Loading...
HomeMy WebLinkAboutAgenda_GTAB_08.13.2021Notice of Meeting for the Georgetown Transportation Adv isory Board of the City of Georgetown August 13, 2021 at 10:00 AM at Georgetown P ublic L ibrary - F riends Room T he C ity o f G eorgetown is c o mmitted to c ompliance with the Americans with Dis ab ilities Ac t (ADA). If yo u req uire as s is tanc e in participating at a p ublic meeting d ue to a disability, as d efined und er the ADA, reasonable as s is tance, ad ap tatio ns , or acc o mmo d ations will b e provid ed up o n req uest. P leas e contac t the C ity S ecretary's O ffic e, at leas t three (3) d ays p rio r to the s cheduled meeting date, at (512) 930-3652 or C ity Hall at 808 Martin Luther King Jr. S treet, G eo rgeto wn, T X 78626 for ad d itional info rmation; T T Y us ers route thro ugh R elay Texas at 711. This B oar d is now me eting in-pe r son with a quorum pr e sent and public is welcome to attend. If spec ial ac c ommodations ar e ne e de d due to C O V I D-19 and atte ndi ng vir tual ly is nec e ssar y, pl ease r eac h out to the Staff L iaison, C indy M e dr ano at c indy.me dr ano@geor getown.or g for assi stance Regular Session (T his R egular S es s ion may, at any time, be rec es s ed to c o nvene an Exec utive S es s ion for any purp o s e authorized b y the O pen Meetings Ac t, Texas G o vernment C ode 551.) A C all to O rd er - Board C hair B Intro d uc tio n o f Vis itors - Bo ard C hair C P ublic Wishing to Address the Board On a subject not posted on the agenda: P ers o ns may ad d an item to a future R egular s ched uled Bo ard agenda by filing a written req uest with the S taff Liaison no later than one week prior to the Board meeting. T he req ues t mus t inc lude the sp eaker ’s name and the s p ecific topic to be ad d res s ed with sufficient info rmation to info rm the b o ard and the pub lic. Only those persons who have submitted a timely request will be allowed to speak. F or Board Liais o n contac t info rmation, p leas e logo n to http ://georgeto wn.org/boardsc o mmis s ions / At the time of posting, no persons had signed up to address the Board. D Augus t 2021 G TAB Up d ates - Wes ley Wright, P.E., S ystems Engineering Directo r / C hris P ous s o n, C I P Manager. E July 2021 F inancial O verview of Airport F und and Budget R ep o rt Works ho p . - Nathan P arras , Assis tant F inanc e Direc to r F July 2021 Airport Mo nthly R eport – Jos eph A. C arney, C .M., Airport Manager L egislativ e Regular Agenda G C ons id eratio n and p o s s ib le ac tion to app ro ve the July 9, 2021 minutes o f the G eorgetown Transportatio n Advis o ry Bo ard . -- C ind y Medrano , Board Liais on Page 1 of 78 H C ons id eratio n and p o s s ib le rec o mmendation to award a contrac t to Aus tin Traffic S ignal C ons truction C o., Inc. o f P flugerville, Texas for all parts fo r a total amount of $405,716.00. – Wes ley Wright, P.E., S ys tems Engineering Direc tor/C hris P ous s o n, C IP Manager. I C ons id eratio n and pos s ible recommendatio n to award a c o ntract to Aus tin Traffic S ignal C o nstruc tio n C o., Inc. o f P flugerville, Texas fo r all parts in the amount o f $860,016.00. -- Wesley Wright, P.E., S ys tems Engineering Direc tor/C hris P ous s o n, C IP Manager J C ons id eratio n and p o s s ib le ac tio n to ap p ro ve a F irs t Annual R enewal Agreement with Asphalt Inc. of Aus tin, Texas fo r the p urc hase o f Asphalt Mixes, in amount not to exc eed $180,000. – Eric Jo hns on, P ub lic Wo rks Directo r and Mo lly R itter, P ublic Wo rks O peratio ns Manager. Adjournment Adjournment - Board C hair Ce rtificate of Posting I, R obyn Dens mo re, C ity S ec retary for the C ity of G eorgetown, Texas, do hereb y certify that this Notice of Meeting was p o s ted at C ity Hall, 808 Martin Luther King Jr. S treet, G eorgeto wn, T X 78626, a p lace readily acc es s ib le to the general p ublic as req uired by law, on the _____ day of _________________, 2021, at __________, and remained so p o s ted fo r at leas t 72 c o ntinuo us hours prec eding the sc heduled time of s aid meeting. __________________________________ R o b yn Dens more, C ity S ecretary Page 2 of 78 City of Georgetown, Texas Transportation Advisory Board August 13, 2021 S UB J E C T: August 2021 G TAB Updates - Wesley Wright, P.E., S ys tems Engineering Direc tor / C hris P o usson, C I P Manager. IT E M S UMMARY: F M 971 - Realignment at Austin Avenue: T xDO T b id June of 2021 Low bid b y C HAS C O c o nstruc tion, contrac ts under review N o rthwest B lvd: · Utility wo rk complete · P aving c o mp lete. · Brid ge complete · Es timated p ro ject c o mp letion p us hed to Mid -August with ad d ition of temporary traffic signal. D B Woods P ro ject design to utilize existing R O W, Design is und erway with typic al sec tio ns currently und er review alo ng with brid ge o p tions . P ublic meeting held o n 6-17 6:00 P M at the p o lic e Head q uarters build ing o n DB Wood R d . Developing answers for the s ubmitted q uestio ns. Meeting held with DB Wo o d residents 7-29 to talk with them about their c o nc erns . S outhwestern B lvd: P reliminary alignment revis ed . P erfo rming Hydrologic and Hydraulic c alc ulations . R O W need s forward ed to Travis . S E Inner Loop: S ubgrad e c omplete c urrent s ectio n and d rainage work underway, b as e c o urs e ins tall current sec tion und erway bas e c o urs e complete, p aving to ins tall this s ec tion by first week in Augus t. C ulvert extension No rth side co mp lete. P rojec t is 75% completed. 75% sidewalk ins talled. R eloc ate ab o ve ground utilities c o mp lete. 2020 Curb and Gutter C o ntracto r has p lac ed notificatio ns o n res idents ’ d o o rs . C urb wo rk is 90% c o mp lete o n Meadowb ro o k. As p halt repairs need to be mad e. Rock S idewalk / F Y20 Downtown AD A sidewalk Improvements C o ntracto r has c ompleted wo rk o n R o ck S t b etween 8th and 9th. T hey are c urrently working on R oc k S t b etween 7th and 8th S t. C urb and s id ewalk are in on 7th S t in fro nt of G eorgeto wn Title. P aving s et fo r the week of 7/26. Page 3 of 78 2021 Signal Improvements S hell R d @ Verd e Vis ta and Williams @ Estrella C ro s s ing were bid July 22 with Aus tin traffic S ignal as the low bid and rec o mmended fo r award . 2021 Intersection P edestrian S afety Enhancements Des ign and survey und erway for rectangular rapid flas h b eacons (R R F B) at the following loc ations . C o ol S p rings Way @ C owan C reek Amenity C enter, 5th S treet @ Austin Ave., 8 th S treet @ Lib rary (new p arking lo t) and Indus trial Ave @ G MC remote parking lot. 100% p lans reviewed. Bid s opened on July 12th. Austin Traffic S ignal s o le bidder fo r the projec t. Unit p rices s imilar to p revious ly b id projec t. S H 29 Access Improvements – traffic signal Ins tallatio n of light is c o mp lete and o p en to traffic at new signal. 2021 High P erformance P avement Seal P roject #1 G TAB Board and C ounc il approved award in May 2021. C ontrac ts s igned and acc ep ted. S c hedules b eing developed. Tentative to start late Augus t to firs t of S ep tember. 2021 High P erformance P avement Seal P roject #2 Andale C o nstruc tio n contrac t was ap p ro ved by G TAB Bo ard and C ity C ounc il in May 2021. Areas inc luded in the p ro ject are Berry C reek, Q uail Valley, P leas ant Valley and G atlin C reek neighborho o d s . Tentative s tart d ate is mid-Augus t. 2021 HIP R project Tree trimming und erway in the area off Williams Dr./ H I P R expec ted to begin firs t p art o f August. F IN AN C IAL IMPAC T: N/A S UB MIT T E D B Y: C hris P o usso n AT TAC H ME N T S: D escription Type Augus t 2021 GTAB Updates Pres entation Page 4 of 78 August 2021 GTAB Updates Cover Sheet FM 971 - Realignment at Austin Avenue: TxDOT bid June of 2021 Low bid by CHASCO construction, contracts under review Northwest Blvd: • Utility work complete • Paving complete. • Bridge complete • Estimated project completion pushed to Mid-August with addition of temporary traffic signal. DB Woods Project design to utilize existing ROW, Design is underway with typical sections currently under review along with bridge options. Public meeting held on 6-17 6:00 PM at the police Headquarters building on DB Wood Rd. Developing answers for the submitted questions. Meeting held with DB Wood residents 7-29 to talk with them about their concerns. Southwestern Blvd: • Preliminary alignment revised. • Performing Hydrologic and Hydraulic calculations. • ROW needs forwarded to Travis. SE Inner Loop: Subgrade complete current section and drainage work underway, base course install current section underway base course complete, paving to install this section by first week in August. Culvert extension North side complete. Project is 75% completed. 75% sidewalk installed. Relocate above ground utilities complete. 2020 Curb and Gutter Contractor has placed notifications on residents’ doors. Curb work is 90% complete on Meadowbrook. Asphalt repairs need to be made. Page 5 of 78 Rock Sidewalk / FY20 Downtown ADA sidewalk Improvements Contractor has completed work on Rock St between 8th and 9th. They are currently working on Rock St between 7th and 8th St. Curb and sidewalk are in on 7th St in front of Georgetown Title. Paving set for the week of 7/26. 2021 Signal Improvements Shell Rd @ Verde Vista and Williams @ Estrella Crossing were bid July 22 with Austin traffic Signal as the low bid and recommended for award. 2021 Intersection Pedestrian Safety Enhancements Design and survey underway for rectangular rapid flash beacons (RRFB) at the following locations. Cool Springs Way @ Cowan Creek Amenity Center, 5th Street @ Austin Ave., 8th Street @ Library (new parking lot) and Industrial Ave @ GMC remote parking lot. 100% plans reviewed. Bids opened on July 12th. Austin Traffic Signal sole bidder for the project. Unit prices similar to previously bid project. SH 29 Access Improvements – traffic signal Installation of light is complete and open to traffic at new signal. 2021 High Performance Pavement Seal Project #1 GTAB Board and Council approved award in May 2021. Contracts signed and accepted. Schedules being developed. Tentative to start late August to first of September. 2021 High Performance Pavement Seal Project #2 Andale Construction contract was approved by GTAB Board and City Council in May 2021. Areas included in the project are Berry Creek, Quail Valley, Pleasant Valley and Gatlin Creek neighborhoods. Tentative start date is mid-August. 2021 HIPR project Tree trimming underway in the area off Williams Dr./ HIPR expected to begin first part of August. Page 6 of 78 FM 971 at Austin Avenue Realignment Intersection Improvements Project No. 1BZ TIP No. AG August 2021 Project Description Design and preparation of final plans, specifications and estimates (PS&E) for the widening and realignment of FM 971 at Austin Avenue, eastward to Gann Street. Purpose To provide a new alignment consistent with the alignment of the proposed Northwest Boulevard Bridge over IH 35; to allow a feasible, alternate route from the west side of I 35 to Austin Avenue, to Georgetown High School, to San Gabriel Park and a more direct route to SH 130. Project Managers Joel Weaver Engineer Klotz Associates, Inc. Element Status / Issues Design TxDOT bid June of 2021 Low bid by CHASCO construction, contracts under review Environmental/ Archeological Complete Rights of Way Final parcel preparing for closing Utility Relocations TBD Construction Utility relocation in the park complete Other Issues AFA with TxDOT complete. Page 7 of 78 Northwest Boulevard (Fontana Drive to Austin Avenue) Project No. 5QX TIP No. AF August 2021 Project Description Construction of overpass and surface roads to connect Northwest Boulevard with Austin Avenue and FM 971. Purpose This project will relieve congestion at the Austin Avenue/Williams Drive intersection and provide a more direct access from the west side of IH 35 corridor to Georgetown High School and SH 130 via FM 971. Project Manager Joel Weaver and Wesley Wright, P.E. Engineer Klotz Associates Element Status / Issues Design Design Complete Environmental/ Archeological Complete Rights of Way ROW Documents are being finalized. All offers have been made. 8 Parcels required. 5 acquired, 1 in closing, 2 in condemnation. Utility Relocations TBD Construction • Utility work complete • Paving complete. • Bridge complete • Estimated project completion pushed to Mid August with addition of temporary traffic signal. Other Issues Page 8 of 78 D B Wood Widening Project No. PRJ000188 TIP No. August 2021 Project Description D.B . Wood (SH 29 to Oak Ridge) ,Roadway improvements on DB Wood from SH29 to Oak Ridge Drive. Expanding Roadway from 2 lanes to 5 lanes (4 travel lanes w/turn lanes). Purpose To manage current and future traffic flow Project Manager Joel Weaver Engineer Kimely-Horn and Associates. Inc. Element Status / Issues Design Design is underway with typical sections currently under review along with bridge options. Public meeting held 6-17 at 6:00 PM at the police Headquarters building on DB Wood Rd. developing answers for the submitted questions. Meeting held with DB Wood residents 7-29 to talk with them about their concerns. Surveying Survey is underway Environmental/ Archeological Underway Rights of Way Project design to utilize existing ROW Utility Relocations TBD Construction N/A Other Issues None Page 9 of 78 Widening of: SE Inner Loop - FM 1460 to Austin Avenue Roadway & Southwestern Boulevard – Raintree Drive to SE Inner Loop Roadway August 2021 Project Description FM 1460 to Austin Avenue Roadway Widening Project & Southwestern Boulevard – Raintree Drive to SE Inner Loop Roadway Widening Project (See Attached Exhibit C). The professional services will consist of providing final roadway, drainage, water, wastewater, incidental designs, as well as, utility coordination, ROW support, environmental phase I investigations, archeological investigations, geotechnical investigations, ROW & Temporary Construction Easement (TCE) metes and bounds documents, bidding documents, bidding services, and construction administration services. Project Managers Joel Weaver and Wesley Wright, P.E. Engineer KPA & Associates Element Status / Issues Design Southwestern: • Preliminary alignment revised • Performing Hydrologic and Hydraulic calculations • ROW needs forwarded to Travis Environmental/ Archeological Efforts to begin April 2019 and any issues are expected to be identified in the coming month. Rights of Way ROW needs on Southwestern to be determined Total Parcels: 0 Possession: 0 Pending: 0 Utility Relocations To be determined Construction SE Inner Loop: Subgrade complete current section and drainage work underway, base course install current section underway base course complete, paving to installed this section by first week in August. Culvert extension North side complete. Project is 75% completed. 75% sidewalk installed. Relocate above ground utilities complete. Page 10 of 78 Other Issues None. Page 11 of 78 2020 Curb and Gutter Project No. PRJ000024 TIP No. None Updated - August 2021 Project Description Design and preparation of final plans, specifications and estimates (PS&E) and construction administration for curb and gutter replacements on Meadowbrook Drive, Oakland Drive and Ridge Oak Drive. Purpose This project consists of removing and replacing old curb and gutter that do not properly drain storm water and prematurely damage streets. Project Managers Chris Pousson / Chris Logan Engineer Contractor KPA Yoko Excavating Element Status / Issues Design Design is complete. Environmental/ Archeological N/A Rights of Way N/A Utility Relocations None Bid Phase Project is advertised. Bid Opening held on December 15th, 2020. Yoko Excavating LLC low qualified bidder. GTAB approved award on February 12th,, Council approved award on February 23rd. Construction Curb work is 90% complete on Meadowbrook. Asphalt repairs need to be made. Other Issues Page 12 of 78 Citywide Sidewalk Improvements Project Rock Sidewalk / FY 20 Downtown ADA Improvements Project No. PRJ000138 TIP No. None Updated - August 2021 Project Description The proposed project consists of the rehabilitation and installation of pedestrian facilities along several streets on Rock Street between 8th and 7th and Downtown ADA Sidewalk Improvements. Various methods of rehabilitating existing non- compliant sidewalks will be considered. This project requires coordination with TCEQ and TDLR and all proposed pedestrian elements will be ADA compliant with the Texas Accessibility Standards (TAS). Purpose To provide ADA/TDLR compliant sidewalks and ramps identified in the 2015 Sidewalk Master Plan . Project Managers Chris Pousson Engineer Contractor KPA TBD Element Status / Issues Design Finalizing design with Facilities and Park departments. Submitting TCEQ WPAP Exception. Environmental/ Archeological TBD Rights of Way / Easements Will require a couple Temporary Construction easement. TCO has been acquired by Georgetown Title Company. Utility Relocations TBD Construction Contractor has completed work on Rock St between 8th and 9th. They are currently working on Rock St between 7th and 8th St. Curb and sidewalk are in on 7th St in front of Georgetown Title. Paving set for week of 7/26. Other Issues Page 13 of 78 Signal Improvements – Various Locations Project No. PRJ000214 TIP No. None August 2021 Project Description Design and preparation of Plans, Specifications, Estimate, Bidding Documents, and construction phase services for the construction of signal improvements for the intersections of Williams Drive & Estrella Crossing, Shell Road & Verde Vista and SE Inner Loop & Rockride Lane. Purpose To better manage traffic movements at the intersection. Project Manager Joel Weaver Engineer KPA Element Status / Issues Design Shell Rd @ Verde Vista and Williams @ Estrella Crossing were bid July 22 with Austin traffic Signal as the low bid and recommended for award. Surveying Completed Environmental/ Archeological TBD Rights of Way TBD Utility Relocations TBD Construction Rock Ride and SE Innerloop contract awarded. Traffic Signal poles and mast arms are on order. Other Issues None Page 14 of 78 2021 Intersection Pedestrian Safety Enhancements Project No. PRJ000215 TIP No. None Updated - August 2021 Project Description Design and preparation of Plans, Specifications, Estimate, Bidding Documents and construction phase services for the construction of intersection pedestrian safety enhancements at the intersections of Cool Springs Way @ Cowan Creek Amenity Center, 5th Street @ Austin Ave, 7th Street @ Library (new parking lot) and Industrial Ave @ GMC remote parking lot. Purpose To enhance pedestrian safety at intersections with push button activated rapid flashing beacons to alert drivers of pedestrian presence. Project Manager Joel Weaver Engineer KPA Element Status / Issues Design 100% plans reviewed. Bids opened July 12th, Austin Traffic Signal was sole bidder. To be presented to GTAB and Council for consideration and approval in August. Surveying Completed Environmental/ Archeological TBD Rights of Way TBD Utility Relocations TBD Construction TBD Other Issues None Page 15 of 78 2021 Street Maintenance Project No. PRJ000211 / PRJ000212 TIP No. None Updated - August 2021 Project Description Purpose 2021 CIP Maintenance project consist of furnishing and installing approximately 230,000 square yards of high performance pavement seal (PMM) and approximately 190,000 square yards of high performance pavement seal (HA5) traffic control, and miscellaneous striping in Sun City, Berry Creek, Gatlin Creek, Reata Trails, Quail Valley and Pleasant valley neighborhoods. To provide protection and maintain an overall pavement condition index of 85% Project Manager Daniel Havins Engineer/Engineers KPA, LP Task Status / Issues High performance pavement seal Package #1 (PMM) GTAB Board and Council approved award in May 2021. Contracts signed and accepted. Schedules being developed. Tentative to start late August to first of September. High performance pavement seal Package #2 (HA5) Andale Construction contract was approved by GTAB Board and City Council in May 2021. Areas included in the project are Berry Creek, Quail Valley, Pleasant Valley and Gatlin Creek neighborhoods. Tentative start date is mid-August. Page 16 of 78 Page 17 of 78 Page 18 of 78 Page 19 of 78 Page 20 of 78 Project: 2021 Street Maintenance Hot In Place Recycling (HIPR) Project# PRJ000210 August 2021 Project Description: This project will consist of furnishing an installing approximately 115,000 square yards of hot-in-place asphalt recycling, edge milling, adjustment of water valves and manholes, tree pruning, traffic control and miscellaneous striping. Purpose: The purpose of this project is to maintain high Pavement Condition Indices (PCI) by Hot-In-Place asphalt recycling within the City Street Maintenance Program Project Manager: Joel Weaver Engineer: KPA Contractor: Cutler repaving Phase Start Finish Status / Comments Preliminary Engineering 10/ 2020 1/ 2021 ROW / Easements N/A N/A Bid / Award Bid # Bid 4-22 $1,662,185.20 TBD Total cost / Sq. Yd 2021 $14.45 (2020 $13.88) Construction TBD TBD Tree trimming underway in the area off Williams Dr./ HIPR expected to begin first part of August. Post Construction Page 21 of 78 Page 22 of 78 Page 23 of 78 City of Georgetown, Texas Transportation Advisory Board August 13, 2021 S UB J E C T: July 2021 F inanc ial O verview o f Airp o rt F und and Bud get R eport Wo rkshop. - Nathan P arras, As s is tant F inance Direc tor IT E M S UMMARY: July 2021 F inanc ial O verview o f Airp o rt F und and Budget R ep o rt Works ho p . - Nathan P arras , Assistant F inance Direc tor F IN AN C IAL IMPAC T: . S UB MIT T E D B Y: Nathan P arras , As s is tant F inance Directo r AT TAC H ME N T S: D escription Type Executive Summary Executive Summary GTAB Financial Report July Backup Material GTAB Pres entation July Pres entation Page 24 of 78 F GTAB MONTHLY REPORT AS OF JULY 31, 2021 Operating revenues include fuel sales, leases, and all other revenue. The operating revenue budget totals $3,951,500. This includes recognizing the Midyear Budget Amendment increasing fuel sales by $500,000. Year-to-date operating revenue totals $3,120,160, or 78.96% of the operating revenue budget. Fuel is the largest revenue stream in the fund and represents $3,000,000, or 75.92% of budgeted operating revenues. Through the period, fuel sales total $2,288,664, or 76.29% the fuel budget. Year-to-date fuel sales are up by 22.38% relevant to the same time last fiscal year. Fuel sales are tracked every month by staff and are part of the Airport’s performance metrics. Hangar rental revenues are the second largest stream of revenue for the Airport, representing 12.02% budgeted operating revenues. Year-to-date, hangar revenue totals $390,550 or 82.22% of budget. Occupancy rates continue to be strong. The stated goal per the Airport performance management program is to have occupancy rates over 90%. In fiscal year 2021, the Airport has monthly basis continues to meet this goal. Operating expenses include personnel costs, airport operations, ongoing capital maintenance, and fuel for resale. Airport operating expenses total budget is $4,427,731. Year-to- date personnel expenses total $350,276, or 75.41% of budget. Year to date personnel costs include the addition of 1 full time employee, who was transferred from Customer Care to Airport as part of the Midyear Budget Amendment. The City has experienced 21 of 26 pay periods through this period, or 80.77% of total cycles. Other Airport operational related expenses include internal service and administrative allocation charges, fuel expenses, and various other operating expense. Internal service charges total $172,919, or 66.67% of budget. Administrative allocation totals $101,663, or 82.23% of budget. Fuel expense is the largest expense of the Airport operating budget totaling $2,600,000, or 58.72% of the operating budget. Fuel expense budget was amended in the Midyear Budget Amendment in the amount of $500,000. Year-to-date fuel expense $2,117,400, or 81.44% of budget. Fuel is encumbered at the beginning of the fiscal year and liquidated throughout the year. At the end of this period, there $394,634 of encumbered funds for the remainder of the fiscal year. Operating capital includes items that are typically routine in nature such as pavement maintenance, hangar maintenance, and wildlife management. The budget for operating capital totals $404,067, or 9.13% of the operating budget. Year-to-date operating capital expenses totals $19,839. 22.38% 2,288,664 FUEL SALES K 500K 1.0M 1.5M 2.0M 2.5M 01 ) O c t 02 ) N o v 03 ) D e c 04 ) J a n 05 ) F e b 06 ) M a r 07 ) A p r 08 ) M a y 09 ) J u n 10 ) J u l FY2020 FY2021 2,117,400 2,288,664 Fuel Sales to Fuel Expenses 150K 301K 451K 583K 713K 958K 1.2M 1.3M 1.6M 1.7M 2.0M 1.8M 1.7M 1.5M 1.4M 1.2M 965K 808K 559K 395K K 500K 1.0M 1.5M 2.0M 2.5M 01) Oct 02) Nov 03) Dec 04) Jan 05) Feb 06) Mar 07) Apr 08) May 09) Jun 10) Jul Actuals Encumbrances 43606:RC0057 Fuel Sales Page 25 of 78 F Non-operating revenues budget includes a total of $705,000 for bond proceeds and miscellaneous revenue for the year. The Airport fund anticipates to issue bond proceeds in the amount of $700,000 for the construction of a new maintenance facility. Non-operating expenses have a total budget of $908,931, year to date spending totals $30,873. The Airport will use $750,000 in CIP expense for the construction of a new maintenance facility. The non-operating budget amount is for the Airport funds debt service payment. The debt service payment is made up of principal reduction, $89,813, and interest expense, $53,618. Page 26 of 78 COG - Airport Operations Financial Report Period: Jul-21 Budget Period FY2021 Jul-21 Jul-21 Pre-Encumbrances Encumbrances YTD Actuals w/Encumbrances Variance % of Budget Beginning Fund Balance 1,463,499 1,463,499 1,463,499 - 100.00% Operating Revenue 40001:Property Taxes 40,000 - - - - - (40,000) 0.00% 42001:Interest Income 3,000 - 3,416 - - 3,416 416 113.87% 43606:Airport Charges 3,908,500 378,659 3,116,744 - - 3,116,744 (791,756) 79.74% Operating Revenue Total 3,951,500 378,659 3,120,160 - - 3,120,160 (831,340) 78.96% Operating Expense Personnel 464,472 38,267 350,276 - - 350,276 114,196 75.41% Operations 3,559,192 187,791 2,315,772 417 1,661,420 3,977,609 (418,417) 111.76% Operating Capital 404,067 - 19,839 - - 19,839 384,228 4.91% Expense 4,427,731 226,059 2,685,887 417 1,661,420 4,347,724 80,008 98.19% Total Net Operations (476,231) 152,601 434,273 (417) (1,661,420) (1,227,564) (911,348) 257.77% Non-Operating Revenue 44001:Grant Revenue - 156,980 156,980 - - 156,980 156,980 0.00% 45001:Misc Revenue 5,000 1,250 2,250 - - 2,250 (2,750) 45.00% 46001:Bond Proceeds 700,000 - 650,000 - - 650,000 (50,000) 92.86% 46002:Bond Premium - - 64,186 - - 64,186 64,186 0.00% Non-Operating Revenue Total 705,000 158,230 873,417 - - 873,417 168,417 123.89% Non-Operating Expense CIP Expense 750,000 - - - - - 750,000 0.00% Debt Service 158,931 - 30,873 - - 30,873 128,058 19.43% Non-Operating Expense 908,931 - 30,873 - - 30,873 878,058 3.40% Net Non-Operations (203,931) 158,230 842,544 - - 842,544 1,046,474 -413.15% Excess (Deficiency) of Total Revenue over Total Requirements (680,162) 310,831 1,276,817 (417) (1,661,420) (385,020) 295,142 -43.39% Ending Fund Balance 783,337 310,831 2,740,316 (417) (1,661,420) 1,078,479 295,142 137.68% Reserves Contingency Reserves 332,917 332,917 332,917 100% Debt Service Reserve 141,478 141,478 141,478 100% Reserves Total 474,395 474,395 474,395 100% Available Fund Balance 308,942 310,831 2,265,921 (417) (1,661,420) 604,084 295,142 195.53% YTD Actuals Budget Vs. Actuals Page 27 of 78 Georgetown Transportation Advisory Board FY2021 Financial Summary: July 21Page 28 of 78 FY2021 FINANCIAL SUMMARY: GTAB Airport Revenue •FY2021 Revenue Budget •Revenue Budget Sources •FY2021 Revenue Budget totals $4,656,500 •Operating Revenue •Airport Charges: •Fuel Sales 64%, including Midyear Budget Amendment addition of $500,000 •Hangar Rentals 10% •Facility Leases 5% •Non-Operating Revenue •Bond Proceeds $700,000 1% 0% 82% 0% 17%40001:Property Taxes 42001:Interest Income 43606:Airport Charges 45001:Misc Revenue 46001:Bond Proceeds Page 29 of 78 FY2021 FINANCIAL SUMMARY: GTAB Airport Operating Revenue COG - Airport Operations Financial Report Period: Jul-21 Budget FY2021 Jul-20 Jul-21 Variance % Variance Variance from Budget % of Budget Operating Revenue 40001:Property Taxes 40,000 - - - 0.00%(40,000) 0.00% 42001:Interest Income 3,000 16,431 3,416 (13,015) -79.21%416 113.87% 43606:Airport Charges 3,908,500 2,639,887 3,116,744 476,857 18.06%(791,756) 79.74% Operating Revenue Total 3,951,500 2,656,318 3,120,160 463,842 17.46%(831,340) 78.96% YTD Comparison YTD Budget Comparison Page 30 of 78 FY2021 FINANCIAL SUMMARY: GTAB Airport Operating Revenue •Operating Revenue •Fuel revenue total 75.92% of the operating revenue budget, or $3.0 million. •Amended fuel revenue by $500,000 as part of the mid-year budget amendment •Year -to-date fuel revenue totals $2.28 million, 76.29% of budget •FY2021 year-to-date fuel revenue are 22.38% more than FY2020 year-to-date collections 22.38% 2,288,664 FUEL SALES K 500K 1.0M 1.5M 2.0M 2.5M 01) Oct 02) Nov 03) Dec 04) Jan 05) Feb 06) Mar 07) Apr 08) May 09) Jun 10) Jul FY2020 FY2021 Page 31 of 78 FY2021 FINANCIAL SUMMARY: GTAB Airport Expenses •FY2021 Expense Budget •Expense Budget Sources •FY2021 Expense Budget totals $5,336,662 •Operating Expense •Personnel 9% •Operations 68%, including Midyear Budget Amendment increase of $500,000 •Operating Capital 7% •Non-Operating Expense •CIP Expense 14% •$750,000 Airport Maintenance Facility •Debt Service 3% 9% 65% 7% 16% 3%Personnel Operations Operating Capital CIP Expense Debt Service Page 32 of 78 FY2021 FINANCIAL SUMMARY: GTAB Airport Operating Expenses COG - Airport Operations Financial Report Period: Jul-21 Budget FY2021 YTD Actuals w/Encumbrances: Jul-20 YTD Actuals w/Encumbrances: Jul-21 Variance % Variance Variance from Budget % of Budget Operating Expense Personnel 464,472 363,516 350,276 13,240 -3.64%114,196 75.41% Operations 3,559,192 1,563,305 3,977,609 (2,414,304) 154.44%(418,417) 111.76% Operating Capital 404,067 21,602 19,839 1,763 -8.16%384,228 4.91% Operating Expense Total 4,427,731 1,948,423 4,347,724 (2,399,301) 123.14%80,008 98.19% YTD Actuals w/Encumbrances Comparison YTD Budget Comparison Page 33 of 78 FY2021 FINANCIAL SUMMARY: GTAB Airport Operating Expense •Operating Expense –Aviation Fuel •Aviation Fuel expense totals 58.72% of operating expense, or $2.6 million •Aviation Fuel actuals plus encumbrances total $2.11 million. •Actuals total $1,722,766 •Encumbrances total $394,634 2,117,400 2,288,664 Fuel Sales to Fuel Expenses 150K 301K 451K 583K 713K 958K 1.2M 1.3M 1.6M 1.7M 2.0M 1.8M 1.7M 1.5M 1.4M 1.2M 965K 808K 559K 395K K 500K 1.0M 1.5M 2.0M 2.5M 01) Oct 02) Nov 03) Dec 04) Jan 05) Feb 06) Mar 07) Apr 08) May 09) Jun 10) Jul Actuals Encumbrances 43606:RC0057 Fuel Sales Page 34 of 78 FY2021 FINANCIAL SUMMARY: GTAB Questions Page 35 of 78 City of Georgetown, Texas Transportation Advisory Board August 13, 2021 S UB J E C T: July 2021 Airp o rt Monthly R ep o rt – Joseph A. C arney, C .M., Airp o rt Manager IT E M S UMMARY: Airport Reports: o Taxiway Ed ge Lighting o Maintenanc e Build ing o O peratio ns R eport o F uel S ales R ep o rt o Hangar / Tie-Do wn Lease R ep o rt o F Y 2021 P ro jec ts and Acc o mp lis hments o Avgas F uel P ric e C o mp aris o n o Jet A F uel P ric e C o mp aris o n F IN AN C IAL IMPAC T: No ne S UB MIT T E D B Y: Deb b ie Jolly, Airport Busines s C oordinator AT TAC H ME N T S: D escription Type Airport Cover Sheet Cover Memo Taxiway Edge Lighting Backup Material Maintenance Building Backup Material Operations Report Backup Material Fuel Sales Report Backup Material Hangar / Tie-Down Leas e Report Backup Material FY 2021 Projects and Accomplis hments Backup Material Avgas Fuel Price Comparis on Backup Material Jet A Fuel Price Comparis on Backup Material Page 36 of 78 GTAB Meeting Date: August 13, 2021 Item No. AGENDA ITEM COVER SHEET _____________________________________________________________________________________________________________________ SUBJECT: Airport Monthly Report – Joseph A. Carney, C.M., Airport Manager ____________________________________________________________________________________________________________________ ITEM SUMMARY: Airport Reports: o Taxiway Edge Lighting o Maintenance Building o Operations Report o Fuel Sales Report o Hangar / Tie-Down Lease Report o FY 2021 Accomplishments and Projects o Avgas Fuel Price Comparison o Jet A Fuel Price Comparison STAFF RECOMMENDATION: None FINANCIAL IMPACT: None COMMENTS: None ATTACHMENTS: Submitted By: Joseph A. Carney, Airport Manager Joseph A. Carney, C.M. Airport Manager Eric Johnson Director of Public Works Page 37 of 78 Airport Improvements Project No. 1914GRGTN July 2021 Project Description FY2018 project: Taxiway Edge Lighting Project Purpose Design and Install Taxiway Edge Lighting Project Project Estimate $1,287,562 Project Bid (F&W) $985,150 City Share $98,515 Project Engineer Garver Engineering Feb 2014 – GTAB consideration of project 1314GRGTN Preliminary Design for FY2014 project: Airfield Electrical Improvements. Aug 8, 2018 Georgetown Municipal Airport requests to use Garver as project engineer in letter to TxDOT. May 29, 2019 TxDOT advises Garver that they can proceed with the Final Design for Project 1914GRGTN May 29, 2019 Pre Design/Design meeting at Georgetown Municipal Airport Conference room with Airport Manager, TxDOT, and Garver to go over timeline for design and contract documents. June 14, 2019 GTAB consideration of project 1914GRGTN Taxiway Lighting Project. June 25, 2019 City Council approved project July 9, 2019 Meeting with TxDOT, Engineer Bid Estimate was $2,862,980.00 which is $1,575,418.00 over the CIP Budgeted amount. July 16, 2019 Meeting with TxDOT and Garver to discuss options for reducing cost. Page 38 of 78 July 30, 2019 Meeting with TxDOT and Garver to discuss proposal that will be submitted for final design. August 4 & 11, 2019 TxDOT will place ads in local newspapers for bids. August 30, 2019 Bid Opening at TxDOT, 4 companies submitted bids. The engineer of record, GarverUSA, is currently reviewing the bid documents for completeness and correctness. September 2019 There were 4 bids, one of which came in significantly under budget for the Base Bid. Garver Engineer was working with TxDOT to see if there was a possibility of pulling the PAPI lights for RWY 11/29 out of the additive alternate while staying under budget. TxDOT refused. Engineer is working on final work in conjunction with TxDOT. October 29, 2019 TELCON 10/31/19 with Garver, F&W. TxDOT and Airport. Contract will be fully executed 11/1/19 between TxDOT and F&W for the Taxiway Lighting Project (1914GEORG). There will be walk through 11/13/19 with all parties to get an eyes-on look and discuss phasing ideas. November 12, 2019 Executed contract between TxDOT and F&W Electrical. November 13, 2019 Notice to Proceed given to GarverUSA for construction phase. November 13, 2019 Notice to Procure given to F&W to start gathering necessary parts and tools. December 16, 2019 F&W Started to preposition equipment and materials. January 6, 2020 F&W Started construction. Working from North to South. February 25, 2020 Work on Twy A btwn the threshold RWY 18 and TWY J is complete along the west side. Complete to TWY E on the east side. Work complete TWY L from TWY G to threshold RWY 36. March 6, 2020 Work on TWY L south of RWY 11/29 complete except marking signs. Work is progressing on TWY F between TWY L and TWY A and should be complete by March 9, 2020. Anticipated work on TWY A and the west side of Terminal Ramp to begin March 6, 2020. May 2020 Work was stopped due to supply system hold up: Sign faces and ALCMS hardware/software. July/August 2020 Sign faces arrived at F&W. ALCMS will be upgraded on August 11 remotely and via local hands-on with F&W Techs. Final punch-list items will be completed by F&W in this time period. Areas left to complete: 1. All dirt work to include topsoil, grass seeding and gravel/rock removal. 2. Missing sign faces Project timeline overruns This has been asked of TxDOT. TxDOT would be the agency that processes the penalties against F&W, who then could process penalties against any of the sub- contractors. Page 39 of 78 September/October 2020 F&W working on final dirt work, filling in low spots with clean fill and establishing correct grade around light/sing bases. Seeding all dirt with clean field grass seed. October 23 GarverUSA hosted a “Lessons Learned” meeting with TxDOT, Garver, Airport Staff, and City Representative. October 30 GarverUSA sent email to F&W concerning final wrap up of the punch list items. December 30 As of this date F&W has not come back to complete the punch list items. TxDOT and GarverUSA are working with F&W to complete project. January 25 F&W is working to get last punchlist items completed, they are running into staffing issues as COVID-19 is affecting the personnel available to send. February 28 F&W is working to complete warranty repairs and punchlist items. Completion dates have been pushed back due to COVID impact, weather impacts and crew availability. March 23 Project accepted and now at TxDOT for final approval/release of funds. Questions about penalty clause and any rebates will be reviewed with TxDOT/GarverUSA June 28 Waiting on TxDOT for completion/wrap up of project. Projected timeline • Construction phase – January - March • Closeout Phase - 68 days post construction o Significant Completion Date is March 14, 2020 • At last count there were 9 weather days accrued Page 40 of 78 1 MEMORANDUM TO: Georgetown Transportation Advisory Board Members FROM: Joseph A. Carney, C.M.., Airport Manager SUBJECT: Airport Maintenance Building DATE: July 31, 2021 The purpose of this memo is to provide GTAB with updates for the Airport Maintenance Facility Building at the Georgetown Municipal Airport. 1. History a. Airport requested and was granted a $700,000 bond in 2019. This was to design and build a new Maintenance Facility that would be able to accommodate all of the maintenance equipment that is currently housed in two storage hangars and in an old, dilapidated hangar. b. The building would have an interior bay for vehicle storage, a tool crib for secure storage of all tools, and supply storage for all the supplies used on the airport. There would also be an outdoor covered wash bay so that equipment could be kept clean and reduce wear and tear. c. An RFP was released in early 2021, with GarverUSA being selected as the design contractor. d. After Design is completed, another RFP will be released for a construction contractor to complete the construction of the building. 2. Current Status a. City Facilities Manager, City Attorney, and GarverUSA are working through the contract, ironing out all details. b. Site has been selected for the new building. This site will be located at the end of Wright Brothers Drive in the woods to the east of Carol’s Corner. This area is not an aeronautical use area and allows easy access to the airport environment. c. As of 6/28/2021 there is no update to the previous information. Page 41 of 78 Georgetown Municipal Airport Contract Tower Program Update Operations for Month of July 2021 YEAR TO DATE YEAR TO DATE 2020 2021 COUNT %2020 2021 COUNT % IFR 899 1107 208 19%8342 9316 974 10.5% VFR 4285 3936 -349 -9%37424 37562 138 0.4% LOCAL 6873 5280 -1593 -30%54181 49111 -5070 -10.3% TOTALS 12057 10323 -1734 -16.8%99947 95989 -3958 -4.1% KGTU OPERATIONS FOR THE MONTH OF JULY TAKEOFF/L ANDING MONTHLY NUMBERS PREVIOUS/CURRENT YR PREVIOUS/CURRENT YR *This does not include flyover operations (i.e. handoffs from ABIA approach/departure control to KGTU tower then onto the next ATC). Page 42 of 78 Georgetown Municipal Airport Fuel Sales Update For Month of July 2021 YEAR TO DATE YEAR TO DATE 2020 2021 2020 2021 GALLONS % AVGAS 36,096 33,863 320,316 311,924 (8,392)-2.6% JET A 36,147 49,642 314,003 432,441 118,438 27.4% TOTALS 72,243 83,505 634,319 744,365 110,046 14.8% FUEL REPORT FOR MONTH OF JULY GALLONS SOLD FOR MONTH CHANGE PREVIOUS/CURRENT YRTYPE OF FUEL Page 43 of 78 Airport Hangar / Tie-Down Lease Update July 2021 Project Description Hangar / Tie-Down Lease Agreements Purpose Occupancy Rates Unit Stats Total T-Hangars – 130 • 127 Occupied • 2 Vacant • 1 Vacant – Maintenance working on electric door Anticipated Time on Waitlist for most recent listee • 6+ years • 347 persons on T-Hangar wait list Total Storage Units – 16 • 15 Occupied • 1 Vacant Total Tie-Downs – 44 Monthly, 8 for Overnight/Transient Parking • 40 Monthly Occupied • 3 Monthly Vacant – Grass location • 1 as last resort due to location • 35 persons on Tie-Down wait list T-Hangars Storage Hangars Tie-Downs Total Total 130 16 44 190 Occupied 127 15 40 182 95.79%Percentage Occupied Page 44 of 78 GTU Airport FY 2021 In-Work Projects Develop Airport Preventative Maintenance Program. Ongoing. Upgrade to bi-fold door drive motors in Hangars BB & CC. In progress. Install roller poppers in Hangar I. In progress – ½ complete. Convert lights in Hangars E, F, and G to LED. In progress. RFP for new fuel contract. ITB released to scoring committee. RFP for Market Rate Analysis and Lease Term Length Study. Working with purchasing to initiate the process. Virtower, LLC Aircraft monitoring system. Working through IT process to purchase device. Will allow for real time operational counts as well as Based Aircraft Inventory, and Noise Mitigation tools. Maintenance Building. Facilities is leading this project, currently they are working with legal and the consultant, GarverUSA, to develop a contract. Building will be designed by GarverUSA and then will be put out for ITB/RFP/RFQ for construction. $750,000 budget, $700,000 of which is bond funded. Planned Projects Obtaining Pesticide Application License to allow for airport staff to spray state regulated chemicals. Install chain link fence around Tower. Update tower communications equipment. Replace HVAC unit in CTA sheet metal shop. Spray seal asphalt pavement at north side of AeroJet Center hangar. Spray seal asphalt pavement at Hangars H, I, and J. Install cattle guard at north and south gates. Install decorative rock around AST and oil recovery tank fences. Replace window shades in Tower Cab. Page 45 of 78 Install Tower alarm when ATC voice recorder is inoperable. Accomplishments Tower CAB computer monitor replacement Fuel System Maintenance Contract Work with outside Attorney for FAA Part 13 response Page 46 of 78 Page 47 of 78 Page 48 of 78 Page 49 of 78 Page 50 of 78 City of Georgetown, Texas Transportation Advisory Board August 13, 2021 S UB J E C T: C o nsideration and pos s ible actio n to ap p rove the July 9, 2021 minutes o f the G eo rgeto wn Trans p o rtation Ad visory Board. -- C indy Med rano, Bo ard Liais o n IT E M S UMMARY: C o nsideration and pos s ible actio n to ap p rove the July 9, 2021 minutes of the G eorgetown Transportation Ad visory Board. F IN AN C IAL IMPAC T: . S UB MIT T E D B Y: C indy Med rano , Board Liais o n AT TAC H ME N T S: D escription Type July 9 Meeting Minutes Backup Material Page 51 of 78 Board Members Present: John Hesser, Michael Miles, Robert Redoutey, James Hougnon, Alfred Hajka Board Members Absent: George (Jerry) McCulley Staff Present: Joseph Carney, Nathan Parras, Elaine Wilson, Wesley Wright, Cindy Medrano, Wayne Nero, Will Parrish, Sheila Mitchell, Eric Johnson Others Present: Heather Witte, Ray Bruett, Melva Harbin, Ron Joseph, Jake French Regular Session A. Call to Order: Meeting called to order by Chair John Hesser at 10:00am Georgetown Transportation Advisory Board may, at any time, recess the Regular Session to Convene an Executive Session at the request of the Chair, a Board Member, The City Manager, Assistant City Manager, General Manager of Utilities, City Council Member, or legal counsel for any purpose authorized by the Open Meetings Act, Texas Government Code Chapter 551, and are subject to action in the Regular Session that follows. B. Introduction of Board Members and Visitors: All board members, visitors, and staff were introduced. Citizens Wishing to Address the Board: • Two public comment emails were presented and read to the board. They are attached to these minutes. • Board requested to check with legal regarding reading public comments into the minutes. • Ron Joseph addressed safety concerns to the board related to the DB Wood Expansion project to the neighborhood. • Ray Bruett addressed safety concerns to the board related to the DB Wood Expansion project including entering and leaving driveway, speed of traffic, noise, and water runoff. Minutes of the Meeting of the Georgetown Transportation Advisory Board and the Governing Body of the City of Georgetown, Texas July 09, 2021 Page 52 of 78 • Heather Witte addressed safety concerns to the board related to the DB Wood Expansion project to the neighborhood. C. July 2021 GTAB Updates – Wesley Wright, P.E., Systems Engineering Director / Chris Pousson, CIP Manager. • Wright provided some feedback and addressed safety concerns that the DB Wood residents brought up. Wright provided an update on the project state along with some possible solutions to comments brought up. • Miles asked about responses to comments brought up regarding the DB Wood Expansion project. Wright responded there is no specific timeline but could possibly take 4-6 weeks. • Miles spoke to the two projects impacting the neighborhood. • Wright shared project updates with the board. • Hesser asked clarification on the light on Williams Dr. and Wright provided clarification. • Public Comment: Melva Harbin addressed safety concerns to the board related to the DR Wood Expansion project to the neighborhood. D. Staff Updates – Wayne Nero, Interim Assistant City Manager • Nero introduced himself as the Interim Assistant City Manager and introduced Eric Johnson as the new director of Public Works. Page 53 of 78 E. July 2021 Financial Overview of Airport Fund and Budget Report Workshop – Nathan Parras, Assistant Finance Director • Parras provided the board with financial overview related to the airport. • Board Chair requested a financial overview tutorial from staff at another meeting. Staff to follow-up with board on this request. F. Airport Monthly Report – Joseph A. Carney, C.M., Airport Manager and Eric Johnson, Public Works Director • Carney provided the board with the monthly airport update. • The board had a question related to Garver on the lighting project. Johnson clarified how the process works to award design contracts which is how Garver was selected. • The board had a question on the maintenance shed at the airport related to parking and equipment. Carney clarified the parking for staff vehicles and all equipment inside the maintenance shed. • The board asked whether staff kept a scorecard on previous contractors. Johnson clarified that there is no scorecard kept for contractors but are evaluated and referenced per project/basis. • A public comment was emailed related to this item. The public comment was printed and presented to the board and attached to the minutes. Legislative Regular Agenda G. Consideration and possible action to approve the May 14, 2021 and June 11, 2021 minutes of the Georgetown Transportation Advisory Board. – Cindy Medrano, Board Liaison • MOTION by Miles, second by Redoutey. APPROVED unanimously 5-0- 1 McCulley Absent H. Consideration and possible recommendation for authorizing the application for the Airport Coronavirus Relief Grant Program (ACRGP) under the Coronavirus Response and Relief Supplemental appropriation Act (CRRSA) Act Funding of $57,162, split between Airport O&M and Air Traffic Control Tower through Page 54 of 78 U.S. Federal Aviation Agency (FAA) and Texas Department of Transportation (TxDOT) for eligible purposes at the airport control tower. – Joseph A. Carney C.M. Airport Manager and Eric Johnson, Public Works Director • The board had a clarifying question related to funding with TXDOT. Carney clarified the question for the board. • The board asked if the legal department had viewed this and had concerned. Carney clarified that they had viewed it and had no concern. • MOTION by Redoutey, second by Miles. APPROVED unanimously 5-0- 1 McCulley Absent Adjournment Motion by Hajka, second by Miles. APPROVED unanimously 5-0-1 The meeting adjourned at 11:10 AM John Hesser - Chair Robert Redoutey – Secretary Cindy Medrano – GTAB Board Liaison Page 55 of 78 Page 56 of 78 Page 57 of 78 Page 58 of 78 ACC GTAB STATEMENT JULY 9, 2021 AGENDA ITEM “F” AIRPORT MONTHLY REPORT Good morning Mr. Chairman and members of the GTAB. My name is Hugh C. Norris, Jr. My residence is 4400 Luna Trail, Georgetown, Texas. I am a member and speaking on behalf of the Airport Concerned Citizens (ACC). Prior to Item F comments, this presentation includes a request for amendment to board minutes in item G for the May 14, 2021 board meeting. ACC public comments that date addressed the Airport Monthly Report, Item “D”. Those prior prepared written comments were excluded from the draft minutes. Mr. Chairman, please request the Board Liaison to include the statement for final approved minutes for that meeting and preserve the customary practice of the city council and this board for inclusion of written public participation comments in official records. The Airport CIP project, Taxiway Edge Lighting Project, highlighted by Mr. Carney is an extracted, segmented component of the 20 year, 2016 Airport Master Plan, 52 project, $60 Million CIP designed to aid in expansion of airport operations from 85 per day in 1980 up to a planned 764 per peak day. This proposed operations expansion is not the last. More expansions and hazards to the community due to the airport’s location will follow. We should expect, due to voracious growth of our region and added demands for general aviation services, another 20 year airport plan will occur within the next 5 years The aerial public safety, health hazards and threats to the Edwards Aquifer by expanding airport operations in its current location in the heart of our growing city and atop the exposed EARZ has been described in previous ACC presentations. To fulfill its Reliever Airport FAA certification, our airport must expand in area and operations. Any extension of the primary runway beyond its current planned length of 6,000 ft will begin destruction of existing neighborhoods. More facilities for more operations will create more hazards and more destruction. The airport must be relocated to a safe and superior site Mr. Chairman, this board must act with its responsibilities and recommend to the city council that a professional plan for airport relocation to a safe, superior site for the future of our city and our region be funded and implemented. Thank you. Page 59 of 78 Page 60 of 78 City of Georgetown, Texas Transportation Advisory Board August 13, 2021 S UB J E C T: C o nsideration and pos s ible recommend ation to award a c o ntract to Austin Traffic S ignal C o nstruc tion C o ., Inc . o f P flugerville, Texas fo r all p arts for a to tal amo unt o f $405,716.00. – Wes ley Wright, P.E., S ystems Engineering Directo r/C hris P ous s on, C I P Manager. IT E M S UMMARY: T his proposed p ro ject c o nsists o f furnis hing, installing, and p ro viding all labor and materials required for the installation o f p us h button ac tivated rapid flashing b eacons , strip ing and signage at 4 loc atio ns noted b elo w. 5th & Austin Ave 8th street @ Library C rosswalk to the new parking lot C o o l S prings Way @ T he C owan C reek Amenity C enter Ind ustrial Ave @ the G eorgetown Munic ip al C enter T he rap id flas hing b eacons are d es igned to alert drivers that pedestrians are p res ent and increase vis ib ility o f the crosswalks in both d ay and night. T his p ro ject was p ublic ly ad vertis ed o n July 7, 2021 and July 14, 2021. O n July 22, 2021 we received one (1) b id . W hile we o nly rec eived o ne bid fo r this projec t, the unit p ric es are competitive to what we recently p aid for s imilar enhanc ements to eight intersec tio ns in S un C ity. S TAF F R E C O MME N D AT ION: Both s taff and our c o ns ulting engineer Kas berg, P atric k & Assoc iates reco mmend awarding the c o ntract to Austin Traffic S ignal C o nstruc tion C o., I nc . fo r all p arts fo r a total amo unt o f $405,716.00 F IN AN C IAL IMPAC T: F und s for the expend iture are b udgeted in the S treets C I P F und S UB MIT T E D B Y: C hris P o usso n AT TAC H ME N T S: D escription Type Bid Tab Backup Material Letter of Recommendation Backup Material Page 61 of 78 BID TABULATION CITY OF GEORGETOWN Intersection Safety Enhancements - RRFBs July 22, 2021; 2:00 PM Bid # 202153 2020-156-40 Bid Estimated Unit Bid Data Unit Extended No.Quantity Description Price Amount Part A: 5th @ Austin and 8th @ Library RRFB's 1 100%LS Insurance, Bonds and Mobilization, not to exceed 5% of Part A Bid, Complete for $7,500.00 $7,500.00 2 100%LS For Providing a Video DVD of the Project Area Prior to and After Construction for Part A Bid, Complete For 2,500.00 2,500.00 3 100%LS Provide Labor, Equipment, Tools and Supervision to Complete Preparation of Right-of-way for Part A, Complete For 2,500.00 2,500.00 4 100%LS Prepare Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian) for Part A Bid, Complete For 3,000.00 3,000.00 5 3 MO Implement and Administer Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian) for Part A Bid, Complete For 1,200.00 3,600.00 6 100%LS Prepare and Administer Stormwater Pollution Prevention Plan for Part A, Complete For 1,200.00 1,200.00 7 50 LF Furnish, Install, & Removal of Silt Fence, Complete for 44.00 2,200.00 8 100%LS For Pruning Trees According to the Specifications, Complete For 2,800.00 2,800.00 9 25 SY Remove Existing Asphalt, Complete For 130.00 3,250.00 10 50 SY Demolition and Haul off of existing Concrete Sidewalk and Ramps, Complete For 130.00 6,500.00 11 45 SY Furnish and Install Concrete Sidewalk, Complete for 175.00 7,875.00 12 2 EA Furnish & Install TxDOT Type 1 Ramp, Complete For 3,200.00 6,400.00 13 50 TN Furnish & Install Asphalt Patch (Type D), Complete For 350.00 17,500.00 14 100 LF CONDT (PVC) (SCH 80) (2")20.00 2,000.00 15 100 LF ELEC CONDR (NO.8) INSULATED 2.00 200.00 16 132 SF ALUMINUM SIGNS (TY A)45.00 5,940.00 17 4 EA IN SM RD SN SUP & AM TY10BWG(1)SA(P)1,200.00 4,800.00 18 4 EA IN SM RD SN SUP & AM TY10BWG(1)SB(P)1,200.00 4,800.00 19 2 EA RELOCATE SM RD SN SUP&AM TY 10BWG 1,000.00 2,000.00 20 2 EA REMOVE SM RD SN SUP&AM 350.00 700.00 21 220 LF REFL PAV MRK TY I (W) 24" (SLD) (100 MIL)13.00 2,860.00 22 25 EA REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)31.00 775.00 23 220 LF REFL PAV MRK TY II (W) 24" (SLD)2.50 550.00 24 25 EA REFL PAV MRK TY II (W) 18" (YLD TRI)6.50 162.50 25 220 LF ELIM EXT PAV MRK & MRKS (24")6.50 1,430.00 26 220 LF PAV SURF PREP FOR MRK (24")1.50 330.00 27 25 EA PAV SURF PREP FOR MRK (18")(YLD TRI)1.50 37.50 28 4 EA PEDESTRIAN PUSH BUTTON POLE 2,000.00 8,000.00 29 6 EA PED DETECT PUSH BUTTON (STANDARD)750.00 4,500.00 30 6 EA REC RAPID FLASH BEACON (2-WAY) SOLAR 12,000.00 72,000.00 31 6 EA WIRELESS PUSH BUTTON PACKAGE FOR EACH INTERSECTION 1,500.00 9,000.00 32 100%LS For Irrigation Repair Allowance by a Licensed Irrigator to be paid Repair Invoice plus 20%, Complete For 5,000.00 5,000.00 33 100%LS For City of Georgetown Force Account, Complete For 15,000.00 15,000.00 Part A: 5th @ Austin and 8th @ Library RRFB's Part B: Cool Springs Way RRFB's 1 100%LS Insurance, Bonds and Mobilization, not to exceed 5% of Part B Bid, Complete for 3,000.00 3,000.00 2 100%LS For Providing a Video DVD of the Project Area Prior to and After Construction for Part B Bid, Complete For 2,500.00 2,500.00 3 100%LS Provide Labor, Equipment, Tools and Supervision to Complete Preparation of Right-of-way for Part B, Complete For 2,500.00 2,500.00 4 100%LS Prepare Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian) for Part B Bid, Complete For 3,000.00 3,000.00 5 3 MO Implement and Administer Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian) for Part B Bid, Complete For 1,200.00 3,600.00 6 100%LS Prepare and Administer Stormwater Pollution Prevention Plan for Part B, Complete For 1,200.00 1,200.00 7 50 LF Furnish, Install, & Removal of Silt Fence, Complete for 44.00 2,200.00 8 100%LS For Pruning Trees According to the Specifications, Complete For 2,800.00 2,800.00 9 10 SY Furnish and Install Concrete Sidewalk, Complete for 175.00 1,750.00 10 20 LF CONDT (PVC) (SCH 80) (2")20.00 400.00 11 20 LF ELEC CONDR (NO.8) INSULATED 2.00 40.00 12 44 SF ALUMINUM SIGNS (TY A)45.00 1,980.00 BIDDER INFORMATION 1 Austin Traffic Signal Construction Co, Inc. 4615 Priem Lane Pflugerville, TX 78660 206,910.00$ Page 1 of 3Page 62 of 78 BID TABULATION CITY OF GEORGETOWN Intersection Safety Enhancements - RRFBs July 22, 2021; 2:00 PM Bid # 202153 2020-156-40 Bid Estimated Unit Bid Data Unit Extended No.Quantity Description Price Amount Part A: 5th @ Austin and 8th @ Library RRFB's 13 8 EA IN SM RD SN SUP & AM TY10BWG(1)SA(P)1,200.00 9,600.00 14 1 EA RELOCATE SM RD SN SUP&AM TY 10BWG 1,000.00 1,000.00 15 2 EA REMOVE SM RD SN SUP&AM 350.00 700.00 16 130 LF REFL PAV MRK TY I (W) 24" (SLD) (100 MIL)13.00 1,690.00 17 20 EA REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)31.00 620.00 18 130 LF REFL PAV MRK TY II (W) 24" (SLD)2.50 325.00 19 20 EA REFL PAV MRK TY II (W) 18" (YLD TRI)6.50 130.00 20 130 LF ELIM EXT PAV MRK & MRKS (24")6.50 845.00 21 130 LF PAV SURF PREP FOR MRK (24")1.50 195.00 22 20 EA PAV SURF PREP FOR MRK (18")(YLD TRI)1.50 30.00 23 1 EA PEDESTRIAN PUSH BUTTON POLE 2,000.00 2,000.00 24 2 EA PED DETECT PUSH BUTTON (STANDARD)750.00 1,500.00 25 3 EA REC RAPID FLASH BEACON (2-WAY) SOLAR 12,000.00 36,000.00 26 2 EA WIRELESS PUSH BUTTON PACKAGE FOR EACH INTERSECTION 1,500.00 3,000.00 27 100%LS For Irrigation Repair Allowance by a Licensed Irrigator to be paid Repair Invoice plus 20%, Complete For 5,000.00 5,000.00 28 100%LS For City of Georgetown Force Account, Complete For 7,500.00 7,500.00 Part B: Cool Springs Way RRFB's Part C: Industrial Avenue RRFB's 1 100%LS Insurance, Bonds and Mobilization, not to exceed 5% of Part C, Complete for $3,500.00 $3,500.00 2 100%LS For Providing a Video DVD of the Project Area Prior to and After Construction for Part C, Complete For 2,500.00 2,500.00 3 100%LS Provide Labor, Equipment, Tools and Supervision to Complete Preparation of Right-of-way for Part C, Complete For 2,500.00 2,500.00 4 100%LS Prepare Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian) for Part C, Complete For 3,000.00 3,000.00 5 3 MO Implement and Administer Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian) for Part C, Complete For 1,200.00 3,600.00 6 100%LS Prepare and Administer Stormwater Pollution Prevention Plan for Part A, Complete For 1,200.00 1,200.00 7 50 LF Furnish, Install, & Removal of Silt Fence, Complete for 44.00 2,200.00 8 100%LS For Pruning Trees According to the Specifications, Complete For 2,800.00 2,800.00 9 25 SY Remove Existing Asphalt, Complete For 130.00 3,250.00 10 30 SY Demolition and Haul off of existing Concrete Sidewalk and Ramps, Complete For 130.00 3,900.00 11 30 SY Furnish and Install Concrete Sidewalk, Complete for 175.00 5,250.00 12 25 TN Furnish & Install Asphalt Patch (Type D), Complete For 350.00 8,750.00 13 20 LF CONDT (PVC) (SCH 80) (2")20.00 400.00 14 20 LF ELEC CONDR (NO.8) INSULATED 2.00 40.00 15 44 SF ALUMINUM SIGNS (TY A)45.00 1,980.00 16 2 EA IN SM RD SN SUP & AM TY10BWG(1)SA(P)1,200.00 2,400.00 17 2 EA IN SM RD SN SUP & AM TY10BWG(1)SB(P)1,200.00 2,400.00 18 2 EA REMOVE SM RD SN SUP&AM 350.00 700.00 19 100 LF REFL PAV MRK TY I (W) 24" (SLD) (100 MIL)13.00 1,300.00 20 14 EA REF PAV MRK TY I(W)18"(YLD TRI)(100MIL)31.00 434.00 21 100 LF REFL PAV MRK TY II (W) 24" (SLD)2.50 250.00 22 14 EA REFL PAV MRK TY II (W) 18" (YLD TRI)6.50 91.00 23 90 LF ELIM EXT PAV MRK & MRKS (24")6.50 585.00 24 100 LF PAV SURF PREP FOR MRK (24")1.50 150.00 25 14 EA PAV SURF PREP FOR MRK (18")(YLD TRI)1.50 21.00 26 1 EA PEDESTRIAN PUSH BUTTON POLE 2,000.00 2,000.00 27 2 EA PED DETECT PUSH BUTTON (STANDARD)750.00 1,500.00 28 2 EA REC RAPID FLASH BEACON (2-WAY) SOLAR 12,000.00 24,000.00 29 2 EA WIRELESS PUSH BUTTON PACKAGE FOR EACH INTERSECTION 1,500.00 3,000.00 30 100%LS For Irrigation Repair Allowance by a Licensed Irrigator to be paid Repair Invoice plus 20%, Complete For 5,000.00 5,000.00 31 100%LS For City of Georgetown Force Account, Complete For 15,000.00 15,000.00 Part C: Industrial Avenue RRFB's BIDDER INFORMATION 1 Austin Traffic Signal Construction Co, Inc. 95,105.00$ 103,701.00$ 4615 Priem Lane Pflugerville, TX 78660 Page 2 of 3Page 63 of 78 BID TABULATION CITY OF GEORGETOWN Intersection Safety Enhancements - RRFBs July 22, 2021; 2:00 PM Bid # 202153 2020-156-40 PROJECT SUMMARY Part A: 5th @ Austin and 8th @ Library RRFB's Part B: Cool Springs Way RRFB's Part C: Industrial Avenue RRFB's I hereby certify that this is a correct & true tabulation of all bids received Alvin R. Sutton III, P.E.Date Kasberg, Patrick & Associates, LP Did Bidder provide Bid Security? Did Bidder provide required documents? Did Bidder Acknowledge Addenda 1? YES 103,701.00$ 206,910.00$ 405,716.00$ 1 Austin Traffic Signal Construction Co, Inc. 4615 Priem Lane Pflugerville, TX 78660 YES YES 95,105.00$ BIDDER INFORMATION Page 3 of 3 July 26, 2021 Page 64 of 78 July 26, 2021 Mr. Joel Weaver Systems Engineering Project Manager City of Georgetown 300-1 Industrial Avenue Georgetown, Texas 78626-8445 Re: City of Georgetown Intersection Safety Enhancement Project - RRFBs Georgetown, Texas Dear Mr. Weaver, Bids were received by the City of Georgetown until 2:00 P.M. on Thursday, July 22, 2021, for the above referenced project. There were eight (8) plan holders, and one (1) competitive bid was received. A detailed bid tabulation of this bid is attached for your use, as well as overall location map of the proposed intersection safety enhancements. The project consists of enhanced pedestrian safety signage and striping at four (4) intersections located at various locations within the City. The locations include two (2) RRFB’s in the Downtown Area, one (1) in the Sun City Neighborhood, and one (1) near the Georgetown Municipal Complex. The bid included three (3) base bid parts. Below is the bid amount of each part and their locations: • Part A: Downtown Locations ($206,910.00): o 5th Street &Austin Avenue o 8th Street at the Library • Part B: Sun City Neighborhood ($95,105.00) o Cool Springs Way & Cowen Creek East Entrance • Part C: Georgetown Municipal Complex ($103,701.00) o Industrial Avenue at GMC South Parking Lot Entrance KASBERG, PATRICK & ASSOCIATES, LP CONSULTING ENGINEERS Texas Firm F-510 Temple RICK N. KASBERG, P.E. Georgetown 19 North Main Street R. DAVID PATRICK, P.E., CFM 800 South Austin Avenue Temple, Texas 76501 THOMAS D. VALLE, P.E. Georgetown, Texas 78626 (254) 773-3731 GINGER R. TOLBERT, P.E. (512) 819-9478 ALVIN R. “TRAE” SUTTON, III, P.E., CFM JOHN A. SIMCIK, P.E., CFM Page 65 of 78 Mr. Joel Weaver July 26, 2021 Page Two The low qualified bidder for the project is Austin Traffic Signal Construction Co., Inc. of Pflugerville, Texas. Austin Traffic Signal Construction Co., Inc. has successfully completed pedestrian and signal improvements for the City of Georgetown and several other Central Texas Municipalities in the past. We have reviewed the current workload, references and construction history of Austin Traffic Signal Construction Co., Inc., and their subcontractors. As a result of our findings, we recommend that a contract be awarded for the Base Bid Austin Traffic Signal Construction Co., Inc. in the total bid amount of $405,716.00. Sincerely, Alvin R. (Trae) Sutton III, P.E., CFM ARS/ xc: Mr. Wesley Wright, PE, City of Georgetown Mr. Chris Pousson, City of Georgetown Ms. Nicole Abrego, City of Georgetown Mr. Ed Schroeder, Austin Traffic Signal Construction Co., Inc. 2020-156-40 Page 66 of 78 City of Georgetown, Texas Transportation Advisory Board August 13, 2021 S UB J E C T: C o nsideration and possible recommend ation to award a contrac t to Austin Traffic S ignal C o nstruc tio n C o ., Inc . o f P flugerville, Texas fo r all p arts in the amo unt o f $860,016.00. -- Wes ley Wright, P.E., S ystems Engineering Direc tor/C hris P o usson, C I P Manager IT E M S UMMARY: T his proposed projec t is for the ins tallatio n of new traffic s ignals , p ed es trian p o les , ADA c o mp liant ramp s , crosswalks, d rainage improvements , s triping, and o ther misc ellaneous c o ns truc tio n activities . Lo catio ns for thes e s ignals are P art A: Williams Drive at Es trella C ro s s ing Traffic S ignal Imp ro vements- $448,294.50 • P art B: S hell R oad at Verd e Vis ta Traffic S ignal Improvements – $411,721.50 We o p ened bids o n July 22nd, 2021. T he c ity rec eived 3 c o mp etitive b id s . Austin Traffic S ignal C o nstruc tion C o., Inc. is the lo w q ualified b id d er and has s uc cessfully completed traffic signal improvements for the C ity o f G eorgetown and s everal o ther C entral Texas Munic ip alities in the past. S TAF F R E C O MME N D AT ION: Both S taff and the c o nsulting engineer Kasberg, P atrick & As s oc iates recommends that a contrac t be awarded fo r all p arts to Aus tin Traffic S ignal C ons truc tion C o., Inc . in the to tal b id amount of $860,016.00. F IN AN C IAL IMPAC T: T he funds for this projec t are bud geted in the S treets C I P fund S UB MIT T E D B Y: Wesley Wright, P.E., S ys tems Engineering Direc tor AT TAC H ME N T S: D escription Type bid tabulation Cover Memo letter of recommendation Cover Memo Page 67 of 78 BID TABULATION CITY OF GEORGETOWN Intersection Safety Enhancements - Traffic Signals July 22, 2021; 2:30 PM Bid # 202154 2020-156-40 Bid Estimated Unit Bid Data Unit Extended Unit Extended Unit Extended No.Quantity Description Price Amount Price Amount Price Amount Part A: Williams Drive at Estrella Crossing Traffic Signal Improvements 1 100%LS Insurance, Bonds and Mobilization, not to exceed 5% of Part A Bid, Complete for $16,000.00 $16,000.00 $20,000.00 $20,000.00 $23,000.00 $23,000.00 2 100%LS For Providing a Video DVD of the Project Area Prior to and After Construction for Part A Bid, Complete For 1,000.00 1,000.00 2,500.00 2,500.00 714.00 714.00 3 100%LS Provide Labor, Equipment, Tools and Supervision to Complete Preparation of Right-of-way for Part A, Complete For 8,000.00 8,000.00 15,000.00 15,000.00 9,595.00 9,595.00 4 100%LS Prepare Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian) for Part A Bid, Complete For 10,000.00 10,000.00 2,500.00 2,500.00 2,200.00 2,200.00 5 4 MO Implement and Administer Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian) for Part A Bid, Complete For 1,100.00 4,400.00 3,000.00 12,000.00 2,040.00 8,160.00 6 100%LS Prepare Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ) for Part A Bid, Complete For 2,300.00 2,300.00 2,200.00 2,200.00 1,430.00 1,430.00 7 50 SY Remove Exising Asphalt, Complete For 58.00 2,900.00 54.00 2,700.00 26.50 1,325.00 8 1 EA Demolition and Haul off of existing 18" Concrete SET, Complete For 1,400.00 1,400.00 300.00 300.00 2,654.40 2,654.40 9 1,100 CY For Unclassified Excavation of Existing Roadway & Right-of-23.00 25,300.00 8.00 8,800.00 15.17 *16,687.00 10 25 CY For Unclassified Fill For Roadway & Right-of-Way, Complete For 18.00 450.00 25.00 625.00 10.62 265.50 11 100 TN Furnish & Install 2" Type D HMAC, Including Tack Coat Patch, Complete For 110.00 11,000.00 110.00 11,000.00 200.00 20,000.00 12 14 LF Furnish & Install 18" RCP Culvert, including Connection to Existing RCP Pipe, Complete For 175.00 2,450.00 85.00 1,190.00 235.00 3,290.00 13 1 EA Furnish & Install 18"SET Headwall (SETB-PD), Complete For 2,400.00 2,400.00 3,500.00 3,500.00 3,880.00 3,880.00 14 50 SY Furnish & Install 4" Concrete Riprap, Complete For 110.00 5,500.00 54.00 2,700.00 18.27 *913.50 15 30 LF Furnish & Install Standard Curb & Gutter, Complete For 75.00 2,250.00 26.00 780.00 190.50 5,715.00 16 65 SY Furnish & Install Concrete Sidewalk, Complete For 92.00 5,980.00 54.00 3,510.00 135.00 8,775.00 17 6 EA Furnish & Install TxDOT Type 7 Ramp, Complete For 3,000.00 18,000.00 2,800.00 16,800.00 1,600.00 9,600.00 18 300 LF Furnish & Install Thermoplastic White Crosswalk Striping, 12.00 3,600.00 22.00 6,600.00 15.24 *4,572.00 19 120 LF Furnish & Install Thermoplastic White 2' Wide Stop Bar, 24.00 2,880.00 12.00 1,440.00 24.53 *2,943.60 20 2 EA Removal of Existing Left Turn Arrow, Complete For 460.00 920.00 100.00 200.00 890.00 1,780.00 21 2 EA Remove Existing Small Roadside Signage, Complete For 325.00 650.00 200.00 400.00 132.00 264.00 22 100 LF Furnish, Install, Maintain & Remove Silt Fence, Complete for 30.00 3,000.00 3.00 300.00 20.50 2,050.00 23 1 EA Furnish, Install, Maintain & Remove Inlet Protection, Complete for 500.00 500.00 95.00 95.00 2,050.00 2,050.00 24 1,800 SY Install, Maintain & Establish Hydromulch with Flexible Growth Medium, Including 4-Inch Top Soil, Complete For 12.00 21,600.00 12.00 21,600.00 6.20 11,160.00 25 22 LF DRILL SHAFT (TRF SIG POLE) (30 IN), Complete For 360.00 7,920.00 325.00 7,150.00 600.00 13,200.00 26 44 LF DRILL SHAFT (TRF SIG POLE) (48 IN), Complete For 450.00 19,800.00 450.00 19,800.00 775.00 34,100.00 27 100 LF CONDT (PVC) (SCHD 40) (2"), Complete For 27.00 2,700.00 15.00 1,500.00 13.83 *1,383.00 28 210 LF CONDT (PVC) (SCHD 40) (3"), Complete For 23.00 4,830.00 18.00 3,780.00 17.55 *3,685.50 29 90 LF CONDT (PVC) (SCHD 40) (4"), Complete For 25.00 2,250.00 24.00 2,160.00 20.05 *1,804.50 30 40 LF CONDT (PVC) (SCHD 80) (2") , Complete For 29.00 1,160.00 26.00 1,040.00 15.83 *633.20 31 395 LF CONDT (PVC) (SCHD 80) (4") (BORE), Complete For 74.00 29,230.00 65.00 25,675.00 52.00 20,540.00 32 330 LF ELEC CONDUCTOR (NO. 12) INSULATED, Complete For 2.00 660.00 4.00 1,320.00 2.90 *957.00 33 1,580 LF ELEC CONDUCTOR (NO. 8) INSULATED, Complete For 2.50 3,950.00 5.00 7,900.00 3.36 *5,308.80 34 670 LF ELEC CONDUCTOR (NO. 6) BARE, Complete For 2.50 1,675.00 4.00 2,680.00 3.49 *2,338.30 35 30 LF ELEC CONDUCTOR (NO. 6) INSULATED, Complete For 3.00 90.00 5.00 150.00 3.64 *109.20 36 5 EA GROUND BOX TY D (162922) W/APRON, Complete For 1,800.00 9,000.00 1,700.00 8,500.00 3,420.00 17,100.00 37 1 EA ELC SRV TY D 120/240 070 (NS)AL(E)PS(U), Complete For 5,500.00 5,500.00 6,500.00 6,500.00 9,500.00 9,500.00 38 1 EA INSTALL HWY TRAF SIG (ISOLATED), Complete For 18,000.00 18,000.00 26,000.00 26,000.00 15,000.00 15,000.00 39 9 EA VEH SIG SEC (12") LED (GRN), Complete For 250.00 2,250.00 400.00 3,600.00 250.00 2,250.00 40 2 EA VEH SIG SEC (12") LED (GRN ARW), Complete For 250.00 500.00 400.00 800.00 250.00 500.00 41 9 EA VEH SIG SEC (12") LED (YEL), Complete For 250.00 2,250.00 400.00 3,600.00 250.00 2,250.00 42 4 EA VEH SIG SEC (12") LED (YEL ARW), Complete For 250.00 1,000.00 400.00 1,600.00 250.00 1,000.00 43 9 EA VEH SIG SEC (12") LED (RED), Complete For 250.00 2,250.00 400.00 3,600.00 250.00 2,250.00 44 4 EA VEH SIG SEC (12") LED (RED ARW), Complete For 250.00 1,000.00 400.00 1,600.00 250.00 1,000.00 45 6 EA PED SIG SEC (LED) (COUNTDOWN)500.00 3,000.00 800.00 4,800.00 550.00 3,300.00 46 9 EA BACKPLATE W/REF BRDR (3 SEC) (VENT) ALUM, Complete For 80.00 720.00 250.00 2,250.00 200.00 1,800.00 47 2 EA BACKPLATE W/REF BRDR (5 SEC) (VENT) ALUM, Complete For 95.00 190.00 250.00 500.00 225.00 450.00 48 453 LF TRF SIG CBL (TY A) (14 AWG) (5 CONDR), Complete For 2.50 1,132.50 4.00 1,812.00 3.07 *1,390.71 49 150 LF TRF SIG CBL (TY A) (14 AWG) (7 CONDR), Complete For 3.00 450.00 6.00 900.00 3.27 *490.50 50 670 LF TRF SIG CBL (TY A) (14 AWG) (10 CONDR), Complete For 3.50 2,345.00 6.00 4,020.00 3.91 *2,619.70 51 635 LF TRF SIG CBL (TY A) (14 AWG) (20 CONDR), Complete For 5.00 3,175.00 6.00 3,810.00 6.84 *4,343.40 52 880 LF TRF SIG CBL (TY C) (12 AWG) (2 CONDR), Complete For 2.00 1,760.00 6.00 5,280.00 2.78 *2,446.40 53 1 EA INS TRF SIG PL AM (S) 1 ARM (24') ILSN, Complete For 8,200.00 8,200.00 9,000.00 9,000.00 10,500.00 10,500.00 54 1 EA INS TRF SIG PL AM (S) 1 ARM (32') ILSN, Complete For 9,000.00 9,000.00 9,000.00 9,000.00 11,850.00 11,850.00 55 1 EA INS TRF SIG PL AM (S) 1 ARM (55') ILSN, Complete For 25,000.00 25,000.00 18,000.00 18,000.00 36,000.00 36,000.00 56 1 EA INS TRF SIG PL AM (S) 1 ARM (55') LUM&ILSN, Complete For 26,000.00 26,000.00 22,000.00 22,000.00 37,600.00 37,600.00 57 5 EA PEDESTAL POLE ASSEMBLY, complete for 2,000.00 10,000.00 2,400.00 12,000.00 3,300.00 16,500.00 58 6 EA PED DETECT PUSH BUTTON (APS), complete for 550.00 3,300.00 950.00 5,700.00 850.00 5,100.00 59 1 EA PED DETECTOR CONTROLLER UNIT, complete for 3,200.00 3,200.00 4,000.00 4,000.00 5,950.00 5,950.00 60 1 EA BBU SYSTEM (EXTERNAL BATT CABINET), Complete For 6,500.00 6,500.00 5,900.00 5,900.00 10,400.00 10,400.00 61 1 EA VIVDS PROSR SYSTEM, Complete For 9,000.00 9,000.00 10,500.00 10,500.00 16,730.00 16,730.00 62 6 EA VIVDS CAM ASSY FXD LENS, Complete For 1,800.00 10,800.00 2,600.00 15,600.00 2,000.00 12,000.00 63 1 EA VIVDS CNTRL SOFTWARE, Complete For 300.00 300.00 4,000.00 4,000.00 250.00 250.00 64 1,329 LF VIVDS CABLING, Complete For 3.00 3,987.00 6.00 7,974.00 3.66 *4,864.14 65 4 EA ILLUMINATED STREET NAMES SIGNS, complete for 2,500.00 10,000.00 4,500.00 18,000.00 3,350.00 13,400.00 66 60 LF FIBER OPTIC CABLE, complete for 29.00 1,740.00 12.00 720.00 7.54 *452.40 67 100%LS For City of Georgetown Electrical Connection Allowance to be paid based off COG Electrical Invoice plus 10%, Complete For 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 68 100%LS City of Georgetown Force Account 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 Part A: Williams Drive at Estrella Crossing Traffic Signal Improvements ** BIDDER INFORMATION 100 North Conahan Drive Austin, TX 78731 471,461.00$ 516,370.75$ Hazelton, PA 18201 3 DeNucci Constructor, LLC 8310-1 Capital of Texas Hwy N, Ste. 275 DBI Services, LLC 1 Austin Traffic Signal Construction Co, Inc. 4615 Priem Lane Pflugerville, TX 78660 448,294.50$ 2 * Extended amount has been corrected. ** Total amount has been corrected.Page 1 of 3Page 68 of 78 BID TABULATION CITY OF GEORGETOWN Intersection Safety Enhancements - Traffic Signals July 22, 2021; 2:30 PM Bid # 202154 2020-156-40 Bid Estimated Unit Bid Data Unit Extended Unit Extended Unit Extended No.Quantity Description Price Amount Price Amount Price Amount Part B: Shell Road at Verde Vista Traffic Signal Improvements 1 100%LS Insurance, Bonds and Mobilization, not to exceed 5% of Part B Bid, Complete for $16,000.00 $16,000.00 $20,000.00 $20,000.00 $23,000.00 $23,000.00 2 100%LS For Providing a Video DVD of the Project Area Prior to and After Construction for Part B Bid, Complete For 1,000.00 1,000.00 2,500.00 2,500.00 714.00 714.00 3 100%LS Provide Labor, Equipment, Tools and Supervision to Complete Preparation of Right-of-way for Part B, Complete For 9,000.00 9,000.00 15,000.00 15,000.00 12,300.00 12,300.00 4 100%LS Prepare Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian) for Part B Bid, Complete For 10,000.00 10,000.00 2,500.00 2,500.00 2,200.00 2,200.00 5 4 MO Implement and Administer Barricade, Signing and Traffic Safety Plan (Vehicular and Pedestrian) for Part B Bid, Complete For 1,100.00 4,400.00 3,000.00 12,000.00 2,000.00 8,000.00 6 100%LS Prepare Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ) for Part B Bid, Complete For 2,300.00 2,300.00 2,200.00 2,200.00 450.00 450.00 7 50 SY Remove Exising Asphalt, Complete For 58.00 2,900.00 54.00 2,700.00 26.54 *1,327.00 8 25 SY Demolition and Haul off of Concrete Sidewalk, Complete For 55.00 1,375.00 10.00 250.00 53.09 *1,327.25 9 100 CY For Unclassified Excavation of Existing Roadway & Right-of- Way, Complete For 23.00 2,300.00 25.00 2,500.00 10.62 *1,062.00 10 25 CY For Unclassified Fill For Roadway & Right-of-Way, Complete For 18.00 450.00 50.00 1,250.00 10.62 *265.50 11 100 TN Furnish & Install 2" Type D HMAC, Including Tack Coat Patch, Complete For 110.00 11,000.00 110.00 11,000.00 125.00 12,500.00 12 45 SF Furnish & Install Concrete Retaining Wall for Sidewalks, Complete For 100.00 4,500.00 125.00 5,625.00 63.86 *2,873.70 13 50 SY Furnish & Install 4" Concrete Riprap, Complete For 110.00 5,500.00 54.00 2,700.00 18.27 *913.50 14 30 LF Furnish & Install Standard Curb & Gutter, Complete For 74.00 2,220.00 26.00 780.00 50.00 1,500.00 15 55 SY Furnish & Install Concrete Sidewalk, Complete For 100.00 5,500.00 54.00 2,970.00 82.00 4,510.00 16 7 EA Furnish & Install TxDOT Type 7 Ramp, Complete For 3,200.00 22,400.00 2,800.00 19,600.00 1,600.00 11,200.00 17 40 LF Furnish & Install TxDOT Type C Pedestrian Rail, Complete For 250.00 10,000.00 265.00 10,600.00 235.00 9,400.00 18 500 LF Furnish & Install Thermoplastic White Crosswalk Striping, Complete For 12.00 6,000.00 22.00 11,000.00 12.77 *6,385.00 19 115 LF Furnish & Install Thermoplastic White 2' Wide Stop Bar, Complete For 24.00 2,760.00 12.00 1,380.00 22.06 *2,536.90 20 250 LF Removal of Existing Striping and Left Turn Arrow, Complete For 7.00 1,750.00 3.00 750.00 17.59 *4,397.50 21 1 EA Furnish & Install Thermoplastic Right Turn Arrow, Complete For 580.00 580.00 400.00 400.00 357.14 357.14 22 4 EA Furnish & Install Thermoplastic Straight and Left Turn Arrow, Complete For 700.00 2,800.00 400.00 1,600.00 464.29 *1,857.16 23 2 EA Remove Existing Small Roadside Signage, Complete For 400.00 800.00 200.00 400.00 132.72 265.44 24 100 LF Furnish, Install, Maintain & Remove Silt Fence, Complete for 30.00 3,000.00 3.00 300.00 13.27 *1,327.00 25 250 SY Install, Maintain & Establish Hydromulch with Flexible Growth Medium, Including 4-Inch Top Soil, Complete For 12.00 3,000.00 12.00 3,000.00 14.24 *3,560.00 26 39 LF DRILL SHAFT (TRF SIG POLE) (36 IN), Complete For 375.00 14,625.00 400.00 15,600.00 550.00 21,450.00 27 22 LF DRILL SHAFT (TRF SIG POLE) (48 IN), Complete For 450.00 9,900.00 450.00 9,900.00 840.00 18,480.00 28 230 LF CONDT (PVC) (SCHD 40) (2"), Complete For 27.00 6,210.00 15.00 3,450.00 13.83 *3,180.90 29 255 LF CONDT (PVC) (SCHD 40) (3"), Complete For 23.00 5,865.00 18.00 4,590.00 17.55 *4,475.25 30 125 LF CONDT (PVC) (SCHD 40) (4"), Complete For 25.00 3,125.00 24.00 3,000.00 20.00 2,500.00 31 10 LF CONDT (PVC) (SCHD 80) (2"), Complete For 38.00 380.00 26.00 260.00 25.83 *258.30 32 275 LF CONDT (PVC) (SCHD 80) (4") (BORE), Complete For 74.00 20,350.00 65.00 17,875.00 36.00 *9,900.00 33 600 LF ELEC CONDUCTOR (NO. 12) INSULATED, Complete For 2.00 1,200.00 4.00 2,400.00 2.90 *1,740.00 34 2,260 LF ELEC CONDUCTOR (NO. 8) INSULATED, Complete For 2.50 5,650.00 5.00 11,300.00 3.36 *7,593.60 35 845 LF ELEC CONDUCTOR (NO. 6) BARE, Complete For 2.50 2,112.50 4.00 3,380.00 3.49 *2,949.05 36 60 LF ELEC CONDUCTOR (NO. 6) INSULATED, Complete For 3.00 180.00 5.00 300.00 3.64 *218.40 37 3 EA GROUND BOX TY D (162922) W/APRON, Complete For 1,800.00 5,400.00 1,700.00 5,100.00 3,420.00 10,260.00 38 1 EA ELC SRV TY D 120/240 070 (NS)AL(E)PS(U), Complete For 5,500.00 5,500.00 6,500.00 6,500.00 9,500.00 9,500.00 39 1 EA INSTALL HWY TRAF SIG (ISOLATED), Complete For 18,000.00 18,000.00 20,000.00 20,000.00 15,000.00 15,000.00 40 8 EA VEH SIG SEC (12") LED (GRN), Complete For 250.00 2,000.00 400.00 3,200.00 250.00 2,000.00 41 2 EA VEH SIG SEC (12") LED (GRN ARW), Complete For 250.00 500.00 400.00 800.00 250.00 500.00 42 8 EA VEH SIG SEC (12") LED (YEL), Complete For 250.00 2,000.00 400.00 3,200.00 250.00 2,000.00 43 4 EA VEH SIG SEC (12") LED (YEL ARW), Complete For 250.00 1,000.00 400.00 1,600.00 250.00 1,000.00 44 8 EA VEH SIG SEC (12") LED (RED), Complete For 250.00 2,000.00 400.00 3,200.00 250.00 2,000.00 45 4 EA VEH SIG SEC (12") LED (RED ARW), Complete For 250.00 1,000.00 400.00 1,600.00 250.00 1,000.00 46 8 EA PED SIG SEC (LED) (COUNTDOWN)500.00 4,000.00 800.00 6,400.00 550.00 4,400.00 47 8 EA BACKPLATE W/REF BRDR (3 SEC) (VENT) ALUM, Complete For 80.00 640.00 250.00 2,000.00 200.00 1,600.00 48 2 EA BACKPLATE W/REF BRDR (5 SEC) (VENT) ALUM, Complete For 95.00 190.00 250.00 500.00 225.00 450.00 49 478 LF TRF SIG CBL (TY A) (14 AWG) (5 CONDR), Complete For 2.50 1,195.00 4.00 1,912.00 3.07 *1,467.46 50 136 LF TRF SIG CBL (TY A) (14 AWG) (7 CONDR), Complete For 3.00 408.00 6.00 816.00 3.27 *444.72 51 1,450 LF TRF SIG CBL (TY A) (14 AWG) (10 CONDR), Complete For 3.50 5,075.00 6.00 8,700.00 3.91 *5,669.50 52 665 LF TRF SIG CBL (TY A) (14 AWG) (20 CONDR), Complete For 5.00 3,325.00 7.00 4,655.00 6.84 *4,548.60 53 1,490 LF TRF SIG CBL (TY C) (12 AWG) (2 CONDR), Complete For 2.00 2,980.00 6.00 8,940.00 2.78 *4,142.20 54 1 EA INS TRF SIG PL AM (S) 1 ARM (36') LUM&ILSN, Complete For 9,000.00 9,000.00 12,500.00 12,500.00 14,870.00 14,870.00 55 2 EA INS TRF SIG PL AM (S) 1 ARM (48') LUM&ILSN, Complete For 11,000.00 22,000.00 16,500.00 33,000.00 17,440.00 34,880.00 56 1 EA INS TRF SIG PL AM (S) 1 ARM (65') ILSN, Complete For 27,000.00 27,000.00 30,000.00 30,000.00 36,720.00 36,720.00 57 8 EA PEDESTAL POLE ASSEMBLY, complete for 2,000.00 16,000.00 2,400.00 19,200.00 3,295.00 26,360.00 58 8 EA PED DETECT PUSH BUTTON (APS), complete for 550.00 4,400.00 950.00 7,600.00 850.00 6,800.00 59 1 EA PED DETECTOR CONTROLLER UNIT, complete for 3,000.00 3,000.00 4,000.00 4,000.00 5,950.00 5,950.00 60 1 EA BBU SYSTEM (EXTERNAL BATT CABINET), Complete For 6,500.00 6,500.00 5,900.00 5,900.00 10,380.00 10,380.00 61 1 EA VIVDS PROSR SYSTEM, Complete For 8,000.00 8,000.00 10,500.00 10,500.00 16,735.00 16,735.00 62 4 EA VIVDS CAM ASSY FXD LENS, Complete For 1,800.00 7,200.00 2,600.00 10,400.00 2,000.00 8,000.00 63 1 EA VIVDS CNTRL SOFTWARE, Complete For 300.00 300.00 4,000.00 4,000.00 250.00 250.00 64 912 LF VIVDS CABLING, Complete For 3.00 2,736.00 6.00 5,472.00 3.66 *3,337.92 65 3 EA ILLUMINATED STREET NAMES SIGNS, complete for 2,500.00 7,500.00 4,500.00 13,500.00 3,350.00 10,050.00 66 60 LF FIBER OPTIC CABLE, complete for 29.00 1,740.00 12.00 720.00 7.54 *452.40 67 100%LS For City of Georgetown Electrical Connection Allowance to be paid based off COG Electrical Invoice plus 10%, Complete For 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 15,000.00 68 100%LS City of Georgetown Force Account 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 25,000.00 Part B: Shell Road at Verde Vista Traffic Signal Improvements **467,742.39$ 480,975.00$ 411,721.50$ Austin Traffic Signal Construction Co, Inc.DeNucci Constructor, LLC DBI Services, LLC BIDDER INFORMATION 1 2 3 Pflugerville, TX 78660 Austin, TX 78731 Hazelton, PA 18201 4615 Priem Lane 8310-1 Capital of Texas Hwy N, Ste. 275 100 North Conahan Drive * Extended amount has been corrected. ** Total amount has been corrected.Page 2 of 3Page 69 of 78 BID TABULATION CITY OF GEORGETOWN Intersection Safety Enhancements - Traffic Signals July 22, 2021; 2:30 PM Bid # 202154 2020-156-40 PROJECT SUMMARY Part A: Williams Drive at Estrella Crossing Traffic Signal Improvements Part B: Shell Road at Verde Vista Traffic Signal Improvements I hereby certify that this is a correct & true tabulation of all bids received Alvin R. (Trae) Sutton III, P.E.Date Kasberg, Patrick & Associates, LP YES YES YES YES BIDDER INFORMATION Austin, TX 78731 Hazelton, PA 18201 100 North Conahan Drive 471,461.00$ 480,975.00$ 952,436.00$ 2 DeNucci Constructor, LLC 8310-1 Capital of Texas Hwy N, Ste. 275 Did Bidder provide required documents? 3 Did Bidder Acknowledge Addenda 1?YES Did Bidder provide Bid Security? DBI Services, LLC YES YES YES 467,742.39$ 516,370.75$ 411,721.50$ 448,294.50$ 984,113.14$ 860,016.00$ YES 1 Austin Traffic Signal Construction Co, Inc. 4615 Priem Lane Pflugerville, TX 78660 * Extended amount has been corrected. ** Total amount has been corrected.Page 3 of 3 July 26, 2021 Page 70 of 78 July 26, 2021 Mr. Joel Weaver Systems Engineering Project Manager City of Georgetown 300-1 Industrial Avenue Georgetown, Texas 78626-8445 Re: City of Georgetown Intersection Safety Enhancements – Traffic Signals Georgetown, Texas Dear Mr. Weaver, Bids were received by the City of Georgetown until 2:30 P.M. on Thursday, July 22, 2021, for the above referenced project. There were three (3) competitive bids submitted for this project. A detailed bid tabulation of this bid is attached for your use. The project was bid in two (2) Parts. A summary of each part and their locations are listed below: Part A: Williams Drive at Estrella Crossing Traffic Signal Improvements- $448,294.50 • Installation of new traffic signal, pedestrian poles, ada compliant ramps, crosswalks, drainage improvements, striping, and other miscellaneous construction activities. Part B: Shell Road at Verde Vista Traffic Signal Improvements– $411,721.50 • Installation of new traffic signal, pedestrian poles, ada compliant ramps, pedestrian railing, crosswalks, drainage improvements, striping, and other miscellaneous construction activities. The attached Exhibit A depicts the proposed improvements for the project. KASBERG, PATRICK & ASSOCIATES, LP CONSULTING ENGINEERS Texas Firm F-510 Temple RICK N. KASBERG, P.E. Georgetown 19 North Main Street R. DAVID PATRICK, P.E., CFM 800 South Austin Avenue Temple, Texas 76501 THOMAS D. VALLE, P.E. Georgetown, Texas 78626 (254) 773-3731 GINGER R. TOLBERT, P.E. (512) 819-9478 ALVIN R. “TRAE” SUTTON, III, P.E., CFM JOHN A. SIMCIK, P.E., CFM Page 71 of 78 Mr. Joel Weaver July 26, 2021 Page Two The low qualified bidder for the project is Austin Traffic Signal Construction Co., Inc. of Pflugerville, Texas. Austin Traffic Signal Construction Co., Inc. has successfully completed traffic signal improvements for the City of Georgetown and several other Central Texas Municipalities in the past. We have reviewed the current workload, references and construction history of Austin Traffic Signal Construction Co., Inc., and their subcontractors. As a result of our findings, we recommend that a contract be awarded for the Base Bid Austin Traffic Signal Construction Co., Inc. in the total bid amount of $860,016.00. Sincerely, Alvin R. (Trae) Sutton III, P.E., CFM ARS/ xc: Mr. Wesley Wright, PE, City of Georgetown Mr. Chris Pousson, City of Georgetown Ms. Nicole Abrego, City of Georgetown Mr. Ed Schroeder, Austin Traffic Signal Construction Co., Inc. 2020-156-40 Page 72 of 78 City of Georgetown, Texas Transportation Advisory Board August 13, 2021 S UB J E C T: C o nsideration and pos s ible ac tion to approve a F irs t Annual R enewal Agreement with Asphalt Inc. of Austin, Texas for the purchas e o f Asphalt Mixes, in amo unt no t to exceed $180,000. – Eric Jo hns on, P ublic Wo rks Direc tor and Molly R itter, P ub lic Works O p erations Manager. IT E M S UMMARY: T he C ity o f G eorgetown and Asphalt Inc . entered into a one-year agreement for the s upp ly o f as p halt mixes, C ontrac t No . 20-0018-G C on Ap ril 16, 2020 and the O riginal Agreement provid ed fo r two (2) one- year renewal terms ; and the term o f the O riginal Agreement expired o n April 15, 2021, but in the event a new agreement c ould no t b e executed at the annivers ary date of the O riginal Agreement, the O riginal Agreement authorized the P arties to renew the agreement o n a month-to-month basis until a new agreement could be exec uted T his contrac t is to provide Asphalt Hot Mix fo r P ublic Works S treet O peratio ns to c o nduc t various rep airs and maintenanc e to c ity s treets . R epairs s uc h as potholes, s ink holes and utility p atc hes . Maintenanc e would include s mall paving p ro jects o n city s treets that co uld use s ome attentio n and that may not be on the larger S treet Maintenanc e P rogram lead b y S ys tems Engineering. T hes e s mall, in-ho us e, p aving p ro jec ts are als o s cattered across the C ity and diffic ult to program in a larger maintenanc e projec t. F IN AN C IAL IMPAC T: T he to tal b ud get for As phalt mixes is no t to exc eed $180,000 annually and is p art o f the annual P ublic Works O p erating Budget S UB MIT T E D B Y: Eric Jo hns o n, P ublic Wo rks Directo r AT TAC H ME N T S: D escription Type Contract Renewal Backup Material Page 73 of 78 Renewal No. 1 to the Agreement between Asphalt, Inc. and the City of Georgetown, Texas This First Renewal Agreement (this "First Renewal") is made and entered into by and between the CITY OF GEORGETOWN, a Texas Home-Rule Municipal Corporation ("City"), and ASPHALT, INC. ("Supplier"), (collectively, the "Parties"), which agree as follows: WHEREAS, the Parties entered into a one-year agreement for the supply of asphalt mixes, Contract No. 20-0018-GC on April 16, 2020 (the "Original Agreement"); and, WHEREAS, the Original Agreement provided for two (2) one-year renewal terms; and, WHEREAS, the term of the Original Agreement expired on April 15, 2021, but in the event a new agreement cannot be executed at the anniversary date of the Original Agreement, the Original Agreement authorized the Parties to renew the agreement on a month-to-month basis until a new agreement can be executed; and WHEREAS, the Parties desire to renew the Original Agreement for a first renewal term; and, NOW THEREFORE, in consideration of the mutual covenants contained herein, the Parties agree as follows: 1.The Parties agree to renew the Original Agreement for one (1) one-year term, which will begin immediately upon the expiration of the Original Agreement term and will end on April 15, 2022, this being the first renewal term. 2.This First Renewal binds and benefits the Parties and their successors or assigns. This First Renewal, including the Original Agreement, is the entire agreement between the Parties. 3.During the term of this First Renewal, City will pay Supplier an amount not to exceed ONE HUNDRED EIGHTY THOUSAND and No/100 DOLLARS ($180,000.00). 4.All other terms of the Original Agreement not inconsistent with this First Renewal shall apply. Except as expressly modified by this First Renewal, the Original Agreement remains unchanged and in full force and effect, subject to its terms. 5.This First Renewal is effective on the date executed by City. BY THE SIGNATURES affixed below, this First Renewal is hereby incorporated into and made a part of the above-referenced Original Agreement. [Signature page to follow J Page 74 of 78 Page 75 of 78 Page 76 of 78 Page 77 of 78 Page 78 of 78