance
and approval by the City. It shall remain in full force and effect with firm fixed prices in
Exhibit B-1 and Exhibit B-2 for twelve (12) months. Upon completion of the Original
Term and upon mutual agreement of both parties, the Agreement may be renewed for up
to two (2) additional terms of one (1) year each [up to three (3) years total]. The renewal
will be under the same terms and conditions except as otherwise provided herein or as
otherwise agreed upon by the parties. In the event a new agreement cannot be executed
at the anniversary date of the original term or any renewal term, the Agreement will
terminate unless the Agreement is renewed month-to-month until a new agreement is
executed.
Page 18 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
5. Amendments. Any changes to the terms of this agreement will not be effective unless
in writing and signed by both parties.
6. Insurance. Contractor shall procure and maintain at its sole cost and expense for the
duration of this Agreement insurance against claims for injuries to persons or damages to
property that may arise from or in connection with the performance of the work hereunder
by the Contractor, its agents, representatives, volunteers, employees or subcontractors.
The polices, limits and endorsements required are set forth in Exhibit C. Contractor’s
insurance certificate satisfying the City insurance requirements is attached as Exhibit D.
7. INDEMNITY. CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD
HARMLESS THE CITY, ITS OFFICERS, AGENTS, SERVANTS AND
EMPLOYEES FROM AND AGAINST ANY AND ALL SUITS, ACTIONS,
LEGAL PROCEEDINGS, CAUSES OF ACTION, CLAIMS, DEMANDS,
DAMAGES, JUDGMENTS, LOSSES, LIENS, COSTS, EXPENSES,
ATTORNEYS’ FEES AND ANY AND ALL OTHER COSTS, FEES AND/OR
CLAIMS OF ANY KIND OR DESCRIPTION ARISING OUT OF, IN
CONNECTION WITH OR RESULTING FROM THE NEGLIGENCE OR
WILLFUL MISCONDUCT OF CONTRACTOR OR ITS EMPLOYEES,
AGENTS, OR REPRESENTATIVES. THE CITY, AS A GOVERNMENTAL
ENTITY IN THE STATE OF TEXAS, SHALL NOT INDEMNIFY
CONTRACTOR.
8. ESCALATION/DE-ESCALATION. The unit prices for Emergency Stock as defined
herein purchased under an estimated annual requirements Agreement is firm for the first
annual period of the contract. If the option to renew for additional one-year term(s) is
exercised by the City and agreed upon by both parties, the City may allow a unit price
adjustment at the time of renewal. The Contractor may request unit price adjustments
when correlated with the Consumer Price Index specified herein or when such
adjustments are needed due to market conditions. The price index shall be the specified
index as published by the Bureau of Labor Statistics, Washington, DC 20212. The
baseline index shall be the index announced for the month in which Proposals
opened. Unit prices may be adjusted for each renewal period in accordance with the
changes in the index or market conditions beyond the control of Contractor. For price
changes based upon the index, the allowable percent change shall be calculated by
subtracting the baseline index from the index announced for the month in which the
renewal option is exercised (or the most current month published by the Bureau of Labor
Statistics) and dividing the result by the baseline index. The allowable percent change
shall be rounded to the nearest one-hundredth of one percent and the maximum unit price
adjustments permitted will be no more than five (5) % increase per renewal period;
however, the City reserves the right to limit the unit price increases at any renewal period.
For price changes based on other market conditions beyond the control of Contractor,
such as tariffs, strikes, riots, civil disturbances, fire, insurrection, war, embargoes, failures
of carriers, acts of God, or the public enemy, supply shortages, acts of terror, explosions,
earthquakes, hurricanes, lightning, floods, natural disasters, global or national recessions,
Page 19 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
energy blackouts, lockouts, legislative changes, regulatory changes, or other similar
conditions or causes beyond Contractor’s control, the parties agree to negotiate in good
faith. If the parties are unable to agree upon appropriate price adjustments, then either
party may terminate this agreement pursuant to section 16 below. The Contractor may
offer price decreases in excess of the allowable percent change. Contractor is required to
give a thirty (30) day written notice requesting the increase. Increases will be effective
on the start date of the renewal term or at such other time as may be mutually agreed by
the parties.
9. PLACE AND CONDITIONS OF WORK, ACCESS TO SITE. If Services are to be
performed principally on the City’s premises or in public rights of way, the City shall
provide the Contractor access to the sites where the Contractor is to perform the Services
as required in order for the Contractor to perform in a timely and efficient manner, in
accordance with and subject to applicable security laws, rules and regulations. After
being granted such access, Contractor agrees that it will confirm the nature of the City’s
service requirements and specifications, the location and essential characteristics of the
work sites, the quality and quantity of the materials, equipment, labor and facilities
necessary to perform the Services and any other conditions or states of fact which could,
in any way, affect performance of the Contractor’s obligations under the Contract. The
Contractor shall promptly notify the City if the actual site or service conditions differ
from the expected conditions. .
10. CONTRACTOR TO PROVIDE ALL MATERIAL, EQUIPMENT, LABOR.
Contractor shall provide all material, equipment and labor necessary to perform
Services. All material must be new, and all equipment utilized must be in good safe
working condition and suitable for Services. Contractor shall employ all personnel for
Services in accordance with the requirements of applicable local, state, and federal law.
11. WARRANTY. The goods or equipment specified shall be warranted against defects in
material or workmanship for a period of not less than twelve (12) months from date of
acceptance by the City. If the manufacturer’s warranty exceeds twelve (12) months, then
the manufacturer’s warranty shall be in effect. Contractor shall furnish a copy of the
manufacturer’s warranty at the time of delivery if requested by the City for that specific
order, and Contractor shall furnish a copy of the manufacturer’s warranty at the time of
delivery without a request from the City if the warranty exceeds twelve (12) months.
12. WORKFORCE. If Services are to be performed principally on the City’s premises or
on public rights-of-way:
a. Contractor shall employ only orderly and competent workers, skilled in the
performance of the Services which they will perform under the Contract.
b. Contractor, its employees, sub-Contractors and sub-Contractors’ employees, while
engaged in participating in a solicitation or while in the course and scope of delivering
services under the Contract, may not use or possess alcoholic or other intoxicating
Page 20 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
beverages, illegal drugs or controlled substances, nor may such workers be
intoxicated or under the influence of alcohol or drugs while on the job.
c. If the City or the City’s representative notifies the Contractor that any worker is
incompetent, disorderly or disobedient, has knowingly or repeatedly violated safety
regulations, has possessed or was under the influence of alcohol or drugs on the job,
the Contractor shall immediately remove such worker and may not employ such
worker again without the City’s prior consent.
13. COMPLIANCE WITH ALL SAFETY AND ENVIRONMENTAL
REQUIREMENTS. If Services are to be performed principally on the City’s premises
or on public rights-of-way, the Contractor, its sub-Contractors, and their respective
employees shall comply fully with all applicable federal, state, and local health, safety,
and environmental laws, ordinances, rules, and regulations in the performance of the
Services, including but not limited to those promulgated with the City and the
Occupational Safety and Health Administration (OSHA). In the case of conflict, the most
stringent safety requirement shall govern. The Contractor shall defend, indemnify and
hold the City harmless from and against all claims, demands, suits, actions, judgments,
fines, penalties and liabilities of any kind or nature arising from the breach of the
Contractor’s obligations under this paragraph.
14. ADVERTISING AND PUBLICITY. Contractor shall not advertise or otherwise
publicize, without the City’s prior written consent, the fact that the City has entered into
the Contract, except to the extent required by applicable law.
15. TERMINATION FOR CAUSE. In addition to the termination rights described above,
either party may terminate this Agreement effective upon written notice to the other if the
other breaches any of the terms and conditions of this Agreement and fails to cure that
breach within thirty (30) days after receiving written notice of the breach. In the event of
an incurable breach, the non-breaching party may terminate this Agreement effective
immediately upon written notice to the breaching party. In addition to all other remedies
available under law and in equity, the City may remove the Contractor from the City’s
Contractor list in the event that this Agreement is terminated for cause and any offer
submitted by the Contractor may be disqualified for up to three (3) years.
16. TERMINATION FOR CONVENIENCE. The City shall have the right to terminate
this Contract, in whole or in part, without cause any time upon thirty (30) calendar days’
prior written notice. The Contractor shall have the right to terminate this Contract, in
whole or in part, without cause any time upon ninety (90) calendar days’ prior written
notice; provided that all existing or outstanding orders placed by the City must be fulfilled
in the event of Contractor’s early termination. Upon receipt of a notice of termination,
the Contractor shall promptly cease all further work pursuant to the Contract, with such
exceptions, if any, specified in the notice of termination. The City shall pay the
Contractor, to the extent of funds appropriated or otherwise legally available for such
Page 21 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
purposes, for all services performed and obligations incurred prior to the date of
termination.
17. NON-APPROPRIATION. This Agreement is a commitment of City’s current revenues
only. It is understood and agreed that the City shall have the right to terminate this
Agreement at the end of any City fiscal year if the governing body of the city does not
appropriate funds sufficient to purchase the services. The City may terminate for non-
appropriation by giving the Contractor a written notice of termination at the end of its
then current fiscal year.
18. CLAIMS. If a claim, demand, suit or other action is asserted against the Contractor
which arises under or concerns the Contract, or which could have a material adverse effect
on the Contractor’s ability to perform thereunder, the Contractor shall give written notice
to the City within ten (10) calendar days after receipt of notice by the Contractor. Such
notice to the City shall state the date of notification of any such claim, demand, suit or
other action; the names and address of the claimant(s); the basis thereof; and the name of
each person against whom such claim is asserted. Such notice shall be delivered to the
City Attorney, PO Box 409, Georgetown, TX 78627.
19. CODES, PERMITS, LICENSES. Contractor shall comply with all federal, state and
local standards, codes and ordinances, as well as other authorities that have jurisdiction
pertaining to equipment and materials used and their application. None of the terms or
provisions of the specification shall be construed as waiving any rules, regulations or
requirements of these authorities. Contractor shall be responsible for obtaining all
necessary permits, certificates and/or licenses to fulfill contractual obligations to the City.
20. CONFIDENTIALITY. In order to provide the deliverables to the City, Contractor may
require access to certain of the City’s and/or its licensors’ confidential information
(including, but not limited to, inventions, employee information, trade secrets,
confidential know-how, confidential business information and other information which
the City or its licensors consider confidential) (collectively, “Confidential
Information”). Contractor acknowledges and agrees that the Confidential Information is
the valuable property of the City and/or its licensors, and any unauthorized use,
disclosure, dissemination or other release of the Confidential Information will
substantially injure the City and/or its licensors. The Contractor (including its employees,
sub-Contractors, agents or representatives) agrees that it will maintain the Confidential
Information in strict confidence and shall not disclose, disseminate, copy, divulge,
recreate or otherwise use the Confidential Information without the prior written consent
of the City, or in a manner not expressly permitted under this Contract, unless the
Confidential Information is required to be disclosed by law or as a result of an order of
any court or other governmental authority with proper jurisdiction, provided the
Contractor promptly notifies the City prior to disclosing such information so as to permit
the City reasonable time to seek an appropriate protective order. The Contractor agrees
to use protective measures no less stringent than the Contractor uses within its own
business to protect its own most valuable information, which protective measures shall
Page 22 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
under all circumstances be at least reasonable measures to ensure the continued
confidentiality of the Confidential Information. The provisions of this paragraph shall
survive the term of the Contract. No information shall be considered “Confidential
Information” if (i) the information is publicly available; (ii) the information was known
to Contractor before receiving it from the City, or (iii) the City has shared the information
with other persons or entities without requiring the agreement to keep the information
confidential. Nothing in this paragraph shall prohibit Contractor from producing
documents or other information (including Confidential Information) in response to a
subpoena, discovery requests, or a court order.
21. CONTRACTOR CERTIFICATION REGARDING BUSINESS WITH CERTAIN
COUNTRIES AND ORGANIZATIONS. Pursuant to Subchapter F, Chapter 2252, Texas
Government Code, Contractor certifies Contractor is not engaged in business with Iran,
Sudan, or a foreign terrorist organization. Contractor acknowledges this Agreement may be
terminated and payment withheld if this certification is inaccurate.
22. DEFAULT. Contractor shall be in default under the Agreement if the Contractor (a) fails
to fully, timely and faithfully perform any of its material obligations under the Contract,
(b) fails to fully, timely and faithfully perform any of its material obligations
under any agreement Contractor has with the City, (c) fails to timely pay any fees or taxes
owed to the City, (d) becomes insolvent or seeks relief under the bankruptcy laws of the
United States, or (e) makes a material misrepresentation in Contractor’s Proposal, or in
any report or deliverable required to be submitted by Contractor to the City.
23. DISPUTE RESOLUTION. If either the Contractor or the City has a claim, dispute or
other matter in question for breach of duty, obligations, services rendered or any warranty
that arises under this Contract, the parties shall first attempt to resolve the matter through
this dispute resolution process. The disputing party shall notify the other party in writing
as soon as practicable after discovering the claim, dispute or breach. The notice shall
state the nature of the dispute and list the party’s specific reasons for such dispute. Within
ten (10) business days of receipt of the notice, both parties shall make a good faith effort,
in person or through generally accepted means, to resolve any claim, dispute, breach or
other matter in question that may arise out of, or in connection with, this Contract. If the
parties fail to resolve the dispute within sixty (60) days of the date of receipt of the notice
of the dispute, then the parties may submit the matter to non-binding mediation, using a
mediator to be agreed upon by the parties. If the parties are unable to agree upon a
mediator, the parties agree to submit their dispute to non-binding mediation using a
mediator to be appointed in accordance with the Arbitration Rules of the American
Arbitration Association. If the parties cannot resolve the dispute through mediation, then
either party shall have the right to exercise any and all remedies available under law
regarding the dispute.
24. FORCE MAJEURE. The City and the Contractor will exert all efforts to perform the
tasks set forth herein within the proposed schedules. However, neither the City nor the
Page 23 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
Contractor shall be held responsible for inability to perform under this Agreement if such
inability is a direct result of a force substantially beyond its control, including but not
limited to the following: , strikes, riots, civil disturbances, fire, insurrection, war,
embargoes, failures of carriers, acts of God, or the public enemy, , acts of terror,
explosions, earthquakes, hurricanes, lightning, floods, natural disasters, global or national
recessions, energy blackouts, lockouts, legislative changes, regulatory changes, or other
similar conditions or causes beyond Contractor’s control.
25. FRAUD. Fraudulent statements by the Contractor on any Proposal or in any report or
deliverable required to be submitted by the Contractor to the City shall be grounds for
termination of the Agreement for cause by the City and may result in legal action.
26. INDEPENDENT CONTRACTOR. The Agreement shall not be construed as creating
an employer/employee relationship, a partnership or joint venture. The Contractor’s
services shall be those of an independent contractor. The Contractor agrees and
understands that the Agreement does not grant any rights or privileges established for
employees of the City. Contractor shall not be within protection or coverage of the City’s
Worker Compensation Insurance, Health Insurance, Liability Insurance or any other
insurance that the City, from time to time, may have in force.
27. INFRINGEMENT. Contractor represents and warrants to the City that: (a) Contractor
shall provide the City good and indefeasible title to the deliverables to be supplied by the
Contractor and (b) the deliverables supplied by the Contractor in accordance with the
specifications of the Agreement shall not infringe, directly or contributory, any patent,
trademark, copyright, trade secret or any other intellectual property right of any kind of
any third party; that no claims have been made by an person or entity with respect to the
ownership or operation of the deliverables and the Contractor does not know of any basis
for any such claims. Contractor shall, at its sole expense, defend, indemnify and hold the
City harmless from and against all liability, damages and costs (including court costs and
reasonable fees of attorneys and other professionals) arising out of or resulting from: (a)
any claim that the City’s exercise anywhere in the world of the rights associated with the
City’s ownership, and if applicable, license rights, and its use of the deliverables to be
supplied by the Contractor infringes the intellectual property rights of any third party; or
(b) Contractor’s breach of any of the Contractor’s representations or warranties stated in
this Contract. In the event of any such claim, the City shall have the right to monitor such
claim or, at its option and at its own expense, engage its own separate counsel to act as
co-counsel on the City’s behalf.
28. INTERPRETATION. The Agreement is intended by both parties as the final, complete
and exclusive statement of the terms of their Contract. No course of prior dealing
between the parties or course of performance or usage of the trade shall be relevant to
supplement or explain any term used in the Contract. Although the Agreement may have
been substantially drafted by one party, it is the intent of the parties that all provisions be
construed in a manner fair to both parties, reading no provision more strictly against one
party of the other. Whenever a term defined by the Uniform Commercial Code (the
Page 24 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
“UCC”), as enacted by the State of Texas, is used in the Contract, the UCC definition
shall control unless otherwise defined in the Contract.
29. LIENS. Contractor shall defend, indemnify and hold the City harmless from and against
any and all liens and encumbrances for all services provided by Contractor under this
Contract. At the City’s request, the Contractor or its sub-Contractor(s) shall provide a
proper release of all liens, or a bond around such liens, or other satisfactory evidence of
freedom from liens to be delivered to the City.
30. NO WAIVER. The waiver by either party of a breach or violation of any provision of
this Agreement shall not operate as or be construed to be a waiver of any subsequent
breach hereof.
31. NONDISCRIMINATION. The Contractor, with regard to the work performed by it
after award and prior to completion of this Contract, shall not discriminate on the basis
of race, color, sex, or national origin in the selection and retention of sub-Contractors,
including procurements of materials and leases of equipment. The Contractor shall not
participate either directly or indirectly in the discrimination prohibited by any federal,
state or local law.
32. NOTICES. Any notice or communication permitted or required by this Agreement shall
be deemed effective when personally delivered or deposited, postage prepaid, in the first
class mail of the United States properly, or sent via electronic means, addressed to the
appropriate party at the address set forth below:
Notice to the Contractor:
______________________
______________________
______________________
______________________
______________________
Notice to the City:
City of Georgetown
ATTN: City Manager
P.O. Box 409
Georgetown, Texas 78627
________________@georgetown.org
With a copy to:
City of Georgetown
ATTN: City Attorney
P.O. Box 409
Georgetown, Texas 78627
________________@georgetown.org.
Page 25 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
33. OWNERSHIP OF DOCUMENTS The City shall retain ownership of all associated
work products and documentation obtained from or created by the Contractor pursuant to
this Contract. Contractor shall deliver all documents or other work product to the City
upon request, including original versions if so specified in the request.
34. PAYMENT TERMS, All payments will be processed in accordance with Texas Prompt
Payment Act, Texas Government Code, Subtitle F, Chapter 2251. The City will pay
Contractor within thirty (30) days after of receipt of a correct invoice for services. The
Contractor may charge a late fee (fee shall not be greater than that permitted under the
Texas Prompt Payment Act) for payments not made in accordance with this prompt
payment policy; however, the policy does not apply to payments made by the City in the
event: (a) there is a bona fide dispute between the City and Contractor concerning the
goods, supplies, materials, equipment delivered, or the services performed, that causes
the payment to be late; (b) the terms of a federal agreement, grant, regulation or statute
prevents the City from making a timely payment with Federal funds; (c) there is a bona
fide dispute between the Contractor and a sub-Contractor and/or its suppliers concerning
goods, supplies, material or equipment delivered, or the services performed, which caused
the payment to be late; or (d) the invoice is not mailed to the City in accordance with
Contract.
35. RIGHT TO AUDIT. The Contractor agrees that the representatives of the City shall
have access to, and the rights to audit, examine, or reproduce, any and all Contractor
records related to the performance under this Contract. The Contractor shall retain all
such records for a period of four (4) years after final payment on this Agreement or until
all audit and litigation matters that the City has brought to the attention of the Contractor
are resolved, whichever is longer.
36. SEVERABILITY. This Agreement is severable and if any one or more parts of it are
found to be invalid, such invalidity shall not affect the remainder of this Agreement if it
can be given effect without the invalid parts.
37. SUCCESSORS AND ASSIGNS. This Agreement shall bind and inure to the benefit of
the parties hereto and any subsequent successors and assigns; provided however, that no
right or interest in the Agreement shall be assigned and no obligation shall be delegated
by either party without the prior written consent of the other party. Any attempted
assignment or delegation shall be void unless made in conformity with this Paragraph.
38. SURVIVABILITY OF OBLIGATIONS. All provisions of the Agreement that impose
continuing obligations on the parties, including but not limited to the warranty, indemnity
and confidentiality obligations of the parties, shall survive the expiration or termination
of the Contract.
39. THIRD PARTY BENEFICIARIES. Nothing contained in this Agreement shall create
a contractual relationship with or a cause of action in favor of a third party against either
the City or the Contractor.
Page 26 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
40. VENUE. This Agreement shall be governed by the laws of the State of Texas. Venue
shall be located in Williamson County, Texas.
Page 27 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
TECHLINE, INC. CITY OF GEORGETOWN
By: ______________________________ By: ______________________________
Printed Name: _____________________ Printed Name: Dale Ross_____________
Title: ____________________________ Title: Mayor_______________________
Date: ____________________________ Date: _____________________________
ATTEST:
__________________________________
Robyn Densmore, City Secretary
APPROVED AS TO FORM:
__________________________________
Skye Masson, First Assistant City Attorney
Page 28 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
EXHIBIT A
SCOPE OF SERVICES
JIT INVENTORY SERVICES
A. GENERAL
1. Contractor shall provide all labor and materials as required to store in a central lay
down yard, electrical supplies, materials and equipment for non-emergency and
emergency situations, and for the City’s electric Capital Improvement Plan (CIP)
projects utilizing Just In Time (JIT) inventory delivery methodology as proposed by
Contractor and that specifically meets the exact needs of the City.
B. STOCK FOR CIP
1. Contractor shall be responsible for stocking items upon request with long
manufacturing lead times that are used by the City.
2. Items in-stock shall be delivered within 48 hours of notification or the delivery date
of the order request, whichever applies per order.
3. Prices for these items shall be the same as the prices Techline provides to LCRA
pursuant to Goods Contract between LCRA and Techline, Inc. dated July 29, 2013 as
amended with the volume discounts shown in Exhibit B-1.
4. Contractor will restock and credit unused packages or unused equipmentwhole items
and provide a credit to the City in a timely manner; provided however that the City
agrees to pay restocking fees charged to or incurred by Contractor for any unused
packages or unused equirement returned by the City that Contractor after reasonable
efforts are made cannot sell to another Customer..
C. EMERGENCY STOCK
1. Contractor shall have a minimal number of select high dollar/high value long lead
items available for emergency purposes at the Contractor’s warehouse or facility and
ready to be sent or picked up by City on demand. Contractor shall keep an inventory
of in-stock items in accordance with the City’s material requirements listed in Exhibit
B-2. Contractor will procure all items and keep in-stock all items on list with
minimum quantity levels as designated in Exhibit B-2. The City’s surplus
transformers and switchgear must be sold or used by the City before the Contractor
will be obligated to purchase any additional such items for the City’s emergency
stock. The City must use best efforts to deplete all emergency stock before or after
the final expiration of this Agreement. If Contractor purchases and holds inventory
in stock pursuant to this Agreement and that inventory is not used or purchased by the
City as of the expiration of this Agreement, City shall have the option to purchase all
Page 29 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
such inventory from the Contractor. If the City does not purchase all such inventory
the City agrees that it will pay all restocking fees charged to or incurred by Contractor
for all inventory that Contractor can return to the manufacturer(s), and (ii) purchase
all such inventory that Contractor cannot return to the manufacturer(s).
D. DELIVERY REQUIREMENTS
1. The City will notify Contractor of the date when the City intends to start construction.
Contractor will provide delivery of the required material to the City lay down yard
one week before the project is due to start construction. The delivery requirements
will be in accordance with each purchase order for each individual order.
2. Contractor will deliver 3 Phase Pad Mount Transformers and other requested
materials directly to the job site when requested and the Contractor can charge a crane
fee per Exhibit B-2 attached hereto if needed.
3. Contractor will also package other materials required for the project such as hardware
and cable accessories, cut to length primary cable as requested in advance by the City
according to manufacturer lead times.
4. Contractor understands that a job site delivery cannot contain any back ordered
material. In addition, kits will be wrapped in a colored shrink-wrap and labeled with
the City work order to distinguish it from normal stock delivery. Any kit jobs will not
be mixed with normal stock deliveries. City reserves the right to provide Contractor
with some or all parts and equipment required for a kit which may have been
purchased off this contract.
5. Appropriate signatures shall be obtained upon receiving material to the City or its
contractors. A duplicate copy of the received material will be retained by City
personnel on site and Contractor shall provide digital copies of all signed proof of
deliveries for each invoice sent to the City.
6. Contractor deliveries shall be made as requested to specific job sites and to the City
locations listed below:
a. City of Georgetown
West Side Service Center
5501 Williams Drive
Georgetown, TX 78633
(No forklift at this site; must have a tow behind)
b. City of Georgetown
Central Warehouse
300-1 Industrial Avenue
Georgetown, TX 78626
Page 30 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
c. Other Locations to be assigned within Williamson County as requested by
City.
7. Contractor will provide after-hours delivery of materials as needed. The City will be
provided with 24-hour contact information of Contractor’s employee responsible for
the initiation of emergency deliveries.
8. Contractor shallinvoice the City for Emergency Stock and Stock for CIPupon
delivery and acceptance unless shipment is refused by the City.
9. After delivery, the City may return unused Emergency Stock and Stock for CIP and
a credit to the City’s account will be applied as set forth in this Agreement.
E. PLANNING AND SCHEDULING
1. Contractor shall communicate with the planners at the City to determine the
appropriate stock levels for the material as well as the amount of future inventory on
order.
2. Contractor shall attend monthly operations meetings with project schedulers,
engineers or consulting engineers to discuss an overview of upcoming work. Work
plan projects that are not detailed to a specific bill of materials can be discussed with
anticipated time lines. The City will provide information not limited to anticipated
quantities and need dates for each project related item to be supplied by the Contractor
3. Contractor shall meet quarterly with City Management on JIT performance.
F. SOFTWARE
1. The City will have real time access to Contractor’s warehouse inventory management
system that will help to manage inventory reserved for City, preferably via some form
of web interface that shall be available to authorized City employees.
2. City employee access to Contractor’s system will be based on the appropriate job
function/security level.
3. City employees shall receive training and tutelage on Contractor’s website as needed
and determined by the City.
4. A City user(s) shall be able to access the following information:
a. View Contractor’s stock on hand by City stock number
b. See product pictures and view Manufacturer Catalog Data by City stock number
c. Check on the status of a City Work order and/or City Purchase Order
d. Reprint a Contractor Invoice
Page 31 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
e. View and Print Proof of Delivery including City employee signature and date.
G. PERFORMANCE METRICS
1. The following metrics will be used to measure the accuracy and performance of this
Agreement:
a. On-Time delivery (measured by projected delivery date vs actual delivery date)
b. Fill rate accuracy of 95% or greater
c. Delivery to Proper location
d. Accuracy of packing lists
e. Access and effective training of their ordering system
f. Availability and on-time delivery of items on the Emergency stock list. City
will get priority over all other businesses or consumers.
2. These metrics will be made available to appropriate City staff via Contractor’s web
based real time KPI dashboard.
H. MISCELLANEOUS
1. Upon request by City, Contractor shall assist the City to reduce its stranded
investment in its inventory by identifying measures for inventory reduction and
bringing efficiencies to City.
I. DELIVERABLES
1. Contractor’s warehouse management system including all items in scope required
by City to be held in stock shall be fully operational within 30 days of contract
award for all items currently in Contractor’s stock and fully operational within 200
days for any major items that Contractor has to order.
2. JIT Financial and Service level reports to be provided on a quarterly basis to City.
3. Training to City on ordering system shall be provided within 30 days of Effective
Date.
4. Access to City staff to Contractor’s software system shall be completed within 30
days of Effective Date.
Page 32 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
EXHIBIT B-1
STOCK FOR CITY OF GOERGETOWN CIP
GEORGETOWN/TECHLINE VOLUME DISCOUNT FOR CONTRACT YEAR SALES
1) Wire and Cable with Sales over $600,000 = 2% Contract Year Volume Discount
Example: $800,000 Sales - $600,000 = $200,000 X 2% = $4,000 Rebate from Techline to COG
2) Stocked Single Phase Pad with Sales over $350,000 = 2% Contract Year Volume Discount
Example: $550,000 Sales - $350,000 = $200,000 X 2% = $4,000 Rebate from Techline to COG
3) Stocked Three Phase Pad with Sales over $225,000 = 2% Contract Year Volume Discount
Example: $425,000 Sales - $225,000 = $200,000 X 2% = $4,000 Rebate from Techline to COG
4) Direct shipped Only OH Transformers with Sales over $50,000 = 1% Contract Year
Volume Discount Example: $100,000 Sales - $50,000 = $50,000 X 1% = $500 Rebate
from Techline to COG
5) Switchgear with Sales over $100,000 = 1% Contract Year Volume Discount
Example: $200,000 Sales - $100,000 = $100,000 X 1% = $1,000 Rebate from Techline to COG
6) Underground Products with Sales over $50,000 = 2% Contract Year Volume Discount
Example: $100,000 Sales - $50,000 = $50,000 X 2% = $1,000 Rebate from Techline to COG
NOTE 1: Contract year begins on date contract is signed and restarts each contract year
thereafter for the life of the contract
NOTE 2: The above Specific Product Volume Discount supercedes any volume discounts offered
by Techline previously in association with RFP 201928
NOTE 3: Sales on the specific pieces of material/equipment listed above means anything COG
bought from Techline including Emergency Transformer or Switchgear sales with-in a contract
single year
NOTE 4: COG Surplus Transformers & Switchgear must be sold or used in COG System before
Techline will purchase any of that particular new gear or transformer for COG emergency stock
Page 33 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
EXHIBIT B-2
EMERGENCY ITEMS TO BE STOCKED BY TECHLINE
Item
No.
COG Part
Number QTY Description
Model Number
or Approved
Equivalent
Price to COG From
Techline To Keep 1 in
Stock with firm fixed
prices during the
original term and any
renewal options
1.0 360051 1
Switchgear
PVl411S-3L
27KV
G&W SWGR-
PVl41-386-1S-3L $63,519
MFTR and Model No. Proposed: G&W SWGR-PVl41-386-
12-12
2.0 3600S7 1 Vacuum Switch
ph PA21-P302
G&W PA21-
P302 $13,276
MFTR and Model No. Proposed: G&W PA21-P302
3.0 360058 1 Switchgear PVl42
2S-2L 27KV
G&W SWGR-
PVl42-386 2S-2L $60,333
MFTR and Model No. Proposed: G&W SWGR-PVl42-386-
12-9
4.0 360059 1
Switchgear PVl43
35-ll
27KV
G&W SWGR-
PVl43-386-3S-1
L
$46,078
MFTR and Model No. Proposed: G&W SWGR-PVl43-386-
12-11
5.0 360383 1 Switchgear
PVl62F 2s-4L
G&W SWGR-
PVl162F-2S-4L $92,029
MFTR and Model No. Proposed: PV162-386-12-62F
TRANSFORMERS BELOW HERE
6.0 360072 1
500 KVA 3ph
Pad Transformer
DV 120/208
Howard 9585-
435626-089 $18,959
Page 34 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
7.0 360073 1
750 KVA 3ph
Pad Transformer
DV 120/208
Howard 9589-
435593-008 $32,213
8.0 360074 1
1,000 KVA
Transformer DV
120/208
3ph Pad
Howard 9593-
435588-096 $39,364
9.0 360075 1
1,500 KVA
3ph Pad
Transformer DV
120/208
Howard 9594-
435577-054 $98,888
10.0 360081 1
500 KVA 3ph
Pad Transformer
DV 277/480
Howard 9585-
435604-065 $16,317
11.0 360082 1
750 KVA 3ph
Pad Transformer
DV 277/480
Howard 9589-
435604-066 $21,235
12.0 360083 1
1.000 KVA
3ph Pad
Transformer DV
277/480
Howard 9593-
435604-067 $23,634
13.0 360084 1
1,500 KVA
3ph Pad
Transformer DV
277/480
Howard 9594-
435604-068 $33,154
14.0 360085 1
2,000 KVA
3ph Pad
Transformer DV
277/480
Howard 9595-
435604-069 $49,938
15.0 360086 1
2,500 KVA
3ph Pad
Transformer DV
277/480
Howard 9596-
435604-070 $62,959
Note #1: Any transformer weighing over 16,000 pounds need to add $500 for crane lift charge for
each location crane will make a lift
Note #2: All Transformers quoted are PEC specification which is the specification Georgetown is
currently using to purchase transformers
Page 35 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
Note #3: All Switchgear quoted are G&W - COG specification which is the unique specification
Georgetown is currently using to purchase switchgear
Note #4: G&W Switchgear is specified to a unique (One of a kind) Georgetown specification and
will not be sold to any other Techline customer
Note #5: COG Surplus Transformers & Switchgear must be sold or used in COG System before
Techline will purchase any of that particular new gear for COG emergency stock
Note #5: All pricing above is for new stock; pricing is guaraunteed first year - subject to change
per contract pricing change methods (COG Surplus Material is priced seperatly)
Page 36 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
Exhibit C
Insurance Requirements
I. The Contractor agrees to maintain the types and amounts of insurance required in this
Agreement throughout the term of the Agreement. The following insurance policies shall be
required:
A. Commercial General Liability
B. Business Automobile Liability
C. Workers' Compensation
D. Professional Liability
II. For each of these policies, the Contractor’s insurance coverage shall be primary with
respect to the City, its officials, agents, employees and volunteers. Any insurance or self-
insurance carried or obtained by the City, its officials, agents, employees or volunteers, shall
be considered in excess of the Contractor’s insurance and shall not contribute to it. No term
or provision of the indemnification provided by the Contractor to the City pursuant to this
Agreement shall be construed or interpreted as limiting or otherwise affecting the terms of
the insurance coverage. All Certificates of Insurance and endorsements shall be furnished to
the City’s Representative at the time of execution of this Agreement, attached hereto as
Exhibit D, and approved by the City before work commences.
III. General Requirements Applicable to All Policies.
A. Only licensed insurance carriers authorized to do business in the State of
Texas shall be accepted.
B. Deductibles shall be listed on the certificate of insurance and are acceptable
only on an “occurrence” basis.
C. “Claims made” policies are not accepted, except for Professional Liability
insurance.
D. Coverage shall not be suspended, voided, canceled, or reduced in coverage or
in limits except after thirty (30) calendar days prior written notice has been
given to the City.
E. The Certificates of Insurance shall be prepared and executed by the insurance
company or its authorized agent. Each certificate shall contain the following
provisions and warranties:
1. The insurance company is licensed and authorized to do business in
the State of Texas
2. The insurance policy is underwritten on forms provided by the Texas
State Board of Insurance or ISO
3. All endorsements and coverages are included according to the
requirements of this Agreement
4. The form of notice of cancellation, termination, or change in coverage
provisions is specified in this attachment
Page 37 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
F. The City, its officials, agents, employees, and volunteers are to be listed as
Additional Insureds on the Commercial General Liability and Business
Automobile Liability Policies. The coverages shall contain no special
limitations on the scope of protection afforded the City, its officials,
employees, and volunteers.
V. Commercial General Liability requirements:
A. Coverage shall be written by a carrier rated “A: VIII” or better in accordance
with the current A. M. Best Key Rating Guide.
B. Minimum Combined Single Limit of $1,000,000 per occurrence per project
for bodily injury and property damage with a $2,000,000 annual aggregate
limit.
C. Coverage shall be at least as broad as Insurance Service's Office Number CG
00 01.
D. No coverage shall be excluded from the standard policy without notification
of individual exclusions being attached for review and acceptance.
E. The coverage shall not exclude: premises/operations; independent contracts;
products/completed operations; contractual liability (insuring the indemnity
provided herein); and where exposures exist, Explosion, Collapse and
Underground coverage.
F. The City shall be listed as Additional Insured, and the policy shall be endorsed
to waive rights of subrogation, to be primary and non-contributory with regard
to any self-insurance or insurance policy held by the City.
VI. Business Automobile Liability requirements:
A. Coverage shall be written by a carrier rated “A:VIII” or better in accordance
with the current Best Key Rating Guide.
B. Minimum Combined Single Limit of $1,000,000 per occurrence for bodily
injury and property damage.
C. The Business Auto Policy must show Symbol 1 in the Covered Autos portion
of the liability section in Item 2 of the declarations page.
D. The coverage shall include owned, leased or rented autos, non-owned autos,
any autos and hired autos.
VII. Workers’ Compensation Insurance requirements:
A. Pursuant to the requirements set forth in Title 28, Section 110.110 of the Texas
Administrative Code, all employees of the Contractor, the Contractor, all
employees of any and all subContractors, and all other persons providing
services on the Project must be covered by a workers compensation insurance
policy, either directly through their employer’s policy (the Contractor’s, or
subonsultant’s policy) or through an executed coverage agreement on an
approved DWC form. Accordingly, if a subContractor does not have his or
Page 38 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
her own policy and a coverage agreement is used, Contractors and
subContractors must use that portion of the form whereby the hiring
Contractor agrees to provide coverage to the employees of the subContractor.
The portion of the form that would otherwise allow them not to provide
coverage for the employees of an independent Contractor may not be used.
B. The workers compensation insurance shall include the following terms:
1. Employer’s Liability limits of $1,000,000 for each accident is
required.
2. “Texas Waiver of Our Right to Recover From Others Endorsement,
WC 42 03 04” shall be included in this policy.
3. Texas must appear in Item 3A of the Worker’s Compensation
coverage or Item 3C must contain the following: All States except
those listed in Item 3A and the States of NV, ND, OH, WA, WV, and
WY.
Page 39 of 40
{00010738 / v9 / / ELEC / TECHLINE / 7/17/2019}
SCON-2000262
Exhibit D
Certificate of Insurance
Page 40 of 40