Loading...
HomeMy WebLinkAboutAgenda_GTEC_02.18.2015Notice of Meeting for the Georgetown Transportation Enhancement Corp and the Governing Body of the City of Georgetown February 18, 2015 at 3:30 PM at 300-1 Industrial Ave, Georgetown, TX 78626 The City of Georgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you require assistance in participating at a public meeting due to a disability, as defined under the ADA, reasonable assistance, adaptations, or accommodations will be provided upon request. Please contact the City at least four (4) days prior to the scheduled meeting date, at (512) 930-3652 or City Hall at 113 East 8th Street for additional information; TTY users route through Relay Texas at 711. Regular Session (This Regular Session may, at any time, be recessed to convene an Executive Session for any purpose authorized by the Open Meetings Act, Texas Government Code 551.) A Call to Order The Board may, at any time, recess the Regular Session to convene in Executive Session at the request of the Chair, a Board Member, the City Manager, Assistant City Manager, General Manager of Utilities, City Council Member, or legal counsel for any purpose authorized by the Open Meetings Act, Texas Government Code Chapter 551, and are subject to action in the Regular Session that follows. B Introduction of Visitors C Industry/CAMPO/TXDOT Updates D Discussion regarding the Project Progress Reports and Time Lines. – Bill Dryden, P.E., Transportation Engineer, and Edward G. Polasek, AICP, Transportation Services Director. E Presentation of Georgetown Transportation Enhancement Corporation monthly financial report for January 2015. - Micki Rundell, Chief Financial Officer, COG, Finance Manager GTEC Legislative Regular Agenda F Consideration and possible action to approve minutes from the regular GTEC Board meeting held January 21, 2015. Jim Briggs, General Manager - GTEC G Consideration and possible action to approve Task Order BGE-15-001 with Brown and Gay Engineers, Inc., of Austin, TX, for professional engineering services related design and preparation of plans, specifications, and estimates for the widening and reconstruction of Airport Road from Lakeway Drive to Aviation Drive, inclusive of intersection improvements at Lakeway Drive and I 35 Southbound Frontage Road improvements in the amount of $485,700.00. – Bill Dryden, P.E., Transportation Engineer, Edward G. Polasek, AICP, Transportation Services Director and Bridget Chapman, City Attorney. H EXECUTIVE SESSION In compliance with the Open Meetings Act, Chapter 551, Government Code, Vernon's Texas Codes, Annotated, the items listed below will be discussed in closed session and are subject to action in the regular session. Section 551.0071 – Consultation with Attorney Discussion regarding the development agreement with 500 South Austin Avenue LLP--Laurie Brewer, Assistant City Manager, Andreina Davila, Project Coordinator, and Bridget Chapman, City Attorney I Action from Executive Session Adjournment CERTIFICATE OF POSTING I, Jessica Brettle, City Secretary for the City of Georgetown, Texas, do hereby certify that this Notice of Meeting was posted at City Hall, 113 E. 8th Street, a place readily accessible to the general public at all times, on the ______ day of __________________, 2015, at __________, and remained so posted for at least 72 continuous hours preceding the scheduled time of said meeting. ____________________________________ Jessica Brettle, City Secretary City of Georgetown, Texas Transportation Enhancement Corp February 18, 2015 SUBJECT: Discussion regarding the Project Progress Reports and Time Lines. – Bill Dryden, P.E., Transportation Engineer, and Edward G. Polasek, AICP, Transportation Services Director. ITEM SUMMARY: GTEC Projects FM 1460 ROW & Utility Relocations – Project No. 5RB Mays Street Extension (Teravista Parkway to Westinghouse Road) – Project No. 5RI NB Frontage Road (SS 158 to Lakeway Dr.) – Project No. 5QY Northwest Blvd Overpass – Project No. 5QX Rivery Boulevard Extension (Williams to Northwest Blvd) – Project 5RM Snead Drive – Project 5QZ Southwest Bypass – Project No. 5QC Wolf Ranch Pkwy Extension – Project No. 5QW GTEC Project Update & Status Report GTAB Projects Austin Avenue Bridge Evaluation and Repairs FM 971 Realignment at Austin Avenue FM 971 Improvements in San Gabriel Park FM 1460 Improvements Project OTP Update Sidewalk Master Plan Southwest Bypass Project (TIP #14C) Transit Study as Requested by City Council Transportation Services Operations – CIP Maintenance FINANCIAL IMPACT: None SUBMITTED BY: Bill Dryden, P.E., Transportation Engineer ATTACHMENTS: Description Type GTEC Project Progress Reports Exhibit GTEC Project Status Report Exhibit GTAB Project Progress Reports Exhibit FM 1460  (Quail Valley Drive to University Drive)  Project No. 5RB     TIP No. EEa, EEb & EEc  Rights‐of‐Way Acquisition and Utility Relocation  February 2015  Project Description Acquisition of ROW and relocation of utilities for the FM 1460 Project (Quail Valley Drive  to University Drive).  Purpose To have all ROWs cleared and utilities prior to TxDOT letting the project foe construction.  Project Managers Ed Polasek, AICP and Bill Dryden, P.E.  Engineer Brown and Gay Engineers, Inc.    Element Status / Issues  Design Complete.  Environmental/  Archeological  Complete  Rights of Way    As of October 16th, the City has obtained  Possession and Use Agreements or have  closings planned for all the remaining FM  1460 parcels.  Section:  North South  Acquired:  34 8  Pending:  0 ‐  Condemnation:  2 ‐  Total:  36 8  Utility Relocations Utility Relocation Agreements were approved by Council at its October 28th  meeting.   Construction Bid opened August 2014  Construction scheduled to commence February 2015.  Other Issues None pending.    Mays Street Extension  (Teravista Parkway in Round Rock to Westinghouse Road)  Project No. 5RI     TIP No. None  February 2015  Unchanged  Project Description Extend Mays Street northward from Teravista Parkway to the existing intersection with  Westinghouse Road at Rabbit Hill Road. The widening along Westinghouse Road and  Rabbit Hill Road will also be included in the schematic for additional turning lanes  to/from Westinghouse Road. Preliminary layouts for future signals and roadway  illumination will also be included.  The project length along the anticipated alignment is  approximately 1.0 miles.  Purpose To complete the schematic design, define rights‐of‐way requirements and complete 30%  design.  Project Managers Bill Dryden, P.E.  Engineer CP&Y, Inc.    Element Status / Issues  Design Engineering has submitted the proposed alignment and is working on the 30%  PS&E.  Environmental/  Archeological  TBD  Rights of Way TBD.  Utility Relocations TBD  Construction TBD  Other Issues None.    NB Frontage Road  (SS 158 to Lakeway Drive)  Project No. 5QX      TIP No. QQ  February 2015  Unchanged  Project Description Design and construct a portion of an IH‐35 NB Frontage Road from Williams Drive to  Northwest Boulevard Bridge of a proposed NB FR which would ultimately extend to  Lakeway Drive.  Purpose To relieve congestion in the Williams Drive/Austin Avenue intersection by providing a NB  alternate, interim route to FM 971 and Georgetown High School. This project is the only  remaining portion of IH 35 in Central Texas without a frontage road existing, under  construction or being designed.  Project Manager Bill Dryden  Engineer Klotz Associates       Element Status / Issues  Design Staff and Engineer has met with TxDOT personnel at both the local Area Office and  District Environmental Division.  Environmental/  Archeology  TBD  Rights of Way None identified  Utility Relocations TBD  Construction TBD  Other Issues Staff is working with TxDOT to develop the AFAs required to complete the project.    Northwest Boulevard Overpass  (Fontana Drive to Austin Avenue)  Project No. 5QX     TIP No. QQ  February 2015  Unchanged  Project Description Construction of overpass and surface roads to connect Northwest Boulevard with  Austin Avenue and FM 971.  Purpose This project will relieve congestion at the Austin Avenue/Williams Drive  intersection and provide a more direct access from the west side of IH 35 corridor to  Georgetown High School and SH 130 via FM 971.  Project Manager Bill Dryden, P.E.  Engineer Klotz Associates    Element Status / Issues  Design Engineer has presented the Preliminary Engineering Report and has begun final  PS&E design efforts.  Environmental/  Archeological  Concurrent with preliminary engineering and schematic design.  Rights of Way Engineer is developing ROW strip map and individual parcel plats and documents.  Utility Relocations TBD  Construction TBD  Other Issues Staff met with TxDOT to develop an AFA for TxDOT review of the bridge crossing  of I 35 and its frontage roads.    Rivery Boulevard Extension  (Williams Drive to Northwest Boulevard @ Fontana Drive)  Project No. 5RM     TIP No. None   February 2015  Project Description Develop the Rights‐of‐Way Map, acquire ROW, address potential environmental  issues and complete construction plans specifications and estimate (PS&E) for the  extension of Rivery Boulevard from Williams Drive to Northwest Boulevard at  Fontana Drive in anticipation of future funding availability.  Purpose To provide a route between Williams Drive and Northwest Boulevard serving the  Gateway area, providing an alternate route from Williams Drive to the future  Northwest Boulevard Bridge over IH 35, to provide a route between the hotels in  the Gateway area and the proposed Conference Center near Rivery Boulevard and  Wolf Ranch Parkway.  Project Manager Bill Dryden, P.E.  Engineer Kasberg Patrick and Associates    Element Status / Issues  Design Surveying and preliminary design underway.  Environmental/  Archeology  TBD  Rights of Way Survey has begun; Engineer expects to have documents available to begin  appraisals late February.  Utility Relocations TBD  Construction TBD  Other Issues TBD    Snead Drive Project  (SE Inner Loop to Airborn Circle)  Project No. 5QZ      TIP No. None  February 2015  Unchanged  Project Description   Develop Construction Plans Specifications and Estimate (PS&E) for the widening  of Snead Drive from S.E. Inner Loop to 600 feet north of Cooperative Way,  including appurtenant waste water improvements.  Purpose This project has been identified as GTEC eligible project and will provide  necessary infrastructure for ongoing economic development in the area.   Project Manager Bill Dryden, P.E.  Engineer Steger Bizzell      Element Status / Issues  Design Complete  Environmental/  Archeological  Included with PS&E.  Rights of Way Awaiting property to be acquired for water quality pond.    Utility Relocations Utility relocations either complete or are part of the construction contract.  Construction TBD – Upon acquisition of property for water quality pond.  Other Issues It was anticipated that the property for construct water quality pond would be  donated, but owner has some issues with the mortgage holder concerning  donation.  Property owner is seeking compensation.     Southwest Bypass Project  (SH 29 to RM 2243)  Project No. 5QC     TIP No. 14b  Unchanged  February 2015  Project Description   Develop a Design Schematic for the Southwest Bypass from Leander Road (RM  2243) to SH 29 and Construction Plans Specifications and Estimate (PS&E) for the  construction of approximately 1.3 miles of 2‐lane interim roadway with bridges  from Leander Road to its intersection with Wolf Ranch Parkway Extension (TIP  Project No. 14A.  Purpose This project is identified as needed in the OTP and GTEC TIP.  This project, in  coordination with Wolf Ranch Parkway Extension, will provide access from  Leander Road to DB Wood Road south of SH 29, allowing alternate access from  southwest to west areas of the City, relieving the increasing traffic demand along  the IH 35 corridor.   Project Manager Bill Dryden, P.E.  Engineer HDR Engineering, Inc.      Element Status / Issues  Design Engineer has completed the project PS&E, less construction contract documents  and environmental permitting required at time of actual construction.  Environmental/  Archeological  Draft Report detailing the environmental, geotechnical and historical issues has  been completed and submitted to the Williamson County Conservation  Foundation for determination of issues to be mitigated.  Rights of Way ROW Acquisition process moving to condemnation for the Weir Trust  properties.  Guy/Knight property – Closing pending  Wolf  property – Acquisition complete. Utility Relocations None identified at this time.  Construction TBD  Other Issues None    Wolf Ranch Parkway Extension  Project  (SW Bypass to DB Wood Road)  Project No. 5QV     TIP No. 14a  February 2015  Unchanged  Project Description   Design Schematic and Plans Specifications & Estimate for the construction of a  roadway from Southwest Bypass (TIP Project # 14B) to DB Wood Road south of  SH 29.  The project is planned as a major arterial.  Purpose This project is identified as needed in the OTP and the TIP.  This project, in  coordination with Southwest Bypass (#14B), will provide access from Leander  Road to DB Wood Road south of SH 29, allowing alternate access from southwest  to west areas of the City, relieving the increasing traffic demand along the IH‐35  corridor.  Project Manager Bill Dryden, P.E.  Engineer HDR, Engineering, Inc.       Element Status / Issues  Design Engineer is completing the fencing plans, its required environmental clearance  documents (to determine the fee for WCCF) and the construction PS&E bidding  package.  Environmental/  Archeological  Final report concerning the environmental, geotechnical and historical issues has  been submitted for review.  Rights of Way Complete.   Utility Relocations None identified at this time.  Construction Future  Other Issues Fencing may not be required with the purchase of the property by Hillwood  Development – awaiting response from developer.    Current Capital Improvement Projects TIP No. Project No. Update On Schedule/ Or Behind Project Budget Project Cost Available Current Year Projected Current Year Cost Current Year Available Wolf Ranch Parkway Extension (SW Bypass to DB Wood Road) #14A 5QW Engineer is completing the fencing plans, its required environmental clearance documents (to determine the fee for WCCF) and the construction PS&E bidding package. ROW has been acquired. On Schedule Unchanged 1,330,000 1,111,233 218,767 283,350 0 283,350 Southwest Bypass (SH29 to RR2243)#14B 5QC Engineer has completed the project PS&E, less construction contract documents and environmental permitting required at time of actual construction. ROW Acquisition process moving to condemnation for the Weir Trust properties. Guy/Knight property – Closing pending Wolf property – Acquisition complete. On Schedule Unchanged 7,756,432 3,225,132 4,531,300 4,539,107 5,787 4,533,320 Northwest Blvd Overpass #QQ 5QX Engineer has presented the Preliminary Engineering Report and has begun final PS&E design efforts. Engineer is developing ROW strip map and In-process Unchanged 1,136,178 1,099,076 37,102 571,178 479,588 91,590 NB Frontage Road (SS 158 to Lakeway)#QQ 5QY Staff and Engineer has met with TxDOT personnel at both the local Area Office and District Environmental Division. In-process Unchanged 613,822 613,822 0 382,822 382,822 0 ROW - 1460 #EEa #EEb #EEc 5RB Construction scheduled to begin in February 2015. Utility coordination on-going as ROW is acquired. All appraisals are complete. Final offers have been made for all ROW parcels. The paperwork has been filed for all parcels requiring condemnation. As of October 16th, the City has obtained Possession and Use Agreements or have closings planned within the next couple weeks for all the remaining FM 1460 parcels. Utility Relocation Agreements were approved by Council at its October 28th meeting On Schedule 11,788,230 5,348,470 6,439,760 6,727,539 2,315,896 4,411,643 Rivery Boulevard 5RM Surveying and preliminary design underway. On Schedule Snead Drive 5QZ PS&E is complete; Awaiting ROW for water quality pond. On Schedule Unchanged 825,100 87,000 738,100 825,100 87,000 738,100 Mays Street Extension 5RI Engineering has submitted the proposed alignment and is working on the 30%PS&E. On Schedule Unchanged 196,000 196,000 0 196,000 196,000 0 IH 35/ Hwy 29 Intersection 5RJ TBD 650,000 0 650,000 650,000 0 650,000 Current Economic Development Projects Project Type Update On Schedule/ Or Behind Project Budget Project Cost Available Current Year Budget Current Year Cost Current Year Available Economic Development Projects 1,137,500 1,137,500 1,137,500 0 1,137,500 16,062,596 3,467,093 12,595,503 Project to Date Current Year Budget (13/14) GTEC PROJECT UPDATE AND STATUS REPORT February 2105 Project to Date Current Year Budget (13/14) L:\Global\CIP Agenda Form\GTEC Status Report\2015\GTEC - Project Status - 2015-02.xlsx Page 1 of 1 2/9/2015 Austin Avenue – Bridge Evaluations  (North and South San Gabriel Rivers)  Project No. TBD     TIP Project No. N/A  February 2015  Unchanged  Project Description Evaluate the repairs necessary to restore full structural capacity to the Austin Avenue  bridges over the North and South San Gabriel Rivers.  The process will involve several  phases – I) determination of testing needed, II) structural testing, analyses and  evaluation of test data to determine/recommend corrective measures and a project  budget, III) develop construction plans, specifications and contract documents,  estimates of probable construction costs and, last, IV) construction administration.  Purpose To extend the structural life of the two bridge and provide long‐term vehicular  capacity and pedestrian safety along Austin Avenue.  Project Manager Bill Dryden, P.E.  Engineer Aguirre & Fields, LP    Element Status / Issues  Design Staff met with Engineer and discussed potential courses of action.  There are four basic  paths to consider:  Do Nothing.  Short Term Temporary Fix.  Medium Term Fix.  Replace  Structure.  Engineer has developed 2 potential conceptual alignments for the proposed  reconstruction of the bridge.  Surveying  TBD  Environmental TBD during Phase II  Rights of Way Prop. ROW from 3rd Street to N. of 2nd; Exist. ROW from N. of 2nd to Morrow Street.  Utility Reloc’ns TBD (future)  Construction TBD  Other Issues Candidate project for May 2015 Bond Program election;  Project submitted for CAMPO funding;  Project eligible for TxDOT Off‐System Bridge Replacement Program.    FM 971 at Austin Avenue  Realignment Intersection Improvements  Project No. 1BZ     TIP No. QQ1  February 2015  Unchanged  Project Description Design and preparation of final plans, specifications and estimates (PS&E) for the widening  and realignment of FM 971 at Austin Avenue, eastward to Gann Street.  Purpose To provide a new alignment consistent with the alignment of the proposed Northwest  Boulevard Bridge over IH 35; to allow a feasible, alternate route from the west side of I 35 to  Austin Avenue, to Georgetown High School, to San Gabriel Park and a more direct route to  SH 130.  Project Managers Bill Dryden, P.E.  Engineer Klotz Associates, Inc.    Element Status / Issues  Design Preliminary Engineering complete;   Engineer working on 60% design submittal  Environmental/  Archeological  10/2015  Rights of Way Complete  Utility Relocations TBD  Construction 10/2016  Other Issues Working with TxDOT to develop an Advance Funding Agreement for plans review  and construction administration.    FM 971 at Austin Avenue  Improvements in San Gabriel Park  Project No. 1BZ     TIP No. QQ1  February 2015  Project Description Design of final plans, specifications and estimates (PS&E) for the moving of all park  amenities from the new FM 971 ROW.  Purpose To clear the ROW of park amenities and allow TxDOT review of the PS&E. Project Managers Bill Dryden, P.E.  Engineer Klotz Associates, Inc.    Element Status / Issues  Design Complete  Environmental/  Archeological  N/A  Rights of Way Complete  Utility Relocations Complete  Construction Work Complete; awaiting final invoice from Contractor’s Surety.  Other Issues See Construction, above.     FM 1460  Quail Valley Drive to University Drive  Project No. 5RB     TIP No. EEa, EEb & EEc  February 2015  Project Description Design and preparation of plans, specifications and estimates (PS&E) for the widening and  reconstruction of FM 1460.  Project will include review and update to existing Schematic,  Right‐of‐Way Map and Environmental Document and completion of the PS&E for the  remaining existing roadway.  Purpose To keep the currently approved environmental documents active; purchase ROW, effect  utility relocations/clearance and to provide on‐the‐shelf PS&E for TxDOT letting not later  than August 2013, pending available construction funding.  Project Managers Ed Polasek, AICP and Bill Dryden, P.E.  Engineer Brown and Gay Engineers, Inc.      Element Status / Issues  Design Complete  Environmental/  Archeological  Complete  Rights of Way As of October 16th, the City has obtained Possession and  Use Agreements or have closings planned for all the  remaining FM 1460 parcels.  Acquired: 34  Pending: 0  Condemnation: 2  Total: 36  Utility Relocations Ongoing as ROW is being acquired.  Construction Bid opened August 2014  Construction scheduled to commence February 2015.  Other Issues None Pending    Overall Transportation Plan Update  February 2015  Project Description The updated OTP is a continuation of the effort that the City completed in 2004  with the adoption of the initial OTP.  That document provided an analysis of  existing conditions and travel characteristics, a refined area‐wide travel demand  model, review of the City’s roadway functional classification system and a revised  Thoroughfare Plan.  Project Managers Ed Polasek, AICP, Bill Dryden, P.E., Nat Waggoner, PMP® and Jordan Maddox,  AICP  Engineer Klotz Associates, Inc.    Element Status / Issues  Key  Accomplishments  DRAFT OTP has been:   Presented to GTAB at its January 9th meeting.   Presented at Council Workshop on January 13th.   Presented to P&Z for review and comments January 20th.  Upcoming Tasks Staff:  • Will compile all comments and present the Final DRAFT OTP to GTAB  February 13th for Public Hearing and recommendation to Council.   • Will present the Final DRAFT OTP to Council February 24th for Public  Hearing and 1st Reading of Ordinance adopting the OTP.  • Will present 2nd Reading of Ordinance adopting the OTP March 10th.  Issues Capital Area Metropolitan Planning Organization (CAMPO) has not yet adopted  the 2040 Regional Transportation Plan nor the 2010 Travel Demand Model  supporting that plan.  When adopted in May 2015, the 2040 plan and model will  provide key data which will allow supporting jurisdictions the opportunity to  update their transportation plans.  Georgetown transportation planning efforts  will benefit from updated modeling data and should pursue funding to update the  2012 data currently informing the OTP.    Sidewalk Master Plan and Public Facility Access Audit  February 2015  Purpose The purpose of the City of Georgetown Sidewalk Study and Public Facility Access  Audit is to inventory existing public infrastructure within the City of Georgetown  City Limits, identify design and compliance deficiencies, evaluate future program  requirements, and develop a long term implementation plan.   Project Manager Nat Waggoner, PMP®  Engineer HDR, Inc.  Task Status / Issues  Initiation ‐ Task 1.3 – Project Kick Off Meeting completed May 15, 2014.  Planning ‐ Task 6.2 – Public Meetings (Adoption)   Execution ‐ See below   Task Name Start End   ADA Reporting Criteria for Sidewalk Analysis May‐14 Jun‐14  Comprehensive Review of Existing Studies, Plans, and Reports May‐14 Jun‐14  Self‐Assessment Survey of Downtown District May‐14 Jul‐14  Data Collection and Field Inventory Jun‐14 Aug‐14  City Facilities Survey Jul‐14 Sep‐14  Sidewalk Implementation Plan and Project Prioritization May‐14 Oct‐14  Parks and Amenities Survey  Nov‐14 Feb‐14 Ongoing Government and Public Stakeholder Meetings May‐14 Jan‐15 Ongoing Public Meetings and Hearings Periodic thru Mar‐15 Ongoing ADA Transition Plan Update to Council Targeting Apr‐15   Other Notes ADA   NOV –Transition Plan amendment planning and audit by Altura Solutions   FEB   –RAS review & recommended revisions complete   MAR –Staff input complete   APR  –Boards, Commissions and Council review   MAY –Adoption  Project Website   Launched July 15, 2014  Open House #2   Completed, public input will conclude February 25th.   Public Hearing and 1st Reading   February 24, 2015  10 Yr. Recommended Implementation Strategy Funding Needed  Priority 1 Projects $10,300,000  Operations and Maintenance $500K Annually  Reserve Funding TBD         Southwest Bypass Project   (RM 2243 to IH 35)  Project No. 1CA     Project No. 14c  February 2015  Unchanged  Project Description   Develop a Design Schematic for the Southwest Bypass from Leander Road (RM 2243) to IH  35 in the ultimate configuration and Construction Plans, Specifications and Estimate (PS&E)  for construction of approximately 1.5 miles of interim 2‐lane roadway from Leander Road  (RM 2243) to its intersection with the existing Inner Loop underpass at IH 35.  The portion  from Leander Road to the east property line of Texas Crushed Stone is a GTAB Project; from  the east line to the existing Inner Loop underpass at IH 35 is being funded by GTEC.  Purpose To extend an interim portion of the SH 29 Bypass, filling in between Leander Road (RM  2243) to IH 35 Southbound Frontage Road.  Project Manager Williamson County  City Contact: Ed Polasek, AICP and Bill Dryden, P.E.  Engineer HDR, Inc.      Element Status / Issues  Design Engineer is in preliminary engineering and schematic design phase of the facility.  Alignment has been presented to staff and management.  Surveying  City stall met with the Surveyor to resolve a conflict in the proposed ROW to be  acquired from Texas Crushed Stone.  Environmental/  Archeological  TBD by preliminary engineering phase.  Rights of Way Conceptually established by the Industrial Agreement; will be refined through the  schematic design phase.  Negotiations ongoing for the remainder of the ROW  Utility Relocations TBD (future)  Construction This project included in the Williamson County 2013 Bond Program to construct 2  lanes of the ultimate roadway.  Other Issues None    Transit Study  as Requested by City Council   Project No. None     Project No. None  February 2015  Unchanged  Project  Description    Council Motion:  Discussion and possible direction to the City of Georgetownʹs Transportation  Advisory Board (GTAB) to conduct an analysis and make a recommendation to the City Council  no later than June 24, 2014 ,regarding the Cityʹs potential future participation in State and  Regional Transportation Organizations including the benefits, conditions, and justification which  would prompt the Cityʹs participation in Project Connect, Lone Star Rail and any other relevant  State and Regional Transportation Organizations that the City should be involved with ‐‐ Steve  Fought, Councilmember, District 4  Amended Motion:  1. The City Manager to determine what time and effort staff have available to conduct this type  of study over the next year.  If it is not in the Transportation Division, Planning Department,  Finance Department and/or City Manager’s Office work program, as outlined in the current  draft budget, can it be adequately staffed to complete this level of work over the next year?  2. Is the challenge to research Federal, State and Regional transportation organizations or is it  transit programs?  This direction to staff is assuming it is transit programs.  3. Narrow the specific analysis to programs that are actually authorized to receive Federal  formula and discretionary funding programs found within the current Federal Transit  Administration.  However, that would narrow the field down to three agencies or programs.   Capital Metro, Lone Star Rail and the State of Texas through the Texas Department of  Transportation.  CARTS is only a contractor to Capital Metro and provides certain 5310  transit opportunities to persons outside of the Capital Metro Service Area in our jurisdiction.   CAMPO, Project Connect, Project Connect North and My35 are simply planning programs  that include staff from Capital Metro, Lone Star Rail District, and TxDOT and  representatives from local governments.  4. The analysis should be based on how those planning programs will lead to funding through  the project delivery agencies.  (Fought amended to include financial risk and benefits to the City)  5. The Council should provide the Board and staff specifics on what type of economic analysis  data will lead to an ultimate decision by the City Council.  6. Finally, some people ‘can’t see what the final project would look like’ or ‘can’t see what a  Transit Oriented Development would look like.’  Years ago, when the City was looking at  transportation options and creating a TOD ordinance, there was a field trip to perform some  on the ground research.  Members of the City Council, Planning and Zoning, and staff  (GTAB was not in existence at the time) went and stayed at a TOD to see for themselves.   We should have at least one field trip during this study.  Since it has been about 8 years or  so since that first and only field trip, it should be extremely informative to do it again and  see what a TOD looks like today and how the project has performed over the years.  Vote on the original motion as amended: Approved (6‐1) (Hesser opposed)    Project  Manager  Ed Polasek, AICP  Engineer TBD  Project Status Workplan Under Development    Transportation Services Operations  CIP Maintenance  February 2015  Project Description 2013/14‐2015 CIP Maintenance of roadways including, Chip seal, Cutler  Overlays, Fog seal applications and Engineering design of future rehabilitation  projects.  Purpose To provide protection and maintain an overall pavement condition index of  85%.  Project Manager Mark Miller  Engineer/Engineers KPA, Steger Bizzell, Halff Assoc.  Task Status / Issues  2nd and 6th Street  Engineering  (KPA) 2nd St. to College St. plans are complete. Advertising, bidding and  construction will coincide with Parks and Recreation VFW Field  reconstruction project in approximately June / July minimizing disruption to  baseball season and to residents.  The engineer’s estimate is much greater than  the project budget.  Last year’s 2nd Street funds (scheduled to roll) were  utilized on additional 9th Street rehabilitation costs.  The 2nd Street project can  be bid and awarded by rolling and utilizing the funds for the 10th and 11th  Street construction scheduled for 2015.  Some of the downtown merchants  have expressed concerns about the constant disruptions of the ongoing  downtown rehabilitation.  Rolling the projects would give a one year break  from rehabilitation in this area.  9th Street  (Main to Rock)  (KPA) (Patin Construction)  Austin to Rock portion 98% completed.  A  separate electric contractor is working on the Austin Ave. to Main St. portion  placing additional underground conduit placement.  Patin is scheduled to  return to this section in February when the conduit is in place.  Contractor has  worked hard to accommodate businesses during shopping season and still  plans to complete project on schedule. (Before the end of April)  Chip Seal  2015 proposed to be bid May 15th and construction complete by August 30th.  Fog Seal 2015 Fog sealing will be completed in‐house.  In‐house engineering is being  provided for specified streets.  Engineering under way and fog sealing will be  completed prior to mid‐June or as temperature allow.  Temperatures much  above 80 degrees slows dry time.  Cutler/overlay 2015 proposed Cutler Overlays Proposed to be bid on or before June 15th with  construction complete by October 1st.  Pavement  Evaluation  KPA Engineering: pavement evaluation/scoring and update of 5 year  (Complete)     City of Georgetown, Texas Transportation Enhancement Corp February 18, 2015 SUBJECT: Presentation of Georgetown Transportation Enhancement Corporation monthly financial report for January 2015. - Micki Rundell, Chief Financial Officer, COG, Finance Manager GTEC ITEM SUMMARY: The Bylaws of GTEC (Article V, Section 6.02) require the Finance Manager to report the financial activity of the Corporation to the Board. Financial reports Sales Tax revenues Any other relevant financial information Sales tax is received two months in arrears; therefore the revenues reflect only the amount received, not actually earned, as of the report date. A report on payments made to vendors for the month of January is also included. **Note: Beginning with the November 2014 report, the format has been modified. FINANCIAL IMPACT: n/a SUBMITTED BY: ATTACHMENTS: Description Type Reports Backup Material Prepared by: LKemp 2/11/2015 Georgetown Transportation Enhancement Corporation As of January 31, 2015 Statement of Operations A B C D E 2014/2015 1/31/2014 Budget $ YTD Actuals $% Beginning Fund Balance 12,390,398 [A]13,501,260 (1,110,862) 12,339,757 1,161,503 9% Operating Revenues: Sales Tax Revenue 5,491,500 [B]820,491 (4,671,009) 799,927 20,563 3% Interest 12,500 14,864 2,364 2,302 12,562 546% Reimbursement due from TXDOT 1,350,000 [C]440,568 (909,432) 2,069,542 (1,628,973) -79% PID Assessments (Wolf Ranch Agreement)500,000 [D]- (500,000) - - 0% Debt Proceeds [E]17,500,000 - (17,500,000) - - 0% Total Operating Revenues 24,854,000 1,275,923 (23,578,077) 2,871,771 (1,595,848) -56% Operating Expenses: Administrative Expense & Supplies (405,101) (79,956) (325,145) (65,207) (14,748) 23% Total Operating Expenses (405,101) (79,956) (325,145) (65,207) (14,748) 23% Total - Net Operating Revenues (Expenses)24,448,899 1,195,968 (23,903,222) 2,806,564 (1,610,596) -57% Non-Operating Revenues (Expenses): Debt Service (2,600,131) - (2,600,131) - - 0% ROW-1460 (1,500,000) [C](517,560) (982,440) FM 1460 Widening (450,000) - (450,000) SH 29 to RM2243 (SW Bypass)(3,704,107) (1,259,385) (2,444,722) SW Bypass - 2243 to IH35 (1,500,000) - (1,500,000) Arterial SE 1: Inner Loop - (27,825) 27,825 Fontana Drive to Austin Avenue (91,590) - (91,590) Wolf Ranch Pkwy Extension (283,350) - (283,350) Snead Drive (739,000) (19,329) (719,671) Rivery Road (Convention Center Prj.)(721,000) - (721,000) IH35/Hwy29 Intersection Improvements (650,000) - (650,000) Rivery Extension (Williamson Dr. to NW Blvd)(1,500,000) (706,110) (793,890) Pecan Center Drive [E](6,850,000) - (6,850,000) Mays Street (Rabbit Hill Road)(S. Georgetown TIRZ)[E](10,650,000) - (10,650,000) Transportation Improvement Program (28,639,047) (2,530,210) (8,608,837) To Be Determined (1,372,875) - (1,372,875) Economic Development Projects (1,372,875) - (1,372,875) Total Non-Operating Revenues (Expenses)(2,530,210) (12,581,843) Ending Fund Balance 4,227,244 Reservations Contingency = 90 days sales tax receipts 1,501,000 TXDOT Refund for Williams Dr. payment 915,891 Total Reserved Fund Balance 2,416,891 Unreserved Fund Balance 1,810,353 NOTES: [A]Preliminary beginning fund balance. [B]Sales tax posts two months after collections. [C]TXDOT reimburses 90% of allowable charges on FM 1460. [D]Assessment revenues are transferred at fiscal year end. [E]Budget amendment approved by City Council January 13, 2015. Bonds to be issued at a later date (2016) and project construction will be in 2016-17. (32,612,053) 1/31/2015 YTD Actuals Variance Year to Date Variance Budget Prepared by: LKemp 2/11/2015 Georgetown Transportation Enhancement Corporation As of January 31, 2015 Balance Sheet Highlights Balance Sheet Highlights: Current Assets (cash) Cash - general/debt service 2,962,143 Investments - Certificates of Deposits & Money Market Accounts 10,029,980 TXDOT Receivables 1,217,124 Current Assets and CASH ON HAND Total:14,209,247 TXDOT Receivables Aging [A] Not Requested 406,614 0 - 60 days - 61- 120 days - 121 or more days 810,510 Total TXDOT Receivables 1,217,124 Bond Debt Outstanding 2007 Sales Tax Bonds 8,470,000 (Proceeds funded SE1) ACTUAL FUNDS AVAILABLE FOR PROJECTS Budgeted Ending Fund Balance 4,227,244 Less: Reserved - TXDOT Refund for Williams Dr. payment [B](915,891) Reserved - Contingency = 90 days of sales tax receipts (1,501,000) Unreserved Fund Balance 1,810,353 Add: Economic Development Projects to be determined 1,372,875 Appropriated per policy Preliminary Projected Excess Beginning Fund Balance [C]1,110,862 TOTAL AVAILABLE FUNDS FOR NEW OR FUTURE PROJECTS 4,294,090 NOTES: [A]TXDOT reimbursement payments are behind due to staffing shortages at TXDOT. Reimbursement requests have been appropriately submitted and full payment is expected. [B]To fund settlement with Williamson Co. [C]Represents excess revenues earned and projects not expended. Prepared by: LKemp 2/11/2015 L:\Division\finance\Share2\AGENDA\GTEC\2015\Finreports\201501-January Georgetown Transportation Enhancement Corporation January 31, 2015 Variance % Var. MONTH [a]2010-11 2011-12 2012-13 2013-14 2014-15 To FY 14 To FY 14 October 264,484 281,056 345,296 367,451 392,374 24,923 6.78% November 309,844 297,888 328,333 398,208 411,566 13,358 3.35% December 467,122 447,872 470,330 538,728 575,095 36,367 6.75% January 271,870 292,708 330,857 357,430 February 231,618 291,782 311,562 347,604 March 432,060 423,287 462,254 457,421 April 288,399 325,447 337,678 424,007 May 293,230 323,676 377,648 450,289 June 404,048 398,654 456,529 493,224 July 279,124 359,877 371,061 409,739 August 300,806 343,168 370,942 392,059 September 359,326 353,337 500,787 477,892 Total $3,901,931 $4,138,751 $4,663,277 $5,114,052 $1,379,035 $74,648 YTD 1,041,450 1,026,815 1,143,958 1,304,387 1,379,035 74,648 5.72%[b] Notes: [a] Sales tax revenue from the State Comptroller is received two months in arrears. [b] YTD compared thru current month. $0 $100,000 $200,000 $300,000 $400,000 $500,000 $600,000 $700,000 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Re v e n u e s Sales Tax 3 Year Trend 2012-13 2013-14 2014-15 Check Report Summary For the Month Ending January 31, 2015 Kasberg, Patrick & Associates, LP $26,751.73 Engineering work on Rivery Blvd. extension $19,401.73 Engineering work on Rivery Blvd. extension 7,350.00 Williamson County Clerk 2,142.00 Condemnation settlement parcel 215 FM 1460 2,142.00 Chiang, Patel & Yerby, Inc.14,702.90 Engineering work on Mays St (Rabbit Hill) S. Georgetown TIRZ 14,702.90 Klotz Associates, Inc.1,761.71 TIP process and model update 805.88 TIP process and model update 955.83 Womake, McClish, Wall & Foster 155,158.50 Condemnation settlement parcel 211 - FM 1460 80,920.50 Condemnation settlement parcel 212 - FM 1460 74,238.00 Carson & Associates Inc.5,612.50 Updating land planning report - Weir Ranch 5,612.50 Lone Star Appraisals 5,140.00 Analysis and valuation of ROW - SE 1 project 5,140.00 $211,269.34 $211,269.34 2/09/2015 8:15 AM A/P HISTORY CHECK REPORT PAGE: 3 VENDOR SET: 02 CITY OF GEORGETOWN BANK: JPM JP MORGAN CHASE DATE RANGE: 1/01/2015 THRU 1/31/2015 CHECK CHECK CHECK CHECK VENDOR I.D. NAME STATUS DATE AMOUNT DISCOUNT NO STATUS AMOUNT 1 WILLIAMSON COUNTY CLERK I-CR122314.3 WILLIAMSON COUNTY CLERK: R 1/05/2015 209042 400 9-0980-90-014 ROW - 1460 WILLIAMSON COUNTY CL 2,142.00 2,142.00 1 WOMAKE McCLISH WALL FOSTER I-CR122314 WOMAKE McCLISH WALL FOSTER: R 1/05/2015 209043 400 9-0980-90-014 ROW - 1460 WOMAKE McCLISH WALL: 80,920.50 80,920.50 1 WOMAKE McCLISH WALL FOSTER I-CR122314.2 WOMAKE McCLISH WALL FOSTER: R 1/05/2015 209044 400 9-0980-90-014 ROW - 1460 WOMAKE McCLISH WALL 74,238.00 74,238.00 10050 CHIANG, PATEL,& YERBY,INC I-GEOR14019.01-5 T. O. CPY 14-001 R 1/15/2015 209389 400 9-0980-90-060 MAYS STREET T. O. CPY 14-001 14,702.90 14,702.90 10990 KLOTZ ASSOCIATES, INC. I-1114060 KAI 14-003 R 1/15/2015 209390 400 5-0902-51-330 SPECIAL SERVICES KAI 14-003 955.83 955.83 011440 CARSON & ASSOCIATES INC I-CR011515 CARSON & ASSOCIATES INC R 1/22/2015 209537 400 9-0980-90-025 ARTERIAL SE1:INNER LOOP/SH130 CARSON & ASSOCIATES 5,612.50 5,612.50 10990 KLOTZ ASSOCIATES, INC. I-1214055 KAI 14-003 R 1/22/2015 209538 400 5-0902-51-330 SPECIAL SERVICES KAI 14-003 805.88 805.88 10560 LONE STAR APPRAISALS I-5027C.CPG INV 5027c.cpg R 1/22/2015 209539 400 9-0980-90-025 ARTERIAL SE1:INNER LOOP/SH130 INV 5027c.cpg 5,140.00 5,140.00 10090 KASBERG, PATRICK & I-14-130-002 KPA 15-001 E 1/05/2015 999999 400 9-0980-90-053 WILLIAMS DRIVE GATEWAY KPA 15-001 19,401.73 19,401.73 10090 KASBERG, PATRICK & I-14-130-003 KPA 15-001 E 1/26/2015 999999 400 9-0980-90-053 WILLIAMS DRIVE GATEWAY KPA 15-001 7,350.00 7,350.00 2/09/2015 8:15 AM A/P HISTORY CHECK REPORT PAGE: 4 VENDOR SET: 02 CITY OF GEORGETOWN BANK: JPM JP MORGAN CHASE DATE RANGE: 1/01/2015 THRU 1/31/2015 CHECK CHECK CHECK CHECK VENDOR I.D. NAME STATUS DATE AMOUNT DISCOUNT NO STATUS AMOUNT * * T O T A L S * * NO INVOICE AMOUNT DISCOUNTS CHECK AMOUNT REGULAR CHECKS: 8 184,517.61 0.00 184,517.61 HAND CHECKS: 0 0.00 0.00 0.00 DRAFTS: 0 0.00 0.00 0.00 EFT: 2 26,751.73 0.00 26,751.73 NON CHECKS: 0 0.00 0.00 0.00 VOID CHECKS: 0 VOID DEBITS 0.00 VOID CREDITS 0.00 0.00 0.00 TOTAL ERRORS: 0 ** G/L ACCOUNT TOTALS ** G/L ACCOUNT NAME AMOUNT ---------------------------------------------------------------------- 400 5-0902-51-330 SPECIAL SERVICES 1,761.71 400 9-0980-90-014 ROW - 1460 157,300.50 400 9-0980-90-025 ARTERIAL SE1:INNER LOOP/SH130 10,752.50 400 9-0980-90-053 WILLIAMS DRIVE GATEWAY 26,751.73 400 9-0980-90-060 MAYS STREET 14,702.90 *** FUND TOTAL *** 211,269.34 NO INVOICE AMOUNT DISCOUNTS CHECK AMOUNT VENDOR SET: 02 BANK: JPM TOTALS: 10 211,269.34 0.00 211,269.34 BANK: JPM TOTALS: 13 211,269.34 0.00 211,269.34 REPORT TOTALS: 34 208,415.34 0.00 211,269.34 City of Georgetown, Texas Transportation Enhancement Corp February 18, 2015 SUBJECT: Consideration and possible action to approve minutes from the regular GTEC Board meeting held January 21, 2015. Jim Briggs, General Manager - GTEC ITEM SUMMARY: Board to review the minutes from the meeting held on January 21, 2015 and revise or approve. FINANCIAL IMPACT: n/a SUBMITTED BY: Jana Kern ATTACHMENTS: Description Type Draft Minutes Backup Material Minutes of the Meeting of Georgetown Transportation Enhancement Corporation and the Governing Body of the City of Georgetown, Texas Wednesday, January 21, 2015 The Georgetown Transportation Enhancement Corporation of the City of Georgetown, Texas, met on Wednesday, January 21, 2015. Board Members Present: Bill Connor - President, John Hesser – Vice President, Jerry Hammerlun - Secretary, Tommy Gonzalez, Leo Wood, Vacant Spot Board Members Absent: Johnny Anderson Staff Present: Jim Briggs, Ed Polasek, Susan Morgan, Jana Kern, La’Mar Kemp, Bill Dryden, Nat Waggoner, Wes Wright, Mike Babin, Bridget Chapman, Mark Miller Others Present: Ben Lake – Steger Bizzell, Tom Crawford – 2015 Road Bond Committee Chair, Minutes Regular Session (This Regular Session may, at any time, be recessed to convene and Executive Session for any purpose authorized by the Open Meetings Act, Texas Government Code 551.) A. Call to Order – Mr. Bill Connor called the regular GTEC meeting to order on Wednesday January 21, 2015 at 3:30 PM The Board may, at any time, recess the Regular Session to convene in Executive Session at the President, A Board Member, The City Manager, Assistant City Manager, General Manager of Utilities, City Council Member, and/or legal counsel for any purpose authorized by the Open Meetings Act, Texas Government Code Chapter 551, and are subject to action in the Regular Session that follows. B. Introduction of Visitors C. Industry/CAMPO/TXDOT Updates: TxDOT feels that a decision for the All System Bridge Program will happen sometime this spring. Once this is done we will know about the Austin Ave. Bridges and possibly the DB Wood Road Bridge. Gonzalez asked if the Austin Ave. Bridges could be part of the GTEC TIP. Polasek stated that it would have to go through the finds process and that we could add it the 2015/16 findings list. D. Discussion regarding the Project Progress Reports and Time Lines. – Bill Dryden, P.E., Transportation Engineer and Edward G. Polasek, AICP, Transportation Services Director E. Presentation of Georgetown Transportation Enhancement Corporation monthly financial report for November 2014. – Micki Rundell, Chief Financial Officer, COG, Finance Manager Legislative Regular Agenda F. Consideration and possible action to approve minutes from the regular GTEC Board meeting held November 19, 2014. – Jim Briggs – General Manager, GTEC Motion by Gonzalez, second by Hammerlun to approve the minutes as presented. Approved unanimously 5-0 (Anderson absent) G. Discussion and possible action regarding amending the 2014/15 GTEC Budget for projects with remaining funding and approval from 2013/14. Micki Rundell, Chief Financial Officer, COG, Finance Manager, GTEC Morgan explained that this amendment is to roll over the appropriation from the 2013/2014 budget into the 2014/2015 budget. This is something that is done annually Motion by Hammerlun, second by Gonzalez to approve the amendment. Approved unanimously 5-0 (Anderson absent) Adjournment Motion by Hesser, second by Wood to adjourn meeting. Meeting adjourned at 4:18 PM Adjournment The meeting was adjourned at 4:18 PM. Approved: Attest: _______________________ ________________________ Bill Connor - President Jerry Hammerlun– Secretary _________________________ Jana R. Kern – Board Liaison City of Georgetown, Texas Transportation Enhancement Corp February 18, 2015 SUBJECT: Consideration and possible action to approve Task Order BGE-15-001 with Brown and Gay Engineers, Inc., of Austin, TX, for professional engineering services related design and preparation of plans, specifications, and estimates for the widening and reconstruction of Airport Road from Lakeway Drive to Aviation Drive, inclusive of intersection improvements at Lakeway Drive and I 35 Southbound Frontage Road improvements in the amount of $485,700.00. – Bill Dryden, P.E., Transportation Engineer, Edward G. Polasek, AICP, Transportation Services Director and Bridget Chapman, City Attorney. ITEM SUMMARY: In September 2014, the City received a request for GTEC funding to support on-site and off-site transportation related improvements for the proposed Pecan Center Commercial development project that will be located North of Lakeway Drive between Airport Road and I 35. The proposed 160 acre development will be developed between 2015 and 2019, and will support retail and employment center type development based on existing zoning of the site. In October 2014, GTEC found that the development of Pecan Center Commercial project was eligible for GTEC funding. Pecan Center Commercial Project – Phase 1 (as currently planned) Affronts IH35 at eastern edge of overall site and includes 250,000 sq. ft. retail development: o 50,000 sq. ft. home repair “big box” type outlet o 25,000 sq. ft. “junior” anchor type outlet o Remaining sq. ft. for support retail and out-parcel services such as restaurant Financial analysis determines: o Project is financially viable with revenues that support the proposed incentives and capital investment in infrastructure necessary to service the project o GTEC investment funded through revenues generated at the site Offsite Transportation o Intersection at Lakeway & Airport Road * Improvement funded by GTEC * Developer to provide ROW including for future expansion of Airport Road o Airport Road Improvements * Required for future Phase 2 * Actual amount of ROW needed will be determined in the future o IH35 South Frontage Road * City agrees to coordinate with TxDOT and Developer to build the excel/deceleration lands on the frontage road directly in front of Phase 1 once the Phase 1 of the project has been built or is substantially complete * Future anticipated GTEC funding (estimated $500,000) * Developer will provide ROW/easements as needed Onsite Transportation - All internal roads/driveways within Phase 1 are funded by Developer No GTEC Performance Agreement with Developer necessary o Lakeway/Airport Road improvements provide economic benefit to adjacent properties and improve economic development opportunities within that quadrant – not project specific o Frontage Road improvements will not be constructed until the project is underway and substantially completed thus guaranteeing ROI on investment In order to accelerate the development of this area and to ensure the quality and type of development the City desires, the City plans to move forward with proactively building the necessary off-site infrastructure improvements, thus encouraging capital investment and creation of new jobs. As part of that project, improvements are required for Airport Road from Lakeway Drive to Aviation Drive, inclusive of intersection improvements at Lakeway Drive and I 35 southbound frontage road improvements. In its amended budget for FY 2014-2015, GTEC has allocated funding to complete the construction plans, specifications and estimate (PS&E) for the project. The City has selected the firm of Brown and Gay Engineers, Inc., (the “Engineer”) for professional engineering services related design and preparation of plans, specifications and estimates for the project. The Engineer has proposed to complete the services for this work in an amount not to exceed $485,700.00. Staff has reviewed the proposal recommends the proposed Task Order BGE-15-001 based upon an acceptable scope of services for the project. STAFF RECOMMENDATION: Staff recommends approval of Task Order BGE-15-001 with Brown and Gay Engineers, Inc., of Austin, TX, for professional engineering services related design and preparation of plans, specifications, and estimates for the widening and reconstruction of Airport Road from Lakeway Drive to Aviation Drive, inclusive of intersection improvements at Lakeway Drive and I 35 southbound frontage road improvements in the amount of $485,700.00. FINANCIAL IMPACT: Funding for the Project is available in the adopted FY 2014-2015 GTEC budget as amended. The financial worksheet is attached. SUBMITTED BY: Bill Dryden, P.E., Transportation Engineer ATTACHMENTS: Description Type Financial Analysis Worksheet Backup Material Task Order BGE-15-001 Exhibit PROJECT No.DATE: PROJECT NAME:5RN 2/9/2014 Division/Department:Director Approval Prepared By:Finance Approval La'Ke2/10/14 TOTAL ANNUAL BUDGET 6,850,000.00 (Current year only) Actual Cost Agenda Total Spent Encumbrance Item & Encumbered % Annual (A) before agenda item (B)(A + B) Budget Consulting (BGE-15-001)485,700.00 485,700.00 7% Right of Way 0.00 0% Construction 0.00 0% Other Costs 0.00 0% Total Current Year Costs 0.00 485,700.00 485,700.00 Approved GENERAL LEDGER ACCOUNT NUMBER CY Budget 400-9-0980-90-063 6,850,000.00 Total Budget 6,850,000.00 TOTAL PROJECT BUDGET 6,850,000.00 (includes all previous yrs.) Prior Years Current Year Total Project % Total Spent/Encumbered Costs Costs Budget Consulting 0.00 485,700.00 485,700.00 7% Right of Way 0.00 0.00 0.00 0% Construction 0.00 0.00 0.00 0% Other Costs 0.00 0.00 0.00 0% Total Project Costs 0.00 485,700.00 485,700.00 later date (2016) and project construction will be in 2016-17. Bill Dryden, Transportation Engineer Transportation Services CDBG - Budgetary and Financial Analysis Worksheet Comments: Budget amendment approved by City Council January 13, 2015. Bonds to be issued at a Airport Rd (Pecan Center Commercial) Pecan Center Commercial Widening and Intersection Impv'ts DRAFT F M 9 7 1 N IH 35 FWY SB 35 FWY NB A IR P O R T R D N IH 35 NB N AUSTIN AVE N E I N N E R L O O P S T A D I U M D R GOLD EN OA KS RD D R EXIT 264 NB OLD AIRPORT RD L O W D R EXIT 262 SB EXIT 265 N B EXIT 264 SB JUNI EXIT 265 SB N AZALEA DR M E D A S T F R E D D I E D R J E F F E R S O N L N A V I AT I O N D R T E R M I N A L D R ENTR 266 SB TON LN H A L M A R C V S E R V I C E D R SUDDUTH DR G A R D E N M E A D O W D R H I C K O R Y T R E E D R S HANGAR DR G A R D E N VIE W D R I N D U S T R I A L P A R K C I R WWRIGHT BR OTHERS DR R A N D Y S T S T E A R M A N D R A N V I S T A L N O S A G E CORSAIR DR K L E I N C T DAVID FERRETTI DR N IH 35 NB A Edwards Aquifer Recharge Zone P e c a n B r a n c h LAKE W AY D R μ §¨¦35 §¨¦35 1 in = 1,000 ft EXHIBIT 'A' - AIRPORT ROAD LOCATION MAP Mon. YYYYDate: Job No:Job No Tel: 512-879-0400 Fax: 512-879-0499 Brown & Gay Engineers, Inc. V: \ 0 1 P r o j e c t s \ C i t y _ G e o r g e t o w n \ P e c a n _ B r a n c h _ D r i v e \ 0 3 _ C A D D \ L a k e w a y D r . m x d Sheet 1 of 17 EXHIBIT B The work to be performed by the Engineer under this contract consists of providing engineering services required for the design and preparation of plans, specifications and estimates (PS&E) for the widening and reconstruction of Airport Road from Lakeway Drive to Aviation Drive, inclusive of intersection improvements at Lakeway Drive and IH-35 southbound frontage road (SBFR) improvements. This project shall involve: Scope of Services • Engineering analyses, designs and associated details necessary to produce an approximately 30% complete Plans, Specifications and Estimate (PS&E) package for the intersection improvements, the widening and reconstruction of Airport Road and the IH- 35 SBFR improvements, • Engineering analyses, designs and associated details necessary to produce a 100% complete PS&E package for the intersection improvements. The Engineer shall perform all work and prepare all deliverables in accordance with the latest version of the City of Georgetown’s specifications, standards and manuals. Whenever possible, City of Georgetown standard drawings. The Engineer shall perform quality control and quality assurance (QA/QC) on all deliverables associated with this project. The Engineer shall provide traffic control in accordance with Texas Manual on Uniform Traffic Control Devices (TMUTCD ROUTE AND DESIGN STUDIES (Function Code 110) ) when performing onsite activities associated with this contract. A. Data Collection – Obtain and review existing data from the City and TxDOT as detailed in Exhibit A. Perform field reconnaissance of project site. Coordinate to obtain project specific files for adjacent project. B. Design Concept Conference (DCC) – Schedule and attend a Design Concept Conference with the City of Georgetown. Submit to the City a completed Design Summary Report (DSR) along with preliminary typical sections and construction cost estimate at least two weeks prior to the meeting. The Engineer shall provide someone to take notes during the meeting. Revise the DSR per DCC meeting comments and submit to the City. C. Geotechnical Investigations – Provide recommended pavement designs. 1. Drill four (4) soil borings for pavement to depths of 15 feet below the existing ground surface. Total drilling footage is 60 feet. 2. The soil borings will be properly backfilled with bentonite chips and a single lift of cold patch asphalt where applicable. The soil samples will be obtained using Shelby tubes and/or split-spoon samplers. Field-testing of soil samples will include pocket penetrometer in the cohesive soils and Standard Penetration Test (SPT) in the cohesionless soils. Sheet 2 of 17 3. All the field sampling and laboratory tests will be performed according to typical geotechnical standards, where applicable, or with other well established procedures. HVJ will perform appropriate laboratory tests on soil samples recovered from the borings. Laboratory testing will include moisture content, liquid limit, plastic limit and percent passing the #200 analysis tests. 4. Pavement Design Scope - Design two flexible pavement section alternatives (HMAC surface over FLEX base and HMAC surface over HMAC base) to achieve a 20 year design life. Collect non-destructive testing (NDT) using the Falling Weight Deflectometer (FWD) to characterize the in-situ strengths of the existing pavement and subgrade soils. Use NDT on existing roadways to quickly evaluate the in-situ strengths of the existing HMAC, base, and subgrade soil layers. These tests provide good data along the existing project alignment and can be used to: a. identify existing conditions and changes in the underlying subgrade; b. locate and select geotechnical boring locations; and c. determine the structural quality for both the existing pavement layers and the underlying subgrade. These data when analyzed can be used to determine the efficacy of recycling the in- situ materials as a design alternative, which can save time and money for the final construction. The pavement design will include consideration of traffic loads, lab test results, and borings. The AASHTO pavement design procedure will be followed, using the DARWin analysis program. The traffic data will be developed by HVJ for pavement design, based on current traffic count data to be collected as part of HVJ’s scope. Traffic data required includes current and projected AADT traffic counts, growth rates, truck percentages, and truck load factors. It is understood that future traffic on Airport Road is subject to change due to growth on the City of Georgetown and the importance of the Georgetown Airport industry. 5. Engineering Report Deliverables – Preliminary and final geotechnical and pavement design report will be prepared. a. The following items will be included in the report: Site Vicinity map, Geology map, Plan of borings, Boring logs, Laboratory test results summary, Groundwater conditions, Generalized subsurface conditions, Pavement thickness design, Subgrade stabilization, if determined necessary, and General earthwork recommendations. ENVIRONMENTAL (Function Code 120) A. Environmental Documentation – Environmental services will include studies and documentation required to comply with the Endangered Species Act, Clean Water Act and Texas Antiquities Code for the various regulating authorities, including the Texas Sheet 3 of 17 Historical Commission (THC), U.S. Army Corp of Engineers (USACE), U.S. Fish and Wildlife Service (USFWS), Williamson County Conservation Foundation (WCCF) and the City of Georgetown. Hazardous Materials Initial Site Assessment – A hazardous materials initial site assessment shall be completed based on a regulatory records review, assessment of current and past land uses and field reconnaissance. This assessment will identify potential hazardous material sites that may be impacted by the proposed project. The results of this assessment will be documented in a Hazardous Materials Technical Report. Waters of the U.S. Determination – Wetlands, waterbodies, regulated special aquatic sites and other waters of the U.S. will be investigated in the project area. Wetland and waterbody boundaries will be mapped using a Trimble GeoXT Global Positioning System (GPS) receiver that is accurate to within one meter. Delineations will be conducted in accordance with the 1987 Corps of Engineers Wetland Delineation Manual along with the 2010 Regional Supplement for the Great Plains Region. For each wetland, a wetland delineation data form will be prepared and representative photographs will be taken. Maps will be provided of all pertinent information collected during the desktop review and field visit. B. The results of this assessment will be documented in a Waters of the U.S. Technical Report. Note: Preparation of a Section 404 permit and coordination with the USACE would be done, if necessary, under a supplemental agreement. C. Threatened and Endangered Species Habitat Assessment – A habitat assessment and preliminary survey for federal threatened and endangered species will be performed in the project area. Specific tasks include the following: 1. Perform a review of data from the USFWS, Texas Parks and Wildlife Department Natural Diversity Database, geologic maps, topographic maps, soil data, project aerials and other additional resources that may indicate the presence of potentially suitable threatened and endangered species habitat. 2. Perform a field investigation to identify potentially suitable threatened and endangered species habitat within the project area. Site conditions will be documented with regards to vegetation, soils, geology and any observations of species or evidence of species in the vicinity of the project. The results of this assessment will be documented in a Threatened and Endangered Species Technical Report. Note: If it is determined that adverse impacts to species or their habitat cannot be avoided, preparation of a Biological Assessment or Biological Evaluation and Section 10 consultation with USFWS would be required; however, this consultation is not included in this scope and would be completed under a supplemental agreement. Sheet 4 of 17 D. Historic Resources Assessment – A historic resources assessment will be conducted in the project area to satisfy requirements of the Texas Administrative Code. Specific tasks include the following: 1. A field survey of each historic-age resource (defined in accordance with 36 CFR 60 as a building, structure, object, historic district or non-archeological site at least 45 years old at the time of letting) will be conducted in the project’s APE. Photographic documentation along with identifying information for each identified historic-age resource will be provided, including resource address (or UTM coordinates), direction of the photograph, style and type of resource, National Register of Historic Places (NRHP) criteria eligibility and resource integrity issues. In addition a location map identifying each historic-age resource within the APE will be provided. 2. A THC Request for SHPO Consultation form will be completed summarizing the findings of the field survey and a cover letter to THC to be used during agency consultation. Furthermore, this documentation will contain sufficient detail and clarity to provide the THC with a basis for making determinations of NRHP eligibility without requiring submission of additional documentation. The results of this assessment will be documented in a Historic Resources Technical Report. Note: Compliance with Section 106 of the National Historic Preservation Act (for projects with federal funding or involvement) is not included in this work authorization. If necessary, these services will be provided under a supplemental agreement. The following services are not included in this work authorization, but can be performed, if needed, under a supplemental work authorization. ADDITIONAL SERVICES • Meetings with Affected Property Owners, Public Meeting or Public Hearing • USACE Section 404 Permit Preconstruction Notification or Individual Permit • Phase I or II Environmental Site Assessment to American Society for Testing and Materials Standards • Cultural Resource Compliance with Section 106 of the National Historic Preservation Act • Documentation to comply with the National Environmental Policy Act RIGHT OF WAY DATA (Function Code 130) A. Review and Update Current Right of Way Map 1. Coordinate regarding updates to boundary surveys and ownership information. B. Utility Coordination Efforts to ensure utility relocations and adjustments required to accommodate the proposed project development shall include Subsurface Utility Engineering, Field Surveys, Utility Adjustment Coordination and Utility Engineering Services. Sheet 5 of 17 1. A list of the utility owners contact information shall be developed from the preliminary survey and maintained throughout project development. 2. Initial notifications of the project details and expected timelines for project development shall be mailed to all utility owners existing within the project limits. 3. A recommended test hole location map shall be developed based the potential utility conflict areas determined from the review of the existing utilities and proposed designs. 4. As required to more accurately define the location of existing utilities and the limits of potential conflicts, Level C Subsurface Utility Engineering shall be performed. Proper coordination with the utility owners as well as appropriate traffic handling measures shall be implemented. 5. Upon determination of required relocation and/or adjustments, intense coordination with impacted utility owners shall be initiated. Utility agreements in accordance with City and TxDOT guidelines shall be prepared and executed with each impacted utility owner. A utility conflict list and tracking report shall be developed and maintained throughout the duration of the relocation effort. Periodic reviews of utility adjustment designs shall be performed and guidance on project timelines for relocation budgeting shall be provided. 6. Based on relocation and adjustment designs, the MicroStation V8 file shall be updated to indicate new locations as well as delineate the limits of existing utilities to remain and to be abandoned. 7. Coordination meetings, public and individual, shall be held as necessary to facilitate utility conflict identification and resolution. It is estimated that 2 public and 12 individual meetings will be required. PROJECT MANAGEMENT (Function Code 145) A. Meetings 1. Attend and document Kickoff Meeting at the City of Georgetown Office. 2. Attend and document Progress Meetings at the City Office. Assume eight meetings shall be required. 3. Attend and document Utility Coordination Meetings at the City Office. Assume three meetings shall be required. Sheet 6 of 17 B. General Contract Administration 1. Develop monthly invoices and progress reports. 2. Design coordination with the City. FIELD SURVEYING (Function Code 150) A. General 1. Surveys provided shall be in accordance with the Texas State Board of Land Surveying and the applicable sections of the TxDOT Generalized Scope of Services. 2. Survey field notes shall be submitted as requested by the City. 3. Unless previously obtained, the Engineer shall obtain right-of-entry (ROE) agreements with property owners for the required field surveys (short of litigation) using forms approved by or provided by the City. 4. Verify and compare previously located utility data with current ground conditions. Contact the One-Call System in advance of performing field surveys so that data collection includes ties to location of marked utilities. Reasonable attempts to coordinate with utility owners shall be made to achieve efficiency in data collection. B. Topographic Surveys for Engineering Design and Hydraulic Analysis 1. Reasonable attempts shall be made to recover existing horizontal control points. Additional control shall be established to adequately position horizontal control points as needed for project design activities and plan notations thereof. Control points shall be established with significant conformance to current specifications for primary control. Control points shall be set to provide a reasonable assurance of survival during and after construction activities. Where possible, reference ties to permanent features shall be provided for each established horizontal control point. Data for the horizontal control shall be based on Texas State Plane, Central Zone, NAD 83 (93) derived from the Online Positioning User Services (OPUS) solutions and verified by other measurement technologies. 2. Reasonable attempts at recovering and verifying existing vertical control shall be made. Additional benchmarks, if needed, shall be established via differential level loops from recovered known project controls. A vertical benchmark system shall be perpetuated at approximate 1,000 foot intervals for future reference on the plans and maintained to construction, if necessary. 3. Survey files with previously obtained project data shall be compared to and merged with survey files generated through this proposal. In areas of uncertainty, changes in previous existing conditions, and/or limited topographic information, additional data shall be collected as directed by the Project Engineer. 4. Data collection shall consist of spot elevations for improvements, edge of roadway, driveways, visible or marked utilities, drainage features, centerline of roadway and grade breaks. Individual roadway cross sections shall be taken at intervals not to Sheet 7 of 17 exceed 100 feet or as required to properly define the surface of the project and generate accurate Digital Terrain Models (DTMs). 5. The survey shall include topographic features within approximately 1,500 feet from each end of certain drainage features along the roadway or a sufficient distance to ensure and/or verify hydraulic cross sections can be developed to adequately accommodate the 100-year rainfall event. Within these limits, the survey shall extend approximately 100 feet left and right of the existing roadway centerline, provided ROE allows such access. 6. Channel cross sections shall be provided from the face of the existing drainage structures (4 sections each) to approximately 200 feet upstream and downstream. The sections shall indicate any ground breaks, top of banks, toe of slopes, water surface elevations, normal high water surface elevations (if discernible), etc., that define the actual contour of the section and the overbank area, provided ROE allows such access. 7. A stream alignment and profile extending the entire limits of the channel cross sections described above shall be developed from the channel cross section information. 8. A profile of the feature’s deck (the uppermost surface) and the low chord shall be provided. 9. Topographic information shall include the limits of the existing concrete riprap upstream, beneath and downstream of the existing drainage features. 10. Profiles of previously uncollected intersecting driveways within the project limits shall extend a sufficient distance beyond the existing ROW to ensure adequate data is available to determine tie-ins with proposed vertical alignment changes, provided ROE allows such access. 11. Field surveys shall provide the locations of all small signs, mailboxes and other visible surface features. Sign text, color, dimensions and standard sign design shall be provided in accordance with City of Georgetown sign standards. 12. Survey shots shall be assigned a unique point number which provides a positive identification of the point. Each point shall be assigned a feature number or feature name using the TxDOT's standard feature table. An ASCII points file and a copy of the print out shall be provided. Each line of the output data shall contain in this order: the point number, northing, easting, elevation and the descriptive feature code. 13. Surveyed data shall be provided in a Microstation (.dgn V8) compatible two dimensional base map format. The survey shot point attributes shall appear on separate levels. 14. A DTM shall be provided in a Microstation (.dgn V8) GEOPAK compatible three- dimensional format. Sheet 8 of 17 ROADWAY DESIGN CONTROLS (Function Code 160) A. 30% Complete Plan Set 1. Intersection of Airport Road and Lakeway Drive a. Geometric Design – Create horizontal and vertical alignments, typical sections and resultant design cross sections to ensure compliance with current design criteria. Delineate and discuss potential deficiencies with City staff. Review constructability of preliminary design prior to final plan preparation. b. Typical Sections – Develop existing and proposed roadway typical sections for Airport Road and Lakeway Drive. c. Alignment Data Sheets – Prepare horizontal and vertical alignment data sheets with the Geopak baseline descriptions. d. Plan & Profile Drawings – Prepare plan & profile sheets (1”=100’ Horizontal, 1”=10’ Vertical, 11” x 17” original sheets) for Airport Road and Lakeway Drive. The sheets shall include the following: i. Critical Basemap data in plan and profile (i.e. existing topography, utilities, etc.). ii. Control and benchmark data. iii. Proposed roadway improvements including horizontal and vertical roadway geometry, pavement edge geometry, drainage, grading and miscellaneous related improvements. e. Intersection Layouts – Develop intersection layouts that define all horizontal and vertical geometry for the following intersections: i. Airport Road and Lakeway Drive. f. GEOPAK Roadway Model – Update the GEOPAK Roadway model provided by TxDOT to accurately show the proposed roadway improvements for utilization in design, analysis of construction sequencing, quantity calculations and plan production. g. Roadway Cross-Sections – Prepare design cross-sections (1”=30’ Horizontal, 1”=15’ Vertical, 11”x17” sheets) at intervals not to exceed 50 feet along the proposed roadway improvement length to a sufficient level of detail to support design decisions. Cross sections shall be prepared for Airport Road and Lakeway Drive as needed. 2. Airport Road (Widening and Reconstruction to Aviation Dr)/IH-35 SBFR a. Geometric Design – Create horizontal and vertical alignments, typical sections and resultant design cross sections to ensure compliance with current design criteria. Delineate and discuss potential deficiencies with City staff. Review constructability of preliminary design prior to final plan preparation. Sheet 9 of 17 b. Typical Sections – Develop existing and proposed roadway typical sections for Airport Road. c. Alignment Data Sheets – Prepare horizontal and vertical alignment data sheets with the Geopak baseline descriptions. d. Preliminary Schematic – Prepare schematic sheets for Airport Road. The sheets shall include the following: i. Critical Basemap data in plan and profile (i.e. existing topography, utilities, etc.). ii. Control and benchmark data. iii. Proposed roadway improvements including horizontal and vertical roadway geometry, pavement edge geometry, drainage, grading and miscellaneous related improvements. iv. ROW needs determination e. Driveway/Acceleration/Deceleration Details – Develop details and layouts that define all of the horizontal and vertical geometry for the widening of the IH-35 Southbound frontage road and driveways. f. GEOPAK Roadway Model – Update the GEOPAK Roadway model provided by TxDOT to accurately show the proposed roadway improvements for utilization in design, analysis of construction sequencing, quantity calculations and plan production. g. Roadway Cross-Sections – Prepare design cross-sections (1”=30’ Horizontal, 1”=15’ Vertical, 11”x17” sheets) at intervals not to exceed 50 feet along the proposed roadway improvement length to a sufficient level of detail to support design decisions. Cross sections shall be prepared for Airport Road as needed. B. 100% Complete Plan Set The following items shall be prepared for the intersection improvements at Airport Road and Lakeway Drive: 1. Typical Sections – Finalize typical sections prepared during the 30% completion phase. 2. Plan & Profile Drawings – Finalize plan & profile drawings prepared during the 30% completion phase. 3. Intersection Layouts – Finalize intersection layouts prepared during the 30% completion phase. The following list of intersections reflects the current configuration. Layouts for intersections that are constructed during the plan development phase will be prepared accordingly. a. Airport Road and Lakeway Drive 4. Driveway Details – Develop typical driveway designs and summarize driveway (approximately 4, to be field verified) features including material type and geometric Sheet 10 of 17 design. Driveways shall be constructed with HMAC or concrete, conforming with existing. 5. Miscellaneous Roadway Details – Develop various details, as required, for pavement, curb, riprap, etc. 6. Removal Layouts – Prepare removal layout sheets (1”=100’) showing all features that are to be removed including pavement, structures, signing, etc. 7. Roadway Cross Sections – Finalize roadway cross sections (1”=30’ Horizontal; 1”=15’ Vertical, 11”x17” sheets) prepared during the 30% completion phase. Cross sections shall be prepared for Airport Road and Lakeway Drive. DRAINAGE (Function Code 161) A. 30% Complete Plan Set (Submitted separately for each of the follow packages) 1. Intersection of Airport Road and Lakeway Drive a. Incorporate all design surveys into computer aided drafting and develop topographies and surfaces. These data shall be utilized to develop drainage areas, hydrology and hydraulics. This shall include topographic working drawings to prepare the preliminary drainage design. b. Develop storm water hydrology for the ultimate roadway section throughout the limits of the project. The hydrology shall be modeled utilizing HEC-HMS with TxDOT drainage criteria. The model shall incorporate the 10%, 4% and 1% annual chance storm (10-year, 25-year and 100-year) events. Modeling shall develop storm water flows to all cross culverts and roadway conveyances. Based on the data developed, drainage infrastructure shall be designed in a preliminary format for the project area. The level of detail shall be sufficient to establish cost estimates and required easements and possession and use agreements for the construction of the proposed drainage structures and channel improvements. c. Develop preliminary hydraulics to all cross culvert conveyances and the roadway system. d. Develop preliminary designs for all cross drainage structures throughout the project limits. The cross drainage shall be modeled with HEC-RAS. e. Develop preliminary designs for proposed storm water collection systems for the proposed curb-and-gutter portion of the project area. Storm sewer designs shall be developed using Geopak Drainage. f. Establish the preliminary water quality requirements for the ultimate roadway section. Designs shall be based on the new impervious cover that shall be established with the ultimate build out of the project and current Texas Commission on Environmental Quality (TCEQ) requirements for construction within the EARZ. Design efforts shall prioritize combining conveyance Sheet 11 of 17 infrastructure with water quality and providing alternatives to detention basins in an effort to minimize project costs. Options shall be preliminarily designed and presented to the City and TxDOT for review. The preferred option shall be included in the preliminary design. g. Develop preliminary drainage easement requirements for the project area. h. Coordinate the preliminary design with the City of Georgetown. Comments and direction shall be incorporated into final designs. 2. Airport Blvd (Widening and Reconstruction to Aviation Dr)/IH-35 SBFR a. Establish the preliminary water quality requirements for the ultimate roadway section. Designs shall be based on the new impervious cover that shall be established with the ultimate build out of the project and current Texas Commission on Environmental Quality (TCEQ) requirements for construction within the EARZ. Design efforts shall prioritize combining conveyance infrastructure with water quality and providing alternatives to detention basins in an effort to minimize project costs. Options shall be preliminarily designed and presented to the City and TxDOT for review. The preferred option shall be included in the preliminary design. b. Develop preliminary drainage easement requirements for the project area. c. Coordinate the preliminary design with the City of Georgetown. Comments and direction shall be incorporated into final designs. B. 100% Complete Plan Set 1. Intersection of Airport Road and Lakeway Drive a. Develop final designs for all cross drainage structures within the project limits. The cross drainage shall be modeled with HEC-RAS. All cross drainage structures shall be illustrated in plan profile sheets as well as detail sheets in the 100% plans. Grading to existing ground elevations shall be detailed as well as elevations for flow lines and headwalls. Hydraulic grade lines for the 4% and 1% annual chance storm (25-year and 100-year) events shall be illustrated in the profile views. Designs for conveyance to reduce erosion shall be completed and detailed in the plans. b. Develop final designs for the storm water collection systems for the curb-and- gutter portion of the project limits. Storm sewer systems shall be analyzed and designed using Geopak Drainage. This shall be accomplished in conjunction with elements for water quality for new impervious cover within the EARZ. The design shall consider curb and gutter systems, roadside channels, extended detention basins, etc. in order to develop the most applicable and cost effective system for the project. Flow lines shall be detailed as well as hydraulic grade lines for the 20% and 1% annual chance storm (5-year and 100- Sheet 12 of 17 year) events. All drainage infrastructure shall be designed and presented in the plans in plan and profile. c. Design storm water conveyance to existing streams and channel ways. Design shall include conveyance for positive drainage and shall check current water surface elevations to proposed water surface elevations after project completion. d. Establish the final detention requirements resulting from the additional impervious cover constructed with this project. Coordinate with the Developer’s engineer to incorporate roadway detention requirements into a single detention facility designed by the Developer for all site detention. e. Establish the final requirements for water quality for the ultimate roadway section. Designs shall be based on the new impervious cover that shall be established with the ultimate build out of the project and current TCEQ requirements for construction within the EARZ. Design efforts shall prioritize combining conveyance infrastructure with water quality and providing alternatives to detention basins in an effort to minimize project costs. Options shall be designed and presented to the City for review. The preferred option shall be included in the final design and submitted to the TCEQ for review and acceptance. f. Existing utility locations shall be illustrated in the drainage plan profile sheets. g. Develop final design for the cross culverts. Develop options for reducing the footprint of the associated floodplain upstream and downstream of the proposed Lakeway Drive crossings. The final design shall include grading plans, proposed flow lines, channel cross sections, connection to existing channel sections and hydraulic grade lines for the 4% and 1% chance storm (25- year and 100-year) events. h. Develop final drainage easement requirements for the project area. Limits of permanent drainage easements shall be kept to a minimum. Layouts for drainage easements shall be prepared for review with the City. Details will be provided for the production of metes and bounds for acquisition. i. Prepare a global Drainage Area Map for the entire project. j. Prepare Hydraulic Data Sheets as appropriate reflecting the results of the hydraulic analyses and designs for proposed cross road culverts. k. Prepare a Hydraulic Report, documenting the results of the hydrologic studies, hydraulic analysis and designs. Include the preliminary Hydraulic Data and Drainage Area Map sheets and the Bridge Layout sheet in the report. l. Develop summary of final quantities for all drainage infrastructure and prepare cost estimates based on current bid data. Sheet 13 of 17 m. Coordinate with the City of Georgetown to review the final drainage design, phasing for the project, utility conflicts and relocations, water quality options, etc. All comments and direction shall be incorporated into final designs. n. Water Pollution Abatement Plan (WPAP) – Prepare a WPAP that shall serve as the Edwards Aquifer Protection Plan for the project. The WPAP shall contain a geologic assessment and the temporary and permanent best management practices (BMPs) proposed for the project. For the preparation of the WPAP, the TCEQ Complying with Edwards Aquifers Rules - Technical Guidance shall be used for the selection of the proposed BMPs. Obtain approval of the WPAP by TCEQ prior the start of any activity that could cause runoff contamination. o. Storm Water Pollution Prevention Plans (SW3P) – Develop SW3P, on separate sheets (1”=100’ scale) from (but in conformance with) the Traffic Control Plan (TCP), to minimize potential impact to receiving waterways. The SW3P shall include text describing the plan, quantities, type and locations of erosion control devices and any required permanent erosion control measures. The SW3P shall be prepared according to the Edwards Aquifer Rules. SIGNING, MARKINGS AND SIGNALIZATION (Function Code 162) A. Traffic Study (Intersection of Airport Rd and Lakeway Drive) 1. Data Collection The Engineer shall conduct a site inspection at the study location. The field work shall include the following: a. Conduct a field investigation, obtain photographs and prepare an existing condition diagram for the study locations. Record traffic characteristics observed while in the field. b. Obtain crash records at the study locations from the City and State for the most recent thirty-six (36) month period. c. Manually record turning movement counts at the intersection for 12 hours during a typical weekday (Tuesday, Wednesday or Thursday) for the following period: 7:00 a.m. – 7:00 p.m. 2. Crash Analysis The Engineer shall analyze crash records provided by the City and State and prepare a summary of the crashes in a collision diagram for the study locations. 3. Traffic Signal Warrant Analysis The Engineer shall perform a traffic signal warrant analysis for the intersection following the guidelines published in the Texas Manual on Uniform Traffic Control Devices, current edition. Sheet 14 of 17 4. Deliverables The Engineer shall prepare and submit two (2) copies of a traffic study report for the location to the City, which summarizes the findings of the traffic counts, warrant analysis, and field investigation. The report shall include an existing condition diagram, field photographs, traffic count data, a collision diagram, and any recommended improvements (if appropriate). Revisions to the report shall be made based on comments received from the City. B. 30% Complete Plan Set Preliminary traffic signal design plans shall be developed for the intersection with Airport Road and Lakeway Drive because signal design and operation shall impact the geometric design of the intersection. The following items shall be prepared: 1. Preliminary Traffic Signal Layouts – The preliminary layouts shall show the proposed configuration of major signal items such as signal poles, controller and electrical service. Pedestrian signal poles shall be laid out as a function of the crosswalk and ramp locations to meet American with Disabilities Act (ADA) design requirements. The proposed signal indications and phasing sequence shall be identified for early review by the City of Georgetown Transportation Engineer. The proposed approach roadway configuration shall be designed for optimum signal operation. C. 100% Complete Plan Set The following items shall be prepared the intersection improvements at Airport Road and Lakeway Drive: 1. Signing and Markings Layouts – Prepare signing and pavement markings layouts (1”=100’ scale) for Airport Road and Lakeway Drive. The layouts shall include roadway layout, centerline with stationing, culverts and other structures, existing signs to remain, to be removed or to be relocated, proposed signs (illustrated and numbered) and proposed permanent markings (illustrated and labeled) including pavement markings, object markers and delineation. Prepare details in accordance with TMUTCD, TxDOT Sign Crew Field Book 2. Summary of Small Signs Tabulation – Prepare and complete standard summary of small signs sheet. , and the applicable City of Georgetown standards. 3. Sign Details – Prepare details for signs not included in the State’s standard details sheets. 4. Traffic Signal Plans – Prepare detailed traffic signal installation plans for the intersection of Airport Road and Lakeway Drive accommodating the ultimate roadway configuration to the extent practicable. The following plans sheets shall be prepared: Sheet 15 of 17 a. Traffic Signal Quantity Summary Sheet b. General Notes for Traffic Signal Installation c. Proposed Traffic Signal Layouts, showing the proposed signal poles, controller, vehicle and pedestrian signals, vehicle detection devices, intersection illumination, signal communications, conduit, ground boxes, electrical service and signal pole type chart. d. Signal Phasing and Wiring Diagrams, showing the conduits and cables chart, cable termination chart, electrical service specifications, phasing diagram orientation diagram, miscellaneous cable charts and street name sign designs. e. Traffic Signal Elevations Sheets, showing elevation drawings for each signal pole with the location of signal heads, signs and detection devices. f. Traffic Signal Striping Sheets, showing the proposed crosswalk and stop line locations in relation to the ramps. g. Traffic Signal Installation Details, showing miscellaneous installation details for vehicle detection, signal communications, pedestrian signals and pushbuttons. h. Traffic Signal pole standards, showing the types and sizes of the proposed poles, mast arms and illumination arms. i. Signal Pole Foundations Standards, showing the size, type and depth of the foundation for each signal pole and pedestrian pole. MISCELLANEOUS (ROADWAY) (Function Code 163) A. 30% Complete Plan Set 1. Traffic Control Plans (TCP), Detours and Sequence of Construction – A conceptual TCP shall be developed including sequence of construction and the existing and proposed traffic control devices (including signs, barricades, pavement markings, etc.). The TCP shall also include the evaluation of temporary drainage throughout the construction process to ensure positive flow during construction. TCP shall based on the TMUTCD a. Sequence of construction narrative. and the latest City of Georgetown Standards. Plan sheets shall include: b. Traffic control typical sections for each phase of construction c. Advance Warning Signs. d. TCP layouts showing work zones, number of lanes open, advance warning signs, typical sections and any necessary detour geometry. e. Intersection phasing layouts. Sheet 16 of 17 2. Miscellaneous Drawings – Prepare the following miscellaneous drawings: a. Title Sheet b. Index of Sheets 3. Cost Estimates – Prepare a construction cost estimate for the 30% design. B. 100% Complete Plan Set 1. Traffic Control Plans (TCP), Detours and Sequence of Construction – A detailed TCP shall be developed including sequence of construction and the existing and proposed traffic control devices (including signs, barricades, pavement markings, etc.). The TCP shall also include the design of temporary drainage throughout the construction process to ensure positive flow during construction. TCP shall based on the TMUTCD a. Sequence of construction narrative. and the latest City of Georgetown Standards. Plan sheets shall include: b. Traffic control typical sections for each phase of construction c. Advance Warning Signs. d. TCP layouts showing work zones, number of lanes open, advance warning signs, typical sections and any necessary detour geometry. e. Intersection phasing layouts. f. Any necessary miscellaneous drawings relevant to traffic control g. Traffic Control Standard sheets h. Traffic Control Summary of Quantity Tables 2. Summary of Quantities – Prepare quantity summary sheets for the following quantities: a. Removals b. Roadway (including earthworks) c. Driveways d. Drainage e. Small Signs f. Pavement Markings g. Traffic Signals h. SW3P 3. Cost Estimates – Prepare detailed construction cost estimates. An estimate shall be provided at each submittal (30% and 100% PS&E) Sheet 17 of 17 4. General Notes and Specifications – Using the latest City of Georgetown Master General Notes, identify required general notes. Also, develop project specific general notes for the items required. City of Georgetown requirements shall be incorporated as necessary. 5. Standard Drawings – Select the standard City of Georgetown drawings applicable to the project. 6. Construction Time Estimate – Prepare a construction time estimate in Primavera or other approved software that shows the time required to construct the project. 7. Bid Proposal – Prepare the project bid proposal that shall include the following: a. General Notes b. Standard and Special Specifications c. Special Provisions d. Reference Item list e. Bid Tabulation Sheets f. Applicable Legal Documents 8. Miscellaneous Drawings – Prepare the following miscellaneous drawings: a. Title Sheet / Index of Sheets b. Environmental Permits, Issues and Commitments (EPIC) Sheet c. Project Layout Page 1 of 1  EXHIBIT C  Schedule of Owner’s Responsibilities   Data for the project that the City has available (i.e. environmental documents, preliminary  schematic design, correspondence, materials, previously conducted studies regarding  proposed improvements, etc.)   Example estimate, general notes master file, sample specification list and related hard  copy documentation for the Engineer’s use in preparing preliminary estimate, general  notes and specifications.   Diskette with files containing templates for the title sheet, plan profile sheet, design cross  section sheets, the Austin District storm water pollution prevention plan (SW3P) index  sheet and design files of any Austin District standard sheets that may be applicable to the  project.   Available existing right‐of‐way maps for the project.   Available as‐built plans from utility companies existing within the project limits.   Assist the Engineer, as necessary, in obtaining any required data and information from  local, regional, state and federal agencies.    Exhibit D - Estimate Fee Schedule - Airport Rd FC DESCRIPTION BGE HVJ CP&Y TOTAL FC 110 ROUTE AND DESIGN STUDIES 5,718.00$ $16,770.00 22,488.00$ FC 120 ENVIRONMENTAL 17,472.00$ 17,472.00$ FC 130 ROW 44,864.00$ 44,864.00$ FC 150 FIELD SURVEYING AND PHOTOGRAMMERTRY 29,453.00$ 29,453.00$ FC 160 ROADWAY DESIGN CONTROLS 45,648.00$ 45,648.00$ FC 161 DRAINAGE 110,730.00$ 110,730.00$ FC 162 SIGNING, PAVEMENT MARKINGS & SIGNALIZATION 99,298.00$ 99,298.00$ FC 163 MISCELLANEOUS ROADWAY 50,952.00$ 50,952.00$ FC 145 GENERAL MANAGEMENT / COORDINATION 56,720.00$ 56,720.00$ EXPENSES 7,659.37$ $415.63 8,075.00$ 451,042.37$ 16,770.00$ 17,887.63$ 485,700.00$ Exhibit D - BGE SR. PROJECT SENIOR PROJECT SENIOR ENGR 3-MAN MANAGER ENGINEER ENGINEER EIT TECH TECH RPLS TECHNICIAN CREW CLERICAL TOTAL FC 110 ROUTE AND DESIGN STUDIES 6 8 12 8 4 0 0000 38 FC 130 ROW 28 73 796868 0 0000 316 FC 150 FIELD SURVEYING AND PHOTOGRAMMERTRY 0 0 32 0 0 0 44 120 168 8 372 FC 160 ROADWAY DESIGN CONTROLS 46 136 120 146 212 212 0000 872 FC 161 DRAINAGE 141646436681800000 796 FC 162 SIGNING, PAVEMENT MARKINGS & SIGNALIZATION 64 28 24 104 32 134 0004 390 FC 163 MISCELLANEOUS ROADWAY 24 104 64 108 30 94 0000 424 FC 145 GENERAL MANAGEMENT / COORDINATION (12 MONTHS)53 65 0 49 0 0 0 0 0 12 179 TOTAL HOURS 235 578 395 849 354 620 44 120 168 24 3387 MANHOUR RATES 225.00$ 174.00$ 138.00$ 110.00$ 110.00$ 98.00$ 120.00$ 85.00$ 150.00$ 69.00$ 130.91$ TOTAL DIRECT LABOR COSTS 52,875.00$ 100,572.00$ 54,510.00$ 93,390.00$ 38,940.00$ 60,760.00$ 5,280.00$ 10,200.00$ 25,200.00$ 1,656.00$ 443,383.00$ EXPENSE COST 7,659.37$ TOTAL TOTAL TOTAL TOTAL 451,042.37$ MANHOUR ESTIMATE - BGE # OF SR. PROJECT SENIOR PROJECT SENIOR ENGR 3-MAN SHTS MANAGER ENGINEER ENGINEER EIT TECH TECH RPLS TECHNICIAN CREW CLERICAL TOTAL FC 110 ROUTE AND DESIGN STUDIES 1 Data Collection 24884 26 1 Design Concept Conference 4 4 4 12 SUBTOTAL 0 6 8 12 8 4 0 0000 38 FC 130 ROW 1 Right of Way Map N/A 4 8 24 36 2 List of utility owners N/A 2 8 10 3 Utility Notification N/A 4 12 16 4 Test hole location map N/A 2 6 8 16 5 Level C Subsurface Utility Engineering N/A 4 24 8 36 6 Determine utility conflicts N/A 4 16 4 24 7 Utility Notification N/A 4 8 12 8 Proposed Utility File N/A 4 16 24 44 9 Coordination meetings (14 meetings) N/A 24 49 49 122 SUBTOTAL 0 28 73 79 68 68 0 0000 316 FC 150 FIELD SURVEYING AND PHOTOGRAMMERTRY 1 Design Topo Survey with a DTM N/A 24 32 96 168 320 2 Re-alignment ROW Parcel Map N/A 8 12 24 8 52 SUBTOTAL 0 0 0 32 0 0 0 44 120 168 8 372 FC 160 ROADWAY DESIGN CONTROLS Intersection of Airport Road and Lakeway Drive 1 Geometric Design 416 2424 68 2 Typical Sections 3 4 8 18 24 54 3 Alignment Data Sheets 2 4 4 8 8 24 4 Roadway Plan & Profile Sheets (1"=100' scale) 5 4 8 20 48 80 5 Intersection Layouts 1 4 8 12 12 36 6 Driveway Details 1 2 6 6 14 7 Miscellaneous Roadway Details 1 2 6 6 14 8 Removal Layouts 5 4 16 20 40 9 GEOPAK Roadway Model N/A 0 10 Roadway Cross Sections 27 8 16 24 60 108 SUBTOTAL 45 24 68 40 98 84 124 0000 438 Airport Road/IH-35 SBFR 1 Geometric Design 41640 40 100 2 Typical Sections 4 4 12 8 24 40 88 3 Alignment Data Sheets 1 4 4 8 16 4 Preliminary Schematic 30% 4 4 8 16 24 52 5 Driveway/Acceleration Details 3 4 8 16 28 6 ROW Needs Determination N/A 2 8 4 8 22 7 GEOPAK Roadway Model N/A 0 8 Roadway Cross Sections 20 8 16 24 80 128 SUBTOTAL 32 22 68 80 48 128 88 0000 434 SUBTOTAL 77 46 136 120 146 212 212 0000 872 FC 161 DRAINAGE Intersection of Airport Road and Lakeway Drive 1 HEC-RAS modelling (2 crossings) N/A 12 24 24 60 2 Storm Sewer modelling N/A 8 24 40 72 3 Determine detention requirements N/A 8 16 24 4 Determine WQ requirements N/A 8 16 24 5 Identify drainage easement requirements N/A 2 6 16 8 32 6 Drainage Area Maps (external) 2 4 16 16 36 7 Drainage Area Maps (internal) 5 2 4 24 24 54 8 Hydrology calculations N/A 4 16 20 9 Hydraulic calculations N/A 4 24 28 10 Hydraulic Data Sheets 4 4 16 24 44 11 Hydraulic Report N/A 2 16 16 4 38 12 Cross Culvert Layout (1) 1 2 4 8 12 26 13 Storm Sewer P&P 5 4 12 30 40 86 14 Quantities Summary 1 4 16 8 28 15 Address comments from COG N/A 2 8 16 16 42 16 WPAP N/A 24 40 12 76 17 SW3P 3 6 16 20 42 18 Coordinate with TCEQ N/A 12 4 16 SUBTOTAL 21 14 148 64 338 8 176 0000 748 TOTAL LABOR AND EXPENSE COSTS FC DESCRIPTION Airport Road/IH-35 SBFR 1 Determine WQ requirements N/A 8 16 24 2 Identify drainage easement requirements N/A 4 8 4 16 3 Address comments from COG N/A 4 4 8 SUBTOTAL 0 0 16 0 28 0 4 0000 48 SUBTOTAL 21 14 164 64 366 8 180 0000 796 FC 162 SIGNING, PAVEMENT MARKINGS & SIGNALIZATION Intersection of Airport Road and Lakeway Drive 1 Traffic Study/Intersection Analysis 12 8 16 24 464 2 Data Collection 264 12 3 Crash Analysis 46 10 4 Traffic Signal Warrant Analysis 12 16 6 4 38 5 Signing and Pavement Marking Layouts (1"=100' scale) 3 8 12 8 24 52 6 Summary of Small Signs Tabulation 1 4 8 12 7 Sign Details 14 8 12 8 Traffic Signal Plans 0 9 Traffic Signal Quantity Summary 1 2 6 8 16 10 General Notes for Traffic Signal Installation 2 2 4 8 14 11 Proposed Traffic Signal layouts 2 4 12 16 32 12 Signal Phasing and Wiring Diagrams 2 4 12 16 32 13 Traffic Signal Elevations Sheet 2 2 8 10 20 14 Traffic Signal Striping Sheets 2 2 8 10 20 15 Traffic Signal Installation Details 2 4 8 12 24 16 Trafffic Signal Pole Standards 2 2 4 6 12 17 Signal Pole Foundation Sheet 1 4 8 8 20 SUBTOTAL 21 64 28 24 104 32 134 0004 390 FC 163 MISCELLANEOUS ROADWAY Intersection of Airport Road and Lakeway Drive 1 Construction Sequence Narrative 1 4 8 4 8 24 2 Advance Warning Signs 1 4 4 8 8 24 3 TCP Typical Sections 2 4 8 16 16 44 4 TCP Layouts (1"=100' scale) 5 4 8 16 16 40 84 5 Summary of Quantities 1 4 16 8 28 6 Title Sheet/Index 2 2 8 4 8 8 12 42 7 Cost Estimate N/A 6 24 8 38 8 General Notes N/A 2 16 8 26 9 Specifications N/A 2 16 16 8 42 10 Standard Drawings 4 4210 20 11 Construction Days Estimate N/A 2 8 4 14 SUBTOTAL 12 20 90 64 92 26 94 0000 386 Airport Road/IH-35 SBFR 1 Conceptual Construction Sequence Narrative 1 4 8 4 16 2 Cost Estimate N/A 6 12 4 22 SUBTOTAL 1 4 14 0 16 4 0 0000 38 SUBTOTAL 13 24 104 64 108 30 94 0000 424 FC 145 GENERAL MANAGEMENT / COORDINATION (12 MONTHS) 1 Kickoff Meeting N/A 4 4 4 12 1 Progress Meetings (8) N/A 12 24 24 60 2 Utility Coordination Meetings (3) N/A 9 9 9 27 3 Submittal Meetings (3) N/A 12 12 12 36 4 Contract Administration N/A 16 16 12 44 SUBTOTAL 0 53 65 0 49 0 0 0 0 0 12 179 EXPENSE ESTIMATE ITEM UNIT RATE QUANT TOTAL Mileage MILE 0.565$ 1800 1,017.00$ Delivery EA 25.00$ 10 250.00$ Copies (11x17)EA 0.20$ 2000 400.00$ Copies (8.5x11)EA 0.10$ 500 50.00$ Meals-Per Diem (3 crewmembers x 12 days) DAY 46.00$ 36 1,656.00$ Lodging DAY 110.00$ 33 3,630.00$ Traffic Count - Gram Traffic Counting EA 600.00$ 1 600.00$ Miscellaneous LS 56.37$ 1 56.37$ 7,659.37$ Field Investigation - Drilling and Soil Sampling No. Rate Units Mobilization/Demobilization - Austin 1 @ $400.00 each $400.00 Drilling & Sampling - Soils 60 @ $16.00 per foot $960.00 Drilling & Sampling - Rock 0 @ $23.00 per foot $0.00 Support Truck 1 @ $100.00 per day $100.00 Plugging of soil borings 60 @ $6.00 per foot $360.00 Field Technician 8 @ $65.00 per hour $520.00 Vehicle Trips 2 @ $50.00 each $100.00 Traffic Control 1 @ $1,200.00 each $1,200.00 Sub Total $3,640.00 Laboratory Testing - Standard Natural Moisture Content (ASTM D-2216) 8 @ $18.00 each $144.00 Atterberg Limits (Liquid and Plastic Limits, ASTM D-4318) 8 @ $65.00 each $520.00 Unconfined Compression Tests 0 @ $50.00 each $0.00 No 200 Sieve (ASTM D-1140) 8 @ $42.00 each $336.00 Consolidation Tests 0 @ $250.00 each $0.00 Swell Test 0 @ $150.00 each $0.00 Sulphates and Chlorides 4 @ $75.00 each $300.00 CBR 1 @ $450.00 each $450.00 Sub Total $1,750.00 FWD Testing and Traffic Counts Mobilization/Demobilization 1 @ $200.00 each $200.00 FWD Equipment 1 @ $2,600.00 day $2,600.00 Traffic Control 1 @ $1,200.00 day $1,200.00 Traffic Counts for Pavement Design 2 @ $300.00 day $600.00 Subtotal $4,600.00 Geotechnical Engineering & Reporting Senior Engineer, P.E. 4 @ $150.00 hr $600.00 Project Engineer, P.E. 8 @ $125.00 hr $1,000.00 Staff Engineer, EIT 8 @ $85.00 hr $680.00 Clerical/Administrative 2 @ $50.00 hr $100.00 Sub-Total $2,380.00 Pavement Engineering & Reporting Senior Engineer, P.E. 5 @ $150.00 hr $750.00 Project Engineer, P.E. 19 @ $125.00 hr $2,375.00 Staff Engineer, EIT 15 @ $85.00 hr $1,275.00 Clerical/Administrative 0 @ $50.00 hr $0.00 Sub-Total $4,400.00 Total $16,770.00 Exhibit D - HVJ Airport Road from Lakeway Drive to Aviation Drive City of Georgetown for Brown & Gay Engineers HVJ Proposal No. AG1511320 Exhibit D ‐ CPY TASK DESCRIPTION Project Sr. Env. Sr. Env. GIS Admin/ Total Total Labor Manager Planner Specialist Operator Clerical Hours Cost I. Project Administration and Coordination A. Invoices and Progress Reports 4 4 8 $1,024.00 B. Meetings and Coordination 8 2 10 $1,780.00 II. Environmental Documentation A. Hazardous Materials Initial Site Assessment 2 16 4 4 26 $3,064.00 B. Waters of the U.S. Determination 2 20 16 8 46 $4,280.00 C. Threatened and Endangered Species Habitat Assessment 2 20 16 4 42 $3,992.00 D. Historic Resources Assessment 2 20 2 4 28 $3,332.00 TOTAL HOURS 20 38 46 32 20 4 160 RATE PER HOUR $192.00 $122.00 $110.00 $70.00 $72.00 $64.00 TOTAL LABOR COST $3,840.00 $4,636.00 $5,060.00 $2,240.00 $1,440.00 $256.00 $17,472.00 TOTAL OTHER DIRECT EXPENSES $415.63 CP&Y TOTAL COST $17,887.63 OTHER DIRECT EXPENSES QUANTITY RATE UNIT TOTAL Mileage 125 $0.565 MILE $70.63 Photocopies B/W (8.5" x 11") 100 $0.10 EACH $10.00 Photocopies B/W (11" x 17") 50 $0.20 EACH $10.00 HazMat Database Search 1 $250.00 EACH $250.00 GPS Rental 1 $75.00 EACH $75.00 TOTAL OTHER DIRECT EXPENSES $415.63 Biologist Exhibit E Airport Road Project Schedule Page 1 of 1 Exhibit E 2016 Description Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan CONSULTANT TASKS Start Date: March 1, 2015 Review Project Data Geotechnical Investigation Environmental Documentation Utility Coordination Survey Roadway Design Drainage Analysis Typical Sections Traffic Signal Layouts Signing and Pavement Markings Traffic Control Plans WPAP SW3P Plans Cost Estimates General Note and Specifications Contract Time Determination Bid Proposal DCC Meeting u Preliminary Engineering Submittal-Intersection u 30% Submittal-Intersection u Incorporate Review Comments 100% Submittal-Intersection u Incorporate Review Comments Final Submittal-Intersection u Letting (November 2015) - Intersection Preliminary Engineering Submittal-Airport Rd Widening u Incorporate Review Comments Final Engineering Schematic Submittal-Airport Rd Widening u Project Coordination with City TxDOT TASKS / REVIEWS Milestone Reviews Work Authorization Termination Date: January 31, 2016 2015 City of Georgetown, Texas Transportation Enhancement Corp February 18, 2015 SUBJECT: EXECUTIVE SESSION In compliance with the Open Meetings Act, Chapter 551, Government Code, Vernon's Texas Codes, Annotated, the items listed below will be discussed in closed session and are subject to action in the regular session. Section 551.0071 – Consultation with Attorney Discussion regarding the development agreement with 500 South Austin Avenue LLP--Laurie Brewer, Assistant City Manager, Andreina Davila, Project Coordinator, and Bridget Chapman, City Attorney ITEM SUMMARY: The City and Developer entered into a development agreement in 2005 to facilitate the redevelopment of the site at 500 South Austin Avenue. This included the relocation of the Monument Café restaurant; the construction of a new retail/office building fronting Austin Ave; the redevelopment and expansion of the specialty food/retail store (Market Building); and the construction of the associated required parking spaces (“Project”).There were four amendments through 2011 to address changes in development conditions. Final development of the site is required by March 31, 2015. A total of $948,361.00 of GTEC funds were reimbursed to the developer based upon actual costs of public infrastructure improvements (streets and parking). The improvements were constructed by the Developer within the guidelines of the City’s Downtown Design Guidelines and the City’s Downtown Master Plan. The City has performed under the conditions of the agreement through reimbursement of infrastructure, as well as fee waivers (with approximately $68,953.00 spent and $8,772.00 remaining of the $77,725.00 authorized in the agreement). The City also purchased the County’s parking lot directly North of the site and dedicated 100 parking spots for 30 years to the Monument, in order to satisfy its parking requirements. The market value of 100 parking spaces in downtown for the next 20 years is $480,000.00 ($240.00/space/year = $24,000.00/year x 20 years (through 2035)). Market value of 100 parking spaces provided for the past 10 years is $240,000.00. In addition, the City, at its cost, provided underground utilities and free use of regional stormwater detention to support the project. City also constructed the pedestrian crossing signal on Austin Avenue in 2013. The Developer has not constructed and does not plan to construct, the office/retail, the expansion of the specialty office/retail or the onsite parking that were components of the agreement. As a result of this anticipated default and material breach of the performance agreement, the City and GTEC have no future obligation to perform. The remaining fee waivers and the parking commitment will terminate on April 1, 2015. The current agreement (as amended) provides for a “clawback” payment from the Developer of 20% of the total GTEC reimbursement, or approximately $189,672.00 (reduced from the 100% cost reimbursement obligation should the Developer fail to complete the construction of the Project as indicated in the 2005 original agreement).The 20% clawback is effective if the Project is not constructed by March 31, 2015. The Developer has requested that the development agreement be amended to eliminate the requirement to construct any future improvements on the subject property, and that the clawback provision be eliminated based upon their economic impact to the City. In addition, the Developer requests that the City continue to provide the 100 parking spaces on the site to the north for the remaining 30-year period (sunset date September 30, 2035). Options for GTEC to consider: 1. Recommend the Council amend the agreement as requested. This would excuse future development obligations and repayment of the clawback. If this option is chosen, staff recommends a full termination of the agreement to clarify that no future obligation is due for either party. City parking commitment and remaining fee waivers would be terminated. 2. Recommend that Council deny the change to the agreement as requested. If this option is chosen, the clawback would be enforced. Development obligations will still be in default as of April 1, so at that time City parking commitment and remaining fee waivers would be excused. 3. Other options as deemed appropriate by GTEC and Council. A History of Agreements is Provided for Reference: Following is a summary of the terms of the original Development Agreement and the four subsequent amendments. Original Development Agreement - August 9, 2005 Developer Obligations Construct 2 New Buildings - retail fronting Austin Avenue; office building fronting Rock. Redevelop 2 Existing Buildings. parking area - 79 spaces (38 street, 41 site). Construct Public Improvements. Landscape and Maintain. Begin construction of Phase 1 by May 31, 2006 and related Public Improvements- complete in 3 years. Begin construction of Phase 2 by May 31, 2007 and related Public Improvements - complete in 3 years. Default -- clawback for all funding. City Obligations GTEC reimbursement of cost of Public Improvements - not to exceed $506,000. fee waivers -- up to $109,481 total (only for listed fees but may "reallocate"). provide parking -- 100 spaces for 30 years. provide underground utilities. provide free use of regional stormwater detention. First Amendment - October 9, 2007 Project Scope modified: Phase 1 requires Restaurant only -- no Retail. Phase 2 includes remainder. Project Schedule modified Begin construction by March 31, 2006 to be reimbursed for Public Improvements. Phase 1 construction complete by March 21, 2009. Extended Phase 2 completion from May 31, 2010 to March 31, 2012. Clawback modified to Phases. Second Amendment - June 10, 2008 Project Scope modified Parking moved to Phase 3. Project Schedule modified Accelerated completion of Phase 2 Public Improvements to August 31, 2009. Phase 3 completed by March 31, 2015. Project Funding modified Add $227,000 to GTEC funding (for same Public Improvements)- total not to exceed $733,000. Third Amendment - August 27, 2009 Project Scope modified 1 New Building fronting Austin Avenue. Redevelop and expand 2 Existing Buildings - Monument Café (complete) and food/retail. Project Schedule modified Extended Phase 2 completion. Complete construction of 1 Building of Phase 2 and Phase 2 Public Improvements by August 31, 2012. Complete construction of last Building of Phase 2 by March 31, 2015. Parking moved to Phase 2. Fourth Amendment - February 14, 2011 Project Scope Remaining obligations - new building (retail/office) fronting Austin Avenue; parking. Crosswalks transferred from the Tamiro Plaza Project. City agrees to pedestrian crossing signal by June 2013. Project Schedule modified Public Improvements completed by August 31, 2011 (modified clawback). Project Funding modified Add $199,607 to GTEC funding (for the same Public Improvements) - total not to exceed $948,361. Transfer GTEC funds from Tamiro Plaza for crosswalks - $15,754. Clawback modified 20% of total amount of Cost Reimbursement actually reimbursed to Developer. FINANCIAL IMPACT: See Item Summary. SUBMITTED BY: Jana Kern for Laurie Brewer ATTACHMENTS: Description Type Letter from Developer Backup Material 4th Amendment to Development Agreement Backup Material Aug 2014 Notice from City on upcpoming deadline Backup Material Current Status of Fee Waivers (Spreadsheet) Backup Material Exhibit E Fee Waivers Development and Construction Fees by City 2005 Original Dev Agr Fee Waivers Fee Waivers Received to Date (2005 fees/ compl) Subdivision Review Preliminary Plat 785 785 Amending Plat 300 Fire Services Review 100 100 Final Plat 650 650 Plat Recordation 218 218 Recording Fees charged by County Clerk Construction Plan 100 100 City cannot waive Fire Services Review 100 100 Total Subdivision Review 1953 1953 300 Site Plan Review Site Plan Review Commercial (Café)Commercial (Café) completed Site Plan Review 390 390 CDC - Site w/ Bldg 250 Fire Services Review 250 250 CDC - Amend Master Sign Permit 75 75 Sign Plan 150 Commercial (Market)Commercial (Market & Austin Ave Retail Office) Site Plan Review 390 Site Plan Review Fire Services Review 250 Market 725 Sign Permit 75 Retail/ Office 725 Commercial (Austin Avenue Retail/ Office) Site Construction Plans Site Plan Review 390 Market 300 Fire Services Review 250 Retail/ Office 300 Sign Permit 75 Add'l Sign permits Commercial (Rock Street Office) Estimate 2 @ 75 ea. 150 Site Plan Review 390 Fire Services Review 250 Sign Permit 75 Total Site Plan Review 2860 715 2900 Construction Permits/ Utility Fees Construction Permits/ Utility Fees Commercial (Café)Commercial (Café) completed Construction Permit (estimated) 1126 777.2 Plan Review 663 388.6 Fire Services Review 250 250 Fire Alarm/ Sprinkler 275 275 Hood Suppression System Plan 125 125 2011 Revised/ Proposed Fee Waivers (2011 Fees) 2/12/2015 500 S. Austin Ave., LP 4th Amendment to the Development Agreement Exhibit E Fee Waivers Development and Construction Fees by City 2005 Original Dev Agr Fee Waivers Fee Waivers Received to Date (2005 fees/ compl) 2011 Revised/ Proposed Fee Waivers (2011 Fees) Certificate of Occupancy 80 80 Demolition 115 115 Water Meter Connect - 1"500 500 Impact Fee 6941 8677 Eng. & Inspect Fee (.20/ sq. ft.) 1000 1318 Sewer Tap - 8"650 650 Eng. & Inspect Fee (.06/ sq. ft.)300 395.4 Electrical 400 amp, 3 phase 2500 2500 Total Café Permit/ Util Fees 14525 16051.2 Commercial (Market)Commercial (Market) Construction Permit (estimated) 1760 Permit - remodel on 1090 est. 10,500 sq ft Plan Review 980 545 Fire Services Review 250 250 Fire Alarm/ Sprinkler 275 275 Hood Suppression System Plan 125 125 Certificate of Occupancy 80 80 Demolition 115 115 Water Meter Connect - 1"500 500 Impact Fee 6941 8677 Eng. & Inspect Fee (.20/ sq. ft.) 2100 1000 Sewer Tap - 8"650 650 Eng. & Inspect Fee (.06/ sq. ft.)630 300 Electrical 800 amp, 3 phase estimated 5000 5000 Total Market Permit/ Util Fees 19406 18607 Commercial (Austin Ave retail/ office)Commercial (Austin Ave retail/ office) Construction Permit (estimated) 2137 Construction Permit 2137 estimated/ no plans available estimated/ no plans available Plan Review 1169 1169 Fire Services Review 250 250 Fire Alarm/ Sprinkler 275 275 Hood Suppression System Plan 125 125 Demolition 115 115 Water Meter Connect - 1"500 500 Impact Fee 6941 8677 Eng. & Inspect Fee (.20/ sq. ft.) 1300 2100 Sewer Tap - 8"650 650 2/12/2015 500 S. Austin Ave., LP 4th Amendment to the Development Agreement Exhibit E Fee Waivers Development and Construction Fees by City 2005 Original Dev Agr Fee Waivers Fee Waivers Received to Date (2005 fees/ compl) 2011 Revised/ Proposed Fee Waivers (2011 Fees) Eng. & Inspect Fee (.06/ sq. ft.)390 300 Electrical 1200 amp, 3 phase 7500 7500 Total Austin Ave retail/ office 21352 23798 Commercial (Courtyard) Permit (estimated)719 Plan Review 460 Demolition 115 Electrical 1200 amp, 3 phase 1550 Total Courtyard Permit/ Util Fees 2844 Commercial (Rock Street Office)Commercial (Rock Street Office) Construction Permit (estimated) 2828 Revised to parking lot Plan Review 1514 no permit/ util fees Fire Services Review 250 Fire Alarm/ Sprinkler 275 Demolition 115 Water Meter Connect - 11/2"650 Impact Fee 13879 Eng. & Inspect Fee (.20/ sq. ft.) 2600 Sewer Tap - 8"650 Eng. & Inspect Fee (.06/ sq. ft.)780 Electrical 1200 amp, 3 phase 7500 Total Austin Ave retail/ office 31041 Electrical Connect Fees (500 KVA transformer, 3 phase, 480/227V) 15500 15500 Transformer Pad Installation actual cost of labor and materials TBD TBD Regional Detention/ Water Quality Facility TBD TBD TOTAL FEE WAIVERS $109,481.00 $18,719.20 $60,805.00 2/12/2015 500 S. Austin Ave., LP 4th Amendment to the Development Agreement Exhibit E Fee Waivers Development and Construction Fees by CityDevelopment and Construction Fees by CityDevelopment and Construction Fees by CityDevelopment and Construction Fees by City 2005 Original Dev 2005 Original Dev 2005 Original Dev 2005 Original Dev Agr Fee WaiversAgr Fee WaiversAgr Fee WaiversAgr Fee Waivers Fee Waivers Received Fee Waivers Received Fee Waivers Received Fee Waivers Received to Dateto Dateto Dateto Date Fees Fees Fees Fees AssessedAssessedAssessedAssessed Fees Fees Fees Fees WaivedWaivedWaivedWaived Fees Fees Fees Fees PaidPaidPaidPaid (2005 fees/ compl)(2005 fees/ compl)(2005 fees/ compl)(2005 fees/ compl) Subdivision ReviewSubdivision ReviewSubdivision ReviewSubdivision Review Preliminary Plat 785 785 Amending Plat 300 Fire Services Review 100 100 Final Plat 650 650 Plat Recordation 218 218 Recording Fees charged by County Clerk Construction Plan 100 100 City cannot waive Fire Services Review 100 100 Total Subdivision Review Total Subdivision Review Total Subdivision Review Total Subdivision Review 1953195319531953 1953195319531953 300300300300 $0.00 Site Plan ReviewSite Plan ReviewSite Plan ReviewSite Plan Review Site Plan ReviewSite Plan ReviewSite Plan ReviewSite Plan Review Commercial (Café)Commercial (Café) completedCommercial (Café) completedCommercial (Café) completedCommercial (Café) completed Site Plan Review 390 390 CDC - Site w/ Bldg 250 $523.00 $544.45$544.45$544.45$544.45 Fire Services Review 250 250 CDC - Amend Master $250.00 $250.00 Sign Permit 75 75 Sign Plan 150 $150.00 $150.00$150.00$150.00$150.00 Commercial (Market)Commercial (Market & Austin Ave Retail Office)Commercial (Market & Austin Ave Retail Office)Commercial (Market & Austin Ave Retail Office)Commercial (Market & Austin Ave Retail Office) Site Plan Review 390 Site Plan Review Fire Services Review 250 Market 725 Sign Permit 75 Retail/ Office 725 $375.00 $375.00$375.00$375.00$375.00 Commercial (Austin Avenue Retail/ Office) Site Construction Plans Site Plan Review 390 Market 300 Fire Services Review 250 Retail/ Office 300 Sign Permit 75 Add'l Sign permits Commercial (Rock Street Office) Estimate 2 @ 75 ea.150 Site Plan Review 390 Not Applicable Fire Services Review 250 Removed from project in 4th Amendment Sign Permit 75 Total Site Plan Review Total Site Plan Review Total Site Plan Review Total Site Plan Review 2860286028602860 715715715715 2900290029002900 $1,319.45$1,319.45$1,319.45$1,319.45 Construction Permits/ Utility FeesConstruction Permits/ Utility FeesConstruction Permits/ Utility FeesConstruction Permits/ Utility Fees Construction Permits/ Utility FeesConstruction Permits/ Utility FeesConstruction Permits/ Utility FeesConstruction Permits/ Utility Fees Commercial (Café)Commercial (Café)Commercial (Café)Commercial (Café)Commercial (Café) completed Construction Permit (estimated) 1126 777.2 $85.00 $85.00 Plan Review 663 388.6 Fire Services Review 250 250 Fire Alarm/ Sprinkler 275 275 $275.00 $275.00 Hood Suppression System Plan 125 125 $125.00 $125.00 Certificate of Occupancy 80 80 $80.00 $80.00 Demolition 115 115 $115.00 $115.00 Water Meter Connect - 1"500 500 $300.00 $300.00 Impact Fee 6941 8677 Eng. & Inspect Fee (.20/ sq. ft.) 1000 1318 Sewer Tap - 8"650 650 Eng. & Inspect Fee (.06/ sq. ft.)300 395.4 Electrical 400 amp, 3 phase 2500 2500 $2,500.00 Total Café Permit/ Util Fees Total Café Permit/ Util Fees Total Café Permit/ Util Fees Total Café Permit/ Util Fees 14525145251452514525 16051.216051.216051.216051.2 $3,480.00$3,480.00$3,480.00$3,480.00 Commercial (Market)Commercial (Market)Commercial (Market)Commercial (Market)Commercial (Market)Commercial (Market)Commercial (Market)Commercial (Market) Construction Permit (estimated) 1760 Permit - remodel on 1090 $285.00 $285.00 est. 10,500 sq. ft. Plan Review 980 545 Fire Services Review 250 250 Fire Alarm/ Sprinkler 275 275 Hood Suppression System Plan 125 125 Certificate of Occupancy 80 80 $80.00 $80.00 Demolition 115 115 Water Meter Connect - 1"500 500 $2,750.00 $2,750.00 Impact Fee 6941 8677 $7,649.23 $7,649.23 Eng. & Inspect Fee (.20/ sq. ft.) 2100 1000 Sewer Tap - 8"650 650 2011 Revised/ Proposed Fee Waivers2011 Revised/ Proposed Fee Waivers2011 Revised/ Proposed Fee Waivers2011 Revised/ Proposed Fee Waivers (2011 Fees)(2011 Fees)(2011 Fees)(2011 Fees) (as of 5/07/2014 - ADQ)(as of 5/07/2014 - ADQ)(as of 5/07/2014 - ADQ)(as of 5/07/2014 - ADQ) 2/12/2015 500 S. Austin Ave., LP 4th Amendment to the Development Agreement Exhibit E Fee Waivers Development and Construction Fees by CityDevelopment and Construction Fees by CityDevelopment and Construction Fees by CityDevelopment and Construction Fees by City 2005 Original Dev 2005 Original Dev 2005 Original Dev 2005 Original Dev Agr Fee WaiversAgr Fee WaiversAgr Fee WaiversAgr Fee Waivers Fee Waivers Received Fee Waivers Received Fee Waivers Received Fee Waivers Received to Dateto Dateto Dateto Date Fees Fees Fees Fees AssessedAssessedAssessedAssessed Fees Fees Fees Fees WaivedWaivedWaivedWaived Fees Fees Fees Fees PaidPaidPaidPaid2011 Revised/ Proposed Fee Waivers2011 Revised/ Proposed Fee Waivers2011 Revised/ Proposed Fee Waivers2011 Revised/ Proposed Fee Waivers (2011 Fees)(2011 Fees)(2011 Fees)(2011 Fees) (as of 5/07/2014 - ADQ)(as of 5/07/2014 - ADQ)(as of 5/07/2014 - ADQ)(as of 5/07/2014 - ADQ) Eng. & Inspect Fee (.06/ sq. ft.)630 300 Electrical 800 amp, 3 phase - estimated 5000 5000 $5,000.00 Total Market Permit/ Util Fees Total Market Permit/ Util Fees Total Market Permit/ Util Fees Total Market Permit/ Util Fees 19406194061940619406 18607186071860718607 $15,764.23$15,764.23$15,764.23$15,764.23 Commercial (Austin Ave retail/ office)Commercial (Austin Ave retail/ office)Commercial (Austin Ave retail/ office)Commercial (Austin Ave retail/ office)Commercial (Austin Ave retail/ office)Commercial (Austin Ave retail/ office)Commercial (Austin Ave retail/ office)Commercial (Austin Ave retail/ office) Construction Permit (estimated) 2137 Construction Permit 2137 estimated/ no plans available estimated/ no plans available Plan Review 1169 1169 Fire Services Review 250 250 Fire Alarm/ Sprinkler 275 275 Hood Suppression System Plan 125 125 Demolition 115 115 Water Meter Connect - 1"500 500 Impact Fee 6941 8677 Eng. & Inspect Fee (.20/ sq. ft.) 1300 2100 Sewer Tap - 8"650 650 Eng. & Inspect Fee (.06/ sq. ft.)390 300 Electrical 1200 amp, 3 phase 7500 7500 $7,500.00 Total Austin Ave retail/ office Total Austin Ave retail/ office Total Austin Ave retail/ office Total Austin Ave retail/ office 21352213522135221352 23798237982379823798 $7,500.00$7,500.00$7,500.00$7,500.00 Commercial (Courtyard)Commercial (Courtyard)Commercial (Courtyard)Commercial (Courtyard) Permit (estimated)719 $95.00 Plan Review 460 $25.00 Demolition 115 Electrical 1200 amp, 3 phase 1550 $1,550.00 Total Courtyard Permit/ Util Fees Total Courtyard Permit/ Util Fees Total Courtyard Permit/ Util Fees Total Courtyard Permit/ Util Fees 2844284428442844 $1,670.00$1,670.00$1,670.00$1,670.00 Commercial (Rock Street Office)Commercial (Rock Street Office)Commercial (Rock Street Office)Commercial (Rock Street Office)Commercial (Rock Street Office)Commercial (Rock Street Office)Commercial (Rock Street Office)Commercial (Rock Street Office) Construction Permit (estimated) 2828 Revised to parking lot Plan Review 1514 no permit/ util fees Fire Services Review 250 Fire Alarm/ Sprinkler 275 Demolition 115 Not Applicable Water Meter Connect - 11/2"650 Removed from project in 4th Amendment Impact Fee 13879 Eng. & Inspect Fee (.20/ sq. ft.) 2600 Sewer Tap - 8"650 Eng. & Inspect Fee (.06/ sq. ft.)780 Electrical 1200 amp, 3 phase 7500 Total Austin Ave retail/ office Total Austin Ave retail/ office Total Austin Ave retail/ office Total Austin Ave retail/ office 31041310413104131041 Electrical Connect Fees (500 KVA transformer, 3 phase, 480/227V) 15500 15500 $15,500.00 Transformer Pad Installation actual cost of labor and materials TBD TBD $23,719.55 Regional Detention/ Water Quality Facility TBD TBD $0.00 $0.00 TOTAL FEE WAIVERS TOTAL FEE WAIVERS TOTAL FEE WAIVERS TOTAL FEE WAIVERS $109,481.00$109,481.00$109,481.00$109,481.00 $18,719.20$18,719.20$18,719.20$18,719.20 $60,805.00$60,805.00$60,805.00$60,805.00 $13,042.23$13,042.23$13,042.23$13,042.23 $68,953.23$68,953.23$68,953.23$68,953.23 $0.00$0.00$0.00$0.00 TOTAL (excluding Rock St Office Bldg.)TOTAL (excluding Rock St Office Bldg.)TOTAL (excluding Rock St Office Bldg.)TOTAL (excluding Rock St Office Bldg.) $77,725.00$77,725.00$77,725.00$77,725.00 $68,953.23$68,953.23$68,953.23$68,953.23 2/12/2015 500 S. Austin Ave., LP 4th Amendment to the Development Agreement Development Applications and Building Permits Received to dateDevelopment Applications and Building Permits Received to dateDevelopment Applications and Building Permits Received to dateDevelopment Applications and Building Permits Received to date Development ApplicationsDevelopment ApplicationsDevelopment ApplicationsDevelopment Applications CDC-2005-008 CDC-2007-012 - Infill construction and height exception CDC-2008-013 - Master Sign Plan $15.00 CDC-2009-017 - Façade and Site Changes $50.00 CDC-2010-022 - Landscape Feature $25.00 CDC-2011-006 - Site Changes including fenced outdoor seating area and urban garden $25.00 CDC-2011-011 CDC-2011-026 - New fence $25.00 CDC-2011-028 - Sign $25.00 CDC-2013-025 - Bandstand $265.00 CDC-2013-041 - ATM Signage $31.00 CON-2007-085 - $133.00 CON-2008-006 - FP-2009-030 - Amending Plat (Expired)$250.00 FP-2013-033 - Amending Plat $315.00 SP-2007-018 - Site Plan $661.45 TotalTotalTotalTotal $1,820.45$1,820.45$1,820.45$1,820.45 Building PermitsBuilding PermitsBuilding PermitsBuilding Permits Monument Café 2006002792 - Demolition $150.00 2008000068 - Remodel $95.00 2008001412 - Fire Suppression/Alarm $275.00 2008002384 - Fire Suppression/Alarm $125.00 2008002858 - Fire Suppression/Alarm $25.00 2008002953 - Sign Permit $75.00 2009000055 - Electrical $35.00 Biergarten (Courtyard?) 2011001433 - Biergarten $1,645.00 2011002687 - Sign $75.00 2011002697 - Fence $25.00 Monument Market 2011000515 - Monument Market - Commercial Remodel Unit 205 $12,234.23 2011001208 - Monument Market - Sign $75.00 2011001520 - Monument Market - Sign $225.00 2011001523 - Monument Market - Sign $75.00 TotalTotalTotalTotal $15,134.23$15,134.23$15,134.23$15,134.23 Electrical FeesElectrical FeesElectrical FeesElectrical Fees Café Building, Dev at 4th St and Austin, Streetlights $30,298.90 Market, Beer garden and Facilities for comm bldg. at Austin and 5th $25,470.65 TotalTotalTotalTotal $55,769.55$55,769.55$55,769.55$55,769.55 File Status Application ID #Appl. Type Appl. Year Application Date Type of File File Location Legal Description or Subdivision Name Legal Description (cont.) Closed CDC-2005-008 CDC 2005 3/28/05 Case File Room City of Georgetown Block 28 Closed CDC-2007-012 CDC 2007 3/19/07 Case File Room City of Georgetown Block 28 Closed CDC-2008-013 CDC 2008 2/26/08 Case File Room City of Georgetown Block 28, Lots 1-8, 1.32 acres Closed CDC-2009-017 CDC 2009 5/21/09 Case File Room City of Georgetown Block 28, Lots 1-8 Closed CDC-2010-022 CDC 2010 9/10/10 Case File Room City of Georgetown Block 28 Closed CDC-2010-022 CDC 2010 9/10/10 Case File Room City of Georgetown Block 28, Lots 1-8 Closed CDC-2011-006 CDC 2011 3/17/11 Case File Room City of Georgetown Block 28, Lots 1-8 Closed CDC-2011-011 CDC 2011 5/19/11 Case File Room City of Georgetown Block 23 Closed CDC-2011-026 CDC 2011 8/18/11 Case File Room City of Georgetown Block 25, Lots 1-8 Closed CDC-2011-028 CDC 2011 8/18/11 Case File Room City of Georgetown Block 25, Lots 1-8 CON-2007-085 Closed CON-2008-006 CON 2008 2/6/08 Case File Room City of Georgetown Block 28, Lots 1-8 Closed DA-2005-003 DA 2005 9/9/05 Case File Room City of Georgetown Block 28 Open FP-2009-030 FP 2009 10/27/09 Case File Room City of Georgetown Block 28, Lots 1-8, 1.32 ac Closed SP-2007-018 SP - mylar 2007 12/31/07 DDP/Site O Monument Café City of Georgetown, Block 28, Lots 1 - 8 File Status Application ID # Closed CDC-2005-008 Closed CDC-2007-012 Closed CDC-2008-013 Closed CDC-2009-017 Closed CDC-2010-022 Closed CDC-2010-022 Closed CDC-2011-006 Closed CDC-2011-011 Closed CDC-2011-026 Closed CDC-2011-028 CON-2007-085 Closed CON-2008-006 Closed DA-2005-003 Open FP-2009-030 Closed SP-2007-018 Common Project Name or Cross-Reference Address Notes 500 South Austin Avenue 500 South Austin Avenue 500 South Austin Avenue 500 South Austin Avenue Xref: Monument Café Site 500 South Austin Avenue Monument Café 500 S. Austin Ave green wall Monument Café 500 S. Austin Ave. Site Changes/Fence Monument Market Sign 500 S. Austin Ave. Monument 500 S. Austin Ave. New Fence Monument 500 S. Austin Ave. New Sign 500 South Austin Avenue/ approved per DM 500 South Austin Avenue 500 South Austin Ave File Status Application ID # Closed CDC-2005-008 Closed CDC-2007-012 Closed CDC-2008-013 Closed CDC-2009-017 Closed CDC-2010-022 Closed CDC-2010-022 Closed CDC-2011-006 Closed CDC-2011-011 Closed CDC-2011-026 Closed CDC-2011-028 CON-2007-085 Closed CON-2008-006 Closed DA-2005-003 Open FP-2009-030 Closed SP-2007-018 Project Manager Approved/ Signed /Recorded Status of Application if not approved Location of Scan Ordinance ## PP or FP Lots RR -- RR 04/26/07 RW 03/27/08 RW 06/25/09 RW 03/27/10 RW 09/27/10 RW 03/24/11 RW 07/28/11 RW 08/25/11 RW 09/14/11 DM TY 08/09/05 -- RW EC 05/19/08 File Status Application ID # Closed CDC-2005-008 Closed CDC-2007-012 Closed CDC-2008-013 Closed CDC-2009-017 Closed CDC-2010-022 Closed CDC-2010-022 Closed CDC-2011-006 Closed CDC-2011-011 Closed CDC-2011-026 Closed CDC-2011-028 CON-2007-085 Closed CON-2008-006 Closed DA-2005-003 Open FP-2009-030 Closed SP-2007-018 Commercial or Residential Approval Expiration Date (PP/SP)Plat Recorded Document #Missing File To Be Renamed COM -- ----