Loading...
HomeMy WebLinkAboutAgenda_GTEC_12.18.2019Notice of Meeting for the Georgetown Transportation E nhancement Corp and the Gov erning B ody of the City of Georgetown December 18, 2019 at 3:30 P M at G MC B uilding, 300-1 I ndustrial Av enue, Georgetown, T X 78626 T he C ity of G eorgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you require as s is tance in partic ipating at a public meeting due to a disability, as defined under the ADA, reas onable as s is tance, adaptations , or ac commodations will be provided upon request. P leas e c ontact the C ity S ec retary's O ffic e, at leas t three (3) days prior to the sc heduled meeting date, at (512) 930-3652 or C ity Hall at 808 Martin Luther King Jr. S treet, G eorgetown, T X 78626 for additional information; T T Y users route through R elay Texas at 711. Regular Session (T his R egular S es s ion may, at any time, be rec es s ed to c onvene an Exec utive S es s ion for any purpose authorized by the O pen Meetings Act, Texas G overnment C ode 551.) A C all to O rder B Introduc tion of New Board Members and Visitors C Indus try/C AMP O /T xDO T Updates - R ay Miller, Acting P ublic Works Direc tor D Dec ember 2019 G T EC Updates - Wesley Wright, P.E., S ystems Engineering Direc tor/Mic hael Hallmark, C I P Manager E P resentation of G eorgetown Trans portation Enhanc ement C orporation preliminary monthly financial reports for November 2019. -- P aul Diaz, Budget Manager, C O G , F inanc e Manager, G T EC . L egislativ e Regular Agenda F C ons ideration and possible approval of the minutes from the November 20, 2019 G T EC Board Meeting. -- David Morgan - G eneral Manager, G T EC Board G C ons ideration and possible action on an Agreement for a Loc al O n-S ys tem Improvement P rojec t with the Texas Department of Trans portation (T xDO T ) for s ignal and roadway improvements along S H29, jus t east of I H35 -- Wes ley Wright, P E, S ys tems Engineering Director H P ublic hearing by the G eorgetown Trans portation Enhanc ement C orporation (G T EC ) regarding the expenditure of 4B s ales tax funds for the proposed C onfido I I I P roject. – Leigh Wallac e, F inance Direc tor, C O G , F inance Manager, G T EC . I P ublic hearing by the G eorgetown Trans portation Enhanc ement C orporation (G T EC ) regarding the expenditure of 4B s ales tax funds for the proposed C os tc o W holesale C orp P rojec t. – Leigh Wallace, F inanc e Direc tor, C O G , F inance Manager, G T EC . Ce rtificate of Posting I, R obyn Densmore, C ity S ecretary for the C ity of G eorgetown, Texas, do hereby c ertify that this Notic e of Meeting was posted at C ity Hall, 808 Martin Luther King Jr. S treet, G eorgetown, T X 78626, a plac e readily Page 1 of 67 acc es s ible to the general public as required by law, on the _____ day of _________________, 2019, at __________, and remained s o posted for at leas t 72 c ontinuous hours prec eding the s cheduled time of said meeting. __________________________________ R obyn Dens more, C ity S ec retary Page 2 of 67 City of Georgetown, Texas Transportation Enhancement Corp December 18, 2019 S UB J E C T: C all to O rder IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Laura Wilkins - Board Liais on Page 3 of 67 City of Georgetown, Texas Transportation Enhancement Corp December 18, 2019 S UB J E C T: Introduction of New Board Members and Vis itors IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Emily Koontz - Board Liais on Page 4 of 67 City of Georgetown, Texas Transportation Enhancement Corp December 18, 2019 S UB J E C T: Industry/C AMP O /T xDO T Updates - R ay Miller, Ac ting P ublic Works Director IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Laura Wilkins - Board Liais on Page 5 of 67 City of Georgetown, Texas Transportation Enhancement Corp December 18, 2019 S UB J E C T: December 2019 G T EC Updates - Wes ley Wright, P.E., S ys tems Engineering Director/Michael Hallmark, C I P Manager IT E M S UMMARY: December 2019 GT E C updates Northwest Boulevard: P re-con held on Nov 16th, C onstruc tion survey c omplete, R O W prep underway. Elec tric is clear near Traffic C ircle, S udden link as well and F rontier almost c omplete relocating. Underground utility relocation to begin Dec ember. 4th Q uarter 2020 expec ted completion. Northwes t to be c los ed to through traffic from January 6th –April from F ontana to I H 35 Rabbit Hill Road Improvements: Des ign is tentatively c omplete. R O W proc urement ongoing. P roject limits have changed to end at the firs t property line North of C ommerc e Blvd on the East side of R abbit Hill R d. Expec ted to bid early 2020. Rivery Boulevard Extension: Rivery, Williams to N orthwest substantially complete. R oad opened to traffic 9-3-19 from Williams to P ark traffic circle. Section from P ark to N orthwest open. U tilities final relocation off Williams turn lane first of D ecember. Contractor moving back in to finish project J anuary 6th to avoid holiday season shut downs. S outheast Inner loop/ Southwestern Blvd S outhwes tern: · P reparing plan/profile sheets. · F inalizing S torm C onveyance System for the project · Evaluating Water Q uality T reatment O ptions; · P reparing U tility plan/profile sheets (water/wastewater) · I dentifying utility conflicts S E Inner Loop: This section to bid first quarter of 2020 · P reparing plan/profile sheets · F inalizing S torm C onveyanc e S ys tem for the project · Evaluating Water Q uality Treatment O ptions ; • P reparing Utility plan/profile s heets (water/wastewater) • Identifying utility conflicts F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Wesley Wright, P.E., S ystems Engineering Direc tor/Mic hael Hallmark, C I P Manager AT TAC H ME N T S: Description Type GTEC cover Cover Memo Page 6 of 67 GTEC Board Meeting Date: Item No. GEORGETOWN TRANSPORTATION ENHANCEMENT CORPORATION AGENDA ITEM COVER SHEET _______________________________________________________________________________________________________________________________ SUBJECT: December 2019 GTEC Updates - Wesley Wright, P.E., Systems Engineering Director/Michael Hallmark, CIP Manager ____________________________________________________________________________________________________________________________________ ITEM SUMMARY: December 2019 GTEC updates Northwest Boulevard: Pre-con held on Nov 16th, Construction survey complete, ROW prep underway. Electric is clear near Traffic Circle, Sudden link as well and Frontier almost complete relocating. Underground utility relocation to begin December. 4th Quarter 2020 expected completion. Northwest to be closed to through traffic from January 6th –April from Fontana to IH 35 Rabbit Hill Road Improvements: Design is tentatively complete. ROW procurement ongoing. Project limits have changed to end at the first property line North of Commerce Blvd on the East side of Rabbit Hill Rd. Rivery Boulevard Extension: Rivery, Williams to Northwest substantially complete. Road opened to traffic 9-3-19 from Williams to Park traffic circle. Section from Park to Northwest open. Utilities final relocation off Williams turn lane first of December. Contractor moving back in to finish project January 6th to avoid holiday season shut downs. Southeast Inner loop/ Southwestern Blvd Southwestern: • Preparing plan/profile sheets. • Finalizing Storm Conveyance System for the project • Evaluating Water Quality Treatment Options; • Preparing Utility plan/profile sheets (water/wastewater) • Identifying utility conflicts SE Inner Loop: This section to bid first quarter of 2020 • Preparing plan/profile sheets • Finalizing Storm Conveyance System for the project • Evaluating Water Quality Treatment Options; • Preparing Utility plan/profile sheets (water/wastewater) • Identifying utility conflicts Page 7 of 67 Northwest Boulevard (Fontana Drive to Austin Avenue) Project No. 5QX TIP No. AF December 2019 Project Description Construction of overpass and surface roads to connect Northwest Boulevard with Austin Avenue and FM 971. Purpose This project will relieve congestion at the Austin Avenue/Williams Drive intersection and provide a more direct access from the west side of IH 35 corridor to Georgetown High School and SH 130 via FM 971. Project Manager Joel Weaver and Wesley Wright, P.E. Engineer Klotz Associates Element Status / Issues Design Design is complete. Environmental/ Archeological Complete Rights of Way Offers have been made on 9 parcels. 9 parcels needed, 7 acquired to date, 2 in condemnation with constructive possession obtained. Utility Relocations TBD Construction Pre-con held on Nov 16th, Construction survey complete, ROW prep underway. Electric is clear near Traffic Circle, Sudden link as well and Frontier almost complete relocating. Underground utility relocation to begin December. 4th Quarter 2020 expected completion. Northwest to be closed to through traffic from January 6th –April from Fontana to IH 35 Other Issues Page 8 of 67 Rabbit Hill Road Improvements Project (Westinghouse Road to S. Clearview Drive) Project No. 5RQ TIP No. BZ December 2019 Project Description Reconstruct Rabbit Hill Road from Westinghouse Road northward to S. Clearview Dr. Widening along Westinghouse Road will also be included in the schematic for additional turning lanes to/from Westinghouse Road. The project length along the anticipated alignment is approximately 0.75 miles Project Managers Ken Taylor and Wesley Wright, P.E. Engineer CP&Y, Inc. Element Status / Issues Design Final Design Tentatively complete. Environmental/ Archeological Efforts underway and any issues are expected to be identified in the coming month. Rights of Way Two properties acquired as part of Mays St. Extension. Two remaining, negotiations ongoing and Council has approved condemnation. Total Parcels: 4 Possession: 2 Pending: 2 Utility Relocations Will be initiated as ROW/easements are acquired and as part of the bidding process. Multiple relocations expected – Round Rock water and Georgetown Electric. Construction ROW procurement ongoing Other Issues Project limits have changed to end at the first property line North of Commerce Blvd on the East side of Rabbit Hill Rd. Page 9 of 67 Widening of: SE Inner Loop - FM 1460 to Austin Avenue Roadway & Southwestern Boulevard – Raintree Drive to SE Inner Loop Roadway Project No. December 2019 Project Description FM 1460 to Austin Avenue Roadway Widening Project & Southwestern Boulevard – Raintree Drive to SE Inner Loop Roadway Widening Project (See Attached Exhibit C). The professional services will consist of providing final roadway, drainage, water, wastewater, incidental designs, as well as, utility coordination, ROW support, environmental phase I investigations, archeological investigations, geotechnical investigations, ROW & Temporary Construction Easement (TCE) metes and bounds documents, bidding documents, bidding services, and construction administration services. Project Managers Joel Weaver and Wesley Wright, P.E. Engineer KPA & Associates Element Status / Issues Design Southwestern: • Preparing plan/profile sheets. • Finalizing Storm Conveyance System for the project • Evaluating Water Quality Treatment Options; • Preparing Utility plan/profile sheets (water/wastewater) • Identifying utility conflicts SE Inner Loop: This section to bid first quarter of 2020 • Preparing plan/profile sheets • Finalizing Storm Conveyance System for the project • Evaluating Water Quality Treatment Options; • Preparing Utility plan/profile sheets (water/wastewater) • Identifying utility conflicts Environmental/ Archeological Efforts to begin April 2019 and any issues are expected to be identified in the coming month. Rights of Way ROW needs on Southwestern to be determined Total Parcels: 0 Possession: 0 Page 10 of 67 Pending: 0 Utility Relocations To be determined Construction Other Issues None. Page 11 of 67 Rivery Boulevard Extension (Williams Drive to Northwest Boulevard @ Fontana Drive) Project No. 5RM TIP No. AD December 2019 Project Description Develop the Rights-of-Way Map, acquire ROW, address potential environmental issues and complete construction plans specifications and estimate (PS&E) for the extension of Rivery Boulevard from Williams Drive to Northwest Boulevard at Fontana Drive in anticipation of future funding availability. Purpose To provide a route between Williams Drive and Northwest Boulevard serving the Gateway area, providing an alternate route from Williams Drive to the future Northwest Boulevard Bridge over IH 35, to provide a route between the hotels in the Gateway area and the proposed Conference Center near Rivery Boulevard and Wolf Ranch Parkway. Project Manager Travis Baird, Joel Weaver, and Wesley Wright, P.E. Engineer Kasberg Patrick and Associates Element Status / Issues Design Complete Environmental/ Archeology Complete Rights of Way All parcels in possession. Condemnation of 1 parcel continuing, no impact on operation of roadway. Total Parcels: 22 Appraised: 22 Offers: 22 Acquired: 21 Closing pending: 0 Condemnation: 1 Utility Relocations Complete Construction Rivery, Williams to Northwest substantially complete. Road opened to traffic 9-3-19 from Williams to Park traffic circle. Section from Park to Northwest open. Utilities final relocation off Williams turn lane first of December. Contractor moving back in to finish project January 6th to avoid holiday season shut downs. Other Issues Page 12 of 67 City of Georgetown, Texas Transportation Enhancement Corp December 18, 2019 S UB J E C T: P res entation of G eorgetown Transportation Enhancement C orporation preliminary monthly financ ial reports for November 2019. -- P aul Diaz, Budget Manager, C O G , F inance Manager, G T EC . IT E M S UMMARY: T he Bylaws of G T EC (Article V, S ec tion 6.02) require the F inanc e Manager to report the financ ial ac tivity of the C orporation to the Board. • F inancial reports • S ales Tax revenues • Any other relevant financ ial information S ales tax is rec eived two months in arrears; therefore the revenues reflec t only the amount rec eived, not actually earned, as of the report date. A report on payments made to vendors for the month of May is also inc luded. F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Leigh Wallace F inance Director, C O G ; F inanc e Manager, G T EC AT TAC H ME N T S: Description Type GTEC Monthly Report Backup Material AP Check Report Backup Material Page 13 of 67 F GTEC Monthly Report GTEC MONTHLY REPORT AS OF NOVEMBER 30, 2019 Please note the November period is still open. These figures are preliminary and unaudited. Operating Operating Operating Operating rrrrevenueevenueevenueevenue is comprised of sales tax and allocated interest. Sales tax revenue is budgeted at $7.9 million. There are two parts to sales tax revenue. The largest part is the amount the City receives from the State Comptroller’s Office. This revenue is received two months in arrears. December will be the first period those funds will appear in the fund schedule. The second part of sales tax is related to self-retained sales tax the City collects on utility billing. Through the period, this smaller amount of self-retained sales tax totals $43,615. Allocated interest totals $77,215. Operating eOperating eOperating eOperating expense xpense xpense xpense includes administrative charges and office supplies. The administrative charges are typically processed monthly. However, at the time of this report, those charges have not been processed due to the workload requirements to close out FY2019. After the close out of FY2019, these charges will be booked monthly. By the end of FY2020, the actual expenses will be at the budgeted amount. Operational expenses total zero through the second month. NonNonNonNon----operating revenue operating revenue operating revenue operating revenue is budgeted at $4.7 million and is comprised of bond proceeds. The City sells debt in the spring and will not receive those proceeds until that point. NonNonNonNon----operating expense operating expense operating expense operating expense is budgeted at $16.5 million and is comprised of transportation improvements for State Highway 29 and Southeast Inner Loop, as well as the debt service payment for previously issued debt. The City pays debt service twice a year in the fall and later in the spring. There have been no expenses on the FY2020 transportation projects. November included continued improvement projects for the intersections: IH35 and HWY 29, as well as FM 971 and Fontana. Both intersections result in a zero balance for non-operating expenses for the month as the expenses to date have been paid for by prior year encumbrances. The continued Mays Street Project and TIA improvements currently have $47,667 in non-operating expenses. The Mays project was budgeted in FY2019 and is part of the CIP rollforward amendment which went to Council this month. Fund Fund Fund Fund Schedule DevelopmentSchedule DevelopmentSchedule DevelopmentSchedule Development In the upcoming weeks, the accounting staff along with the City’s outside independent auditor Weaver and Associates will begin the Year-End Audit and Comprehensive Annual Financial Report or CAFR process. Following the completion of the CAFR, staff will update fund schedules with audited fund balances. Currently, the fund balance is only the budgeted figure and not the actual. It is anticipated staff will have that information around the January or February meeting. Staff brought a CIP Rollforward Amendment to Council this month. Staff proposed to rollforward a combined total of $5.1 million for the following improvement projects: Fontana Northwest Bridge, Interstate 35/ Highway 29 intersection, Mays Street/ Rabbit Hill Road intersection, and the Rivery Extension. Pending the approval of the budget amendment in January, staff will update the fund schedule to reflect the CIP Rollforward Amendment in February. Later in the year as part of the FY2021 Budget Development Process, the Budget Office will develop year-end projections for FY2020. This occurs in April and May. After those projections are completed, staff will add an additional column to show those figures to the fund schedule and their proximity to budget. Page 14 of 67 F GTEC Monthly Report Fund Schedule as of November 30, 2019 400 - GTEC FY2020 Budget Beginning Fund Balance 17,130,653 Operating Revenue FY2020 Budget FY2020 YTD Actuals FY2020 YTD Encumbrances FY2020 Actuals % Of Budget Interest 230,000 77,215 - 77,215 33.57% Sales Tax 7,937,500 43,615 - 43,615 0.55% Operating Revenue Total 8,167,500 120,830 - 120,830 1.48% Operating Expense FY2020 Budget FY2020 YTD Actuals FY2020 YTD Encumbrances FY2020 Actuals % of Budget Administrative Support 410,223 - - - 0.00% Operating Expense Total 410,223 - - - 0.00% FY2020 Budget Ending Operating Fund Balance 24,887,930 Non-Operating Revenue FY2020 Budget FY2020 YTD Actuals FY2020 YTD Encumbrances FY2020 Actuals % Of Budget Debt Proceeds 4,700,000 - - - 0.00% Non-Operating Revenue Total 4,700,000 - - - 0.00% Non-Operating Expense FY2020 Budget FY2020 YTD Actuals FY2020 YTD Encumbrances FY2020 Actuals % of Budget Arterial SE1:Inner Loop/SH130 7,200,000 - - - 0.00% Available for Projects TBD 1,984,375 - - - 0.00% BIG C 2,000,000 - - - 0.00% Confido 600,000 - - - 0.00% Debt Service 3,333,921 - - - 0.00% FM 971 / Fontana - 6,155 (6,155) - 0.00% IH 35 / HWY29 Intersection - 14,936 (14,936) - 0.00% Mays Street/Rabbit Hill Road - 43,527 - 43,527 0.00% Rivery TIA Improvements 300,000 - 4,140 4,140 1.38% SH29 1,150,000 - - - 0.00% Non-Operating Expense Total 16,568,296 64,618 (16,950) 47,668 0.29% FY2020 Budget Ending Fund Balance 13,019,634 Contingency Reserve 1,984,375 Debt Service Reserve 3,225,642 Available Fund Balance 7,809,617 FY2020 Actuals Page 15 of 67 12/12/2019 3:59 PM A/P HISTORY CHECK REPORT PAGE: 1 VENDOR SET: 01 CITY OF GEORGETOWN BANK: * ALL BANKS DATE RANGE:11/01/2019 THRU 11/30/2019 CHECK CHECK CHECK CHECK VENDOR I.D. NAME STATUS DATE AMOUNT DISCOUNT NO STATUS AMOUNT C-CHECK VOID CHECK V 11/01/2019 255257 C-CHECK VOID CHECK V 11/01/2019 255258 C-CHECK VOID CHECK V 11/01/2019 255259 C-CHECK VOID CHECK V 11/01/2019 255282 1 JESSICA BOESE UNPOST C-CHECK JESSICA BOESE UNPOST V 11/08/2019 255422 1,000.00CR 137661 MICHAEL PATROSKI C-CHECK MICHAEL PATROSKI VOIDED V 11/08/2019 255441 82.50CR 113541 NATHANIEL WAGGONER C-CHECK NATHANIEL WAGGONER VOIDED V 11/08/2019 255470 82.50CR 130341 SUSAN WATKINS C-CHECK SUSAN WATKINS VOIDED V 11/08/2019 255473 82.50CR C-CHECK VOID CHECK V 11/15/2019 255580 88841 TEXAS DEPT OF TRANSPORTATION C-CHECK TEXAS DEPT OF TRANSPORTAVOIDED V 11/22/2019 255745 9.36CR C-CHECK VOID CHECK V 11/29/2019 255810 C-CHECK VOID CHECK V 11/29/2019 255811 * * T O T A L S * * NO INVOICE AMOUNT DISCOUNTS CHECK AMOUNT REGULAR CHECKS: 0 0.00 0.00 0.00 HAND CHECKS: 0 0.00 0.00 0.00 DRAFTS: 0 0.00 0.00 0.00 EFT: 0 0.00 0.00 0.00 NON CHECKS: 0 0.00 0.00 0.00 VOID CHECKS: 12 VOID DEBITS 0.00 VOID CREDITS 1,256.86CR 1,256.86CR 0.00 TOTAL ERRORS: 0 NO INVOICE AMOUNT DISCOUNTS CHECK AMOUNT VENDOR SET: 01 BANK: * TOTALS: 12 1,256.86CR 0.00 0.00 BANK: * TOTALS: 12 1,256.86CR 0.00 0.00 Page 16 of 67 12/12/2019 3:59 PM A/P HISTORY CHECK REPORT PAGE: 2 VENDOR SET: 01 CITY OF GEORGETOWN BANK: JPM JP MORGAN CHASE DATE RANGE:11/01/2019 THRU 11/30/2019 CHECK CHECK CHECK CHECK VENDOR I.D. NAME STATUS DATE AMOUNT DISCOUNT NO STATUS AMOUNT 23371 GRESHARE ENTERPRISES INC I-45890 NAME TAG - JOE CARNEY V 7/19/2019 252614 14.50 23371 GRESHARE ENTERPRISES INC M-CHECK GRESHARE ENTERPRISES INCUNPOST V 11/07/2019 252614 14.50CR 136261 SPENSER VANBUREN I-71919 SPENSER VANBUREN V 7/19/2019 252748 286.00 136261 SPENSER VANBUREN M-CHECK SPENSER VANBUREN UNPOST V 11/07/2019 252748 286.00CR 127541 TIFFANY HUNTER I-R002984 TIFFANY HUNTER V 7/26/2019 252862 169.50 127541 TIFFANY HUNTER M-CHECK TIFFANY HUNTER UNPOST V 11/07/2019 252862 169.50CR 06711 PROGRESSIVE COMMERCIAL AQUATIC I-IA3435 CW POOL CHEMICALS V 9/20/2019 254238 I-IA3436 CW POOL CHEMICALS V 9/20/2019 254238 I-IA3437 CT MURIATIC ACID 2019 V 9/20/2019 254238 I-IA3438 CT MURIATIC ACID 2019 V 9/20/2019 254238 6,402.48 06711 PROGRESSIVE COMMERCIAL AQUATIC M-CHECK PROGRESSIVE COMMERCIAL AUNPOST V 11/06/2019 254238 6,402.48CR 127931 MARRIOTT HOTEL SERVICES INC I-CR-10012019 MARRIOTT HOTEL SERVICES INC V 10/04/2019 254535 541.41 127931 MARRIOTT HOTEL SERVICES INC M-CHECK MARRIOTT HOTEL SERVICES UNPOST V 11/06/2019 254535 541.41CR 1 CRYSTAL FONTENOT I-201910106278 CRYSTAL FONTENOT V 10/11/2019 254597 52.82 1 CRYSTAL FONTENOT UNPOST M-CHECK CRYSTAL FONTENOT UNPOST V 11/18/2019 254597 52.82CR 1 Oscar Lara I-201910106287 Oscar Lara V 10/11/2019 254622 43.90 1 Oscar Lara UNPOST M-CHECK Oscar Lara UNPOST V 11/18/2019 254622 43.90CR Page 17 of 67 12/12/2019 3:59 PM A/P HISTORY CHECK REPORT PAGE: 3 VENDOR SET: 01 CITY OF GEORGETOWN BANK: JPM JP MORGAN CHASE DATE RANGE:11/01/2019 THRU 11/30/2019 CHECK CHECK CHECK CHECK VENDOR I.D. NAME STATUS DATE AMOUNT DISCOUNT NO STATUS AMOUNT 87541 KIMLEY-HORN AND ASSOCIATES INC I-069226616-0919 NA KHA-19-001-TO R 11/01/2019 255263 400 9-0980-90-059 IH 35/ HWY 29 INTERSECTION IMPKHA-19-001-TO 2,364.00 2,364.00 1 FORSTER & GILES I-CR-111119 FORSTER & GILES: R 11/15/2019 255549 400 9-0980-90-060 MAYS STREET/ RABBIT HILL ROAD FORSTER & GILES: 22,000.00 22,000.00 89091 RPS INFRASTRUCTURE INC I-1019027 NA AMENDMENT #2 E 11/22/2019 999999 400 9-0980-90-044 FM 971/ FONTANA (NW BRIDGE) AMENDMENT #2 862.99 862.99 * * T O T A L S * * NO INVOICE AMOUNT DISCOUNTS CHECK AMOUNT REGULAR CHECKS: 2 24,364.00 0.00 24,364.00 HAND CHECKS: 0 0.00 0.00 0.00 DRAFTS: 0 0.00 0.00 0.00 EFT: 1 862.99 0.00 862.99 NON CHECKS: 0 0.00 0.00 0.00 VOID CHECKS: 7 VOID DEBITS 0.00 VOID CREDITS 7,510.61CR 7,510.61CR 0.00 TOTAL ERRORS: 0 ** G/L ACCOUNT TOTALS ** G/L ACCOUNT NAME AMOUNT ---------------------------------------------------------------------- 400 9-0980-90-044 FM 971/ FONTANA (NW BRIDGE) 862.99 400 9-0980-90-059 IH 35/ HWY 29 INTERSECTION IMP 2,364.00 400 9-0980-90-060 MAYS STREET/ RABBIT HILL ROAD 22,000.00 *** FUND TOTAL *** 25,226.99 NO INVOICE AMOUNT DISCOUNTS CHECK AMOUNT VENDOR SET: 01 BANK: JPM TOTALS: 10 25,226.99 0.00 25,226.99 Page 18 of 67 12/12/2019 3:59 PM A/P HISTORY CHECK REPORT PAGE: 4 VENDOR SET: 02 CITY OF GEORGETOWN BANK: JPM JP MORGAN CHASE DATE RANGE:11/01/2019 THRU 11/30/2019 CHECK CHECK CHECK CHECK VENDOR I.D. NAME STATUS DATE AMOUNT DISCOUNT NO STATUS AMOUNT 10990 KLOTZ ASSOCIATES INC I-1019026 PROFESSIONAL SERVICES R 11/22/2019 255653 400 9-0980-90-044 FM 971/ FONTANA (NW BRIDGE) PROFSSIONAL SERVICES 5,291.54 5,291.54 * * T O T A L S * * NO INVOICE AMOUNT DISCOUNTS CHECK AMOUNT REGULAR CHECKS: 1 5,291.54 0.00 5,291.54 HAND CHECKS: 0 0.00 0.00 0.00 DRAFTS: 0 0.00 0.00 0.00 EFT: 0 0.00 0.00 0.00 NON CHECKS: 0 0.00 0.00 0.00 VOID CHECKS: 0 VOID DEBITS 0.00 VOID CREDITS 0.00 0.00 0.00 TOTAL ERRORS: 0 ** G/L ACCOUNT TOTALS ** G/L ACCOUNT NAME AMOUNT ---------------------------------------------------------------------- 400 9-0980-90-044 FM 971/ FONTANA (NW BRIDGE) 5,291.54 *** FUND TOTAL *** 5,291.54 NO INVOICE AMOUNT DISCOUNTS CHECK AMOUNT VENDOR SET: 02 BANK: JPM TOTALS: 1 5,291.54 0.00 5,291.54 BANK: JPM TOTALS: 11 30,518.53 0.00 30,518.53 REPORT TOTALS: 11 30,518.53 0.00 30,518.53 Page 19 of 67 12/12/2019 3:59 PM A/P HISTORY CHECK REPORT PAGE: 5 SELECTION CRITERIA ------------------------------------------------------------------------------------------------------------------------------------ VENDOR SET: * - All VENDOR: ALL BANK CODES: All FUNDS: Include: 400 ------------------------------------------------------------------------------------------------------------------------------------ CHECK SELECTION CHECK RANGE: 000000 THRU 999999 DATE RANGE: 11/01/2019 THRU 11/30/2019 CHECK AMOUNT RANGE: 0.00 THRU 999,999,999.99 INCLUDE ALL VOIDS: YES ------------------------------------------------------------------------------------------------------------------------------------ PRINT OPTIONS SEQUENCE: CHECK NUMBER PRINT TRANSACTIONS: YES PRINT G/L: YES UNPOSTED ONLY: NO EXCLUDE UNPOSTED: NO MANUAL ONLY: NO STUB COMMENTS: NO REPORT FOOTER: NO CHECK STATUS: NO PRINT STATUS: * - All ------------------------------------------------------------------------------------------------------------------------------------ Page 20 of 67 City of Georgetown, Texas Transportation Enhancement Corp December 18, 2019 S UB J E C T: C onsideration and pos s ible approval of the minutes from the November 20, 2019 G T EC Board Meeting. - - David Morgan - G eneral Manager, G T EC Board IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: David Morgan - G eneral Manager, G T EC Board AT TAC H ME N T S: Description Type GTEC Minutes 11-20-19 Backup Material Page 21 of 67 Minutes of the Meeting of Georgetown Transportation Enhancement Corporation and the Governing Body of the City of Georgetown, Texas Wednesday, November 20, 2019 The Georgetown Transportation Enhancement Corporation of the City of Georgetown, Texas, met on Wednesday, November 20, 2019. Board Members Present: Jay Warren – President, Al Hajka, Bob Whetsell, John Marler, Mike Triggs Board Members Absent: Colin McGahey – Secretary, Rachael Jonrowe Staff Present: Wayne Reed, Laurie Brewer, Michaela Dollar, Emily Koontz, Wesley Wright, Paul Diaz Others Present: None Minutes Regular Session: (This Regular Session may, at any time, be recessed to convene an Executive Session for any purpose authorized by the Open Meetings Act, Texas Government Code 551.) A. Call to Order: Meeting was called to order at 4:15 PM by Warren B. Introduction of New Board Members and Visitors: No visitors. C. Industry/CAMPO/TxDOT Updates – There were no updates. Morgan told the board that CAMPO is doing their call for projects. The city is going to be bringing some large projects to Council to get on the CAMPO list to make sure that they are eligible for funding. TxDOT advance funding agreement is currently under review at legal. D. Update of current projects - Wesley Wright, P.E., Systems Engineering Director/Michael Hallmark, CIP Manager. Wright gave updates which are included in the packet. Warren asked and Wright replied that the Williams Dr right turn on to Rivery was waiting on utilities to be moved. They have now been moved and the contractor is moving in. E. Presentation of Georgetown Transportation Enhancement Corporation preliminary monthly financial reports for October 2019. Diaz gave the reports which are included in the packet. Page 22 of 67 Legislative Regular Agenda: F. Consideration and possible approval of the minutes from the June 19, 2019 GTEC Board Meeting. -- David Morgan - General Manager, GTEC Board MOTION by Hajka, SECOND by Warren to approve the minutes with a corrected spelling from Cadodo to Kubota in item G. APPROVED 5-0-2 (Jonrowe and McGahey – absent) G. Discussion Set a Public hearing for December 18, 2019 by the Georgetown Transportation Enhancement Corporation (GTEC) regarding the expenditure of 4B sales tax funds for the proposed Confido III Project. Leigh Wallace, Finance Director, COG, Manager, GTEC. MOTION by Marler, SECOND by Hajka. APPROVED 5-0-2 (Jonrowe and McGahey – absent) H. Set a Public hearing for December 18, 2019 by the Georgetown Transportation Enhancement Corporation (GTEC) regarding the expenditure of 4B sales tax funds for the proposed Costco Wholesale Corporation Project. Leigh Wallace, Finance Director, COG, Manager, GTEC. MOTION by Marler, SECOND by Hajka. APPROVED 5-0-2 (Jonrowe and McGahey – absent) I. EXECUTIVE SESSION In compliance with the Open Meetings Act, Chapter 551, Government Code, Vernon's Texas Codes, Annotated, the item listed below will be discussed in closed session and is subject to action in the regular session. Sec. 551.087 Deliberation Regarding Economic Development Negotiations Extension of Aviation Drive - Michaela Dollar, Economic Development Director J. Action from Executive Session – Extension of Aviation Drive. MOTION by Marler, SECOND by Whetsell. APPROVED 5-0-2 (Jonrowe and McGahey – absent) ADJOURNMENT: MOTION by Marler, second by Hajka to adjourn the meeting. APPROVED 5-0-2 (Jonrowe and McGahey – absent) Meeting adjourned at 4:42 PM. Adjournment Approved: Attest: Page 23 of 67 _______________________ ________________________ Jay Warren- President Colin McGahey – Secretary _________________________ Emily Koontz – Board Liaison Page 24 of 67 City of Georgetown, Texas Transportation Enhancement Corp December 18, 2019 S UB J E C T: C onsideration and pos s ible ac tion on an Agreement for a Local O n-S ystem Improvement P roject with the Texas Department of Transportation (T xDO T ) for signal and roadway improvements along S H29, just eas t of I H35 -- Wesley Wright, P E, S ystems Engineering Direc tor IT E M S UMMARY: P revious ly, the G eorgetown Trans portation Enhanc ement C orporation (G T EC ) agreed to fund a traffic s ignal reloc ation and various roadway improvement on S H29, jus t eas t of I H35 to help improve the flow of traffic near the existing HEB and Wolf C rossing retail developments. In addition to shifting the traffic s ignal east, promoting better flow through all inters ections in the immediate area, a rais ed median and multiple turn lanes are propos ed with the project. T he proposed agreement dictates terms by which T xDO T will allow these improvements within their right- of-way. T he document is a T xDO T standard, very s imilar to others we have c ompleted and worked under in the past. T he doc ument has been reviewed by the C ity Attorney's O ffice. S taff and our cons ulting engineer rec ommend approval of the propos ed agreement. F IN AN C IAL IMPAC T: T here is no direct c os t as s ociated with this agreement. T he C ity, spec ifically G T EC , has agreed to fund all cons truction costs . S UB MIT T E D B Y: Wesley Wright AT TAC H ME N T S: Description Type Agreement - SH29 Signal Relocate Backup Material Page 25 of 67 CSJ # 0337-01-047 District # 14-AUS Code Chart 64 # 16000 Project Name SH 29 at Wolf Crossing Traffic Signal Relocation Page 1 of 7 LOSA Rev 07/17/2019 STATE OF TEXAS § COUNTY OF TRAVIS § AGREEMENT For A LOCAL ON-SYSTEM IMPROVEMENT PROJECT THIS AGREEMENT (Agreement) is made by and between the State of Texas, acting by and through the Texas Department of Transportation called the “State”, and the City of Georgetown, acting by and through its duly authorized officials, called the “Local Government.” The State and Local Government shall be collectively referred to as “the parties” hereinafter. WITNESSETH WHEREAS, the Texas Transportation Code, Section 201.103 establishes that the State shall design, construct and operate a system of highways in cooperation with local governments and Section 222.052 authorizes the Texas Transportation Commission to accept contributions from political subdivisions for development and construction of public roads and the state highway system within the political subdivision; and WHEREAS, the Texas Transportation Commission passed Minute Order Number 115550, authorizing the State to accept Local Government funded projects performed on the state highway system. The project covered by this Agreement includes only work within the state right of way as described in the Agreement, Article 2, Scope of Work (Project); and, WHEREAS, the Governing Body of the Local Government has approved entering into this Agreement by resolution, ordinance, or commissioners court order dated {Enter Date of Resolution}, which is attached to and made a part of this Agreement as Attachment A, Resolution, Ordinance, or Commissioners Court Order (Attachment A) for the improvement covered by this Agreement. A map showing the Project location appears in Attachment B, Project Location Map (Attachment B), which is attached to and made a part of this Agreement. NOW, THEREFORE, in consideration of the premises and of the mutual covenants and agreements of the parties, to be by them respectively kept and performed as set forth in this Agreement, it is agreed as follows: AGREEMENT 1. Period of the Agreement This Agreement becomes effective when signed by the last party whose signing makes the Agreement fully executed. This Agreement shall remain in effect until the completed Project is accepted by the State or unless terminated as provided below. Page 26 of 67 CSJ # 0337-01-047 District # 14-AUS Code Chart 64 # 16000 Project Name SH 29 at Wolf Crossing Traffic Signal Relocation Page 2 of 7 LOSA Rev 07/17/2019 2. Scope of Work The Project consists of relocating the traffic signal on SH 29 east of its current location at HEB main entrance, to the new Wolf Crossing Entrance/HEB back entrance in the City of Georgetown, Texas. 3. Local Project Sources and Uses of Funds A. The total estimated cost of the Project is shown in Attachment C, Local On-System Improvement Project Budget (Attachment C), which is attached to and made a part of this Agreement. The estimated funds from the Local Government are shown in Attachment C. The State will pay for no Project costs performed by or managed by Local Government under this Agreement. B. Attachment C shows how necessary resources for completing the Project will be provided by major cost categories. These categories may include but are not limited to: (1) costs of real property (right of way); (2) costs of utility work; (3) costs of environmental assessment and remediation; (4) cost of preliminary engineering and design; (5) cost of construction and construction management; and (6) any other Project costs. C. The Local Government shall be solely responsible for all of its costs associated with the Project provided for in this Agreement. The Local Government shall be responsible for cost overruns for the Project in excess of the estimated amount to be paid by the Local Government on Attachment C. The Local Government shall also be responsible for direct and indirect costs incurred by the State related to performance of this project if so indicated on Attachment C. If the State determines that the on-system improvements are of significant operational benefit to the State, the State may waive its direct or indirect costs. The State’s waiver of its direct or indirect costs shall be indicated on Attachment C by showing the State as responsible for these costs. When the Local Government is responsible for the State’s direct or indirect costs, the amount indicated on Attachment C is a fixed fee and not subject to adjustment except through the execution of an amendment to this Agreement. D. Prior to the performance of any engineering review work by the State, the Local Government shall pay to the State the amount of direct and indirect State costs specified in Attachment C. E. Whenever funds are paid by the Local Government to the State under this Agreement, the Local Government shall remit a check or warrant made payable to the “Texas Department of Transportation” or may use the State’s Automated Clearing House (ACH) system for electronic transfer of funds in accordance with instructions provided by TxDOT’s Financial Management Division. The funds shall be deposited and managed by the State and are not refundable. F. The Local Government will begin construction on the Project within 12 months after execution of the Agreement. G. The Local Government will complete construction and receive the State’s acceptance of the project within 6 months after the date the State authorizes in writing for the Local Government to commence construction of the Project. H. If the Local Government chooses not to or fails to complete the work once construction on the Project commences, the State may terminate this Agreement in accordance with paragraph 4.C. below. The State may address unfinished construction work as it Page 27 of 67 CSJ # 0337-01-047 District # 14-AUS Code Chart 64 # 16000 Project Name SH 29 at Wolf Crossing Traffic Signal Relocation Page 3 of 7 LOSA Rev 07/17/2019 determines necessary to protect the interests of the State, which includes returning the Project area to its original condition or completing the work using State forces or contractors. The Local Government shall pay all costs incurred by the State under this provision. 4. Termination of this Agreement This Agreement shall remain in effect until the Project is completed and accepted by the State, unless: A. The Agreement is terminated in writing with the mutual consent of the parties; B. The State terminates the Agreement in writing due to the Local Government’s failure to comply with paragraphs 3.F or 3.G; or C. The Agreement is terminated by one party because of a breach, in which case any cost incurred because of the breach shall be paid by the breaching party. 5. Amendments Amendments to this Agreement due to changes in the character of the work, terms of the Agreement, or responsibilities of the parties relating to the Project may be enacted through a mutually agreed upon, written amendment. Amendments may not include the addition of State or Federal funds. If any funds other than Local Government funds are proposed, this Agreement must be terminated and a new agreement with appropriate terms and clauses executed in its place. 6. Remedies This Agreement shall not be considered as specifying the exclusive remedy for any Agreement default, but all remedies existing at law and in equity may be availed of by either party to this Agreement and shall be cumulative. 7. Architectural and Engineering Services The Local Government has responsibility for the performance of architectural and engineering services. The engineering plans shall be developed in accordance with the applicable State’s Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges and the special specifications and special provisions related to it. The Project design shall, at a minimum conform to applicable State manuals. The State shall review the plans, specifications, and estimates provided by the Local Government upon completion or at any time deemed necessary by the State. Should the State determine that the complete plans, specifications, and estimates for the Project are not acceptable, the Local Government shall correct the design documents to the State’s satisfaction. Should additional specifications or data be required by the State, the Local Government shall redesign the plans and specifications to the State’s satisfaction. The costs for additional work on the plans, specifications, and estimates shall be borne by the Local Government. 8. Environmental Assessment and Mitigation Development of a transportation project must comply with applicable environmental laws. The Local Government is responsible for: Page 28 of 67 CSJ # 0337-01-047 District # 14-AUS Code Chart 64 # 16000 Project Name SH 29 at Wolf Crossing Traffic Signal Relocation Page 4 of 7 LOSA Rev 07/17/2019 A. The identification and assessment of any environmental problems associated with the development of the Project governed by this Agreement. B. The cost of any environmental problem’s mitigation and remediation. C. Providing any public meetings or public hearings required for development of all required environmental documents and obtaining all required permits and approvals. D. The preparation of documents required for the environmental clearance of the Project. Before the advertisement for bids, the Local Government shall provide to the State written documentation from the appropriate regulatory agency or agencies that all environmental clearances and approvals have been obtained. 9. Right of Way and Real Property The Local Government shall acquire all required right of way and necessary right of entry for performance of the Project in accordance with applicable requirements of the Texas Department of Transportation Right of Way Manual, State law, and Federal law governing the acquisition of real property including but not limited to Title II and Title III of the Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970 Title 42 U.S.C.A. Section 4601 et seq. Right of way acquired for improvements to the state highway system shall be acquired in the name of the State. Local Government shall provide right of entry to State personnel and its authorized representatives to areas off the state highway system throughout the duration of the Project for the State to perform inspection and oversight of the Project. 10. Utilities The Local Government shall be responsible for the adjustment, removal, or relocation of utility facilities for the Project in accordance with applicable State and Federal laws, regulations, rules, policies, and procedures, including any cost to the State of a delay resulting from the Local Government’s failure to ensure that utility facilities are adjusted, removed, or relocated before the scheduled beginning of construction. The Local Government will not be reimbursed for the cost of required utility work. The Local Government must obtain advance approval for any variance from established procedures. 11. Compliance with Texas Accessibility Standards and ADA Local Government shall ensure that the plans for and the construction of the Project are in compliance with standards issued or approved by the Texas Department of Licensing and Regulation (TDLR) as meeting or consistent with minimum accessibility requirements of the Americans with Disabilities Act (P.L. 101-336) (ADA). 12. Construction Responsibilities A. The Local Government shall advertise for construction bids, issue bid proposals, receive and tabulate the bids, and award and administer the contract for construction of the Project. Administration of the contract includes the responsibility for construction engineering and for issuance of any change orders, supplemental agreements, amendments, or additional work orders that may become necessary subsequent to the award of the construction contract. Project plans and specifications for improvements on the state highway system must be approved by the State prior to advertising for Page 29 of 67 CSJ # 0337-01-047 District # 14-AUS Code Chart 64 # 16000 Project Name SH 29 at Wolf Crossing Traffic Signal Relocation Page 5 of 7 LOSA Rev 07/17/2019 construction. Upon selection of a contractor and prior to commencing construction within the state highway system right of way, the Local Government shall request and obtain written authorization to commence construction of the Project from the State. The Local Government will supervise and inspect all work performed hereunder and provide such engineering inspection and testing services as may be required to ensure that the construction is accomplished in accordance with the approved plans and specifications. All construction change orders impacting the proposed improvements, traffic control, environmental mitigation, or drainage on the state highway system require written pre-approval by the State prior to execution by the Local Government. B. Upon completion of the Project, the Local Government will issue and sign a “Notification of Completion” acknowledging the Project’s construction completion. A copy will be provided to the State prior to State’s final acceptance of the improvements. C. Prior to the State’s acceptance of the improvements on the state highway system, Local Government shall furnish to the State written certification from a Texas Registered Professional Engineer that the Project was constructed in substantial compliance with the Project’s plans, specifications, and quality assurance requirements. 13. Project Maintenance After Local Government completion of the work and acceptance by the State, the State will be responsible for maintenance of the improvements within the state highway system right of way outside the boundaries of an incorporated city. This obligation may be fulfilled through other agreements signed by the State. 14. Notices All notices to either party shall be delivered personally or sent by certified or U.S. mail, postage prepaid, addressed to that party at the following address: Local Government City of Georgetown ATTN: Mayor 113 E. Eighth Street Georgetown, Texas 78626 State Director of Contract Services Texas Department of Transportation 125 E. 11th Street Austin, Texas 78701 All notices shall be deemed given on the date delivered in person or deposited in the mail, unless otherwise provided by this Agreement. Either party may change the above address by sending written notice of the change to the other party. Either party may request in writing that notices shall be delivered personally or by certified U.S. mail, and that request shall be carried out by the other party. Page 30 of 67 CSJ # 0337-01-047 District # 14-AUS Code Chart 64 # 16000 Project Name SH 29 at Wolf Crossing Traffic Signal Relocation Page 6 of 7 LOSA Rev 07/17/2019 15. Legal Construction If one or more of the provisions contained in this Agreement shall for any reason be held invalid, illegal, or unenforceable in any respect, such invalidity, illegality, or unenforceability shall not affect any other provisions and this Agreement shall be construed as if it did not contain the invalid, illegal, or unenforceable provision. 16. Responsibilities of the Parties The State and the Local Government agree that neither party is an agent, servant, or employee of the other party, and each party agrees it is responsible for its individual acts and deeds as well as the acts and deeds of its contractors, employees, representatives, and agents. 17. Ownership of Documents Upon completion or termination of this Agreement, copies of all documents and data prepared under this Agreement by the Local Government for improvements within the state highway system right of way shall be provided to the State prior to State acceptance of the Project without restriction or limitation on their further use. The originals shall remain the property of the Local Government. At the request of the State, the Local Government shall submit any Project information required by the State in the format directed by the State. 18. Compliance with Laws The parties shall comply with all federal, state, and local laws, statutes, ordinances, rules and regulations, and the orders and decrees of any courts or administrative bodies or tribunals in any manner affecting the performance of this Agreement. When required, the Local Government shall furnish the State with satisfactory proof of this compliance. 19. Sole Agreement This Agreement constitutes the sole and only agreement between the parties and supersedes any prior understandings or written or oral agreements respecting the Agreement’s subject matter. 20. Inspection of Books and Records The parties to this Agreement shall maintain all books, documents, papers, accounting records, and other documentation relating to costs incurred and engineering inspection and testing services performed under this Agreement and shall make such materials available to the State and the Local Government or their duly authorized representatives for review and inspection at its office during the Agreement period and for seven (7) years from the date of completion of work defined under this Agreement or until any impending litigation or claims are resolved. Additionally, the State and the Local Government and their duly authorized representatives shall have access to all the governmental records that are directly applicable to this Agreement for the purpose of making audits, examinations, excerpts, and transcriptions. 21. Insurance Before beginning work on the state highway system, the Local Government and its contractor performing the work shall provide the State with a fully executed copy of the State's Form 1560 Page 31 of 67 CSJ # 0337-01-047 District # 14-AUS Code Chart 64 # 16000 Project Name SH 29 at Wolf Crossing Traffic Signal Relocation Page 7 of 7 LOSA Rev 07/17/2019 Certificate of Insurance verifying the existence of coverage in the amounts and types specified on the Certificate of Insurance for all persons and entities working on state right of way. Self- insurance documentation acceptable to the State may be substituted for all or part of the coverage’s required for the Local Government. This coverage shall be maintained until all work on the state right of way is complete. If coverage is not maintained, all work on state right of way shall cease immediately, and the State may recover damages and all costs of completing the work. 22. Pertinent Non-Discrimination Authorities During the performance of this Agreement, the Local Government, for itself, its assignees, and successors in interest agree to comply with all applicable Federal and State nondiscrimination statutes and authorities. 23. Signatory Warranty Each signatory warrants that the signatory has necessary authority to execute this Agreement on behalf of the entity represented. Each party is signing this agreement on the date stated under that party’s signature. THE STATE OF TEXAS THE LOCAL GOVERNMENT Signature Signature Kenneth Stewart Dale Ross Typed or Printed Name Typed or Printed Name Director of Contract Services Mayor Typed or Printed Title Typed or Printed Title Date Date Page 32 of 67 CSJ # 0337-01-047 District # 14-AUS Code Chart 64 # 16000 Project Name SH 29 at Wolf Crossing Traffic Signal Relocation Page 1 of 1 LOSA Attachment A ATTACHMENT A RESOLUTION, ORDINANCE, OR COMMISSIONERS COURT ORDER {Insert Local Government Resolution, Ordinance, or Commissioners Court Order} Page 33 of 67 CSJ # 0337-01-047 District # 14-AUS Code Chart 64 # 16000 Project Name SH 29 at Wolf Crossing Traffic Signal Relocation Page 1 of 1 LOSA Attachment B ATTACHMENT B PROJECT LOCATION MAP Page 34 of 67 CSJ # 0337-01-047 District # 14-AUS Code Chart 64 # 16000 Project Name SH 29 at Wolf Crossing Traffic Signal Relocation Page 1 of 1 LOSA Attachment C ATTACHMENT C LOCAL ON-SYSTEM IMPROVEMENT PROJECT BUDGET (Locally Funded and Performed Project) The Local Government is responsible for 100% of the costs allocated to it as described below, including overruns. Description Estimated Costs Subtotals PROJECT PHASES: Work performed by the Local Government or its Consultant or Contractor Environmental $ Right of Way $ Engineering $30,000 Utility Work $ Construction $400,000 Subtotal for Project Phases $430,000 DIRECT STATE COSTS: Paid By: ☐☐☐☐ Local Government State Environmental $2,150 Right of Way $538 Engineering $3,225 Utility Work $538 Construction $15,050 Subtotal for Direct State Costs $21,501 INDIRECT STATE COSTS: Paid By: ☐☐☐☐ Local Government State Subtotal for Indirect State Costs (4.52%) $19,436 TOTAL ESTIMATED COST OF PROJECT $470,937 $0.00 Fixed price amount of payment by the Local Government to the State for the State’s direct and indirect costs as stated in Article 3, C and D of the Agreement. Page 35 of 67 City of Georgetown, Texas Transportation Enhancement Corp December 18, 2019 S UB J E C T: P ublic hearing by the G eorgetown Transportation Enhancement C orporation (G T EC ) regarding the expenditure of 4B sales tax funds for the propos ed C onfido I I I P rojec t. – Leigh Wallace, F inanc e Director, C O G , F inanc e Manager, G T EC . IT E M S UMMARY: S tate Law (Loc al G overnment C ode 505.159) requires G T EC to provide public notice and hold a public hearing on the proposed projects to be funded with the 4B sales tax. T he required notic e was publis hed in the Williamson C ounty S un on Dec 11, 2019. T he public hearing will be c onducted by the G T EC Board of Directors . F IN AN C IAL IMPAC T: $600,000 to be funded on or before F Y2022 S UB MIT T E D B Y: AT TAC H ME N T S: Description Type Proof of Public Notice Backup Material GTEC Findings of Project Eligibility Backup Material Pres entation Backup Material Page 36 of 67 GEORGETOWN TRANSPORTATION ENHANCEMENT CORPORATION NOTICE OF PUBLIC HEARING Wednesday, December 18, 2019 - 3:30pm Georgetown Municipal Complex 300-1 Industrial Avenue – Georgetown, TX In accordance with Local Government Code 505.159, the Georgetown Transportation Enhancement Corporation will hold a public hearing re- garding the expenditures of 4B sales taxes not to exceed Fiscal Year 2025 proposed transportation improvement plan. Proposed projects to be funded on or before FY2025 Estimated Amount Costco Wholesale Corp. $ 2,000,000 Confido III $ 600,000 Total $ 2,600,000 Page 37 of 67 1 GTEC (4B) Analysis of Expenditures under the ACT Question 1 Is the expenditure for “streets, roads, drainage and other related transportation system improvements, including the payment of maintenance and operating expenses associated with such authorized projects?”(Ballot Language) Question 2 Is the expenditure for “streets, roads, drainage and other related transportation system improvements, including the payment of maintenance and operation expenses associated with such authorized projects” an authorized “Cost” as that term is defined in the Act {Act 2(4)} (see below definition of “Cost under the Act): a. Acquisition, cleanup, construction, reconstruction, improvement, expansion, including the cost of acquisition of all land, rights-of-way, property rights, easements and interests. b. Machinery and equipment, financing charges, inventory, raw materials and other supplies. c. Research and development costs. d. Interest prior to and during construction and for one year after completion of construction whether or not capitalized. e. Necessary reserve funds. f. Cost of estimates and of engineering and legal services. g. Plans. h. Specifications. i. Surveys. j. Estimates of cost and revenue. k. Other expenses necessary or incident to determining the feasibility and practicability of acquiring, cleaning, constructing, reconstructing, improving, and expanding any such project. l. Administrative expense or such expense as may be necessary or incident to the acquisition, cleanup, construction, reconstruction, improvement and expansion thereof, the placing of the same in operation and the financing or refinancing of any such project. m. Refunding of any outstanding obligations, mortgages, or advances issued, made or given by any person for any of the aforementioned costs. Page 38 of 67 2 Question 3 Is the expenditure for “streets, roads, drainage and other related transportation system improvements, including the payment of maintenance and operation expenses associated with such authorized projects” an authorized project related to an authorized “Project” as defined in the Act (see below definition of “Project under the Act): a. Targeted infrastructure and improvements (one or more) (limited to the ballot language to streets, roads, drainage and other related transportation system improvements) that are for the creation and retention of primary jobs{defined in Section 2(17) of the Act as jobs available at a company for which a majority of the products or services of that company ultimately exported to regional, statewide, national or international markets infusing new dollars into the location economy, and that are in one of the following NAICS sectors: 111 (crop production); 112 (animal production); 113 (forestry and logging); 11411 (commercial fishing); 115 (support activities for agriculture and forestry); 211 to 213 (mining); 221 (utilities); 311 to 339 (manufacturing); 42 (wholesale trade); 48 and 49 (transportation and warehousing); 51 (excluding 512131 and 5121332) (information (excluding movie theatres and drive in theatres)); 523-525 (securities, commodity contracts, and other financial investments and related activities; insurance carriers and related activities; funds, trusts and other financial vehicles); 5413, 5415, 5416, 5417, and 5419 (scientific research and development services; 551 (management of companies and enterprises); 56142 (telephone call centers); 922140 (correctional institutions), or 928110 (National Security for the corresponding index entries for Armed Forces, Army, Navy, Air Force, Marine Corps, and Military Bases)} and that are found by the board of directors to be required and suitable for the development, retention or expansion of manufacturing and industrial facilities, research and development facilities, military facilities, including closed and realigned military bases, transportation facilities (included but not limited to airports, ports, mass commuting facilities, and parking facilities), sewage or solid waste disposal facilities, recycling facilities, air or water pollution control facilities, facilities for the furnishing of water to the general public, distribution centers, primary jobs training facilities for the use of institutions of higher education; and regional or national corporate headquarters facilities [Act 2(11)(A)]; or b. Job training required or suitable for the promotion of the development and expansion of business enterprises and other enterprises described by this Act as provided by Section 38 of the Act, which requires a business enterprise offering job training to commit in writing to create new jobs that pay wages that are at least equal to the prevailing water for applicable occupation in the local labor market area, or increase its payroll to pay wages that are at least equal to the prevailing wage for the applicable occupation in the local labor market area {Act 2(11)(B)]; or c. Infrastructure necessary to promote or develop new or expanded business enterprises limited to streets, and roads, rail spurs, water and sewer utilities, electric utilities, gas utilities, drainage, site improvements and related improvements, and telecommunications and internet improvements and beach remediation along the Gulf of Mexico [Act 2(11)(C)]; or d. Land, buildings, equipment, facilities, improvements, and expenditures found by the board of directors to be required or suitable for the use for a career center, if the area to be benefited by the career center in not located in the taxing jurisdiction of a junior college district [Act 2(11)(D)}]; or Page 39 of 67 3 e. Infrastructure, improvements, land acquisition, buildings, or expenditures that are for the creation or retention of primary jobs for NAICS Sector 928110 (National Security, for the corresponding index entries for the Armed Forces, Army, Navy, Air Force, Marine Corps, and Military Bases) and that are found by the board of directors to be required or suitable for prompting or supporting military bases in active use to prevent the possible future closure or realignment of the base; attracting new military missions to a military base in active use; or redeveloping a military base that has been closed or realigned. [Act 2(11)(_)] f. Professional and amateur (including children’s) sports, athletic, entertainment, tourist, convention, and public park purposes and events, including stadiums, ball parks, auditoriums, amphitheaters, concert halls, parks and park facilities, open space improvements, museums, exhibition facilities, and related store, restaurant, concession, and automobile parking facilities, related transportation facilities, and related roads, streets, water and sewer facilities, and other related improvements that enhance any of those items. [Act 4B(a)(2)(A)]; or g. Promote or develop new or expanded business enterprises that create or retain primary jobs, including a project to provide public safety facilities, streets and road, drainage and related improvements, demolition of existing structures, general municipally owned improvements, as well as any improvements or facilities that are related to any of those projects and any other project that the board in its discretion determines promotes or develops new or expanded business enterprises that create and retain primary jobs [Act 4B(a)(2)(B)]; or h. Required or suitable for the promotion of development and expansion of affordable housing as defined by 42 U.S.C. Section 12745 [Act 4B(a)(2)(C)]; or i. Required or suitable for the development or improvement of water supply facilities including dams, transmission lines, well field developments, and other water supply alternatives. [NOTE: Only if approved by the voters at a special election.] Act 4B(a)(2)(D), 4B(a-5)(1) and (2).] j. Required or suitable for the development and institution of water or for the development and institution of water conservation programs, including incentives to install water-saving plumbing fixtures, educational programs, brush control programs and programs to replace malfunctioning or leaking water lines and other water facilities. [NOTE; Only is approved by the voters at a special election) Act 4B(a)(2)(E), 4B(a-5)(1) and (2).]; k. Required or suitable for the development, retention, or expansion of business enterprises if the project is undertaken by a corporation created by an eligible city that has not for each of the preceding two years received more than $50,000 in revenues from sales and use tax imposed under this section, and the governing body which has authorized the project by adopting a resolution at least two separate reading conducted at least on week apart. [Act 4B(a)(2)(F)] Question 4 Did the Board of Directors of GTEC make specific findings with regard to the type of expenditure, whether it was within the definition of “Cost”; and what type of “Project” it relates to? *************** THE ANSWERS TO ALL OF THE FOUR MAIN QUESTIONS ABOVE MUST BE “YES” IN ORDER FOR THE EXPENDITURE OF GTEC FUNDS TO BE PROPER UNDER THE BALLOT LANGUAGE AND THE ACT. *************** Page 40 of 67 GTEC Public Hearing Costco Wholesale December 18, 2019 Page 41 of 67 Confido Project Background •Discussed with GTEC in fall 2018 •Land adjacent to the portion of the airport property identified as future nonaviation industrial development in the Airport Master Plan update Page 42 of 67 Confido Project Background Page 43 of 67 Confido Development Plans •Developer has purchased property for a business park development •Plans include a collector level access road to airport property •Road allows access to future nonaviation industrial development on airport •Creates “shovel-ready” sites for industrial development Page 44 of 67 Development Plans Page 45 of 67 Access Road Costs •Total cost of the public access road and utilities is $1,700,000 •City will reimburse up to $1,200,000 for the cost of the road –$600,000 from GTEC –$600,000 from GEDCO •Must complete construction in three years •Approved by Council on February 26, 2019 Page 46 of 67 GTEC PROJECT ELIGIBILITY FINDINGS PROCESS Page 47 of 67 Question 1 Is the expenditure for “streets, roads, drainage and other related transportation system improvements, including the payment of maintenance and operating expenses associated with such authorized projects?” YES Page 48 of 67 Question 2 Is the expenditure for “streets, roads, drainage and other related transportation system improvements, including the payment of maintenance and operation expenses associated with such authorized projects” an authorized “Cost” as that term is defined in the Act {Act 2(4)}? Yes –A) Acquisition, cleanup, construction, reconstruction, improvement, expansion, including the cost of acquisition of all land, rights-of-way, property rights, easements and interests. Page 49 of 67 Question 3 Is the expenditure for “streets, roads, drainage and other related transportation system improvements, including the payment of maintenance and operation expenses associated with such authorized projects” an authorized projects” related to an authorized “Project” as defined in the Act (see below definition of “Project under the Act): Yes –A) Targeted infrastructure and improvements (one or more) … that are for the creation and retention of primary jobs … Page 50 of 67 Question 4 Did the Board of Directors of GTEC make specific findings with regard to the type of expenditure, whether it was within the definition of “Cost”; and what type of “Project” it relates to? YES Page 51 of 67 City of Georgetown, Texas Transportation Enhancement Corp December 18, 2019 S UB J E C T: P ublic hearing by the G eorgetown Transportation Enhancement C orporation (G T EC ) regarding the expenditure of 4B sales tax funds for the propos ed C ostco W holes ale C orp P roject. – Leigh Wallac e, F inance Director, C O G , F inanc e Manager, G T EC . IT E M S UMMARY: S tate Law (Loc al G overnment C ode 505.159) requires G T EC to provide public notice and hold a public hearing on the proposed projects to be funded with the 4B sales tax. T he required notic e was publis hed in the Williamson C ounty S un on Dec 11, 2019. T he public hearing will be c onducted by the G T EC Board of Directors . F IN AN C IAL IMPAC T: $2,000,000 to be funded on or before F Y2025 S UB MIT T E D B Y: AT TAC H ME N T S: Description Type Proof of Public Notice Backup Material GTEC Findings of Project Eligibility Backup Material Pres entation Backup Material Page 52 of 67 GEORGETOWN TRANSPORTATION ENHANCEMENT CORPORATION NOTICE OF PUBLIC HEARING Wednesday, December 18, 2019 - 3:30pm Georgetown Municipal Complex 300-1 Industrial Avenue – Georgetown, TX In accordance with Local Government Code 505.159, the Georgetown Transportation Enhancement Corporation will hold a public hearing re- garding the expenditures of 4B sales taxes not to exceed Fiscal Year 2025 proposed transportation improvement plan. Proposed projects to be funded on or before FY2025 Estimated Amount Costco Wholesale Corp. $ 2,000,000 Confido III $ 600,000 Total $ 2,600,000 Page 53 of 67 1 GTEC (4B) Analysis of Expenditures under the ACT Question 1 Is the expenditure for “streets, roads, drainage and other related transportation system improvements, including the payment of maintenance and operating expenses associated with such authorized projects?”(Ballot Language) Question 2 Is the expenditure for “streets, roads, drainage and other related transportation system improvements, including the payment of maintenance and operation expenses associated with such authorized projects” an authorized “Cost” as that term is defined in the Act {Act 2(4)} (see below definition of “Cost under the Act): a. Acquisition, cleanup, construction, reconstruction, improvement, expansion, including the cost of acquisition of all land, rights-of-way, property rights, easements and interests. b. Machinery and equipment, financing charges, inventory, raw materials and other supplies. c. Research and development costs. d. Interest prior to and during construction and for one year after completion of construction whether or not capitalized. e. Necessary reserve funds. f. Cost of estimates and of engineering and legal services. g. Plans. h. Specifications. i. Surveys. j. Estimates of cost and revenue. k. Other expenses necessary or incident to determining the feasibility and practicability of acquiring, cleaning, constructing, reconstructing, improving, and expanding any such project. l. Administrative expense or such expense as may be necessary or incident to the acquisition, cleanup, construction, reconstruction, improvement and expansion thereof, the placing of the same in operation and the financing or refinancing of any such project. m. Refunding of any outstanding obligations, mortgages, or advances issued, made or given by any person for any of the aforementioned costs. Page 54 of 67 2 Question 3 Is the expenditure for “streets, roads, drainage and other related transportation system improvements, including the payment of maintenance and operation expenses associated with such authorized projects” an authorized project related to an authorized “Project” as defined in the Act (see below definition of “Project under the Act): a. Targeted infrastructure and improvements (one or more) (limited to the ballot language to streets, roads, drainage and other related transportation system improvements) that are for the creation and retention of primary jobs{defined in Section 2(17) of the Act as jobs available at a company for which a majority of the products or services of that company ultimately exported to regional, statewide, national or international markets infusing new dollars into the location economy, and that are in one of the following NAICS sectors: 111 (crop production); 112 (animal production); 113 (forestry and logging); 11411 (commercial fishing); 115 (support activities for agriculture and forestry); 211 to 213 (mining); 221 (utilities); 311 to 339 (manufacturing); 42 (wholesale trade); 48 and 49 (transportation and warehousing); 51 (excluding 512131 and 5121332) (information (excluding movie theatres and drive in theatres)); 523-525 (securities, commodity contracts, and other financial investments and related activities; insurance carriers and related activities; funds, trusts and other financial vehicles); 5413, 5415, 5416, 5417, and 5419 (scientific research and development services; 551 (management of companies and enterprises); 56142 (telephone call centers); 922140 (correctional institutions), or 928110 (National Security for the corresponding index entries for Armed Forces, Army, Navy, Air Force, Marine Corps, and Military Bases)} and that are found by the board of directors to be required and suitable for the development, retention or expansion of manufacturing and industrial facilities, research and development facilities, military facilities, including closed and realigned military bases, transportation facilities (included but not limited to airports, ports, mass commuting facilities, and parking facilities), sewage or solid waste disposal facilities, recycling facilities, air or water pollution control facilities, facilities for the furnishing of water to the general public, distribution centers, primary jobs training facilities for the use of institutions of higher education; and regional or national corporate headquarters facilities [Act 2(11)(A)]; or b. Job training required or suitable for the promotion of the development and expansion of business enterprises and other enterprises described by this Act as provided by Section 38 of the Act, which requires a business enterprise offering job training to commit in writing to create new jobs that pay wages that are at least equal to the prevailing water for applicable occupation in the local labor market area, or increase its payroll to pay wages that are at least equal to the prevailing wage for the applicable occupation in the local labor market area {Act 2(11)(B)]; or c. Infrastructure necessary to promote or develop new or expanded business enterprises limited to streets, and roads, rail spurs, water and sewer utilities, electric utilities, gas utilities, drainage, site improvements and related improvements, and telecommunications and internet improvements and beach remediation along the Gulf of Mexico [Act 2(11)(C)]; or d. Land, buildings, equipment, facilities, improvements, and expenditures found by the board of directors to be required or suitable for the use for a career center, if the area to be benefited by the career center in not located in the taxing jurisdiction of a junior college district [Act 2(11)(D)}]; or Page 55 of 67 3 e. Infrastructure, improvements, land acquisition, buildings, or expenditures that are for the creation or retention of primary jobs for NAICS Sector 928110 (National Security, for the corresponding index entries for the Armed Forces, Army, Navy, Air Force, Marine Corps, and Military Bases) and that are found by the board of directors to be required or suitable for prompting or supporting military bases in active use to prevent the possible future closure or realignment of the base; attracting new military missions to a military base in active use; or redeveloping a military base that has been closed or realigned. [Act 2(11)(_)] f. Professional and amateur (including children’s) sports, athletic, entertainment, tourist, convention, and public park purposes and events, including stadiums, ball parks, auditoriums, amphitheaters, concert halls, parks and park facilities, open space improvements, museums, exhibition facilities, and related store, restaurant, concession, and automobile parking facilities, related transportation facilities, and related roads, streets, water and sewer facilities, and other related improvements that enhance any of those items. [Act 4B(a)(2)(A)]; or g. Promote or develop new or expanded business enterprises that create or retain primary jobs, including a project to provide public safety facilities, streets and road, drainage and related improvements, demolition of existing structures, general municipally owned improvements, as well as any improvements or facilities that are related to any of those projects and any other project that the board in its discretion determines promotes or develops new or expanded business enterprises that create and retain primary jobs [Act 4B(a)(2)(B)]; or h. Required or suitable for the promotion of development and expansion of affordable housing as defined by 42 U.S.C. Section 12745 [Act 4B(a)(2)(C)]; or i. Required or suitable for the development or improvement of water supply facilities including dams, transmission lines, well field developments, and other water supply alternatives. [NOTE: Only if approved by the voters at a special election.] Act 4B(a)(2)(D), 4B(a-5)(1) and (2).] j. Required or suitable for the development and institution of water or for the development and institution of water conservation programs, including incentives to install water-saving plumbing fixtures, educational programs, brush control programs and programs to replace malfunctioning or leaking water lines and other water facilities. [NOTE; Only is approved by the voters at a special election) Act 4B(a)(2)(E), 4B(a-5)(1) and (2).]; k. Required or suitable for the development, retention, or expansion of business enterprises if the project is undertaken by a corporation created by an eligible city that has not for each of the preceding two years received more than $50,000 in revenues from sales and use tax imposed under this section, and the governing body which has authorized the project by adopting a resolution at least two separate reading conducted at least on week apart. [Act 4B(a)(2)(F)] Question 4 Did the Board of Directors of GTEC make specific findings with regard to the type of expenditure, whether it was within the definition of “Cost”; and what type of “Project” it relates to? *************** THE ANSWERS TO ALL OF THE FOUR MAIN QUESTIONS ABOVE MUST BE “YES” IN ORDER FOR THE EXPENDITURE OF GTEC FUNDS TO BE PROPER UNDER THE BALLOT LANGUAGE AND THE ACT. *************** Page 56 of 67 GTEC Public Hearing Costco Wholesale December 18, 2019 Page 57 of 67 Costco Project Background •2016 Retail Assessment showed over 1,000,000 SF in retail leakage •The City has been working with Costco to identify a location in Georgetown since 2017 •Discussed with GTEC in early 2019 Page 58 of 67 Costco Project Background Page 59 of 67 Costco Development Plans •Costco has received approval of a Planned Unit Development for the site •Site plans include two public roads that would be constructed by Costco •Construction must be completed within five years Page 60 of 67 Development Plans Page 61 of 67 Incentive Package •$2,000,000 infrastructure reimbursement grant from GTEC upon the certificate of occupancy issuance for the Costco facility •Must complete construction within five years •Approved by Council on December 10, 2019 Page 62 of 67 GTEC PROJECT ELIGIBILITY FINDINGS PROCESS Page 63 of 67 Question 1 Is the expenditure for “streets, roads, drainage and other related transportation system improvements, including the payment of maintenance and operating expenses associated with such authorized projects?” YES Page 64 of 67 Question 2 Is the expenditure for “streets, roads, drainage and other related transportation system improvements, including the payment of maintenance and operation expenses associated with such authorized projects” an authorized “Cost” as that term is defined in the Act {Act 2(4)}? Yes –A) Acquisition, cleanup, construction, reconstruction, improvement, expansion, including the cost of acquisition of all land, rights-of-way, property rights, easements and interests. Page 65 of 67 Question 3 Is the expenditure for “streets, roads, drainage and other related transportation system improvements, including the payment of maintenance and operation expenses associated with such authorized projects” an authorized projects” related to an authorized “Project” as defined in the Act (see below definition of “Project under the Act): Yes –C) Infrastructure necessary to promote or develop new or expanded business enterprises… Page 66 of 67 Question 4 Did the Board of Directors of GTEC make specific findings with regard to the type of expenditure, whether it was within the definition of “Cost”; and what type of “Project” it relates to? YES Page 67 of 67