HomeMy WebLinkAboutAgenda_GGAF_06.24.2015Notice of Meeting for the
General Government and Finance Advisory Board
of the City of Georgetown
June 24, 2015 at 3:30 PM
at Georgetown Communications and Technology Conference Room, located at 510
West 9th Street, Georgetown, TX
The City of Georgetown is committed to compliance with the Americans with Disabilities Act (ADA).
If you require assistance in participating at a public meeting due to a disability, as defined under the
ADA, reasonable assistance, adaptations, or accommodations will be provided upon request. Please
contact the City at least four (4) days prior to the scheduled meeting date, at (512) 930-3652 or City
Hall at 113 East 8th Street for additional information; TTY users route through Relay Texas at 711.
Legislative Regular Agenda
A Employee Compensation and Benefits - Tadd Phillips, Human Resources Director
B Presentation, discussion, and direction regarding the phasing and funding for the 5-Year Capital
Improvement Plan for Parks, Downtown and Facilities – Laurie Brewer, Assistant City Manager;
Micki Rundell, Chief Financial Officer
CERTIFICATE OF POSTING
I, Jessica Brettle, City Secretary for the City of Georgetown, Texas, do hereby certify that this Notice
of Meeting was posted at City Hall, 113 E. 8th Street, a place readily accessible to the general public
at all times, on the ______ day of __________________, 2015, at __________, and remained so
posted for at least 72 continuous hours preceding the scheduled time of said meeting.
____________________________________
Jessica Brettle, City Secretary
Page 1 of 24
City of Georgetown, Texas
Government and Finance Advisory Board
June 24, 2015
SUBJECT:
Employee Compensation and Benefits - Tadd Phillips, Human Resources Director
ITEM SUMMARY:
Human Resources staff share additional information in response to June 15 meeting. Staff will also
seek GGAF input on group health plan employee cost-sharing.
Presentation Outline
Compensation
Additional Cost Information
Benefits
Group Health Plan
2013/2014 Comparison
2016 Philosophical Discussion
FINANCIAL IMPACT:
To be discussed in presentation
SUBMITTED BY:
Tadd Phillips, Human Resources Director
ATTACHMENTS:
Description Type
Employee Comp-Benefits Presentation Backup Material
Page 2 of 24
6/18/2015
1
BUDGET:
Employee
Compensation & Benefits
Part II
GGAF
June 24, 2015
Presentation Outline
•Compensation
Additional Cost Information
•Benefits
Group Health Plan
2013/2014 Comparison
2016 Philosophical Discussion
Page 3 of 24
6/18/2015
2
Compensation Add’l Info
• 2014 Gross Employee Wages*
All City Funds: $33,419,529
General Fund: $21,985,361
Civil Service All: $11,485,729
Fire Civil Service: $6,357,417
Police Civil Service: $5,128,312
• Civil Service proportion of All Funds: 34.3%
• Civil Service proportion of General Fund: 52.2%
* Actual wages paid; wages do no include employer payroll costs nor benefits costs
Group Health 2013 v 2014
Discussion:
•Apples & Oranges
•Trend
•Increased HSA Participation
•Long-term
Calendar Year 2013 2014 Difference
Funding Methodology Fully Insured Partially Self Insured
Cost of Admin, S/L & Claims 3,364,729$ 3,661,956$ 8.8%
Employees 447 453 1.3%
Cost per Employee 7,527$ 8,084$ 7.4%
Page 4 of 24
6/18/2015
3
Group Health
•Currently reviewing financials and
developing projections for 2016; Highlights:
Monthly claims are projecting within budget
Current industry claims annual trend is 7.5%
2014 Stop loss reimbursements exceeded
premiums by $66,163
Stop loss renewal for 2016 likely to increase by 20%
Current self-insurance fund reserve of $221,000;
target of $1M
Likely need 10% increase in revenue + $200,000 to
meet reserve funding target
Group Health
•Philosophical Discussion
Employer/employee split of 85/15
Costs increase each year, do we want to:
1.Share in building reserves?
2.Share trend?
3.Manner of sharing: maintain current 85/15 split?
Page 5 of 24
6/18/2015
4
Group Health
• 85/15 Split Example
10% trend increase for Calendar Year 2016 =
$558,000
Break down between employee/employer
85% employer share = $474,300
15% employee share = $83,700
$83,700/485 = $172.65 avg additional annual cost per employee
Group Health
•Employer Portion of $474,300
General Fund Portion $280,311
Fiscal Year General Fund Impact $210,233
Page 6 of 24
6/18/2015
5
Group Health
•15% Employee Portion
2015 Parks Maintenance Worker starting salary
$27,809.60
Meets Expectations increase of 2% = $556.19
15% Employee Portion = $172.65
Remainder of take home from merit increase =
$383.54
Group Health
•New Programs Requested for 2016
Targeted Health Intervention
Study Employee Clinic Options
•RFP’s Planned for Remainder of 2015
TPA
Consultant
Page 7 of 24
6/18/2015
6
Conclusion
•Will bring back recommendation on group
health premiums
Consistent with GGAF and City Council Feedback
Involving input of Employee Benefits Committee
•All other items will be built into City
Manager recommended budget to Council
•Open to any GGAF questions or policy
direction
Page 8 of 24
City of Georgetown, Texas
Government and Finance Advisory Board
June 24, 2015
SUBJECT:
Presentation, discussion, and direction regarding the phasing and funding for the 5-Year Capital
Improvement Plan for Parks, Downtown and Facilities – Laurie Brewer, Assistant City Manager;
Micki Rundell, Chief Financial Officer
ITEM SUMMARY:
General Capital Projects planning is a collaborative effort among several city departments. Staff
has been meeting since February to discuss projects and funding sources. The five-year plan, and
any recommended changes, will be reviewed at the July 14, 2015 City Council workshop and
included in the five-year business plan update.
The proposed Parks CIP for 2015/2016 includes funds for Garey Park and San Gabriel Park
construction.
The Downtown Master Plan will address items priorities identified in the Downtown Master
Plan. For 2015/2016 the proposed funds will be used for on-going general maintenance and ADA
repairs, antique streetlights, tree replacement, and burying downtown utilities. New capital
improvements include design work for the Austin Avenue pedestrian bridge and trail access and
construction of a canopy in the library courtyard.
The Facilities CIP for 2015/2016 requests funds first year improvements related to the ADA
transition plan, design work to convert the current Council Chambers into the Visitor Center,
design work for the festival space and historic light and water works building for the City Center
project, design work for Fire Station 6, renovating the 1987 library and GCAT buildings,
remodeling the Georgetown Municipal Complex, and renovating Grace Heritage Center.
Proposed funding requests from 2016/2017 through 2019/2020 and beyond are enumerated in the
attached capital improvement plan.
FINANCIAL IMPACT:
See attachment “General Capital Projects Financial Impact for FY 2015-2016”
SUBMITTED BY:
Laurie Brewer, Assistant City Manager and Micki Rundell, Chief Financial Officer
ATTACHMENTS:
Description Type
GCP Financial Impact 2015-16 Backup Material
GCP Presentation Backup Material
GCP Downtown CIP Backup Material
GCP Facilities CIP Backup Material
Page 9 of 24
FY2016 Annual Budget
FY 2015 – 2016 FISCAL IMPACT
Total ‐$18,021,549
Page 10 of 24
6/18/2015
1
FY2016 Annual Budget
GENERAL CAPITAL PROJECTS ‐
DOWNTOWN AND FACILITIES
FY 2015 ‐2016
GGAF
June 24, 2015
FY2016 Annual Budget
BUDGET PROCESS
DEBT
OVERVIEW
FOCUS AREA:
SIGNATURE
DEST. & CIP
FIVE YEAR PLAN
UPDATE
COMPENSATION,
BENEFITS, &
SELF INSURANCE
FOCUS AREA:
UTILITY & CIP
BUDGET
PARKING LOT
FOCUS AREA:
TRANSPORTATION
& CIP
FOCUS AREA:
CROSSCUTTING
THEMES
ANNUAL
BUDGET
PRESENTATION
FOCUS AREA:
ECONOMIC
DEVELOPMENT
& CIP
BUDGET
PUBLIC
HEARINGS
FOCUS AREA:
PUBLIC SAFETY
BUDGET
ADOPTION
GENERAL CAPITAL
PROJECTS
FISCAL AND
BUDGETARY
POLICY
Page 11 of 24
6/18/2015
2
FY2016 Annual Budget
AGENDA
•Background and Current Progress
•FY 2015‐2016 Plan
•Downtown
•Facilities
•5‐year Plan (Downtown and Facilities)
•Funding Sources (Downtown, Facilities, and
Parks)
FY2016 Annual Budget
BACKGROUND –CURRENT PROJECTS
•Parking Study
•City Center
•GCAT Redesign
•Old Library Redesign
•Red Poppy Canopy Design
•Master Sign Plan
•Programming for campus
(including historic power
and light building and
festival area)
•Westside Service Center
•Fire Station (ESD)
•Grace Heritage Center
Design
•Historic District street
signs
•6th, 8th, 9th Street
•10th & 11th Street
•Rolled to 2016‐2017
•MLK & 8th Parking Lot
Page 12 of 24
6/18/2015
3
FY2016 Annual Budget
ON‐GOING PROJECTS FY 2015‐2016
(DOWNTOWN)
•General Repair and Maintenance ($125,000 ‐TIRZ)
•Underground electric ($185,000 ‐GUS)
•Tree replacement ($22,000 ‐TIRZ)
•Antique Street Lights ($40,000 ‐GUS)
•Reconfiguring existing parking and wayfinding
($50,000 –TIRZ)
FY2016 Annual Budget
FY 2015 – 2016 PROJECTS (DOWNTOWN)
•Design for pedestrian element on Austin Ave. bridges
($250,000)
•Will coordinate with transportation and parks
•Construct Red Poppy Canopy Cover ($67,500)
•Downtown TIRZ
Page 13 of 24
6/18/2015
4
FY2016 Annual Budget
FY 2015 – 2016 PROJECTS (FACILITIES)
•Georgetown Municipal Complex Remodel
($1.9M)
•Design and construct 2016
•Lobby area/Customer Service
•Increase functionality
•Enhance meeting spaces
FY2016 Annual Budget
FY 2015 – 2016 PROJECTS (FACILITIES)
•Fire Station 6 Design ($250,000)
•ADA Transition Plan ($242,049)
•Historic Light and Waterworks design
($200,000)
•New Visitor Center design ($100,000)
•HOT Funds
•Grace Heritage Center renovation ($400,000)
Page 14 of 24
6/18/2015
5
FY2016 Annual Budget
FY 2015 – 2016 PROJECTS (FACILITIES)
•City Center Phase I Construction ($6.502 M)
•Renovate GCAT building for Municipal Court + 8500 sqft addition for
courtroom ($3.535M)
•Renovate 1987 Library for City Hall ($2.97 M)
FY2016 Annual Budget
DOWNTOWN FY 2016 ‐2020
•Continue on‐going projects (2016‐2020)
•General Repair and Maintenance
•Underground electric
•Tree replacement
•Antique Street Lights )
•Reconfiguring existing parking and wayfinding
•Construct Austin Ave bridge pedestrian element (2016‐
2017)
•Mast Arms at 8th, 7th, & 5th Streets along Austin Ave.
(2016‐2018)
•Design signature gateway on Austin Ave (2017)
Page 15 of 24
6/18/2015
6
FY2016 Annual Budget
FACILITIES FY 2016 ‐2020
•Construct Fire Station 6 (2017)
•Design and Build Fire Station 7 (2019‐2020)
•GMC Expansion (2017)
•Festival Space Design and Construction (2017‐2018)
•Visitor Center renovation (2017)
•Historic Light and Waterworks Building Renovation
(2017‐2018)
FY2016 Annual Budget
FY 2015 – 2016 FISCAL IMPACT
Total ‐$18,021,549
Page 16 of 24
6/18/2015
7
FY2016 Annual Budget
Garey Park Financing
•Follow‐up from June 17, 2015 GGAF Mtg.
–Endowment for O&M
–Debt issuance strategy
•Tranches
•Length
–Cost of service for residents/non‐residents
FY2016 Annual Budget
QUESTIONS AND DIRECTION
Page 17 of 24
FY2016 Annual Budget
DOWNTOWN CIP
DOWNTOWN CIP DOWNTOWN ELECTRIC
DOWNTOWN MASTER PLAN
DOWNTOWN CIP FUND SUMMARY
The FY2016 Downtown CIP includes continuing funding for general repair
and maintenance, Americans with Disability Act (ADA) access improvements
for sidewalks in the downtown overlay district, and to continue placing
utilities underground (funded in the Utility CIP).
Additional requests for FY2016 are:
A tree mitigation program to ensure that as trees are removed in the
downtown overlay district, they are replaced appropriately;
Recurring funding it extend street lights throughout the overlay district;
Construction of a canopy on the north side courtyard of the library (design
completed in 2015).
Implementing the downtown parking study and reconfiguring existing parking
resources and signage.
The 2016 plan request funds for design work related to pedestrian access
and amenities along the Austin Avenue Bridge, with construction to be
funded in 2017.
DOWNTOWN CIP
CAPITAL IMPROVEMENT PLAN
A general Capital Improvement Plan
(CIP) is presented for the coming
fiscal year to implement
infrastructure and facilities projects
contemplated in the Downtown
Master Plan adopted by City Council
in 2014. The downtown projects
incorporate recommendations from
the Arts and Culture Board, the
Parks and Recreation Board, the
Convention and Visitors Bureau
Board, the Library Board, the Main
Street Advisory Board, and the
Historic and Architectural Review
Commission, and work to continue
developing Georgetown as a
Signature Destination.
The Downtown five-year Capital
Improvement Program funding
comes from a combination of cash
contributions, debt funding and
interest income. Actual amount of
debt issues will be determined upon
project timing and available and
previously unallocated funds
(previous year-end excess funds).
Page 18 of 24
FY2016 Annual Budget
DOWNTOWN MASTER PLAN CIP FUND SUMMARY
Subproject Listings FY2016 FY2017 FY2018 FY2019 FY2020
Revenues by Source
Certificates of Obligation 925,000 4,900,000 2,960,000 270,000 -
Electric Revenues 225,000 388,000 275,000 885,000 340,000
Downtown TIRZ 264,500 297,000 197,000 197,000 197,000
Total 1,414,500$ 5,585,000$ 3,432,000$ 1,352,000$ 537,000$
Expenses by Type
Downtown Electric*225,000 388,000 275,000 885,000 340,000
Downtown Master Plan 1,189,500 5,197,000 3,157,000 467,000 197,000
Total 1,414,500$ 5,585,000$ 3,432,000$ 1,352,000$ 537,000$
*Less:Downtown Electric is funded and budgeted in the Electric department capital fund.
Certificates of
Obligation
74%
Electric
Revenues
17%
Downtown
TIRZ
9%
Combined 5 -Year Estimated Funding Sources
Downtown
Electric*
32%
Downtown
Master Plan
68%
FY2016 Expenses by Type
Page 19 of 24
FY2016 Annual Budget
DOWNTOWN MASTER PLAN CAPITAL IMPROVEMENT PROGRAM
Subproject Listings
Project
to Date FY2016 FY2017 FY2018 FY2019 FY2020 Total
Downtown Electric Proj.300,000 185,000 348,000 235,000 845,000 300,000 2,213,000
Antique Lights 40,000 40,000 40,000 40,000 40,000 40,000 240,000
Total 340,000$ 225,000$ 388,000$ 275,000$ 885,000$ 340,000$ 2,453,000$
Project Title: Downtown Electric
Project Description: In an effort to expand successful retail opportunities beyond the 9-block core of the square, antique street lights will be installed
throughout the overlay district in conjunction with streescape projects. A tree mitigation program is needed to ensure that as trees are removed in the
downtown overlay district, they are replaced appropriately. To ensure safety on Austin Ave., the City will install a pedestrian signal at the intersection of
Austin Ave. and 5th Street to help protect people as the cross from downtown to restaurants north of the square. To continue to improve the appeal and
usability of Downtown, the City will perennially work to move utilities underground.
Funding Source: Funded by Electric Operating Revenues and Downtown TIRZ Revenues
Subproject Listings
Project
to Date FY2016 FY2017 FY2018 FY2019 FY2020 Total
Red Poppy Canopy - 67,500 - - - - 67,500
General Repair &
ADA Maintenance - 125,000 125,000 125,000 125,000 125,000 625,000
Trailhead/Cantilevered
Bridge - 250,000 2,500,000 - - - 2,750,000
Austin Bridge Design 675,000 675,000
Tree Mitigation/Lighting 22,000 22,000 22,000 22,000 22,000 22,000 132,000
Signature Gateway - - 100,000 - - - 100,000
Mast Arms - - 560,000 270,000 - 830,000
Reconfigure Parking - 50,000 50,000 50,000 50,000 50,000 250,000
Austin Bridge Construction 2,400,000 2,400,000 4,800,000
Total 22,000$ 1,189,500$ 5,197,000$ 3,157,000$ 467,000$ 197,000$ 10,229,500$
Funding Source: Funded by Tax-Supported Certificates of Obligation Bonds.
Project Title: Downtown Master Plan
Project Description: In an effort to create more outdoor seating, funding for designing a canopy on the north side courtyard of the library is being requested.
Future plans include installing mast arms at major intersections, developing signature gateway signage, constructing a cantilevered bridge and trailhead on
Austin Ave.
PROJECTS COMPLETED IN FY2015
Grace Heritage Assessment / Design
PROJECTS PLANNED FOR FY2016
Underground Electric
Pedestrian Signal
Street Lights
Red Poppy Canopy
Tree Replacement
General Repair & Maintenance
Grace Heritage Church Rehabilitation
ADA Sidewalk Repair
Trailhead/Cantilevered Bridge
Signature Gateway
LONG-RANGE PROJECTS (5-YEAR CIP PLAN)
Underground Electric
Street Lights
Tree Replacement
General Repair & Maintenance
ADA Sidewalk Repair
Trailhead/Cantilevered Bridge
Mast Arms
Page 20 of 24
FY2016 Annual Budget
FACILITIES CAPITAL IMPROVEMENT PLAN
FACILITIES PLAN
PUBLIC SAFETY FACILITIES
GENERAL FACILITIES
DOWNTOWN WEST-CITY CTR
FACILITIES CIP FUND SUMMARY
The Facilities five-year Capital Improvements Program funding comes from a
combination of cash contributions, debt funding and interest income.
Actual amount of debt issues will be determined upon project timing and
available and previously unallocated funds (previous year-end excess funds).
Public Safety: The plan includes several major projects to enhance public
safety services and response capability. The Public Safety Operations and
Training Center (PSOTC) was completed in early 2015. This facility was
funded by general obligation bonds approved by voters in May 2011. A
tactical building and range will be considered and added in future years. As
the City grows and expands its partnership with Emergency Services District
#8 (ESD #8), additional fire stations will be required. Two potential fire
stations, one to be funded in partnership with the ESD are included;
however, these projects are still early in the planning stages.
General Facilities: The Georgetown Municipal Complex (GMC) will undergo a
remodel in 2016. This project will renovate the entrance of the building for
improved customer care interaction and office space efficiency.
Additionally, on-going funding will be dedicated to ensure ADA concerns
discovered during the City’s self-assessment are addressed in a timely
manner. Finally, the City will update the city –wide facilities master plan in
2016.
Downtown Facilities: With the adoption of the Downtown Master Plan, the
City is working towards providing citizens with: an expanded outdoor public
space for special events and gatherings; indoor public space for meetings
and small performances; an outdoor amphitheater; additional public
parking; consolidated city facilities; and renewed investment on the west
side of downtown. In FY 2016, the City Center Plan calls for renovating the
GCAT building and the 1987library. Once these facilities are renovated, staff
will be relocated from the existing municipal court and city hall. The old city
hall building will then be sold. Design work for renovating the current
municipal court, the historic power and light building, and the festival space
will also be completed in 2016.
Parking: To help increase the availability of public parking, a parking garage
feasibility study was done in FY2015, implementation of study to begin in
2016.
FACILITIES
CAPITAL IMPROVEMENT PLAN
The facilities CIP is calls for
developing and/or redeveloping
city-owned facilities to
accommodate the needs of staff
and the public. The major projects
outlined in the CIP include
completing the Public Safety
Training and Operations Center,
completing the City Center plan,
and ensuring accessibility to all
facilties.
Page 21 of 24
FY2016 Annual Budget
FACILITIES CIP FUND SUMMARY
Subproject Listings FY2016 FY2017 FY2018 FY2019 FY2020
Sources of Funding
Sale Proceeds
City Owned Facilities 6,705,000 2,000,000 - - -
Self-Supporting COs 2,550,000 5,800,000 - 300,000 2,500,000
Tax-Supported COs 702,049 6,580,692 1,978,741 - -
CVB 100,000 400,000
Total 10,057,049$ 14,780,692$ 1,978,741$ 300,000$ 2,500,000$
Expenses by Type
Public Safety Facilities 250,000 2,500,000 - 1,800,000 2,500,000
Parking - - - - -
General Facilities 1,900,000 4,800,000 - - -
Downtown West-City Center 7,907,049 7,480,692 478,741 - 9,281,000
Total 10,057,049$ 14,780,692$ 478,741$ 1,800,000$ 11,781,000$
Sale
Proceeds
City Owned
Facilities
67%
Self-
Supporting
COs
25%
Tax-
Supported
COs
7%
FY2016 Revenues by Source
Public Safety
Facilities
2%
General
Facilities
19%
Downtown
West-City
Center
79%
FY2016 Expenses by Type
Page 22 of 24
FY2016 Annual Budget
FACILITIES CAPITAL IMPROVEMENT PROGRAM
Subproject Listings
Project
to Date FY2016 FY2017 FY2018 FY2019 FY2020 Total
Fire Station 6 ESD - 250,000 2,500,000 - - - 2,750,000
Fire Station 7 Eastside - - - - 300,000 2,500,000 2,800,000
Emergency Warning System
&Signaling Software 700,000 - - - - - 700,000
Firing Range at PSTOC - - - 1,500,000 - 1,500,000
Total 700,000$ 250,000$ 2,500,000$ -$ 1,800,000$ 2,500,000$ 7,750,000$
Project Title: Public Safety Facilities
Project Description: As the City grows and expands its partnership with Williamson County Emergency Services District #8 (ESD #8),
additional fire stations will be required. Two future fire stations are in early planning stages. Station #6 will be in the northwest service
area and will be done in partnership with ESD #8, while the eastside station is projected to begin design in FY2018.
Funding Source: Funded by Tax-Supported Certificates of Obligation, grants, and interlocal contributions.
NOTE: Fire Station 6 costs to be funded in participation with the ESD #8.
Subproject Listings
Project
to Date FY2016 FY2017 FY2018 FY2019 FY2020 Total
GMC Remodel - 1,900,000 - - - - 1,900,000
GMC Expansion - - 3,300,000 - - - 3,300,000
Lake Plant Data Center - 1,500,000 - - - 1,500,000
Total - 1,900,000 4,800,000 - - - 6,700,000$
Project Title: General Facilities
Project Description:
GMC Remodel: This project is to remodel the existing front end offices of the GMC to improve space utilization, functionality, and
customer interaction.
GMC Expansion: This project includes the construction of a new fleet facility along with offices and/or additional shop space and
work bays to accommodate operations. The existing fleet facility will be used for Transportation and additional covered storage.
Lake Plant Data Center: This project is for the redundant technology access for plant opertations.
Funding Source: Funded by Self-Supporting Certificates of Obligation.
PROJECTS COMPLETED IN FY2015
Public Safety Operational & Training Center
Parking Study
PROJECTS PLANNED FOR FY2016
Fire Station #6 (ESD)
GMC Remodel
Former PD Renovation
Former Library Renovation
Festival / Public Space
GCAT / Municipal Court Redesign
LONG-RANGE PROJECTS (5-YEAR CIP PLAN)
Fire Station #7 Eastside
GMC Expansion
Firing Range at PSOTC
Play Areas
Lake Plant Data Center
Plaza
Amphitheater
Tensile Structures
Page 23 of 24
FY2016 Annual Budget
Subproject Listings
Project
to Date FY2016 FY2017 FY2018 FY2019 FY2020 Total
GCAT / Municipal Court Redesign - 3,535,000 - - - - 3,535,000
Council Chambers /
CVB Redesign - 100,000 400,000 - - - 500,000
Former PD Renovation - 200,000 2,000,000 - - - 2,200,000
Former Library Renovation - 2,970,000 - - - 9,281,000 12,251,000
Festival / Public Space - 460,000 4,844,000 - - - 5,304,000
ADA Transition Plan - 242,049 236,692 478,741 - - 957,482
Grace Heritage Rehabilitation - 400,000 - - - - 400,000
Total -$ 7,907,049$ 7,480,692$ 478,741$ -$ 9,281,000$ 25,147,482
Funding Source: Funded by Certificates of Obligation, CVB funds, and proceeds from the sale of City Facilities.
Project Title: Downtown West - City Center
Project Description: With the adoption of the Downtown Master Plan, the City is working towards providing citizens with an
expanded outdoor public space for special events and gatherings, indoor public space for meetings and small performances, an outdoor
amphitheater, additional public parking, consolidated city facilities, and sparking reviewed investment on the west side of downtown.
This will also include expanding the audio/visual resources available in the library for the public and renovating Grace Heritage Church.
Subproject Listings
Project
to Date FY2016 FY2017 FY2018 FY2019 FY2020 Total
MLK & 8th Lot 350,000 350,000$
Parking Garage Study 400,000 - - - - - 400,000
Total 400,000$ -$ -$ -$ -$ -$ 400,000$
Project Description: The City is working to complete an improved surface lot on the corner of MLK and 8th for short-term parking
needs. Structured parking will improve the availability of parking for festivals, as well as for increased business as a long-term solution.
This project would determine the feasibility of a structured parking facility on city-owned property. Various methods of partnerships will
be considered to address costs, access and use.
Funding Source: Funded by previously issued Tax-Supported Certificates of Obligation; possible partnerships.
Page 24 of 24