Loading...
HomeMy WebLinkAboutAgenda_GTEC_01.18.2017Notice of Meeting for the Georgetown Transportation Enhancement Corp and the Gov erning Body of the City of Georgetown January 18, 2017 at 3:30 PM at Georgetown Municipal Complex, 300-1 Industrial Av e., Georgetown, TX 78626 The City o f G eo rgeto wn is committed to comp lianc e with the Americans with Dis abilities Ac t (ADA). If yo u req uire as s is tanc e in participating at a p ublic meeting d ue to a disability, as d efined und er the ADA, reas onab le as s is tance, ad ap tatio ns , or acc o mmo d ations will b e provid ed up o n req uest. P leas e c o ntact the City Sec retary's Office, at leas t three (3) days prior to the sc hed uled meeting d ate, at (512) 930-3652 o r City Hall at 113 Eas t 8th Street fo r add itional info rmation; TTY us ers ro ute through Relay Texas at 711. Regular Session (This Regular S es s io n may, at any time, b e rec es s ed to convene an Exec utive S es s io n fo r any p urpose authorized b y the Op en Meetings Act, Texas Go vernment Co d e 551.) A Call to Ord er The Board may, at any time, rec es s the R egular S es s io n to convene in Exec utive S es s io n at the reques t of the Chair, a Board Memb er, the City Manager, As s is tant City Manager, G eneral Manager of Utilities, City Co uncil Member, o r legal c o uns el for any p urpos e authorized b y the Op en Meetings Act, Texas Government C o d e Chapter 551, and are s ubjec t to actio n in the Regular Ses s ion that follows . B Introduction of Vis itors C Ind ustry/C AMP O/TXDOT Updates D Pro ject Updates -- Wes ley Wright, P.E., S ys tems Engineering Direc tor E Pres entatio n o f Georgetown Trans p o rtation Enhanc ement Co rp o ration mo nthly financ ial reports for December 2016. Leigh Wallac e, Financ e Direc tor, COG, F inance Manager, GTEC Legislativ e Regular Agenda F Co nsideration and possible actio n to approve minutes from the sepc ial GT EC Board meeting held December 14, 2016. David Morgan, City Manager – COG, General Manager - GT EC G Exec utive S es s io n SEC: 551.072 -Deliberation R egarding Real Property - Travis Baird Rivery Blvd Ext. P ro ject (Parcel 14, No rthwest Blvd ) SW Bypas s Projec t (Laub ach, 4200 IH 35 S o uth) H Actio n from Executive S es s io n Adjournment CERTIFICATE OF POSTING I, Shelley No wling, C ity S ecretary fo r the C ity of Geo rgeto wn, Texas , d o hereby c ertify that this Notice of Page 1 of 17 Meeting was p o s ted at City Hall, 113 E. 8th Street, a p lace read ily acc es s ible to the general p ublic at all times , on the ______ d ay o f __________________, 2017, at __________, and remained so p o s ted fo r at leas t 72 c o ntinuo us ho urs p receding the sc heduled time o f s aid meeting. ____________________________________ S helley No wling, City Sec retary Page 2 of 17 City of Georgetown, Texas Transportation Enhancement Corp January 18, 2017 SUBJECT: Projec t Updates -- Wes ley Wright, P.E., Systems Engineering Directo r ITEM SUMMARY: Projec t Updates fo r January 2017 are as follo ws : Airport Ro ad (Lakeway to Aviatio n) - Under Des ign Engineering d es ign underway: finalizing alignment, R OW/easement needs, and ad d res s ing sto rm water/water quality. Targeting Summer 2017 to bid and b egin c o nstruc tion. FM 1460 (Quail Valley to Univers ity) - Under Cons tructio n Contrac tor currently ins talling b rid ge o ver Smith Branch, making ro ad way grade and p ro cessing s ubgrade, and laying as phalt in multip le loc ations . Storm d rain imp ro vements are largely c o mp lete. Tentatively s ched uled to be c omplete S p ring 2018. Mays Street (Wes tinghous e to Teravista) - Under Cons tructio n Embankment/S ubgrad e 90% complete. Storm d rain b o x culverts , concrete p ip e & inlet b o xes 90% installed . Contrac to r ins talling utility sleeves fo r adjac ent property o wner and making final grade inc luding s etting base. C o ns truc tion is expec ted to be c ompleted in late 2017 Rabbit Hill (Wes tingho use to Clearview) - Und er Des ign ROW needs will be b etter defined in the next month as p reliminary design/alignment p lans are finalized . Multip le parc els are exp ected to be needed whic h will likely pus h cons truction into late 2017/early 2018. Northwes t Boulevard Brid ge (Fontana to Aus tin Ave) - Und er Des ign Engineer is co o rd inating design with the design for Rivery Bo ulevard in mo ving toward s c o nstruc tion PS &E for b oth p ro jects to minimize overlap work between these two projec ts . Engineer has develo p ed alternatives fo r s to rmwater outfall northward fro m NW Blvd . F und ing to b egin R OW ac q uisitio n is s ched ule to be available in Octo b er 2017. Rivery Bo ulevard T IA Improvements (Williams to Wo lf Ranc h) - Under Des ign Engineering und erway with utility conflicts being as s es sed. S light mo d ification is b eing made to length of ad d ed lane to fit with existing features. Cons truc tion exp ected to start in s ummer 2017. Rivery Bo ulevard Extens io n (Williams to No rthwes t Blvd ) - ROW Acquis itio n Ac tively p ursuing o uts tand ing parc els . Co ns truc tio n fund ing exp ected to b e availab le in Oc tober 2017. Additio nal d etails and exhibits are attached fo r reference. Page 3 of 17 FINANCIAL IMPACT: N/A SUBMITTED BY: Wes ley Wright ATTACHMENTS: Description Type Project Updates - January 2017 Backup Material Page 4 of 17 Airport Road (Lakeway Blvd. to Aviation Dr.) January 2017 Project Description Expand Airport Road to 5 lanes (2 northbound, 2 southbound, & center turn lane). Purpose This project will relieve congestion on Airport Road, facilitate economic growth in the area, and improve the flow of traffic at the Lakeway intersection Project Manager Joel Weaver and Wesley Wright, P.E. Engineer KPA Engineers Element Status / Issues Design Engineering design underway: finalizing alignment, ROW/easement needs, and addressing storm water/water quality. Environmental/ Archeological Concurrent with preliminary engineering and schematic design. Rights of Way ROW and easement needs are being finalized. Discussions with landowners should begin in February. Utility Relocations Still currently being identified as part of design. Conflicts exist, but appear to be minimal. Construction Summer 2017 start, pending ROW/easements. Other Issues All ROW will be expanded to the east as a result of Airport/Federal complications. Page 5 of 17 FM 1460 (Quail Valley Drive to University Drive) Project No. 5RB TIP No. BO & CD Rights-of-Way Acquisition and Utility Relocation January 2017 Unchanged Project Description Acquisition of ROW and relocation of utilities for the FM 1460 Project (Quail Valley Drive to University Drive). Purpose To have all ROWs cleared and utilities prior to TxDOT letting the project for construction. Project Managers Ed Polasek, AICP, and Michael Hallmark Engineer Brown and Gay Engineers, Inc. Element Status / Issues Design Complete Environmental/ Archeological Complete Rights of Way Right of way acquisition complete. Section: North South Acquired: 36 8 Utility Relocations Ongoing with final water tie in at Inner Loop scheduled for mid- November Two Utility companies have submitted invoices for reimbursement – Atmos Energy and Seminole Pipeline Construction Under Construction. Tentatively scheduled to be complete Spring 2018. Contractor currently installing bridge over Smith Branch, making roadway grade and processing subgrade, and laying asphalt in multiple locations. Storm drain improvements are largely complete. Other Issues Engineer preparing Change Orders for construction contract to add a full intersection at the Vantage Apartment drive. This effort includes ongoing discussions with neighboring properties regarding access and utilities. Page 6 of 17 Mays Street Extension (Teravista Parkway in Round Rock to the intersection with Westinghouse Road) Project No. 5RI TIP No. CK January, 2017 Project Description Extend Mays Street northward from Teravista Parkway to the existing intersection with Westinghouse Road at Rabbit Hill Road. The widening along Westinghouse Road and Rabbit Hill Road will also be included in the schematic for additional turning lanes to/from Westinghouse Road. Preliminary layouts for future signals and roadway illumination will also be included. The project length along the anticipated alignment is approximately 1.2 miles. Project Managers Ken Taylor Engineer CP&Y, Inc. Element Status / Issues Design Complete Environmental/ Archeological Complete Rights of Way ROW –on-going. Only 1 parcel not pending closing. This parcel has been approved by Council for condemnation and proceedings are moving forward. This only impacts signal construction. Total Parcels: 8 Acquired: 5 Pending: 5 Utility Relocations Complete Construction Council – August 9th; NTP – October 10, 2016 Embankment/Subgrade 90% complete. Storm drain box culverts, concrete pipe & inlet boxes 90% installed. Contractor installing utility sleeves for adjacent property owner and making final grade including setting base. Other Issues Groundwater persistent during subgrade prep. Field meeting with design engineer and geotechnical engineer to discuss mitigation measures early January. Page 7 of 17 Page 8 of 17 Northwest Boulevard (Fontana Drive to Austin Avenue) Project No. 5QX TIP No. AF January 2017 Project Description Construction of overpass and surface roads to connect Northwest Boulevard with Austin Avenue and FM 971. Purpose This project will relieve congestion at the Austin Avenue/Williams Drive intersection and provide a more direct access from the west side of IH 35 corridor to Georgetown High School and SH 130 via FM 971. Project Manager Joel Weaver and Wesley Wright, P.E. Engineer Klotz Associates Element Status / Issues Design Engineering underway: Engineer is coordinating design with the design for Rivery Boulevard in moving towards construction PS&E for both projects to minimize overlap work between these two projects. Engineer has developed alternatives for stormwater outfall northward from NW Blvd. Environmental/ Archeological Concurrent with preliminary engineering and schematic design. Rights of Way ROW Documents are being finalized. Part of the ROW for this project is being required to complete the Rivery Boulevard Extension project. Funding to begin ROW acquisition tentatively scheduled for October 2017 or later. Utility Relocations TBD Construction Tentatively scheduled to begin mid-FY 2019. Other Issues Paper work has been submitted to TxDOT to create an AFA for design and environmental reviews of the bridge over I 35. Page 9 of 17 Rabbit Hill Road Improvements Project (Westinghouse Road to S. Clearview Drive) Project No. 5RQ TIP No. BZ January 2017 Project Description Reconstruct Rabbit Hill Road from Westinghouse Road northward to S. Clearview Dr. Widening along Westinghouse Road will also be included in the schematic for additional turning lanes to/from Westinghouse Road. The project length along the anticipated alignment is approximately 0.75 miles Project Managers Ken Taylor and Wesley Wright, P.E. Engineer CP&Y, Inc. Element Status / Issues Design Task Order awarded by Council August 9, 2016 80% construction set currently under review Environmental/ Archeological Efforts underway and any issues are expected to be identified in the coming month. Rights of Way ROW needs will be better defined in the next month as preliminary design/alignment plans are finalized. Multiple parcels are expected to be needed. Total Parcels: Acquired: Pending: Utility Relocations Will be identified as preliminary design and alignment plans are finalized. Multiple relocations expected – Round Rock water and Georgetown Electric. Construction Tentatively scheduled to be bid Summer 2017, but will be ROW dependent. Other Issues None. Page 10 of 17 Rivery Boulevard (TIA Improvements) Project No. 5RP TIP No. None January 2017 Project Description Develop the Plans, Specifications and Estimate for roadway improvements necessitated by the development for the Summit at Rivery. Purpose To provide improved traffic flow into the Summit at Rivery hotel and conference center from Rivery Boulevard. Project Manager Joel Weaver and Wesley Wright, P.E. Engineer M&S Engineering, LLC Element Status / Issues Design Engineering underway with utility conflicts being addressed. Slight modification is being made to length of added lane to fit with existing features. Environmental/ Archeology Existing ROW is clear from previous jobs. To the extent additional ROW is needed, additional environmental clearance efforts may be required. Rights of Way TBD – several parcels are expected to be necessary (either ROW or easements). A precise determination is expected in Jan/Feb as utility conflicts are finalized. Total Parcels: Appraised: Offers: Acquired: Closing pending: Condemnation: Utility Relocations Currently being determined. Possible conflicts with existing fiber, gas, and electric. Construction Tentatively scheduled to begin Spring 2017, pending ROW acquisition and clearing of utility conflicts. Other Issues TBD Page 11 of 17 Rivery Boulevard Extension (Williams Drive to Northwest Boulevard @ Fontana Drive) Project No. 5RM TIP No. AD January 2017 Project Description Develop the Rights-of-Way Map, acquire ROW, address potential environmental issues and complete construction plans specifications and estimate (PS&E) for the extension of Rivery Boulevard from Williams Drive to Northwest Boulevard at Fontana Drive in anticipation of future funding availability. Purpose To provide a route between Williams Drive and Northwest Boulevard serving the Gateway area, providing an alternate route from Williams Drive to the future Northwest Boulevard Bridge over IH 35, to provide a route between the hotels in the Gateway area and the proposed Conference Center near Rivery Boulevard and Wolf Ranch Parkway. Project Manager Travis Baird, Joel Weaver, and Wesley Wright, P.E. Engineer Kasberg Patrick and Associates Element Status / Issues Design City staff reviewing 75% plans. Environmental/ Archeology Complete Rights of Way Appraisals complete. Offers have been made to all 22 parcels. Closed on 11 parcels; 3 pending contract execution or final closing preparation. Environmental assessment complete on 7 parcels. Aggressive efforts continue to close all outstanding parcels in FY 2017. Total Parcels: 22 Appraised: 22 Offers: 22 Acquired: 11 Closing pending: 3 Condemnation: 0 Utility Relocations TBD Construction Tentatively scheduled to begin mid-FY 2018. Other Issues TBD Page 12 of 17 City of Georgetown, Texas Transportation Enhancement Corp January 18, 2017 SUBJECT: Presentatio n of Geo rgeto wn Transportation Enhancement Corporatio n monthly financial rep o rts fo r Dec emb er 2016. Leigh Wallace, F inance Direc to r, C OG, Financ e Manager, GTEC ITEM SUMMARY: See attachment FINANCIAL IMPACT: n/a SUBMITTED BY: Page 13 of 17 City of Georgetown, Texas Transportation Enhancement Corp January 18, 2017 SUBJECT: Cons id eration and p o s s ib le ac tion to approve minutes fro m the s ep cial GTEC Bo ard meeting held Dec emb er 14, 2016. David Mo rgan, City Manager – COG, General Manager - GTEC ITEM SUMMARY: Bo ard to review the minutes fro m the meeting held on Oc tober 19, 2016 and revis e o r approve. FINANCIAL IMPACT: n/a SUBMITTED BY: David Morgan, City Manager - jk ATTACHMENTS: Description Type Draft Minutes Backup Material Page 14 of 17 Minutes of the Meeting of Georgetown Transportation Enhancement Corporation and the Governing Body of the City of Georgetown, Texas Wednesday, December 14, 2016 The Georgetown Transportation Enhancement Corporation of the City of Georgetown, Texas, met on Wednesday December 21, 2016 SPECIAL MEETING Board Members Present: Tom Crawford - President, Jay Warren – Vice President, Joe Pondrom - Secretary, John Hesser, Leo Wood, Colin McGahey, Board Members Absent: Ty Gipson Staff Present: David Morgan, Jim Briggs, Laurie Brewer, Mike Babin, Ed Polasek, Wes Wright, Travis Baird, Tristin Whitmire, Paul Diaz, Michaela Dollar, Sheila Mitchell, Wayne Reed Others Present: Bill Maples – Maples & Associates, Kristina Silcocks - Gardere Minutes Regular Session A. Call to Order: Mr. Crawford called the special GTEC Board meeting to order on Wednesday, December 14, 2016 at 3:30 PM The Board may, at any time, recess the Regular Session to convene in Executive Session at the President, A Board Member, The City Manager, Assistant City Manager, General Manager of Utilities, City Council Member, and/or legal counsel for any purpose authorized by the Open Meetings Act, Texas Government Code Chapter 551, and are subject to action in the Regular Session that follows. B. Introduction of Visitors C. Industry/CAMPO/TXDOT Updates: Mokan corridor and Lone Star Rail project – TxDOT, CAMPO, Travis County, Williamson County and cities along the corridor have gotten together D. Presentation and discussion regarding eminent domain laws, regulations and procedures. – Travis Baird, Real Estate Services Coordinator Baird gave the board an overview and there was lengthy discussion/questions from the board; which were answered by Baird, Bill Maples and Kristina Silcocks. E. Discussion regarding the Project Progress Reports and Time Lines. – E. Presentation of Georgetown Transportation Enhancement Corporation monthly financial report for August 2016. – Leigh Wallace, Finance Director, COG, Finance Manager, GTECF. HESSER STEPPED OUT OF THE MEETING AT 5:03 Pm and returned at 5:06 PM Legislative Regular Agenda Page 15 of 17 F. Consideration and possible action to approve the minutes from the regular GTEC Board meeting held October 19, 2016. – David Morgan, General Manager, GTEC Board Motion by Warren, second by Wood to approve the minutes as presented. Approved 5-2 (Hesser & Gipson absent) Entered into Executive Session at 5:06 PM H. Executive Session Sec. 551-087 – Economic Development Negotiations  Update on Project Cat – Michaela Dollar Returned to Regular session at 5:18 PM I. Action from Executive Session: No Action Required Adjournment Motion by Pondrom, second by Warren to adjourn meeting. Approved 6-1 (Gipson absent). Meeting adjourned at 5:19 PM Adjournment The meeting was adjourned at PM. Approved: Attest: _______________________ ________________________ Tom Crawford - President Joe Pondrom – Secretary _________________________ Jana R. Kern – Board Liaison Page 16 of 17 City of Georgetown, Texas Transportation Enhancement Corp January 18, 2017 SUBJECT: Executive Ses s ion S EC: 551.072 -Delib eratio n Regard ing Real P ro p erty - Travis Baird Rivery Blvd Ext. Projec t (Parc el 14, Northwes t Blvd) SW Byp as s P ro ject (Laubac h, 4200 IH 35 South) ITEM SUMMARY: FINANCIAL IMPACT: n/a SUBMITTED BY: Michaela Dollar - jk Page 17 of 17