Loading...
HomeMy WebLinkAboutAgenda_GTEC_04.21.2021Notice of Meeting for the Georgetown Transportation E nhancement Corp and the Gov erning B ody of the City of Georgetown April 21, 2021 at 3:30 P M at Virtual T he C ity of G eorgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you require as s is tance in partic ipating at a public meeting due to a disability, as defined under the ADA, reas onable as s is tance, adaptations , or ac commodations will be provided upon request. P leas e c ontact the C ity S ec retary's O ffic e, at leas t three (3) days prior to the sc heduled meeting date, at (512) 930-3652 or C ity Hall at 808 Martin Luther King Jr. S treet, G eorgetown, T X 78626 for additional information; T T Y users route through R elay Texas at 711. Consiste nt with Gover nor Gr eg A bbott’s suspension of var ious provisions of the O pen M ee tings A ct, e ffec tive A ugust 1, 2020 and until fur the r notic e, to r educ e the c hance of C O V I D-19 tr ansmission, all C ity of Ge orge town Advisor y B oar d mee tings will be held vir tually. P ublic c omment will be allowed via telec onfer ence ; no one will be allowed to appear in pe rson. To participate, please co py and paste the fo llo wing weblink into yo ur bro wser: https://geor getowntx.zoom.us/j/94371404586 M e eting I D: 943 7140 4586 O ne tap mobile +13462487799,,94371404586# U S (H ouston) +12532158782,,94371404586# U S (Tac oma) Dial by your loc ation +1 346 248 7799 U S (H ouston) +1 253 215 8782 U S (Tac oma) +1 669 900 6833 U S (San J ose) +1 301 715 8592 U S (Washington D C) +1 312 626 6799 U S (Chic ago) +1 929 205 6099 U S (Ne w Yor k) 877 853 5257 U S Toll-fre e 888 475 4499 U S Toll-fre e 833 548 0276 U S Toll-fre e 833 548 0282 U S Toll-fre e M e eting I D: 943 7140 4586 F ind your loc al numbe r: https://geor getowntx.zoom.us/u/addF x Y J yx7 Citizen comme nts are acc epted in thr ee differ ent for mats: 1. Submit written comme nts to noah.koontz@ge orge town.org by 3:00p.m. on the date of the me eting and the Re cor ding Se cr etar y will re ad your c omments into the r ec ording during the item that is being discussed. Page 1 of 96 2. L og onto the mee ting at the link above and “r aise your hand” during the item 3. Use your home /mobile phone to call the toll-fre e numbe r To join a Zoom me eting, c lick on the link provided and join as an attende e. You will be aske d to e nte r your name and email addre ss (this is so we can ide ntify you when you ar e c alled upon). To spe ak on an item, clic k on the “Raise your H and” option at the bottom of the Zoom mee ting we bpage once that ite m has opened. Whe n you are calle d upon by the Re cor ding Se cr etar y, your devic e will be r emotely un-muted by the A dministrator and you may spe ak for thre e minute s. P lease state your name clear ly, and when your time is over, your de vice will be muted again. Use of pr ofanity, thr eate ning language, slande rous r emarks or thr eats of harm are not allowed and will re sult in your being immediate ly r emove d from the me eting. Regular Session (T his R egular S es s ion may, at any time, be rec es s ed to c onvene an Exec utive S es s ion for any purpose authorized by the O pen Meetings Act, Texas G overnment C ode 551.) A C all to O rder B Introduc tion of New Board Members and Visitors C R eview Board/Meeting P roc edures - Noah Koontz, G T EC Board Liais on D April 2021 G T EC Updates - Wes ley Wright, P.E., S ys tems Engineering Director E P resentation of G eorgetown Trans portation Enhanc ement C orporation preliminary monthly financial reports for January 20, 2021. -- Nathan P arras , Assistant F inanc e Direc tor; Leigh Wallace, F inanc e Direc tor L egislativ e Regular Agenda F Nominations and elec tion of P res ident of the G T EC Board cons is tent with S ection 3.02 of the G T EC Bylaws . – David Morgan – G eneral Manager - G T EC G Nominations and elec tion of Vic e-P res ident of the G T EC Board cons is tent with S ection 3.02 of the G T EC Bylaws.--David Morgan-G eneral Manager, G T EC Board H Nominations and elec tion of S ecretary of the G T EC Board c onsistent with S ec tion 3.02 of the G T EC Bylaws .--David Morgan-G eneral Manager, G T EC Board I R eview and pos s ible ac tion related to the Day and Time of G T EC Board Meetings. – Noah Koontz, G T EC Board Liais on J C ons ideration and possible approval of the minutes from the January 20, 2021 G T EC Board Meeting. -- Noah Koontz, G T EC Board Liais on K C ons ideration and p o s s ib le ac tio n to fo rmally terminate an agreement b etween the C ity and G T E C related Page 2 of 96 to the funding of the Mays S treet/R abbit Hill project – Laurie Brewer, As s is tant C ity Manager L P ublic hearing by the G eo rgeto wn Trans p o rtatio n Enhanc ement C orporatio n (G T E C ) regard ing the expenditure o f 4B sales tax fund s for the p ro p o s ed Titan NorthP ark35 P rojec t – Mic haela Dollar, Ec onomic Development Direc tor M E XE C UT IVE S E S S ION In compliance with the O pen Meetings Act, C hapter 551, G overnment C ode, Vernon's Texas C odes , Annotated, the item lis ted below will be disc ussed in closed s es s ion and is subject to ac tion in the regular session. Sec. 551.087 Deliberation Regarding Economic Development Negotiations P rojec t Diana - Michaela Dollar, Economic Development Director N E XE C UT IVE S E S S ION In compliance with the O pen Meetings Act, C hapter 551, G overnment C ode, Vernon's Texas C odes , Annotated, the item lis ted below will be disc ussed in closed s es s ion and is subject to ac tion in the regular session. Sec. 551.087 Deliberation Regarding Economic Development Negotiations P rojec t Ac cess - Michaela Dollar, Economic Development Director O C ons ideration and possible action from Executive S ession - P roject Diana -- Mic haela Dollar, Ec onomic Development Direc tor P C ons ideration and possible action from Executive S ession - P roject Acc es s -- Michaela Dollar, Ec onomic Development Direc tor Ce rtificate of Posting I, R obyn Densmore, C ity S ecretary for the C ity of G eorgetown, Texas, do hereby c ertify that this Notic e of Meeting was posted at C ity Hall, 808 Martin Luther King Jr. S treet, G eorgetown, T X 78626, a plac e readily acc es s ible to the general public as required by law, on the _____ day of _________________, 2021, at __________, and remained s o posted for at leas t 72 c ontinuous hours prec eding the s cheduled time of said meeting. __________________________________ R obyn Dens more, C ity S ec retary Page 3 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: C all to O rder IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Page 4 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: Introduction of New Board Members and Vis itors IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Noah Koontz - Board Liais on Page 5 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: R eview Board/Meeting P rocedures - Noah Koontz, G T EC Board Liaison IT E M S UMMARY: T he following doc uments will be provided, at the meeting, for your referenc e: Bylaws R eview: Attendance P olicy Q uorum R equirements S ign in S heet P arking Attorney G eneral Trainings - https ://www.texasattorneygeneral.gov/og/open-government-training 1. O pen Meeting Ac t 2. P ublic Meetings Ac t F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: AT TAC H ME N T S: Description Type Bylaws Backup Material Page 6 of 96 Page 7 of 96 Page 8 of 96 Page 9 of 96 Page 10 of 96 Page 11 of 96 Page 12 of 96 Page 13 of 96 Page 14 of 96 Page 15 of 96 Page 16 of 96 Page 17 of 96 Page 18 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: April 2021 G T EC Updates - Wesley Wright, P.E., S ystems Engineering Direc tor IT E M S UMMARY: April 2021 G T E C updates Northwest Boulevard: · P reparing for paving eas t s ide, added c hanges to Aus tin Ave. elevations to this project along with temporary s ignal. · Travel s urfac e pour on dec k completed · S idewalks poured ac ros s bridge and bridge rail pour at 95% · C urbing complete wes t s ide and sidewalks underway · MS E walls complete, center barrier rec onstruc t complete · Es timated c ompletion S pring 21 Rabbit Hill Road Improvements: R eturning to initial projec t limits with the landowner donation of R O W. Engineering new sc hedule to post for bids is May S outheast Inner loop/ Southwestern Blvd S outhwes tern: · P reparing plan/profile sheets. · F inalizing S torm C onveyanc e S ys tem for the project · Evaluating Water Q uality Treatment O ptions ; · P reparing Utility plan/profile sheets (water/was tewater) · Identifying utility c onflic ts R O W needs asc ertained to be forwarded to Travis by 1-17 S E Inner Loop: C ontractor working on drainage c ulvert extension North s ide, Working on grading North s ide and new drainage ins tallation, Base installation underway North side S idewalk ins tallation underway S H 29 Access Improvements : reengineered electric hookup and installation to begin in April. S ignal Improvements- Various locations: Des ign underway for Williams and Es trella inters ection. Page 19 of 96 P oles and mast arms being ordered for R oc kride inters ect, low bid in is EART C approved at board and counc il in March S hell location being surveyed. F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: AT TAC H ME N T S: Description Type April GTEC Updates Backup Material Page 20 of 96 GTEC Board Meeting Date: Item No. GEORGETOWN TRANSPORTATION ENHANCEMENT CORPORATION AGENDA ITEM COVER SHEET ______________________________________________________________________________________________________________________________ _ SUBJECT: April 2021 GTEC Updates - Wesley Wright, P.E., Systems Engineering Director __________________________________________________________________________________________________________________________________ __ ITEM SUMMARY: April 2021 GTEC updates Northwest Boulevard: • Preparing for paving east side, added changes to Austin Ave. elevations to this project along with temporary signal. • Travel surface pour on deck completed • Sidewalks poured across bridge and bridge rail pour at 95% • Curbing complete west side and sidewalks underway • MSE walls complete, center barrier reconstruct complete • Estimated completion Spring 21 Rabbit Hill Road Improvements: Returning to initial project limits with the landowner donation of ROW. Engineering new schedule to post for bids is May Southeast Inner loop/ Southwestern Blvd Southwestern: • Preparing plan/profile sheets. • Finalizing Storm Conveyance System for the project • Evaluating Water Quality Treatment Options; • Preparing Utility plan/profile sheets (water/wastewater) • Identifying utility conflicts ROW needs ascertained to be forwarded to Travis by 1-17 SE Inner Loop: Contractor working on drainage culvert extension North side, Working on grading North side and new drainage installation, Base installation underway North side Sidewalk installation underway Page 21 of 96 SH 29 Access Improvements: reengineered electric hookup and installation to begin in April. Signal Improvements- Various locations Design underway for Williams and Estrella intersection. Poles and mast arms being ordered for Rockride intersect, low bid in is EARTC approved at board and council in March Shell location being surveyed. Page 22 of 96 D B Wood widening – Project No. PRJ000188 TIP No. April 2021 Project Description Design and preparation of Plans, Specifications, Estimate, Bidding Documents and construction phase services for DB Wood Widening/Reconstruction from TxDOT/County SH 29 intersection improvements to just North of Oak Ridge Rd. Converting from ditch to storm. Along with expansion of the Bridge at fork of San Gabriel Purpose To better manage traffic movement. Project Manager Joel Weaver Engineer Kimely-Horn and Associates. Inc. Element Status / Issues Design Design is underway Surveying Survey is underway Environmental/ Archeological Rights of Way Utility Relocations TBD Construction Other Issues None Page 23 of 96 Rabbit Hill Road Improvements Project (Westinghouse Road to S. Clearview Drive) Project No. 5RQ TIP No. BZ April 2021 Project Description Reconstruct Rabbit Hill Road from Westinghouse Road northward to S. Clearview Dr. Widening along Westinghouse Road will also be included in the schematic for additional turning lanes to/from Westinghouse Road. The project length along the anticipated alignment is approximately 0.75 miles Project Managers Ken Taylor and Wesley Wright, P.E. Engineer CP&Y, Inc. Element Status / Issues Design Engineering complete prepping docs for April posting. Environmental/ Archeological Efforts underway and any issues are expected to be identified in the coming month. Rights of Way Two properties acquired as part of Mays St. Extension. Two remaining, negotiations ongoing and Council has approved condemnation. Total Parcels: 4 Possession: 2 Pending: 2 Utility Relocations Will be initiated as ROW/easements are acquired and as part of the bidding process. Multiple relocations expected – Round Rock water and Georgetown Electric. Construction Project to go out for bids in May 2021 Other Issues Return to initial project limits with the landowner donation of ROW. Engineering to get new schedule to letting Page 24 of 96 Northwest Boulevard (Fontana Drive to Austin Avenue) Project No. 5QX TIP No. AF April 2021 Project Description Construction of overpass and surface roads to connect Northwest Boulevard with Austin Avenue and FM 971. Purpose This project will relieve congestion at the Austin Avenue/Williams Drive intersection and provide a more direct access from the west side of IH 35 corridor to Georgetown High School and SH 130 via FM 971. Project Manager Joel Weaver and Wesley Wright, P.E. Engineer Klotz Associates Element Status / Issues Design Design Complete Environmental/ Archeological Complete Rights of Way ROW Documents are being finalized. All offers have been made. 8 Parcels required. 5 acquired, 1 in closing, 2 in condemnation. Utility Relocations TBD Construction • Preparing for paving east side, added changes to Austin Ave. elevations to this project along with temporary signal. • Travel surface pour on deck completed • Sidewalks poured across bridge and bridge rail pour at 95% • Curbing complete west side and sidewalks underway • MSE walls complete, center barrier reconstruct complete • Estimated completion Spring 21 Other Issues Page 25 of 96 SH 29 Access Improvements – Traffic Signal Project No. PRJ000214 TIP No. None April 2021 Project Description Design and preparation of Plans, Specifications, Estimate, Bidding Documents and construction phase services for the proposed corridor improvements along SH-29- Unversity Avenue between IH35 and Scenic Drive including a right-turn deceleration lane, auxiliary lane, median improvements, drainage improvements and traffic signal relocation. Purpose To better manage traffic movements at the intersection. Project Manager Joel Weaver Engineer Kimely-Horn and Associates. Inc. Element Status / Issues Design Design is complete Surveying Survey is complete Environmental/ Archeological Rights of Way Utility Relocations TBD Construction reengineered electric hookup and installation to begin in April. Other Issues None Page 26 of 96 Signal Improvements – Various Locations Project No. PRJ000214 TIP No. None April 2021 Project Description Design and preparation of Plans, Specifications, Estimate, Bidding Documents, and construction phase services for the construction of signal improvements for the intersections of Williams Drive & Estrella Crossing, Shell Road & Verde Vista and SE Inner Loop & Rockride Lane. Purpose To better manage traffic movements at the intersection. Project Manager Engineer KPA Element Status / Issues Design Design underway for Williams and Estrella intersection. Poles and mast arms being ordered for Rockride intersect Surveying Shell location being surveyed. Environmental/ Archeological TBD Rights of Way TBD Utility Relocations TBD Construction Rockride intersection bid- low bidder EARTC Other Issues None Page 27 of 96 Widening of: SE Inner Loop - FM 1460 to Austin Avenue Roadway & Southwestern Boulevard – Raintree Drive to SE Inner Loop Roadway April 2021 Project Description FM 1460 to Austin Avenue Roadway Widening Project & Southwestern Boulevard – Raintree Drive to SE Inner Loop Roadway Widening Project (See Attached Exhibit C). The professional services will consist of providing final roadway, drainage, water, wastewater, incidental designs, as well as, utility coordination, ROW support, environmental phase I investigations, archeological investigations, geotechnical investigations, ROW & Temporary Construction Easement (TCE) metes and bounds documents, bidding documents, bidding services, and construction administration services. Project Managers Joel Weaver and Wesley Wright, P.E. Engineer KPA & Associates Element Status / Issues Design Southwestern: • Preliminary alignment revised • Performing Hydrologic and Hydraulic calculations • ROW needs forwarded to Travis Environmental/ Archeological Efforts to begin April 2019 and any issues are expected to be identified in the coming month. Utility Relocations To be determined Construction Contractor working on drainage culvert extension North side, Working on grading North side and new drainage installation, Base installation underway North side Sidewalk installation underway Other Issues None. Page 28 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: P res entation of G eorgetown Transportation Enhancement C orporation preliminary monthly financ ial reports for January 20, 2021. -- Nathan P arras, As s is tant F inance Director; Leigh Wallac e, F inance Director IT E M S UMMARY: T he Bylaws of G T EC (Article V, S ec tion 6.02) require the F inanc e Manager to report the financ ial ac tivity of the C orporation to the Board. • F inancial reports • S ales Tax revenues • Any other relevant financ ial information S ales tax is rec eived two months in arrears; therefore the revenues reflec t only the amount rec eived, not actually earned, as of the report date. A report on payments made to vendors for the month of January is als o included. F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: AT TAC H ME N T S: Description Type Financial Report Backup Material Pres entation Backup Material Page 29 of 96 F GTEC MONTHLY REPORT AS OF MARCH 31, 2021 Operating revenue is comprised of sales tax and allocated interest. The budget for sales tax collections for GTEC is $8,255,000. Year-to-date sales tax revenue totals $3,302,454, or 40.01% of budget. Through this period, sales tax collections are up $474,776, or 16.79% over year-to-date collections from the prior fiscal year. The City continues to see and monitor the strong performance in sales tax. Operating expenses total $644,034, or 20.34% of budget through the period. Operating expenses are predominately made up of administrative expenses and transfers to other City funds. Administrative expenses include the allocation for City staff to support the GTEC fund. Year-to-date administrative expense total $201,081, or 50.00% of budget. GTEC will transfer out $2,763,242 for their portion of debt that is paid out of the General Debt Service. Non-Operating revenue, totals $10,600,000, and is made up of bond proceeds. Projects included in this fiscal year are Aviation Drive, Big C Project, and Confido III. City staff will recognize bond proceeds as part of the upcoming bond issuance later in the spring. Non-Operating expense budget totals $26,114,238 in the current year. Year-to-date non-operating expenses total $780,682, or 2.99% of budget through the period. Non-Operating expenses include funding for strategic partnerships, capital improvement projects, and debt service payment. GTEC’s debt service payment includes principal reduction of $620,000, and an interest expense of $219,550. The debt service payment is made annually in the spring and aligns all other debt service payments for the City. CIP expense totals, $23,076,813 in the current year. This amount includes the CIP Roll Forward amendment approved by Council in January. Ending fund balance for FY2021 is anticipated to be $15,567,040. After accounting for the contingency reserve of $1,984,375, and the debt service reserve of $3,494,232, this fund will have an available fund balance of $10,178,433. K 1.0M 2.0M 3.0M 4.0M 01) Oct 02) Nov 03) Dec 04) Jan 05) Feb 06) Mar SALES TAX FY2020 FY2021 Page 30 of 96 COG ‐ GTEC Financial Report Period: Mar‐21 Budget Period  FY2021  Mar‐21   YTD Actuals  w/Encumbrances  Variance  % of Budget  Beginning Fund Balance 26,022,482                 ‐                              26,022,482                 ‐                              100.00% Operating Revenue 40002:Sales Taxes 8,255,000                  704,723                     3,302,454                  (4,952,546)                 40.01% 42001:Interest Income 60,000                        1,616                          16,769                        (43,231)                      27.95% Operating Revenue Total 8,315,000                  706,339                     3,319,223                  (4,995,777)                 39.92% Operarting Expense 53001:Public Notices & Recording Fees 300                              ‐                               ‐                              300                             0.00% 53016:Travel Expense 500                              ‐                               ‐                              500                             0.00% 51001:Administrative Expense 402,162                     33,514                        201,081                     201,081                     50.00% 51005:Professional Services ‐                               ‐                              18,690                        (18,690)                      0.00% 80001:Transfers Out 2,763,242                   ‐                              420,122                     2,343,120                  15.20% Operating Expense Total 3,166,204                  33,514                        644,034                     2,522,170                  20.34% Total Net Operations 5,148,796                  672,826                     2,675,190                  (7,517,947)                51.96% Non‐Operating Revenue 46001:Bond Proceeds 10,600,000                 ‐                               ‐                              (10,600,000)              0.00% Non‐Operating Revenue Total 10,600,000                 ‐                               ‐                              (10,600,000)              0.00% Non‐Operating Expense 53009:Strategic Partnership 1,984,375                   ‐                               ‐                              1,984,375                  0.00% 62001:CIP Expense 23,076,813                67,410                        670,157                     22,406,656                2.90% Debt Service 1,053,050                   ‐                              110,525                     942,525                     10.50% Non‐Operating Expense Total 26,114,238                67,410                        780,682                     25,333,556                2.99% Net Non‐Operations Total (15,514,238)              (67,410)                      (780,682)                    14,733,556                5.03% Excess (Deficiency) of Total Revenue over Total Requirements (10,365,442)              605,416                     1,894,508                  (8,470,934)                 81.72% Ending Fund Balance 15,657,040                605,416                     27,916,990                43,574,030                56.08% Reserves Contingency Reserve 1,984,375                   ‐                              1,984,375                   ‐                              100% Debt Service Reserve 3,494,232                   ‐                              3,494,232                   ‐                              100% Reserves Total 5,478,607                   ‐                              5,478,607                   ‐                              100% Available Fund Balance 10,178,433                22,438,383                12,259,950                45.36% Actuals Budget Vs. Actuals Page 31 of 96 GTEC Financial Summary: March 21 Page 32 of 96 FY2021 FINANCIAL SUMMARY: GTEC GTEC Revenue •FY2021 Revenue Budget •Revenue Budget Sources •The FY2021 revenue budget for  the GTEC is $18.9 million •99% of budgeted revenue is sales  tax, $8.3 million •Interest  Income accounts for   $60,000 •Bond proceeds total $10.6 million 43.64% 0.32% 56.04% 40002:Sales Taxes 42001:Interest  Income 46001:Bond Proceeds Page 33 of 96 FY2021 FINANCIAL SUMMARY: GTEC GTEC Revenue COG ‐ GTEC Financial Report Period: Mar‐21 Budget  FY2021  Mar‐20  Mar‐21  Variance   %  Variance   Variance from  Budget  % of Budget  Operating Revenue 40002:Sales Taxes 8,255,000                      2,827,678                       3,302,454                       474,776                          16.79% (4,952,546)                 40.01% 42001:Interest Income 60,000                            213,571                          16,769                             (196,801)                          ‐92.15% (43,231)                       27.95% Operating Revenue  Total 8,315,000                      3,041,249                       3,319,223                       277,974                          9.14% (4,995,777)                 39.92% Non‐Operating Revenue 46001:Bond Proceeds 10,600,000                     ‐                                     ‐                                     Non‐Operating Revenue  Total 10,600,000                     ‐                                     ‐                                     ‐                                    0.00% (10,600,000)              0.00%  YTD Comparison  YTD Budget Comparison  Page 34 of 96 FY2021 FINANCIAL SUMMARY: GTEC GTEC Revenue •Sales Tax •Year ‐to‐date sales tax revenue  totals $3.3 million, 40% of budget •FY2021 year‐to‐date collections  are 17% more than FY2020 year‐ to‐date collections •There is a two‐month lag on sales  tax collections. 16.79%                               3,302,454   SALES TAX   01) Oct 02) Nov 03) Dec 04) Jan 05) Feb 06) Mar  FY2020 ‐720,080 735,844 1,426,86 2,256,30 2,827,67  FY2021 ‐28,090 811,070 1,597,19 2,597,73 3,302,45 K 1.0M 2.0M 3.0M  FY2020  FY2021 Page 35 of 96 FY2021 FINANCIAL SUMMARY: GTEC GTEC Expense •FY2021 Expense Budget •Expense Budget Sources •The FY2021 expense budget for   the GTEC is $29.3 million •8% of budgeted expenses are for operations •79% of budgeted expenses are for   CIP expense •9.4% of budget is for transfer out  to other City funds. •3.6% budget is for debt service  payment 8.15% 9.44% 78.81% 3.60% Operations Transfers CIP Expense Debt Service Page 36 of 96 FY2021 FINANCIAL SUMMARY: GTEC GTEC Expense COG ‐ GTEC Financial Report Period: Mar‐21 Budget  FY2021   YTD Actuals  w/Encumbrances:  Mar‐20   YTD Actuals  w/Encumbrances:  Mar‐21  Variance  % Variance   Variance from  Budget  % of Budget  Operating Expense 51001:Administrative Expense 402,162                          204,711                             201,081                             3,630                                   ‐1.77% 201,081                             50.00% 51005:Professional Services ‐                                    264,149                             18,690                               245,459                              ‐92.92% (18,690)                              0.00% 53001:Public Notices & Recording Fees 300                                    ‐                                        ‐                                       ‐                                      0.00% 300                                      0.00% 53016:Travel Expense 500                                    ‐                                        ‐                                       ‐                                      0.00% 500                                      0.00% 60004:Capital Outlay ‐ Equipment ‐                                    34,777                                 ‐                                      34,777                                ‐100.00%‐                                       0.00% 60010:Capital Outlay ‐                                    995,843                             4,140                                  991,703                              ‐99.58% (4,140)                                 0.00% 80001:Transfers Out 2,763,242                       365,150                             420,122                             (54,973)                              15.05% 2,343,120                          15.20% Operating Expense Total 3,166,204                       1,864,631                          644,034                             (61,697)                               ‐65.46% 2,522,170                          20.34% Non‐Operating Expense 53009:Strategic Partnership 1,984,375                        ‐                                        ‐                                       ‐                                      0.00% 1,984,375                          0.00% 55001:Principal Reduction 620,000                           ‐                                        ‐                                       ‐                                      0.00% 620,000                             0.00% 55002:Interest Expense 219,550                          121,675                             110,525                             11,150                                ‐9.16% 109,025                             50.34% 55003:Handling Fees 1,500                               750                                       ‐                                      750                                      ‐100.00% 1,500                                  0.00% 55004:Bond Issuance Costs 212,000                           ‐                                        ‐                                       ‐                                      0.00% 212,000                             0.00% 62001:CIP Expense 23,076,813                    136,938                              ‐                                      136,938                              ‐100.00% 23,076,813                       0.00% Non‐Operating Expense Total 26,114,238                    259,363                             780,682                             (376,765)                            201.00% 25,333,556                       2.99%  YTD Actuals w/Encumbrances Comparison  YTD Budget Comparison  Page 37 of 96 FY2021 FINANCIAL SUMMARY: GTEC Questions Page 38 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: Nominations and election of P resident of the G T EC Board c onsistent with S ec tion 3.02 of the G T EC Bylaws. – David Morgan – G eneral Manager - G T EC IT E M S UMMARY: P er the Bylaws of the G eorgetown Transportation Enhanc ement C o rp o ration Board – “S ec tion 3.02 – O ffic ers. T he offic ers of the corporatio n s hall be a president, vice pres ident and s ecretary. T he b o ard , at each annual meeting, s hall elect thes e offic ers . T he b o ard may ap p o int such o ther offic ers as it deems nec es s ary, who s hall have the authority, and shall p erfo rm such d uties as from time to time may be pres cribed by the board.” F IN AN C IAL IMPAC T: n/a S UB MIT T E D B Y: David Morgan - G eneral Manager, G T EC Board Page 39 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: Nominations and election of Vice-P resident of the G T EC Board c onsistent with S ec tion 3.02 of the G T EC Bylaws .--David Morgan-G eneral Manager, G T EC Board IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: David Morgan - G eneral Manager, G T EC Board Page 40 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: Nominations and election of S ec retary of the G T EC Board cons is tent with S ection 3.02 of the G T EC Bylaws.--David Morgan-G eneral Manager, G T EC Board IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: David Morgan - G eneral Manager, G T EC Board Page 41 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: R eview and possible action related to the Day and Time of G T EC Board Meetings . – Noah Koontz, G T EC Board Liaison IT E M S UMMARY: P er the G T EC Bylaws Section 2.03 Time & Date of Regular Meeting. T he board shall meet on a regular basis, at a s pecified time, day and loc ation as approved annually by the board. All meetings shall be called and held in acc ordanc e with the Texas O pen Meetings Act, C hapter 551, G overnment C ode, as amended. T he pres ident of the board may cancel the meeting if there is no busines s to be conduc ted. Currently, the GT E C Board meets on the third Wednesday of each month at 3:30 P M. F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Noah Koontz, G T EC Board Liaison AT TAC H ME N T S: Description Type Dates Backup Material Page 42 of 96 GEORGETOWN TRANSPORTATION ENHANCEMENT CORPORATION (GTEC) Meeting Schedule March 2021 – February 2022 All Regular Meetings will be held on the third Wednesday of every month at 3:30 p.m. at the Georgetown Municipal Complex, located at 300-1 Industrial Avenue or virtual through Zoom as needed. Please contact Noah Koontz at 512-930-6556 if you have any questions regarding meeting dates or times. MARCH 17, 2021 APRIL 21, 2021 MAY 19, 2021 JUNE 16, 2021 JULY 21, 2021 AUGUST 18, 2021 SEPTEMBER 15, 2021 OCTOBER 20, 2021 NOVEMBER 17, 2021 DECEMBER 15, 2021 JANUARY 19, 2022 FEBRUARY 16, 2022 Page 43 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: C onsideration and pos s ible approval of the minutes from the January 20, 2021 G T EC Board Meeting. -- Noah Koontz, G T EC Board Liaison IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Noah Koontz, G T EC Board Liaison AT TAC H ME N T S: Description Type Minutes Backup Material Page 44 of 96 Board Members Present: John Marler - Chair, Mike Triggs, Steve Fought, Colin McGahey, Al Hajka Board Members Absent: Bob Whetsell, Keith Fruge Staff Present: David Morgan, Michaela Dollar, Noah Koontz, Wesley Wright, Nathan Parras Others Present: None Minutes Minutes of the Meeting of Georgetown Transportation Enhancement Corporation and the Governing Body of the City of Georgetown, Texas Wednesday, January 20, 2021 The Georgetown Transportation Enhancement Corporation of the City of Georgetown, Texas, met on Wednesday, January 20, 2021. Regular Session: (This Regular Session may, at any time, be recessed to convene an Executive Session for any purpose authorized by the Open Meetings Act, Texas Government Code 551.) A. Call to Order: Meeting was called to order at 3:30 PM by John Marler B. January 2021 GTEC Updates - Wesley Wright, P.E., Systems Engineering Director/Michael Hallmark, CIP Manager. Wright gave updates which are included in the packet. C. Presentation of Georgetown Transportation Enhancement Corporation preliminary monthly financial reports for October 2020. -- Leigh Wallace, Finance Director; Laurie Brewer Assistant City Manager. Parras gave presentation which is included in the packet. Legislative Regular Agenda: D. Consideration and possible approval of the minutes from the November 18, 2020 GTEC Board Meeting. -- David Morgan - General Manager, GTEC Board Page 45 of 96 Adjournment Motion by Hajka to approve minutes, second by McGahey. Roll call vote Marler – yes Triggs – yes Fought – yes McGahey – yes Hajka – yes Approved 5-0 (Whetsell, and Fruge – absent) E. Set a Public hearing for February 17, 2021 by the Georgetown Transportation Enhancement Corporation (GTEC) regarding the expenditure of 4B sales tax funds for the proposed Titan NorthPark35 Project. - Michaela Dollar, Economic Development Director Motion by Triggs to approve minutes, second by Hajka. Roll call vote Marler – yes Triggs – yes Fought – yes McGahey – yes Hajka – yes Approved 5-0 (Whetsell, and Fruge – absent) ADJOURNMENT: MOTION by Hajka, second by Marler to adjourn the meeting. Roll call vote Marler – yes Triggs – yes Hajka – yes Fought – yes McGahey - yes Approved 5-0 (Whetsell and Fruge – absent Meeting adjourned at 3:50 PM. Page 46 of 96 Approved: Attest: John Marler - President Keith Fruge – Secretary Noah Koontz – Board Liaison Page 47 of 96 Page 48 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: C onsideration and p o s s ib le actio n to formally terminate an agreement b etween the C ity and G T E C related to the funding of the Mays S treet/R abbit Hill projec t – Laurie Brewer, Assistant C ity Manager IT E M S UMMARY: T he 2016 fund ing agreement was intend ed to reimburs e G T EC fo r the d eb t s ervic e that funded $10.65M of bond s issued for the c o ns truc tion o f the extension of Mays S treet/R ab b it Hill R o ad through the us e of property taxes from additional value c onstruc ted in the zone. In June 2018, during the G T EC fis cal year bud get disc ussion, the C ity Manager o utlined the G T EC ’s financial c ond ition and its ab ility to fund the debt s ervic e o n the projec t witho ut reimb ursement from the T I R Z, as well as G T EC ’s o ngo ing capac ity to fund ad d itional trans portation p ro jects . T he b o ard agreed that the G T EC ’s purpose was to inves t in trans portation projects for economic development and that it would be ap p ro p riate to have the property taxes within the zone go bac k to the C ity’s G eneral F und to provide s ervic es , s uc h as public s afety and street maintenance. T he bud get p ro c es s for the pas t three years has continued to fund all G T E C d eb t service related to economic d evelopment trans p o rtatio n p ro jects ; however this agreement was never formally terminated. T he C ity is working to wards dissolving the S outh G eo rgeto wn T I R Z and approval o f this termination would aid in the legal review of the dis s olution. F IN AN C IAL IMPAC T: T he d eb t annual s ervic e, which is currently fund ed in the G T E C ’s annual bud get is an average of $730,000. T here is no additional financial impact to G T EC . S UB MIT T E D B Y: Danella Elliott AT TAC H ME N T S: Description Type Agreement - City-GTEC related to SGTTIRZ and Mays Str/Rabbit Hill Backup Material Page 49 of 96 Page 50 of 96 Page 51 of 96 Page 52 of 96 Page 53 of 96 Page 54 of 96 Page 55 of 96 Page 56 of 96 Page 57 of 96 Page 58 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: P ublic hearing by the G eorgetown Transportation Enhanc ement C orporatio n (G T EC ) regarding the expenditure o f 4B s ales tax fund s for the proposed Titan NorthP ark35 P rojec t – Michaela Dollar, Economic Development Director IT E M S UMMARY: S tate Law (Loc al G o vernment C o d e 505.159) req uires G T EC to provid e p ublic notice and ho ld a public hearing o n the proposed p ro jec ts to be fund ed with the 4B s ales tax. T he req uired notic e was p ublished in the Williamson C ounty S un on Wednesday, F ebruary 10, 2021. T he public hearing will be c onducted by the G T EC Board of Directors . F IN AN C IAL IMPAC T: $8,000,000 to be funded in F Y2021 S UB MIT T E D B Y: S haron P arker AT TAC H ME N T S: Description Type Titan North Park 35 GTEC Public Hearing Pres entation Copy of the Public Hearing Notice Backup Material Executed Contract Backup Material Page 59 of 96 Titan NorthPark35 Georgetown Transportation Enhancement Corporation Public Hearing February 17, 2021 Page 60 of 96 •Titan Development is one of the Southwest’s largest and most active, vertically integrated real estate developers. •Titan offers development and construction services for multifamily, mixed use, office, industrial, and retail real estate. •Founded in 1999 with offices in New Mexico and Texas, Titan has multiple projects along the I-35 corridor. Company Profile Page 61 of 96 Project Description •Titan plans to develop approximately 150 acres located at I-35 and Toll 130 into a business park called NorthPark35. •This will be the City’s first master-planned Class A industrial park. •The first phase of the business park will include two ~150,000 SF buildings, totaling more than 300,000 SF along with a planned third building. •A critical element to the development is accessibility and infrastructure associated with the extension of Aviation Drive, as shown in the City’s Overall Transportation Plan. Page 62 of 96 No r t h P a r k 3 5 C o n c e p t Page 63 of 96 City Strategy •The City’s 2030 Comprehensive Plan identified proactive infrastructure investment to encourage targeted development as a strategy for growth. •This area is identified in the City’s Future Land Use map as a mix of regional commercial and employment center due to it’s connectivity. •The Economic Development Strategic Plan’s fourth strategic goal is to encourage speculative development. •Target industries for economic development include advanced manufacturing, professional services, and life sciences, all of which are well-suited for this site. Page 64 of 96 GTEC Incentive Incentive Amount Road Reimbursement Grant Paid from the Type B Corporation sales tax fund *Includes the cost of engineering design. $8,000,000 Grants will be paid in three installments, for the reimbursements of qualified expenditures. Page 65 of 96 Incentive Requirements •Invest a minimum of $15,000,000 in capital expenditures; •Construct a minimum of 300,000 square feet of industrial development in Phase I of the park; •Construction of the road extension with utilities within 24 months; and •Approval of a master plan for the park with restricted uses and design standards in place. Page 66 of 96 Date: January 27, 2021 To: Williamson County Sun From: Michaela Dollar- Economic Development – 512-930-3688 Subject: Public Hearing Notice Please publish a border ad for the following Public Hearing Notice in the Wednesday, February 10, 2021 edition of the Williamson County Sun. City of Georgetown Attn: Michaela Dollar P.O. Box 409 Georgetown, TX 78627-0409 Please send proof and cost and we will send the PO # GEORGETOWN TRANSPORTATION ENHANCEMENT CORPORATION NOTICE OF PUBLIC HEARING Wednesday, February 17, 2021 at 3:30pm Virtual Meeting – Visit agendas.georgetown.org to view meeting information In accordance with Local Government Code 505.159, the Georgetown Transportation Enhancement Corporation will hold a public hearing regarding the expenditures of 4B sales taxes not to exceed Fiscal Year 2021 proposed transportation improvement plan. Proposed projects to be funded FY2021 Estimated Amount Titan NorthPark35 – Aviation Drive Extension Construction $8,000,000 Page 67 of 96 Page 68 of 96 Page 69 of 96 Page 70 of 96 Page 71 of 96 Page 72 of 96 Page 73 of 96 Page 74 of 96 Page 75 of 96 Page 76 of 96 Page 77 of 96 Page 78 of 96 Page 79 of 96 Page 80 of 96 Page 81 of 96 Page 82 of 96 Page 83 of 96 Page 84 of 96 Page 85 of 96 Page 86 of 96 Page 87 of 96 Page 88 of 96 Page 89 of 96 Page 90 of 96 Page 91 of 96 Page 92 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: E XE C UT IVE S E S S IO N In c omplianc e with the O pen Meetings Ac t, C hapter 551, G overnment C ode, Vernon's Texas C odes, Annotated, the item listed below will be dis cus s ed in c los ed session and is s ubjec t to action in the regular s es s ion. S ec. 551.087 Deliberation Regarding Economic Development Negotiations P roject Diana - Mic haela Dollar, Ec onomic Development Direc tor IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Page 93 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: E XE C UT IVE S E S S IO N In c omplianc e with the O pen Meetings Ac t, C hapter 551, G overnment C ode, Vernon's Texas C odes, Annotated, the item listed below will be dis cus s ed in c los ed session and is s ubjec t to action in the regular s es s ion. S ec. 551.087 Deliberation Regarding Economic Development Negotiations P roject Acc es s - Mic haela Dollar, Ec onomic Development Direc tor IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Page 94 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: C onsideration and pos s ible ac tion from Exec utive S es s ion - P rojec t Diana -- Michaela Dollar, Economic Development Director IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Page 95 of 96 City of Georgetown, Texas Transportation Enhancement Corp April 21, 2021 S UB J E C T: C onsideration and pos s ible ac tion from Exec utive S es s ion - P rojec t Ac cess -- Mic haela Dollar, Ec onomic Development Director IT E M S UMMARY: F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: Page 96 of 96