Loading...
HomeMy WebLinkAboutAgenda_GTEC_01.19.2022Notice of Meeting for the Georgetown Transportation E nhancement Corp of the City of Georgetown January 19, 2022 at 3:30 P M at Georgetown P ublic Library-F riends Room T he C ity of G eorgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you require as s is tance in partic ipating at a public meeting due to a disability, as defined under the ADA, reas onable as s is tance, adaptations , or ac commodations will be provided upon request. P leas e c ontact the C ity S ec retary's O ffic e, at leas t three (3) days prior to the sc heduled meeting date, at (512) 930-3652 or C ity Hall at 808 Martin Luther King Jr. S treet, G eorgetown, T X 78626 for additional information; T T Y users route through R elay Texas at 711. Regular Session (T his R egular S es s ion may, at any time, be rec es s ed to c onvene an Exec utive S es s ion for any purpose authorized by the O pen Meetings Act, Texas G overnment C ode 551.) A P ublic Wishing to Address the Board O n a subject that is posted on this agenda, please fill out a speaker regis tration form whic h can be found on the table at the entrance to the Board Meeting. C learly print your name and the letter of the item on whic h you wis h to s peak and pres ent it to the S taff Liais on, prior to the start of the meeting. You will be called forward to s peak when the Board c onsiders that item. O nly persons who have delivered the speaker form prior to the meeting being called to order may speak. O n a subject not posted on the agenda: P ers ons may add an item to a future R egular sc heduled Board agenda by filing a written reques t with the S taff Liaison no later than one week prior to the Board meeting. T he request mus t inc lude the speaker’s name and the spec ific topic to be addres s ed with sufficient information to inform the board and the public. Only those persons who have submitted a timely request will be allowed to speak. P lease s end comments to G T EC Board Liaison, Danielle Dutra at danielle.dutra@georgetown.org. B C all to O rder C Introduc tion of Board Members and Visitors D January 2022 G T EC Updates - Wesley Wright, P.E., S ystems Engineering Direc tor L egislativ e Regular Agenda E C ons ideration and possible approval of the minutes from the December 15, 2021 G T EC Board Meeting. -- Danielle Dutra, G T EC Board Liaison F S et a pub lic hearing fo r Wednes d ay, F eb ruary 16, 2022 by the G eorgetown Transportation Enhancement C orporation (G T EC ) regarding the expend iture of 4B s ales tax fund s fo r the p ro p o s ed F M 972 P roject. - Mic haela Dollar, Ec onomic Development Direc tor G S et a P ub lic hearing for Wednes d ay, F ebruary 16, 2022 by the G eorgetown Trans p o rtatio n Enhancement C orporation (G T EC ) regarding the exp enditure o f 4B s ales tax fund s for the proposed Wittera Way P rojec t. - Mic haela Dollar, Ec onomic Development Direc tor Page 1 of 20 H C ons ideration and possible action from Executive S ession - P roject S pur - Mic haela Dollar, Ec onomic Development Direc tor E xecutiv e Session In c omplianc e with the O pen Meetings Ac t, C hapter 551, G overnment C ode, Vernon's Texas C odes, Annotated, the items listed below will be dis cus s ed in c los ed session and are s ubjec t to action in the regular s es s ion. I S ec. 551.087 D eliberatio n R egarding Eco no mic Develo pment Nego tiatio ns P rojec t S pur, Mic haela Dollar, Ec onomic Development Direc tor Adjournment Ce rtificate of Posting I, R obyn Densmore, C ity S ecretary for the C ity of G eorgetown, Texas, do hereby c ertify that this Notic e of Meeting was posted at C ity Hall, 808 Martin Luther King Jr. S treet, G eorgetown, T X 78626, a plac e readily acc es s ible to the general public as required by law, on the _____ day of _________________, 2022, at __________, and remained s o posted for at leas t 72 c ontinuous hours prec eding the s cheduled time of said meeting. __________________________________ R obyn Dens more, C ity S ec retary Page 2 of 20 City of Georgetown, Texas Transportation Enhancement Corp January 19, 2022 S UB J E C T: January 2022 G T EC Updates - Wes ley Wright, P.E., S ys tems Engineering Director IT E M S UMMARY: J anuary 2022 GT E C updates D B Wood Rd Widening: Des ign is underway with typic al sec tions c urrently under review along with bridge options . New s ection pushed out to community, G eotech tes ting for struc tural underway. Northwest Blvd: P roject ac cepted and final paperwork underway. F M 971 - Realignment at Austin Avenue: T xDO T bid June of 2021 Low bid by C HAS C O c onstruc tion, contrac ts exec uted. C onstruc tion to begin 9-7-21. Utility relocation in the park c omplete, ped tunnel c omplete s ubgrade and base work underway Eas t of tunnel. To be complete summer of 22. Rabbit Hill Road Improvements: Returning to initial project limits with the landowner donation of R O W. M ultiple relocations – G eorgetown E lectric has not scheduled move; O N C O R electric move currently underway. S outhwestern Blvd: P reliminary alignment revised. P erforming Hydrologic and Hydraulic c alculations . R O W negotiation currently underway with Williamson C ounty. S E Inner Loop: O pen to traffic in November. P unchlis t completion underway. S ignal Improvements- Various locations R ock R ide and S E Inner loop is operating. Appurtenances ordered for other loc ations , s hould start cons truction in May. F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Page 3 of 20 Wesley Wright, P.E., S ystems Engineering Direc tor AT TAC H ME N T S: Description Type jan 22 gtec pdf Cover Memo Page 4 of 20 GTEC Board Meeting Date: Item No. GEORGETOWN TRANSPORTATION ENHANCEMENT CORPORATION AGENDA ITEM COVER SHEET ______________________________________________________________________________________________________________________________ _ SUBJECT: January 2022 GTEC Updates - Wesley Wright, P.E., Systems Engineering Director __________________________________________________________________________________________________________________________________ __ ITEM SUMMARY: January 2022 GTEC updates DB Wood Rd Widening: Design is underway with typical sections currently under review along with bridge options. New section pushed out to community, Geotech testing for structural underway. Northwest Blvd: Project accepted and final paperwork underway FM 971 - Realignment at Austin Avenue: • TxDOT bid June of 2021 Low bid by CHASCO construction, contracts executed. Construction to begin 9-7-21 • Utility relocation in the park complete, ped tunnel complete subgrade and base work underway East of tunnel. To be complete summer of 22 Rabbit Hill Road Improvements: Returning to initial project limits with the landowner donation of ROW. Multiple relocations – Georgetown Electric has not scheduled move; ONCOR electric move currently underway. Southeast Inner loop/ Southwestern Blvd Southwestern Blvd: • Preliminary alignment revised. • Performing Hydrologic and Hydraulic calculations. • ROW negotiation currently underway with Williamson County SE Inner Loop: Open to traffic in No vember Punchlist completion underway Page 5 of 20 Signal Improvements- Various locations Rock Ride and SE Inner loop is operating. Appurtenances ordered for other locations, should start construction in May Page 6 of 20 FM 971 at Austin Avenue Realignment Intersection Improvements Project No. 1BZ TIP No. AG January 2022 Project Description Design and preparation of final plans, specifications and estimates (PS&E) for the widening and realignment of FM 971 at Austin Avenue, eastward to Gann Street. Purpose To provide a new alignment consistent with the alignment of the proposed Northwest Boulevard Bridge over IH 35; to allow a feasible, alternate route from the west side of I 35 to Austin Avenue, to Georgetown High School, to San Gabriel Park and a more direct route to SH 130. Project Managers Joel Weaver Engineer Klotz Associates, Inc. Element Status / Issues Design TxDOT bid June of 2021 Low bid by CHASCO construction, contracts finalized, work to begin September 7th Environmental/ Archeological Complete Rights of Way Final parcel preparing for closing Utility Relocations TBD Construction Utility relocation in the park complete, ped tunnel complete subgrade and base work underway East of tunnel. To be complete summer of 22 Other Issues AFA with TxDOT complete. Page 7 of 20 D B Wood Widening Project No. PRJ000188 TIP No. January 2022 Project Description D.B . Wood (SH 29 to Oak Ridge) ,Roadway improvements on DB Wood from SH29 to Oak Ridge Drive. Expanding Roadway from 2 lanes to 5 lanes (4 travel lanes w/turn lanes). Purpose To manage current and future traffic flow Project Manager Joel Weaver Engineer Kimely-Horn and Associates. Inc. Element Status / Issues Design Design is underway with typical sections currently under review along with bridge options. New section pushed out to community, Geotech testing for structural underway. Surveying Survey is underway Environmental/ Archeological Underway Rights of Way Project design to utilize existing ROW Utility Relocations TBD Construction N/A Other Issues None Page 8 of 20 Northwest Boulevard (Fontana Drive to Austin Avenue) Project No. 5QX TIP No. AF January 2022 Project Description Construction of overpass and surface roads to connect Northwest Boulevard with Austin Avenue and FM 971. Purpose This project will relieve congestion at the Austin Avenue/Williams Drive intersection and provide a more direct access from the west side of IH 35 corridor to Georgetown High School and SH 130 via FM 971. Project Manager Joel Weaver and Wesley Wright, P.E. Engineer Klotz Associates Element Status / Issues Design Design Complete Environmental/ Archeological Complete Rights of Way ROW Documents are being finalized. All offers have been made. 8 Parcels required. 5 acquired, 1 in closing, 2 in condemnation. Utility Relocations TBD Construction • Project accepted and final paperwork underway Other Issues Page 9 of 20 Rabbit Hill Road Improvements Project (Westinghouse Road to S. Clearview Drive) Project No. 5RQ TIP No. BZ January 2022 Project Description Reconstruct Rabbit Hill Road from Westinghouse Road northward to S. Clearview Dr. Widening along Westinghouse Road will also be included in the schematic for additional turning lanes to/from Westinghouse Road. The project length along the anticipated alignment is approximately 0.75 miles Project Managers Joel Weaver and Wesley Wright, P.E. Engineer CP&Y, Inc. Element Status / Issues Design Engineering complete prepping docs for summer posting. Environmental/ Archeological complete Rights of Way Two properties acquired as part of Mays St. Extension. Two remaining, negotiations ongoing and Council has approved condemnation. Total Parcels: 4 Possession: 2 Pending: 2 Utility Relocations Multiple relocations expected –Georgetown Electric has not scheduled move; ONCOR electric move currently underway. Construction Project to go out for bids in May 2021 Other Issues Returning to initial project limits with the landowner donation of ROW. Engineering new schedule to post when Georgetown electric move underway Page 10 of 20 Signal Improvements – Various Locations Project No. PRJ000214 TIP No. None January 2022 Project Description Design and preparation of Plans, Specifications, Estimate, Bidding Documents, and construction phase services for the construction of signal improvements for the intersections of Williams Drive & Estrella Crossing, Shell Road & Verde Vista and SE Inner Loop & Rockride Lane. Purpose To better manage traffic movements at the intersection. Project Manager Joel Weaver Engineer KPA Element Status / Issues Design Shell Rd @ Verde Vista and Williams @ Estrella Crossing were bid July 22 with Austin traffic Signal as the low bid and recommended for award. Contracts executed, precon set for week of 10-18 work to begin April or May upon receipt of poles. Surveying Completed Environmental/ Archeological TBD Rights of Way TBD Utility Relocations TBD Construction Rock Ride and SE Inner loop is operating. Appurtenances ordered for others should start construction in May Other Issues None Page 11 of 20 Widening of: SE Inner Loop - FM 1460 to Austin Avenue Roadway & Southwestern Boulevard – Raintree Drive to SE Inner Loop Roadway January 2022 Project Description FM 1460 to Austin Avenue Roadway Widening Project & Southwestern Boulevard – Raintree Drive to SE Inner Loop Roadway Widening Project (See Attached Exhibit C). The professional services will consist of providing final roadway, drainage, water, wastewater, incidental designs, as well as, utility coordination, ROW support, environmental phase I investigations, archeological investigations, geotechnical investigations, ROW & Temporary Construction Easement (TCE) metes and bounds documents, bidding documents, bidding services, and construction administration services. Project Managers Joel Weaver and Wesley Wright, P.E. Engineer KPA & Associates Element Status / Issues Design Southwestern: • Preliminary alignment revised • Performing Hydrologic and Hydraulic calculations • ROW negotiation underway with Williamson County Environmental/ Archeological Efforts to begin April 2019 and any issues are expected to be identified in the coming month. Rights of Way ROW needs on Southwestern to be determined Total Parcels: 0 Possession: 0 Pending: 0 Utility Relocations To be determined Construction SE Inner Loop: Open to traffic in November Punchlist completion underway Other Issues None. Page 12 of 20 City of Georgetown, Texas Transportation Enhancement Corp January 19, 2022 S UB J E C T: C onsideration and pos s ible approval of the minutes from the Dec ember 15, 2021 G T EC Board Meeting. - - Danielle Dutra, G T EC Board Liais on IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Danielle Dutra, Board Liais on AT TAC H ME N T S: Description Type GTEC Minutes 12.15.21 Backup Material Page 13 of 20 Minutes of the Meeting of Georgetown Transportation Enhancement Corporation and the Governing Body of the City of Georgetown, Texas Wednesday, December 15, 2021 The Georgetown Transportation Enhancement Corporation of the City of Georgetown, Texas, met on Wednesday, December 15, 2021 Regular Session: (This Regular Session may, at any time, be recessed to convene an Executive Session for any purpose authorized by the Open Meetings Act, Texas Government Code 551.) A. Call to Order: Meeting was called to order at 4:33 PM by John Marler B. Introduction of Board Members and Visitors • Board members and staff were introduced. C. December 2021 GTEC Updates – Wesley Wright, P.E., Systems Engineering Director • Wright presented the board with transportation updates. • Board asked when Shell Rd would be resurfaced? Wright responded that there is currently an RFQ out for engineering services. • Board asked if current construction costs have increased? Wright responded yes; current construction costs have increased 20%. D. Consideration of the GTEC Executive Summary – Nathan Parras, Assistant Finance Director • Parras presented the board with the monthly financial report. The board had no questions. Board Members Present: Mike Triggs, Keith Fruge, John Marler, William Boughton & Colin McGahey Board Members Absent: Shawn Hood & Bob Whetsell Staff Present: David Morgan, Laurie Brewer, Michaela Dollar, Wesley Wright, Nathan Parras, Danielle Dutra & Sheila Mitchell Others Present: None Page 14 of 20 Legislative Regular Agenda E. Consideration and possible approval of the minutes from the July 21, 2021 GTEC Board Meeting – David Morgan-General Manager, GTEC Board • MOTION by Keith Fruge second by Colin McGahey. APPROVED unanimously 4-0-3 absent: Whetsell & Hood. Boughton had not arrived yet. F. Consideration and possible action from Executive Session – Project Triangle – Michaela Dollar, Economic Development Director • MOTION by Colin McGahey second by William Boughton. APPROVED unanimously 5-0-2 absent: Whetsell & Hood G. EXECUTIVE SESSION In Compliance with the Open Meetings Act, Chapter 551, Government Code, Vernon’s Texas Codes, Annotated, the item listed below will be discussed in closed session and is subject to action in the regular session. Sec. 551.087 Deliberation Regarding Economic Development Negotiations Project Triangle – Michaela Dollar, Economic Development Director ADJOURNMENT: • MOTION by Keith Fruge second by Colin McGahey. APPROVED unanimously 5-0-2 absent: Whetsell & Hood Meeting adjourned at 5:05 PM Approved: Attest: John Marler - President Keith Fruge – Secretary Danielle Dutra – Board Liaison Page 15 of 20 Page 16 of 20 City of Georgetown, Texas Transportation Enhancement Corp January 19, 2022 S UB J E C T: S et a pub lic hearing fo r Wednes d ay, F ebruary 16, 2022 b y the G eo rgeto wn Trans portation Enhancement C orporation (G T E C ) regarding the expend iture o f 4B sales tax fund s fo r the proposed F M 972 P roject. - Michaela Dollar, Economic Development Director IT E M S UMMARY: S tate Law (Loc al G o vernment C o d e 505.159) req uires G T EC to provid e p ublic notice and ho ld a public hearing on the proposed projects to be fund ed with the 4B sales tax. T he required no tic e will b e publis hed in the Williamson C ounty S un on F ebruary 9, 2022. T he public hearing will be c onducted by the G T EC Board of Directors . F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Mic haela Dollar, Ec onomic Development Direc tor AT TAC H ME N T S: Description Type Sun Publication-972 & Wittera Way Backup Material Page 17 of 20 Date: January 19, 2022 To: Williamson County Sun From: Sharon Parker - Finance & Administration – 512-930-6534 Michaela Dollar- Economic Development – 512-930-3688 Subject: Public Hearing Notice Please publish a border ad for the following Public Hearing Notice in the Wednesday, February 9, 2022 edition of the Williamson County Sun. City of Georgetown Attn: Amy Mertink/Michaela Dollar P.O. Box 409 Georgetown, TX 78627-0409 Please send proof and cost and we will send the PO # GEORGETOWN TRANSPORTATION ENHANCEMENT CORPORATION NOTICE OF PUBLIC HEARING Wednesday, February 16, 2022 - 3:30pm Georgetown Public Library 402 W. 8th Street – Georgetown, TX In accordance with Local Government Code 505.159, the Georgetown Transportation Enhancement Corporation will hold a public hearing regarding the expenditures of 4B sales taxes not to exceed Fiscal Year 2025 proposed transportation improvement plan. Proposed projects to be funded on or before FY2025 Estimated Amount FM 972 $ 4,600,000 Wittera Way $ 1,700,000 Total $ 6,300,000 Page 18 of 20 City of Georgetown, Texas Transportation Enhancement Corp January 19, 2022 S UB J E C T: S et a P ublic hearing for Wednes d ay, F eb ruary 16, 2022 by the G eorgetown Transportation Enhancement C orporation (G T E C ) regarding the expend iture of 4B s ales tax fund s for the p ro p o s ed Wittera Way P roject. - Michaela Dollar, Economic Development Director IT E M S UMMARY: S tate Law (Loc al G o vernment C o d e 505.159) req uires G T EC to provid e p ublic notice and ho ld a public hearing o n the propos ed projec ts to b e fund ed with the 4B s ales tax. T he req uired no tic e will be publis hed in the Williamson C ounty S un on F ebruary 9, 2022. T he public hearing will be c onducted by the G T EC Board of Directors . F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Mic haela Dollar, Ec onomic Development Direc tor AT TAC H ME N T S: Description Type Sun Publication-972 & Wittera Way Backup Material Page 19 of 20 Date: January 19, 2022 To: Williamson County Sun From: Sharon Parker - Finance & Administration – 512-930-6534 Michaela Dollar- Economic Development – 512-930-3688 Subject: Public Hearing Notice Please publish a border ad for the following Public Hearing Notice in the Wednesday, February 9, 2022 edition of the Williamson County Sun. City of Georgetown Attn: Amy Mertink/Michaela Dollar P.O. Box 409 Georgetown, TX 78627-0409 Please send proof and cost and we will send the PO # GEORGETOWN TRANSPORTATION ENHANCEMENT CORPORATION NOTICE OF PUBLIC HEARING Wednesday, February 16, 2022 - 3:30pm Georgetown Public Library 402 W. 8th Street – Georgetown, TX In accordance with Local Government Code 505.159, the Georgetown Transportation Enhancement Corporation will hold a public hearing regarding the expenditures of 4B sales taxes not to exceed Fiscal Year 2025 proposed transportation improvement plan. Proposed projects to be funded on or before FY2025 Estimated Amount FM 972 $ 4,600,000 Wittera Way $ 1,700,000 Total $ 6,300,000 Page 20 of 20