Loading...
HomeMy WebLinkAboutAgenda_GTEC_02.21.2018Notice of Meeting for the Georgetown Transportation Enhancement Corp of the City of Georgetown February 21, 2018 at 3:30 PM at GMC Building, 300-1 Industrial Av enue, Georgetown, TX 78626 The City o f G eo rgeto wn is committed to comp lianc e with the Americans with Dis abilities Ac t (ADA). If yo u req uire as s is tanc e in participating at a p ublic meeting d ue to a disability, as d efined und er the ADA, reas onab le as s is tance, ad ap tatio ns , or acc o mmo d ations will b e provid ed up o n req uest. P leas e c o ntact the City Sec retary's Office, at leas t three (3) days prior to the sc hed uled meeting d ate, at (512) 930-3652 o r City Hall at 113 Eas t 8th Street fo r add itional info rmation; TTY us ers ro ute through Relay Texas at 711. Regular Session (This Regular S es s io n may, at any time, b e rec es s ed to convene an Exec utive S es s io n fo r any p urpose authorized b y the Op en Meetings Act, Texas Go vernment Co d e 551.) A Call to Ord er B Introduction of Vis itors C Ind ustry/C AMP O/TxDOT Updates D Pres entatio n o f Georgetown Trans p o rtation Enhanc ement Co rp o ration mo nthly financ ial reports for January 2018. Leigh Wallac e, Financ e Direc tor, COG, F inance Manager, GT EC . E Feb ruary 2018 GTEC Updates - Wes ley Wright, P.E., S ystems Engineering Directo r/Mic hael Hallmark, CIP Manager. Legislativ e Regular Agenda F Co nsideration and possible ap p ro val o f the minutes from the January 17, 2018 GT EC Board Meeting. -- David Morgan - General Manager, GTEC Bo ard G Co nsideration and possible recommendatio n to award a c o ntract to Aaro n Concrete Co ntracto rs , LP of Austin, Texas for the c o nstruc tion of the Rivery Blvd. TIA imp ro vements projec t in the amount of $578,384.40 – Wes ley Wright, P.E., Systems Engineering Directo r/Mic hael Hallmark, CIP Manager. CERTIFICATE OF POSTING I, Shelley No wling, C ity S ecretary fo r the C ity of Geo rgeto wn, Texas , d o hereby c ertify that this Notice of Meeting was p o s ted at City Hall, 113 E. 8th Street, a p lace read ily acc es s ible to the general p ublic at all times , on the ______ d ay o f __________________, 2018, at __________, and remained so p o s ted fo r at leas t 72 c o ntinuo us ho urs p receding the sc heduled time o f s aid meeting. ____________________________________ S helley No wling, City Sec retary Page 1 of 29 City of Georgetown, Texas Transportation Enhancement Corp February 21, 2018 SUBJECT: Call to Ord er ITEM SUMMARY: FINANCIAL IMPACT: N/A SUBMITTED BY: Laura Wilkins - Board Liaison Page 2 of 29 City of Georgetown, Texas Transportation Enhancement Corp February 21, 2018 SUBJECT: Intro d uc tion o f Vis ito rs ITEM SUMMARY: FINANCIAL IMPACT: N/A SUBMITTED BY: Laura Wilkins - Board Liaison Page 3 of 29 City of Georgetown, Texas Transportation Enhancement Corp February 21, 2018 SUBJECT: Indus try/CAMPO/T xDOT Up d ates ITEM SUMMARY: FINANCIAL IMPACT: N/A SUBMITTED BY: Laura Wilkins - Board Liaison Page 4 of 29 City of Georgetown, Texas Transportation Enhancement Corp February 21, 2018 SUBJECT: Presentatio n of Geo rgeto wn Transportation Enhancement Corporatio n monthly financial rep o rts fo r January 2018. Leigh Wallace, F inance Direc to r, C OG, Financ e Manager, GTEC. ITEM SUMMARY: The Bylaws o f GTEC (Article V, S ectio n 6.02) req uire the F inance Manager to rep o rt the financ ial ac tivity o f the Corporation to the Bo ard . • Financ ial rep o rts • Sales Tax revenues • Any other relevant financ ial info rmation Sales tax is rec eived two months in arrears; therefo re the revenues reflect only the amo unt received , not actually earned, as o f the rep o rt d ate. A repo rt o n p ayments mad e to vendo rs for the month of January is als o includ ed. FINANCIAL IMPACT: N/A SUBMITTED BY: Leigh Wallace, Financ e Directo r, COG, Financ e Manager, GTEC ATTACHMENTS: Description Type JAN 2018 REPORT Backup Material Page 5 of 29 Meeting Date February 21, 2018 Item No. _________ GEORGETOWN TRANSPORTATION ENHANCEMENT CORPORATION AGENDA ITEM COVER SHEET SUBJECT: Presentation of Georgetown Transportation Enhancement Corporation monthly financial reports for January 2018. Leigh Wallace, Finance Director, COG, Finance Manager, GTEC. ITEM SUMMARY: The Bylaws of GTEC (Article V, Section 6.02) require the Finance Manager to report the financial activity of the Corporation to the Board. • Financial reports • Sales Tax revenues • Any other relevant financial information Sales tax is received two months in arrears; therefore the revenues reflect only the amount received, not actually earned, as of the report date. A report on payments made to vendors for the month of January is also included. ATTACHMENTS: Monthly Financial Report Sales Tax History Disbursement Report SUBMITTED BY: Leigh Wallace Finance Manager, GTEC Finance Director, COG Page 6 of 29 APPROVED BUDGET CURRENT PERIOD YEAR YO DATE (W/ENCUMB) YEAR-END PROJECTION BEGINNING FUND BALANCE 22,051,111 22,051,111 Operating Revenue Sales Tax 6,575,000 506,015 1,024,981 6,575,000 PID Assessments 553,201 - - 553,201 Interest 127,000 8,776 70,249 127,000 Operating Revenue Total 7,255,201 514,791 1,095,230 7,255,201 Operating Expenditure - Administrative Support 364,814 30,276 121,104 364,814 Operating Expenditure Total 364,814 30,276 121,104 364,814 TOTAL NET OPERATIONS 6,890,387 484,515 974,126 6,890,387 Non-Operating Revenue Other Grant Revenue - 11,222 11,222 - Non-Operating Revenue Total - 11,222 11,222 - Non-Operating Expenditure Pecan Center Dr to Airport Rd (FY15)5,390,290 4,676 195,573 5,390,290 Rivery TIA Improvements 1,016,790 - 872 1,016,790 FM 971 / Fontana 66,431 - - 66,431 Rivery-Extension Williams Dr to NW Blvd (FY16)767,678 871 23,443 767,678 IH 35 / HWY29 Intersection 650,000 - - 650,000 SH 29 to RM 2243 SW Bypass - 584 205,376 (205,376) SW Bypass 2243 to IH35 333,962 - - 333,962 FM1460 Widening 501,260 - 121 501,260 Wolf Ranch Pkwy Extension 283,350 - - 283,350 Mays St 3,252,729 4,282 248,223 3,252,729 Tamiro Improvements 410,000 - - 410,000 Available for Projects TBD 1,643,750 - - 1,643,750 Debt Service 3,330,135 - - 3,330,135 Non-Operating Expenditure Total 17,646,375 10,413 673,608 17,646,375 TOTAL NET NON-OPERATIONS (17,646,375) 809 (662,386) (17,646,375) EXCESS (DEFICIENCY) OF TOTAL REVENUE OVER TOTAL REQUIREMENTS (10,755,988) 485,324 311,740 (10,755,988) ENDING FUND BALANCE 11,295,123 11,295,123 RESERVES Contingency 1,643,750 1,643,750 Reserved Bond Proceeds 4,150,000 4,150,000 Reserves Total 5,793,750 5,793,750 AVAILABLE FUND BALANCE 5,501,373 5,501,373 Georgetown Transportation Enhancement Corporation Fund Year-End Projection to Approved: Jan FY2018 Page 7 of 29 Variance % Var. Month [a]2013-14 2014-15 2015-16 2016-17 2017-18 To FY 17 To FY 17 Oct 367,451 392,374 424,201 458,993 497,912 38,919 7.82% Nov 398,208 411,566 451,065 500,856 508,257 7,401 1.46% Dec 538,728 575,095 592,798 642,167 Jan 357,430 350,778 386,252 440,023 Feb 347,604 356,428 432,468 422,226 Mar 457,421 495,804 533,967 549,206 Apr 424,007 410,683 435,906 469,044 May 450,289 382,794 481,672 500,753 Jun 493,224 522,356 571,069 605,936 Jul 409,739 435,977 478,136 619,557 Aug 392,059 411,552 530,326 491,386 Sep 477,892 500,805 541,513 575,588 Total 5,114,052$ 5,246,212$ 5,859,373$ 6,275,735$ 1,006,169$ 46,320$ 4.60% YTD 765,659$ 803,940$ 875,266$ 959,849$ 1,006,169$ 46,320$ 4.60%[b] Notes: [a] Sales tax revenue from the State Comptroller is received two months in arrears. [b] YTD compared thru current month. Georgetown Transportation Enhancement Corporation $0.00 $100,000.00 $200,000.00 $300,000.00 $400,000.00 $500,000.00 $600,000.00 $700,000.00 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Re v e n u e s Sales Tax 3 Year Trend 2015-16 2016-17 2017-18 Page 8 of 29 Check Report Summary For the Month Ending January 31, 2018 Atrium Real Estate Services 3,500.00 Pecan Center Dr 3,500.00 Rivery Ext - C.C.Carlton Construction 127,231.15 Retainage 127,231.15 Chiang, Patel & Yerby, Inc 2,229.80 Mays St 2,229.80 Gardere Wynne Sewell LP 3,000.31 SW Bypass SH 29 to 2243 531.00 Rivery Ext 870.92 Mays St 1,598.39 Kasberg, Patrick 2,175.89 Pecan Center Dr / Airport Rd 2,175.89 M & S Engineering 9,025.30 Rivery TIA Improvements 9,025.30 147,162.45 147,162.45 Page 9 of 29 Page 10 of 29 City of Georgetown, Texas Transportation Enhancement Corp February 21, 2018 SUBJECT: February 2018 GT EC Up d ates - Wesley Wright, P.E., Sys tems Engineering Direc tor/Michael Hallmark, CIP Manager. ITEM SUMMARY: February 2018 Cover Sheet Airport Road: Engineering d es ign 100% +: addressing s torm water/water quality, performing environmental investigatio ns fo r c learanc es . WPAP ap p ro ved. Awaiting final 3 parc els to begin letting pro c es s . Set to c lo s e F eb . 2018. FM 1460 ROW & Utility Relocations: All water/was tewater utility relo cates have been c o mp leted and are in servic e Three Utility c ompanies have s ubmitted invoic es for reimb ursement – Atmos Energy, ONCOR and Semino le Pipeline Northwest Boulevard: Engineering und erway: 60% p lans s ubmitted for review, received the fully exec uted AFA 10-20-17 plans s ubmitted to TxDOT fo r review. Engineering c ompletio n s ched uled 1-18, Environmental Clearanc e 2-18/ NEPA C learanc e 3-18 Read y to Let 3-18. Rabbit Hill Road Improvements: Task Order award ed by Co uncil August 9, 2016. C P&Y surveying and identifying utility c o nflic ts alo ng ro ute with Final Des ign P lans fo r review early fall o f 2017. ROW to be p roc ured late 2017 early 2018 Rivery Boulevard - TIA Improvements: Engineering 100% c omplete. Slight modific atio n is being mad e to length of ad d ed lane to fit with exis ting features . Modific ations are als o being mad e to Williams’s d r turn lane to eliminate the need fo r ROW at this lo catio n. TCEQ written WPAP ap p ro val is c omplete for Hintz, Williams and Wo lf Ranc h Pkwy turn lanes . Bid Opening held o n 1-23-2018, M&S Engineering has is s ued Letter o f Rec o mmendatio n. GTAB will cons id er on 2-21-18 Rivery Boulevard Extension: Plans at 100%. WPAP ap p ro ved. Demo lition c ontrac t fo r struc tures in the R OW to be p res ented to Counc il 2/27/18. P ro ject letting p ro cess b egins firs t q uarter 2018. Offers have been made o n 22 parc els . Clo s ed o n 20 parc els . Enviro nmental as s es s ment complete on 11 p arcels. Condemnation proc eed ings have been reques ted o n 2 p arcels. Aggres s ive effo rts continue to close all outstand ing parc els in F Y 2017. FINANCIAL IMPACT: N/A SUBMITTED BY: Wes ley Wright, P.E., S ystems Engineering Direc to r/Mic hael Hallmark, CIP Manager. ATTACHMENTS: Page 11 of 29 Description Type February 2018 GTEC Updates Backup Material Page 12 of 29 February 2018 Cover Sheet Airport Road: Engineering design 100% +: addressing storm water/water quality, performing environmental investigations for clearances. WPAP approved. Awaiting final 3 parcels to begin letting process. Set to close Feb. 2018. FM 1460 ROW & Utility Relocations: All water/wastewater utility relocates have been completed and are in service Three Utility companies have submitted invoices for reimbursement – Atmos Energy, ONCOR and Seminole Pipeline Northwest Boulevard: Engineering underway: 60% plans submitted for review, received the fully executed AFA 10-20-17 plans submitted to TxDOT for review. Engineering completion scheduled 1-18, Environmental Clearance 2-18/ NEPA Clearance 3-18 Ready to Let 3-18. Rabbit Hill Road Improvements: Task Order awarded by Council August 9, 2016. CP&Y surveying and identifying utility conflicts along route with Final Design Plans for review early fall of 2017. ROW to be procured late 2017 early 2018 Rivery Boulevard - TIA Improvements: Engineering 100% complete. Slight modification is being made to length of added lane to fit with existing features. Modifications are also being made to Williams’s dr turn lane to eliminate the need for ROW at this location. TCEQ written WPAP approval is complete for Hintz, Williams and Wolf Ranch Pkwy turn lanes. Bid Opening held on 1-23-2018, M&S Engineering has issued Letter of Recommendation. GTAB will consider on 2-21-18 Rivery Boulevard Extension: Plans at 100%. WPAP approved. Demolition contract for structures in the ROW to be presented to Council 2/27/18. Project letting process begins first quarter 2018. Offers have been made on 22 parcels. Closed on 20 parcels. Environmental assessment complete on 11 parcels. Condemnation proceedings have been requested on 2 parcels. Aggressive efforts continue to close all outstanding parcels in FY 2017. Page 13 of 29 Airport Road (Lakeway Blvd. to Aviation Dr.) February 2018 Project Description Expand Airport Road to 5 lanes (2 northbound, 2 southbound, & center turn lane). Purpose This project will relieve congestion on Airport Road, facilitate economic growth in the area, and improve the flow of traffic at the Lakeway intersection Project Manager Joel Weaver and Wesley Wright, P.E. Engineer KPA Engineers Element Status / Issues Design Engineering design 100% +: addressing storm water/water quality, performing environmental investigations for clearances. Row docs ready with ROW procurement underway. WPAP approved. Awaiting final 3 parcels to begin letting process. The scope of the project has been slightly altered, ending just north of Aviation Drive. This will facilitate an expedited schedule and help avoid costly and time consuming condemnation proceedings. Environmental/ Archeological Complete Rights of Way Procurement underway, offers made on all properties. 2 closed, 3 parcels preparing to close acquisition (title clearing). Tentative closing 2/23/18. Total Parcels: 5 Acquired: 2 Closing Pending: 3 Condemnation: 0 Utility Relocations Conflicts exist, but appear to be minimal. Page 14 of 29 Construction Fiscal 2017/18 start, pending ROW/easements. Other Issues All ROW will be expanded to the east as a result of Airport/Federal complications. Page 15 of 29 FM 1460 (Quail Valley Drive to University Drive) Project No. 5RB TIP No. BO & CD Rights-of-Way Acquisition and Utility Relocation January 2018 Project Description Acquisition of ROW and relocation of utilities for the FM 1460 Project (Quail Valley Drive to University Drive). Purpose To have all ROWs cleared and utilities prior to TxDOT letting the project for construction. Project Managers Ed Polasek, AICP, and Michael Hallmark Engineer Brown and Gay Engineers, Inc. Element Status / Issues Design Complete Environmental/ Archeological Complete Rights of Way Right of way acquisition complete. Section: North South Acquired: 36 8 Pending: 0 - Condemnation: 0 - Total: 36 8 Utility Relocations Final water line tie in completed and all utility work completed Three Utility companies have submitted invoices for reimbursement – Atmos Energy, ONCOR and Seminole Pipeline Construction Under Construction, with TxDOT oversight. Tentatively scheduled to be complete Spring 2018. All City utilities have been relocated and are in service Other Issues Engineer preparing Change Orders for construction contract. Page 16 of 29 Northwest Boulevard (Fontana Drive to Austin Avenue) Project No. 5QX TIP No. AF February 2018 Project Description Construction of overpass and surface roads to connect Northwest Boulevard with Austin Avenue and FM 971. Purpose This project will relieve congestion at the Austin Avenue/Williams Drive intersection and provide a more direct access from the west side of IH 35 corridor to Georgetown High School and SH 130 via FM 971. Project Manager Joel Weaver and Wesley Wright, P.E. Engineer Klotz Associates Element Status / Issues Design Engineering underway: 60% plans submitted for review, received the fully executed AFA 10-20-17 plans submitted to TxDOT for review. . Engineering completion scheduled 1-18, Environmental Clearance 2-18/ NEPA Clearance 3-18 Ready to Let 3-18. Environmental/ Archeological Concurrent with preliminary engineering and schematic design. Rights of Way ROW Documents are being finalized. Preliminary outreach to landowners has been made and appraisal process is underway. Utility Relocations TBD Construction Tentatively scheduled to begin mid-FY 2019. Other Issues Page 17 of 29 Rabbit Hill Road Improvements Project (Westinghouse Road to S. Clearview Drive) Project No. 5RQ TIP No. BZ February, 2018 Project Description Reconstruct Rabbit Hill Road from Westinghouse Road northward to S. Clearview Dr. Widening along Westinghouse Road will also be included in the schematic for additional turning lanes to/from Westinghouse Road. The project length along the anticipated alignment is approximately 0.75 miles Project Managers Ken Taylor and Wesley Wright, P.E. Engineer CP&Y, Inc. Element Status / Issues Design Task Order awarded by Council August 9, 2016 Utility coordination meeting on 2/21/17 Environmental/ Archeological Efforts underway and any issues are expected to be identified in the coming month. Rights of Way ROW to be acquired late 2018, two properties acquired as part of Mays St. Extension. Total Parcels: 9 Possession: 2 Pending: 0 Utility Relocations Will be identified as preliminary design and alignment plans are finalized. Multiple relocations expected – Round Rock water and Georgetown Electric. Construction ROW to be procured late 2018 Other Issues None. Page 18 of 29 Rivery Boulevard (TIA Improvements) Project No. 5RP TIP No. None February 2018 Project Description Develop the Plans, Specifications and Estimate for roadway improvements necessitated by the development for the Summit at Rivery. Purpose To provide improved traffic flow into the Summit at Rivery hotel and conference center from Rivery Boulevard. Project Manager Joel Weaver and Wesley Wright, P.E. Engineer M&S Engineering, LLC Element Status / Issues Design Engineering 100% complete. Slight modification is being made to length of added lane to fit with existing features. Modifications are also being made to Williams Dr turn lane to eliminate the need for ROW at this location. TCEQ written WPAP approval is complete for Hintz, Williams and Wolf Ranch Pkwy turn lanes. Environmental/ Archeology TBD Rights of Way All easements acquired. Total Parcels: 2 Appraised: 0 Offers: 0 Acquired: 2 Closing pending: 0 Condemnation: 0 Utility Relocations TBD Bid Phase Bid Opening held on 1-23-2018, M&S Engineering has issued Letter of Recommendation. GTAB will consider on 2-21-18. Construction TBD Other Issues TBD Page 19 of 29 Rivery Boulevard Extension (Williams Drive to Northwest Boulevard @ Fontana Drive) Project No. 5RM TIP No. AD February 2018 Project Description Develop the Rights-of-Way Map, acquire ROW, address potential environmental issues and complete construction plans specifications and estimate (PS&E) for the extension of Rivery Boulevard from Williams Drive to Northwest Boulevard at Fontana Drive in anticipation of future funding availability. Purpose To provide a route between Williams Drive and Northwest Boulevard serving the Gateway area, providing an alternate route from Williams Drive to the future Northwest Boulevard Bridge over IH 35, to provide a route between the hotels in the Gateway area and the proposed Conference Center near Rivery Boulevard and Wolf Ranch Parkway. Project Manager Travis Baird, Joel Weaver, and Wesley Wright, P.E. Engineer Kasberg Patrick and Associates Element Status / Issues Design Plans at 100%. WPAP approved. Demolition contract for structures in the ROW to be bid 1-25-18. Project letting process begins first quarter 2018. Environmental/ Archeology Complete Rights of Way Offers have been made on 22 parcels, and 20 have closed. Environmental assessment complete on 11 parcels in preparation for demolition. Condemnation proceedings have been requested on 2 parcels. Aggressive efforts continue to close all outstanding parcels in FY 2017. Total Parcels: 22 Appraised: 22 Offers: 22 Acquired: 20 Closing pending: 0 Condemnation: 2 Utility Relocations TBD Construction Tentatively scheduled to begin FY 17/18. Other Issues TBD Page 20 of 29 City of Georgetown, Texas Transportation Enhancement Corp February 21, 2018 SUBJECT: Cons id eration and p o s s ib le approval of the minutes fro m the January 17, 2018 GTEC Bo ard Meeting. -- David Morgan - General Manager, GTEC Board ITEM SUMMARY: FINANCIAL IMPACT: N/A SUBMITTED BY: Laura Wilkins fo r David Mo rgan, General Manager ATTACHMENTS: Description Type GTEC Minutes from 1-17-18 Backup Material Page 21 of 29 Minutes of the Meeting of Georgetown Transportation Enhancement Corporation and the Governing Body of the City of Georgetown, Texas Wednesday, January 17, 2018 The Georgetown Transportation Enhancement Corporation of the City of Georgetown, Texas, met on Wednesday, January 17, 2018 Board Members Present: Jay Warren – President, John Hesser – Vice President,– Secretary, Al Hajka (delayed by traffic, arrived at 3:40 pm), Colin McGahey, Rachael Jonrowe Board Members Absent: Leo Wood, Joe Pondrom Staff Present: David Morgan, Jim Briggs, Mike Babin, Wes Wright, Octavio Garza, Ed Polasek, Wesley Wright Laura Wilkins, Paul Diaz, Michaela Dollar, Elaine Wilson, Glenn Dishong Others Present: Brian Van de Walle – Kimley-Horn and Associates Minutes Regular Session (This Regular Session may, at any time, be recessed to convene an Executive Session for any purpose authorized by the Open Meetings Act, Texas Government Code 551.) A Call to Order: Meeting called to order at 3:32 pm by Warren. The Board may, at any time, recess the Regular Session to convene in Executive Session at the request of the Chair, a Board Member, the City Manager, Assistant City Manager, General Manager of Utilities, City Council Member, or legal counsel for any purpose authorized by the Open Meetings Act, Texas Government Code Chapter 551, and are subject to action in the Regular Session that follows. B Introduction of Visitors C Industry/CAMPO/TXDOT Updates – Edward G. Polasek, AICP – Transportation Planning Coordinator. Polasek gave update. TxDOT has agreed to sponsor a CAMPO grant application for the Leander Road Frontage Road project. Includes work on the bridge abutments. Co-sponsored by Georgetown and W illiamson County. D January, 2018 GTEC Updates - Wesley Wright, P.E.., Systems Engineering Director/Michael Hallmark, CIP Manager. Wright gave updates: Airport Road - right-of-way acquisitions are under way- may be ready to bid in the spring. FM1460 - good progress. NW Blvd – TxDOT plan review – actively pursuing appraisals – hope to bid in the spring. Rabbit Hill – moving slowly. W orking through utility conflicts. Rivery TIA Improvements – out to bid. Rivery Blvd Extension – demolition of existing structures (10 structures) will come forward to the GTAB Board in February for approval. Bidding the actual road construction out in March or April with construction to begin this summer. Page 22 of 29 E Presentation of Georgetown Transportation Enhancement Corporation monthly financial reports for December 2017. Leigh Wallace, Finance Director, COG, Finance Manager, GTEC. . Elaine Wilson gave update in Leigh Wallace’s absence. Legislative Regular Agenda F Consideration and possible action to approve minutes from the regular GTEC Board meeting held November 15, 2017. – David Morgan, City Manager, COG; General Manager – GTEC - MOTION by Hesser, second by McGahey to approve minutes as presented. APPROVED 4-0 (Pondrom and Wood absent. Hajka had not yet arrived) G Consideration and possible action to approve Task Order KHA-18-001 with Kimley-Horn and Associates, Inc. of Georgetown, Texas, for professional services related to the study of traffic signal and driveway access, on SH 29, East of IH 35, in the amount of $43,352.81 -- Edward G. Polasek, AICP, Transportation Planning Coordinator - Polasek presented the item. Brian Van de Walle from Kimley-Horn on his way stuck in traffic on IH-35. Redevelopment was proposed several years ago for this corner. Now need to move the signal sooner. Need to address TxDOT and HEB to move the signal now to prepare for the Wolf Lakes development. Traffic studies and analysis to determine how to move the signal. TxDOT is in favor of the move sooner. The benefit to move now is to provide more storage capacity for cars entering exiting the facility. Question about light synchronization by Warren – answered by Polasek and Briggs. Question about left- hand turns by Jonrowe – answered by Briggs and Morgan. MOTION by Jonrowe, second by Hesser to approve Task Order KHA-18-001 with Kimley-Horn and Associates, Inc. of Georgetown, Texas, for professional services related to the study of traffic signal and driveway access on SH29 east of IH-35, in the amount of $43,352.81. APPROVED 5-0 (Pondrom and Wood absent) ADJOURNMENT Motion by Jonrowe, second by Hesser to adjourn the meeting. APPROVED 5-0 (Pondrom and Wood absent) Meeting adjourned at 4:08 pm. Adjournment Approved: Attest: _______________________ ________________________ Jay Warren- President Joe Pondrom– Secretary _________________________ Laura – Board Liaison Page 23 of 29 City of Georgetown, Texas Transportation Enhancement Corp February 21, 2018 SUBJECT: Cons id eration and p o s s ib le rec o mmendation to award a contrac t to Aaro n C o nc rete Contrac tors, LP of Aus tin, Texas fo r the cons tructio n o f the Rivery Blvd . T IA improvements p ro jec t in the amo unt o f $578,384.40 – Wes ley Wright, P.E., Sys tems Engineering Direc tor/Michael Hallmark, CIP Manager. ITEM SUMMARY: The Rivery Boulevard Traffic Impac t Analys is (T IA) Imp ro vements Projec t was approved in the FY 2015- 2016 GTEC bud get for various roadway improvements stemming from the d evelopment o f the Sheraton Hotel and Conferenc e Center and the Summit at R ivery. This projec t inc lud es c o ns truc ting 3 right turn lanes o n Rivery Blvd at Wolf Ranch Pkwy, Hintz R d and Williams Dr. This p ro ject also inc ludes relo cating 2 fire hydrants , s torm water improvements , traffic lights and p ed es trian fac ilities . This p ro ject was p ublic ly ad vertis ed on January 3, 2018 and January 10, 2018. Eleven (11) firms o b tained p lans. Fro m thes e plan ho ld ers on January 23, 2018 we received five (5) c ompetitive bids. The apparent lo w b id d er fo r the p ro ject was Aaron Co nc rete C o ntracto rs , LP o f Aus tin, Texas with a to tal b id of $578,384.40. Aaron Co nc rete C o ntracto rs provid ed a s ub s tantial lis t o f c o mp leted and c urrent p ro jects , inc luding referenc es . M&S s taff contac ted s everal o f thes e references and fo und that their performance o n s imilar s ize projec ts, and larger, has b een d eemed ac c ep table. Based upon these referenc es and their sub mitted s taff and eq uip ment exhibiting their capac ity to p erfo rm the p ro p o s ed wo rk, it is M&S Engineering’s recommend atio n that Aaro n Concrete Co ntrac tors , LP be awarded the subjec t c ons tructio n contrac t. STAFF RECOMMENDATION: M&S Engineering and s taff rec o mmend award ing the contrac t to Aaro n Co nc rete Contrac tors, LP of Aus tin, Texas fo r the cons tructio n o f the Rivery Blvd . T IA improvements p ro jec t in the amo unt o f $578,384.40 FINANCIAL IMPACT: Funding fo r this projec t is availab le in the GTEC b udget SUBMITTED BY: Chris Po usso n ATTACHMENTS: Description Type Recommendation of Award & Bid Tabulation Backup Material B&FAW Backup Material Project Scope Backup Material Page 24 of 29 FIRM F-1394 102 W. MORROW STE. 101 GEORGETOWN, TX 78626 WWW.MSENGR.COM | (512) 686-3924 January 29, 2018 City of Georgetown 300-1 Industrial Ave. Georgetown, TX 78626 Attention: Chris Pousson Project Manager RE: Rivery Blvd. TIA Improvements Bid No. 201812 Recommendation of Award of Construction Contract Gentlemen: Bids for the subject project were received on Tuesday, January 23, 2018 until 2:00 p.m. They were then opened and publicly read aloud at the City’s offices at 300-1 Industrial Ave. A total of five (5) bids were received with an apparent low bid submitted by Aaron Concrete Contractors, LP (Aaron) of Austin, in the amount of $573,424.40, including alternates. Their alternate for “black base” results in a net increase of $4,960.00, and an amount of $578,384.40. A tabulation of the submitted bids (attached) has been prepared and confirms that either option would result in the low bid amount. Aaron provided a substantial list of completed and current projects, including references. M&S staff contacted several of these references and found that their performance on similar size projects, and larger, has been deemed acceptable. Based upon these references and their submitted staff and equipment exhibiting their capacity to perform the proposed work, it is M&S Engineering’s recommendation that Aaron Concrete Contractors, LP be awarded the subject construction contract. Based upon direction from City staff, the alternate for black base will be accepted. Therefore, the contract award will be in the amount of $578,384.40. Should you have any questions regarding the preceding please contact the undersigned via phone (512.686.3924) or email (swidacki@msengr.com). Sincerely, M&S Engineering, LP Steven D. Widacki, PE Senior Project Manager Attachment Page 25 of 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 ACDEFGHIJKLMNOPQ BID TABULATION M&S ENGINEERING, LLC.Tabulation performed on   01/24/2018   by Steven D. Widacki, P.E. Rivery Blvd. TIA Improve. Line No. Bid Item Unit Estimated Quantity Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount 1 Insurance/Bonds/Move‐In Related Expenses not to exceed  5% of Total Bid LS 1 35,000.00$                         35,000.00$                            38,000.00$                         38,000.00$                          35,000.00$                         35,000.00$                                   31,000.00$                         31,000.00$                         28,000.00$                         28,000.00$                         58,818.00$                         58,818.00$                         2 Trench Safety Plan Preparation LS 1 1,000.00$                            1,000.00$                             498.00$                              498.00$                               800.00$                              800.00$                                        415.00$                               415.00$                               1,000.00$                            1,000.00$                           3,500.00$                            3,500.00$                           3 Trench Safety Plan Implementation LF 154 20.00$                                  3,080.00$                              25.00$                                  3,850.00$                            25.00$                                  3,850.00$                                      1.00$                                    154.00$                               1.00$                                   154.00$                               5.00$                                    770.00$                               4 Barricades, Signs and Traffic Handling LS 1 8,500.00$                            8,500.00$                              35,000.00$                         35,000.00$                          15,000.00$                         15,000.00$                                   13,000.00$                         13,000.00$                         15,000.00$                         15,000.00$                         28,525.00$                         28,525.00$                         5 Right‐of‐way Preparation STA 9 10,000.00$                         90,000.00$                            16,000.00$                        144,000.00$                       9,000.00$                            81,000.00$                                   1,300.00$                            11,700.00$                         5,000.00$                            45,000.00$                         1,200.00$                            10,800.00$                         6 Furnish/Install Concrete Trench Cap LF 115 15.00$                                  1,725.00$                              65.00$                                  7,475.00$                            15.00$                                  1,725.00$                                      29.00$                                  3,335.00$                           50.00$                                  5,750.00$                           25.00$                                  2,875.00$                           7 Furnish/Install/Maintain Silt Fence LF 971 3.00$                                    2,913.00$                              3.00$                                    2,913.00$                            2.00$                                    1,942.00$                                      2.00$                                    1,942.00$                           2.00$                                    1,942.00$                           3.25$                                    3,155.75$                           8 Furnish/Install/Remove Curb Inlet Protection EA 8 75.00$                                 600.00$                                  80.00$                                 640.00$                                70.00$                                 560.00$                                        100.00$                               800.00$                               90.00$                                 720.00$                              175.00$                               1,400.00$                           9 Furnish/Install/Maintain Tree Protection LF 57 3.00$                                   171.00$                                  4.00$                                   228.00$                                2.60$                                   148.20$                                         3.00$                                    171.00$                               3.50$                                   199.50$                              350.00$                               19,950.00$                         10 Remove Existing Concrete Sidewalk SY 405 25.00$                                  10,125.00$                            16.00$                                  6,480.00$                            20.00$                                  8,100.00$                                      8.00$                                    3,240.00$                           20.00$                                  8,100.00$                           13.00$                                  5,265.00$                           11 Remove Existing Concrete Curb‐and‐Gutter LF 871 5.00$                                    4,355.00$                              10.00$                                  8,710.00$                            5.00$                                    4,355.00$                                      8.00$                                    6,968.00$                           9.00$                                    7,839.00$                           8.00$                                    6,968.00$                           12 Block Sodding SY 547 9.00$                                    4,923.00$                              9.00$                                    4,923.00$                            5.00$                                    2,735.00$                                      8.00$                                    4,376.00$                           10.00$                                  5,470.00$                           6.00$                                    3,282.00$                           13 Adjust/Relocate Irrigation System components in conflict  with proposed improvements LS 2 2,500.00$                            5,000.00$                              4,000.00$                            8,000.00$                            4,100.00$                            8,200.00$                                      1,000.00$                            2,000.00$                           4,500.00$                            9,000.00$                           5,000.00$                            10,000.00$                         14 HMAC Pavement (4‐Inch Thick.)SY 710 50.00$                                  35,500.00$                            38.00$                                  26,980.00$                          35.00$                                  24,850.00$                                   40.00$                                  28,400.00$                         35.00$                                  24,850.00$                         28.00$                                  19,880.00$                         15 Flexible Base (18‐Inch Thick.)SY 992 50.00$                                  49,600.00$                            51.00$                                  50,592.00$                          40.00$                                  39,680.00$                                   79.00$                                  78,368.00$                        110.00$                              109,120.00$                      50.00$                                  49,600.00$                         16 Thermoplastic Striping (4” White, Broken)LF 210 2.00$                                   420.00$                                  1.00$                                   210.00$                                1.60$                                   336.00$                                         2.00$                                    420.00$                               1.75$                                   367.50$                               1.70$                                    357.00$                               17 Thermoplastic Striping (8” White, Solid)LF 1183 3.00$                                    3,549.00$                              2.00$                                    2,366.00$                            3.00$                                    3,549.00$                                      3.00$                                    3,549.00$                           3.00$                                    3,549.00$                           2.50$                                    2,957.50$                           18 Thermoplastic Striping (24” White, Solid)LF 595 8.00$                                    4,760.00$                              4.00$                                    2,380.00$                            8.00$                                    4,760.00$                                      10.00$                                  5,950.00$                           8.50$                                    5,057.50$                           6.00$                                    3,570.00$                           19 Thermoplastic Striping (Arrow White)EA 10 250.00$                               2,500.00$                             180.00$                               1,800.00$                           240.00$                               2,400.00$                                     300.00$                               3,000.00$                          250.00$                               2,500.00$                          135.00$                               1,350.00$                           20 Thermoplastic Striping (Word White)EA 10 300.00$                               3,000.00$                             240.00$                               2,400.00$                           300.00$                               3,000.00$                                     300.00$                               3,000.00$                          300.00$                               3,000.00$                          220.00$                               2,200.00$                           21 Work Zone Pavement Marking (Removable) (8” White,  Solid)LF 250 4.00$                                    1,000.00$                              4.00$                                    1,000.00$                            4.00$                                    1,000.00$                                      5.00$                                    1,250.00$                           3.75$                                   937.50$                               2.00$                                    500.00$                               22 Storm Sewer Manhole (6’ Dia.)EA 1 6,400.00$                            6,400.00$                              15,000.00$                         15,000.00$                          5,300.00$                            5,300.00$                                      12,000.00$                         12,000.00$                         6,500.00$                            6,500.00$                           6,500.00$                            6,500.00$                           23 Junction Box (Type PB) (3’ x 3’)EA 2 8,000.00$                            16,000.00$                            10,000.00$                         20,000.00$                          2,300.00$                            4,600.00$                                      11,000.00$                         22,000.00$                         4,000.00$                            8,000.00$                           4,500.00$                            9,000.00$                           24 StormTrooper Stormwater Quality Interceptor (Model No.  SWAQ‐05)EA 2 75,000.00$                        150,000.00$                         39,530.00$                         79,060.00$                          42,000.00$                         84,000.00$                                   37,000.00$                         74,000.00$                         25,000.00$                         50,000.00$                         35,000.00$                         70,000.00$                         25 Street Signs EA 9 400.00$                               3,600.00$                             450.00$                               4,050.00$                           350.00$                               3,150.00$                                     400.00$                               3,600.00$                          600.00$                               5,400.00$                          500.00$                               4,500.00$                           26 Relocation of Existing Fire Hydrant EA 2 10,000.00$                         20,000.00$                            9,000.00$                            18,000.00$                          1,700.00$                            3,400.00$                                      5,000.00$                            10,000.00$                         5,500.00$                            11,000.00$                         2,800.00$                            5,600.00$                           27 Curb Inlet (Type PCU)EA 1 5,000.00$                            5,000.00$                              10,000.00$                         10,000.00$                          4,000.00$                            4,000.00$                                      11,000.00$                         11,000.00$                         5,300.00$                            5,300.00$                           5,500.00$                            5,500.00$                           28 Curb Inlet (Type PCO)EA 1 6,500.00$                            6,500.00$                              8,500.00$                            8,500.00$                            4,600.00$                            4,600.00$                                      11,000.00$                         11,000.00$                         4,400.00$                            4,400.00$                           5,500.00$                            5,500.00$                           29 Area Inlet (Type PAZD) (FG)EA 1 6,500.00$                            6,500.00$                              6,500.00$                            6,500.00$                            2,700.00$                            2,700.00$                                      11,000.00$                         11,000.00$                         6,000.00$                            6,000.00$                           4,500.00$                            4,500.00$                           30 Concrete Curb and Gutter LF 879 25.00$                                  21,975.00$                            35.00$                                  30,765.00$                          20.00$                                  17,580.00$                                   23.00$                                  20,217.00$                         32.00$                                  28,128.00$                         20.00$                                  17,580.00$                         31 Concrete Sidewalk (5” Thick.)SY 595 66.00$                                  39,270.00$                            76.00$                                  45,220.00$                          65.00$                                  38,675.00$                                  100.00$                               59,500.00$                         52.00$                                  30,940.00$                         52.00$                                  30,940.00$                         32 Concrete Curb Ramp (Type 1)EA 5 2,500.00$                            12,500.00$                            1,100.00$                            5,500.00$                            1,100.00$                            5,500.00$                                      2,000.00$                            10,000.00$                         1,500.00$                            7,500.00$                           1,500.00$                            7,500.00$                           33 Concrete Curb Ramp (Type 2)EA 1 2,500.00$                            2,500.00$                              1,100.00$                            1,100.00$                            1,700.00$                            1,700.00$                                      2,600.00$                            2,600.00$                           1,700.00$                            1,700.00$                           1,900.00$                            1,900.00$                           34 Reinforced Concrete Pipe (18” Dia.)LF 136 250.00$                               34,000.00$                           230.00$                               31,280.00$                          55.00$                                  7,480.00$                                     230.00$                               31,280.00$                         75.00$                                  10,200.00$                         95.00$                                  12,920.00$                         35 Concrete Sidewalk Bridge Sect. (5½” Thick.)LS 1 4,000.00$                            4,000.00$                              6,000.00$                            6,000.00$                            1,600.00$                            1,600.00$                                      14,000.00$                         14,000.00$                         9,000.00$                            9,000.00$                           7,500.00$                            7,500.00$                           36 Sidewalk Pipe Railing LF 14 150.00$                               2,100.00$                             180.00$                               2,520.00$                           160.00$                               2,240.00$                                     370.00$                               5,180.00$                          145.00$                               2,030.00$                           95.00$                                  1,330.00$                           37 Drilled Shaft for Traffic Signal Pole (24” Dia.)LF 30 150.00$                               4,500.00$                             135.00$                               4,050.00$                           140.00$                               4,200.00$                                     160.00$                               4,800.00$                          140.00$                               4,200.00$                          270.00$                               8,100.00$                           38 Drilled Shaft for Traffic Signal Pole (36” Dia.)LF 13 400.00$                               5,200.00$                             365.00$                               4,745.00$                           370.00$                               4,810.00$                                     430.00$                               5,590.00$                          350.00$                               4,550.00$                          400.00$                               5,200.00$                           39 PVC Conduit, (2”) (Sch. 40), Trenched LF 35 22.00$                                 770.00$                                  21.00$                                 735.00$                                22.00$                                 770.00$                                         25.00$                                  875.00$                               20.00$                                 700.00$                               14.60$                                  511.00$                               40 PVC Conduit, (3”) (Sch. 40), Trenched LF 115 25.00$                                  2,875.00$                              22.00$                                  2,530.00$                            23.00$                                  2,645.00$                                      26.00$                                  2,990.00$                           22.00$                                  2,530.00$                           15.00$                                  1,725.00$                           41 Electrical Conductor (No. 6), Bare LF 150 2.50$                                   375.00$                                  2.20$                                   330.00$                                2.50$                                   375.00$                                         3.00$                                    450.00$                               2.25$                                   337.50$                               1.20$                                    180.00$                               42 Electrical Conductor (No. 6), Insulated LF 50 3.50$                                   175.00$                                  3.20$                                   160.00$                                3.50$                                   175.00$                                         4.00$                                    200.00$                               3.50$                                   175.00$                               1.20$                                    60.00$                                 43 Ground Box w/ Concr Apron (TxDOT Type D)EA 2 1,500.00$                            3,000.00$                              1,600.00$                            3,200.00$                            1,700.00$                            3,400.00$                                      2,000.00$                            4,000.00$                           1,600.00$                            3,200.00$                           1,200.00$                            2,400.00$                           44 Remove Existing Ground Box EA 1 175.00$                              175.00$                                 180.00$                              180.00$                               180.00$                              180.00$                                        200.00$                               200.00$                              190.00$                              190.00$                              400.00$                               400.00$                               45 Elec Svc Ty D, 120/240V, 070(NS)AL(E)PS(U)EA 1 6,000.00$                            6,000.00$                              6,000.00$                            6,000.00$                            6,100.00$                            6,100.00$                                      7,000.00$                            7,000.00$                           6,000.00$                            6,000.00$                           3,600.00$                            3,600.00$                           46 Highway Traffic Signal (Isolated – TxDOT) (Wolf Ranch  Pkwy.)EA 1 12,000.00$                         12,000.00$                            12,500.00$                         12,500.00$                          13,000.00$                         13,000.00$                                   15,000.00$                         15,000.00$                         12,500.00$                         12,500.00$                         15,000.00$                         15,000.00$                         47 Highway Traffic Signal (Isolated – TxDOT) (Williams Dr.)EA 1 12,000.00$                         12,000.00$                            12,000.00$                         12,000.00$                          12,300.00$                         12,300.00$                                   15,000.00$                         15,000.00$                         12,300.00$                         12,300.00$                         14,000.00$                         14,000.00$                         M&S Cost Estimate Project:  Rivery Blvd. T.I.A. Improvements Owner:  City of Georgetown, TX  Bid Opening Date: January 23, 2018 Bid Tabulation Date:  January 24, 2018 Patin Construction 3800 W 2nd Street Taylor, TX 76547 512‐269‐1071 Aaron Concrete Contractors, LP P.O. Box 27107 Austin, TX 78755 512‐926‐7326, x‐307 CHASCO Constructors Ltd., LLP PO Box 1057 Round Rock, TX 78680 512‐244‐0600 Smith Contracting Co., Inc. 15308 Ginger St. Austin, TX 78728 512‐990‐7640 Joe Bland Construction, LP 13111 Dessau Road Austin, TX 78754 512‐821‐2808 Page 26 of 29 1 2 3 4 5 6 7 8 ACDEFGHIJKLMNOPQ BID TABULATION M&S ENGINEERING, LLC.Tabulation performed on   01/24/2018   by Steven D. Widacki, P.E. Rivery Blvd. TIA Improve. Line No. Bid Item Unit Estimated Quantity Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount M&S Cost Estimate Project:  Rivery Blvd. T.I.A. Improvements Owner:  City of Georgetown, TX  Bid Opening Date: January 23, 2018 Bid Tabulation Date:  January 24, 2018 Patin Construction 3800 W 2nd Street Taylor, TX 76547 512‐269‐1071 Aaron Concrete Contractors, LP P.O. Box 27107 Austin, TX 78755 512‐926‐7326, x‐307 CHASCO Constructors Ltd., LLP PO Box 1057 Round Rock, TX 78680 512‐244‐0600 Smith Contracting Co., Inc. 15308 Ginger St. Austin, TX 78728 512‐990‐7640 Joe Bland Construction, LP 13111 Dessau Road Austin, TX 78754 512‐821‐2808 56 57 58 59 60 61 62 63 64 65 66 67 68 69 70 71 72 73 74 75 76 77 78 79 80 81 82 83 84 85 86 87 88 89 90 91 92 93 94 95 96 97 98 99 100 101 102 103 104 105 106 107 108 109 110111 112 48 Vehicle Signal Section (12” LED) (Green)EA 2 250.00$                              500.00$                                 220.00$                              440.00$                               230.00$                              460.00$                                        300.00$                               600.00$                              215.00$                              430.00$                              250.00$                               500.00$                               49 Vehicle Signal Section (12” LED) (Green Arw)EA 1 250.00$                              250.00$                                 220.00$                              220.00$                               230.00$                              230.00$                                        300.00$                               300.00$                              215.00$                              215.00$                              250.00$                               250.00$                               50 Vehicle Signal Section (12” LED) (Yellow)EA 2 250.00$                              500.00$                                 220.00$                              440.00$                               230.00$                              460.00$                                        300.00$                               600.00$                              215.00$                              430.00$                              250.00$                               500.00$                               51 Vehicle Signal Section (12” LED) (Yellow Arw)EA 1 250.00$                              250.00$                                 220.00$                              220.00$                               230.00$                              230.00$                                        300.00$                               300.00$                              215.00$                              215.00$                              250.00$                               250.00$                               52 Vehicle Signal Section (12” LED) (Red)EA 2 250.00$                              500.00$                                 220.00$                              440.00$                               230.00$                              460.00$                                        300.00$                               600.00$                              215.00$                              430.00$                              250.00$                               500.00$                               53 Vehicle Signal Section (12” LED) (Red Arrow)EA 1 250.00$                              250.00$                                 220.00$                              220.00$                               230.00$                              230.00$                                        300.00$                               300.00$                              215.00$                              215.00$                              250.00$                               250.00$                               54 Pedestrian Signal Sect (LED) (Count Down)EA 4 600.00$                               2,400.00$                             600.00$                               2,400.00$                           610.00$                               2,440.00$                                     700.00$                               2,800.00$                          600.00$                               2,400.00$                          700.00$                               2,800.00$                           55 Vehicle Signal Back Plate (12”) (3‐Section)EA 2 75.00$                                 150.00$                                  70.00$                                 140.00$                                71.00$                                 142.00$                                         90.00$                                  180.00$                               70.00$                                 140.00$                               50.00$                                  100.00$                               56 Vehicle Signal Back Plate (12”) (4‐Section)EA 1 90.00$                                  90.00$                                    90.00$                                  90.00$                                  92.00$                                  92.00$                                           100.00$                               100.00$                               90.00$                                  90.00$                                 60.00$                                  60.00$                                 57 Traffic Signal Cbl Type A (14 AWG) (2‐Cond)LF 120 1.00$                                   120.00$                                  1.00$                                   120.00$                                1.00$                                   120.00$                                         2.00$                                    240.00$                               0.90$                                   108.00$                               2.00$                                    240.00$                               58 Traffic Signal Cbl Type A (14 AWG) (3‐Cond)LF 95 1.00$                                    95.00$                                    1.50$                                   142.50$                                1.10$                                   104.50$                                         2.00$                                    190.00$                               1.10$                                   104.50$                               2.00$                                    190.00$                               59 Traffic Signal Cbl Type A (14 AWG) (4‐Cond)LF 100 2.00$                                   200.00$                                  1.50$                                   150.00$                                1.30$                                   130.00$                                         2.00$                                    200.00$                               1.30$                                   130.00$                               2.25$                                    225.00$                               60 Traffic Signal Cbl Type A (14 AWG) (5‐Cond)LF 280 2.00$                                   560.00$                                  1.50$                                   420.00$                                1.50$                                   420.00$                                         2.00$                                    560.00$                               1.50$                                   420.00$                               2.50$                                    700.00$                               61 Traffic Signal Cbl Type A (14 AWG) (7‐Cond)LF 482 3.00$                                    1,446.00$                              2.50$                                    1,205.00$                            2.30$                                    1,108.60$                                      2.00$                                    964.00$                               2.25$                                    1,084.50$                           2.75$                                    1,325.50$                           62 Traffic Signal Pole Assembly (1‐Arm) (32‐Ft)EA 1 6,000.00$                            6,000.00$                              6,000.00$                            6,000.00$                            6,200.00$                            6,200.00$                                      7,000.00$                            7,000.00$                           6,000.00$                            6,000.00$                           5,500.00$                            5,500.00$                           63 Pedestrian Pole Assembly EA 3 550.00$                               1,650.00$                             575.00$                               1,725.00$                           600.00$                               1,800.00$                                     700.00$                               2,100.00$                          600.00$                               1,800.00$                           2,700.00$                            8,100.00$                           64 Relocate Pedestrian Pole Assembly EA 1 550.00$                              550.00$                                 550.00$                              550.00$                               570.00$                              570.00$                                        700.00$                               700.00$                              600.00$                              600.00$                              800.00$                               800.00$                               65 Pedestrian Detection Push Button (APS)EA 9 850.00$                               7,650.00$                             900.00$                               8,100.00$                           900.00$                               8,100.00$                                      1,000.00$                            9,000.00$                          900.00$                               8,100.00$                          850.00$                               7,650.00$                           66 Removal of Pedestrian Push Buttons EA 6 50.00$                                 300.00$                                  50.00$                                 300.00$                                50.00$                                 300.00$                                         60.00$                                  360.00$                               50.00$                                 300.00$                               50.00$                                  300.00$                               67 Removal of Control Cabinet (Grd Mounted)EA 1 600.00$                              600.00$                                 550.00$                              550.00$                               560.00$                              560.00$                                        700.00$                               700.00$                              600.00$                              600.00$                              500.00$                               500.00$                               68 Removal of Signal Pole Assembly EA 1 600.00$                              600.00$                                 550.00$                              550.00$                               560.00$                              560.00$                                        700.00$                               700.00$                              600.00$                              600.00$                               1,000.00$                            1,000.00$                           69 Removal of Pedestrian Pole Assembly EA 1 150.00$                              150.00$                                 145.00$                              145.00$                               150.00$                              150.00$                                        200.00$                               200.00$                              150.00$                              150.00$                              700.00$                               700.00$                               70 VIVDS Processor System EA 1 9,000.00$                            9,000.00$                              9,500.00$                            9,500.00$                            10,000.00$                         10,000.00$                                   12,000.00$                         12,000.00$                         10,000.00$                         10,000.00$                         7,000.00$                            7,000.00$                           71 VIVDS Camera Assembly EA 1 1,700.00$                            1,700.00$                              1,750.00$                            1,750.00$                            1,800.00$                            1,800.00$                                      2,000.00$                            2,000.00$                           1,700.00$                            1,700.00$                           2,500.00$                            2,500.00$                           72 VIVDS Set‐Up System EA 1 300.00$                              300.00$                                 300.00$                              300.00$                               310.00$                              310.00$                                        400.00$                               400.00$                              300.00$                              300.00$                              800.00$                               800.00$                               73 VIVDS Communication Cable (Coaxial)LF 162 4.00$                                   648.00$                                  3.25$                                   526.50$                                3.50$                                   567.00$                                         4.00$                                    648.00$                               3.50$                                   567.00$                               4.00$                                    648.00$                               74 Spread Spectrum Radio EA 1 2,600.00$                            2,600.00$                              2,750.00$                            2,750.00$                            2,900.00$                            2,900.00$                                      3,000.00$                            3,000.00$                           3,000.00$                            3,000.00$                           3,000.00$                            3,000.00$                           75 Coaxial Cable LF 67 5.00$                                   335.00$                                  4.50$                                   301.50$                                4.50$                                   301.50$                                         5.00$                                    335.00$                               4.50$                                   301.50$                               4.00$                                    268.00$                               76 Antenna (Uni‐Directional)EA 1 450.00$                              450.00$                                 450.00$                              450.00$                               450.00$                              450.00$                                        500.00$                               500.00$                              450.00$                              450.00$                              750.00$                               750.00$                               77 Elim Exist Striping Blast Meth (4” solid‐white)LF 254 1.00$                                   254.00$                                  1.50$                                   381.00$                                0.60$                                   152.40$                                         1.00$                                    254.00$                               0.70$                                   177.80$                               0.75$                                    190.50$                               78 Elim Exist Striping Blast Meth (4” broken‐white)LF 220 1.00$                                   220.00$                                  1.50$                                   330.00$                                0.60$                                   132.00$                                         1.00$                                    220.00$                               0.70$                                   154.00$                               0.75$                                    165.00$                               79 Elim Exist Striping Blast Meth (8” solid‐white)LF 515 2.00$                                    1,030.00$                              2.50$                                    1,287.50$                            1.90$                                   978.50$                                         2.00$                                    1,030.00$                           2.10$                                    1,081.50$                           1.45$                                    746.75$                               80 Elim Exist Striping Blast Meth (12” solid‐white)LF 405 3.00$                                    1,215.00$                              3.50$                                    1,417.50$                            3.20$                                    1,296.00$                                      4.00$                                    1,620.00$                           3.25$                                    1,316.25$                           4.70$                                    1,903.50$                           81 Elim Exist Striping Blast Meth (24” solid‐white)LF 99 4.00$                                   396.00$                                  7.50$                                   742.50$                                4.30$                                   425.70$                                         5.00$                                    495.00$                               5.00$                                   495.00$                               8.95$                                    886.05$                               82 Elim Exist Striping Blast Meth (symbol ‐ dbl arw)EA 1 200.00$                              200.00$                                 235.00$                              235.00$                               160.00$                              160.00$                                        200.00$                               200.00$                              180.00$                              180.00$                              100.00$                               100.00$                               83 Elim Exist Striping Blast Meth (symbol ‐ arrow)EA 3 150.00$                              450.00$                                 135.00$                              405.00$                               135.00$                              405.00$                                        200.00$                               600.00$                              150.00$                              450.00$                               58.00$                                  174.00$                               84 Elim Exist Striping Blast Meth (word)EA 3 200.00$                              600.00$                                 245.00$                              735.00$                               215.00$                              645.00$                                        250.00$                               750.00$                              240.00$                              720.00$                               91.00$                                  273.00$                               85 Elim Exist Striping Blast Meth (symbol ‐ diamond)EA 1 260.00$                              260.00$                                 110.00$                              110.00$                               270.00$                              270.00$                                        300.00$                               300.00$                              300.00$                              300.00$                               55.00$                                  55.00$                                 86 Raised Pavement Markers, Type I‐C EA 49 6.00$                                   294.00$                                  12.00$                                 588.00$                                6.00$                                   294.00$                                         8.00$                                    392.00$                               6.75$                                   330.75$                               6.00$                                    294.00$                               87 Force Account allowance LS 1 50,000.00$                         50,000.00$                            50,000.00$                         50,000.00$                          50,000.00$                         50,000.00$                                   50,000.00$                         50,000.00$                         50,000.00$                         50,000.00$                         50,000.00$                         50,000.00$                         ALTERNATE BID 15A BLACK BASE (8‐INCH THICK.)SY 992 49.00$                                  48,608.00$                            30.00$                                  29,760.00$                          45.00$                                  44,640.00$                                   70.00$                                  69,440.00$                        100.00$                               99,200.00$                         52.00$                                  51,584.00$                         DEDUCT AMOUNT 992.00$                                 DEDUCT AMOUNT 29,760.00$                         DEDUCT AMOUNT (4,960.00)$                                   DEDUCT AMOUNT 8,928.00$                          DEDUCT AMOUNT 9,920.00$                          DEDUCT AMOUNT (1,984.00)$                          Low Bid M&S Engineering, LLC 102 W Morrow, Ste. 101 Georgetown, TX 78626 Office (512) 686-3924 FIRM F-1394 Total Alternate Bid  579,863.55$                     774,747.00$                      Total Base Bid  739,899.00$                        573,424.40$                                659,958.00$                     606,422.30$                      581,847.55$                     738,907.00$                        744,987.00$                      578,384.40$                                651,030.00$                     596,502.30$                      Page 27 of 29 PROJECT No.DATE: PROJECT NAME:5RP 1/29/2018 Division/Department:Director Approval Prepared By:Finance Approval TW01/31/18 TOTAL ANNUAL BUDGET 1,016,790.00 (Current year only) Actual Cost Agenda Total Spent Encumbrance Item & Encumbered % Annual (A) before agenda item (B)(A + B)Budget Consulting 834.00 834.00 0% Right of Way 0.00 0% Construction 578,384.40 578,384.40 57% Other Costs 38.00 38.00 0% Total Current Year Costs 872.00 578,384.40 579,256.40 Approved GENERAL LEDGER ACCOUNT NUMBER CY Budget 400-9-0980-90-064 1,016,790.00 Total Budget 1,016,790.00 TOTAL PROJECT BUDGET 1,399,999.23 (includes all previous yrs.) Prior Years Current Year Total Project % Total Spent/Encumbered Costs Costs Budget Consulting (MSE-16-001)383,209.23 834.00 384,043.23 27% Right of Way 0.00 0.00 0.00 0% Construction 0.00 578,384.40 578,384.40 41% Other Costs 0.00 38.00 38.00 0% Total Project Costs 383,209.23 579,256.40 962,465.63 69% Chris Pousson Transportation Services CIP - Budgetary and Financial Analysis Worksheet Comments: GTEC FY 2015-2016 Budget Rivery TIA Improvements Rivery TIA Impv'ts Aaron Concrete Contractors LP Page 28 of 29 RIVERY BLVD TIA IMPROVEMENTS CITY OF GEORGETOWN, TEXAS PROJECT LOCATION 3 PROJECT LOCATION 2 PROJECT LOCATION 1 Page 29 of 29