Loading...
HomeMy WebLinkAboutAgenda_GUS_12.04.2018Notice of Meeting for the Georgetown Utility System Adv isory Board and the Gov erning Body -- Special Meeting of the City of Georgetown December 4, 2018 at 10:00 AM at Georgetown Municipal Complex, 300-1 Industrial Av enue, Georgetown TX The City o f G eo rgeto wn is committed to comp lianc e with the Americans with Dis abilities Ac t (ADA). If yo u req uire as s is tanc e in participating at a p ublic meeting d ue to a disability, as d efined und er the ADA, reas onab le as s is tance, ad ap tatio ns , or acc o mmo d ations will b e provid ed up o n req uest. P leas e c o ntact the City Sec retary's Office, at leas t three (3) days prior to the sc hed uled meeting d ate, at (512) 930-3652 o r City Hall at 113 Eas t 8th Street fo r add itional info rmation; TTY us ers ro ute through Relay Texas at 711. SP ECIAL M E E TING Regular Session (This Regular S es s io n may, at any time, b e rec es s ed to convene an Exec utive S es s io n fo r any p urpose authorized b y the Op en Meetings Act, Texas Go vernment Co d e 551.) A Call to Ord er The Board may, at any time, rec es s the R egular S es s io n to convene in Exec utive S es s io n at the reques t of the Chair, a Board Memb er, the City Manager, As s is tant City Manager, G eneral Manager of Utilities, City Co uncil Member, o r legal c o uns el for any p urpos e authorized b y the Op en Meetings Act, Texas Government C o d e Chapter 551, and are s ubjec t to actio n in the Regular Ses s ion that follows . B Introduction of Vis itors Emp lo yee R ec ognitio n -- -- Water S ervic es -- David Tho mis o n, Water Services Manager C December 2018 GUS CIP P ro ject Up d ates Wesley Wright, P.E., Sys tems Engineering Direc tor/Michael Hallmark, CIP Manager D Pres entatio n o f F Y2018 4th Quarter Financ ial Sc hedules for Elec tric Fund and Water Fund. – Leigh Wallac e, F inanc e Direc tor E Ind ustry Up d ates Legislativ e Regular Agenda F Review and p o s s ib le ac tion to approve the minutes from the regular GUS Bo ard meeting held on Oc to b er 12, 2018 and the regular GUS Bo ard meeting s ched uled fo r No vember 9, 2018. - S heila K. Mitchell, GUS Board Liais o n G Co nsideration and possible recommendatio n to ap p ro ve the purchas e o f Enviro s ight s ewer inspec tion c amera sys tem from Green Equip ment Co., Inc ., of Fort Worth, TX, in the amo unt o f $73,296.00. – David W. Tho mis o n, Water S ervic es Manager H Co nsideration and possible recommendatio n to award a c o ntract for the Edward s Aquifer Recharge Zo ne Page 1 of 62 (EARZ) Was tewater S ystem Rehabilitatio n Area 1 - 2018, to PM Cons truc tion & Rehab, LLC of Pas ad ena, T X, for the amount of $749,306.00. – Wesley Wright, P.E., Sys tems Engineering Directo r/Mic hael Hallmark, CIP Manager I Co nsideration and possible recommendatio n to ap p ro ve a c o ntract with Santa Clara Cons tructio n, Ltd , o f Austin, Texas for the Berry Creek Was tewater Interc ep tor p ro ject in the amount of $5,544,473.00. - Wesley Wright, P.E., Systems Engineering Director/Michael Hallmark, CIP Manager J Co nsideration and possible recommendatio n to ap p ro ve a c o ntract with Royal Vista, Inc . o f Lib erty Hill, Texas fo r the R o nald Reagan and Mis s ion Oaks Waterline Imp ro vements projec t in the amount of $6,149,425.00. - Wesley Wright, P.E., Systems Engineering Director/Michael Hallmark, CIP Manager K Co nsideration and possible recommendatio n to ap p ro ve a c o ntract with M.A.S mith Co ntracting of Aus tin, Texas fo r the Wes t Univers ity Avenue 2018 Waterline Improvements pro jec t in the amo unt o f $546,510.00. - Wes ley Wright, P.E., S ystems Engineering Directo r/Mic hael Hallmark, C IP Manager L EXECUTIVE SESSION In c o mp lianc e with the Open Meetings Ac t, Chap ter 551, Government C o d e, Verno n's Texas Co d es , Anno tated, the item lis ted b elo w will b e d is c us s ed in c lo s ed session and is s ub ject to ac tion in the regular session. Sec. 551.086 Competitive Matters Po wer Supply planning d is cus s io n. -- Jim Briggs , General Manager Utilities (no action required) M Actio n from Executive S es s io n - Po wer S upply planning d is cus s io n (no action required) Adjournment CERTIFICATE OF POSTING I, Shelley No wling, C ity S ecretary fo r the C ity of Geo rgeto wn, Texas , d o hereby c ertify that this Notice of Meeting was p o s ted at City Hall, 113 E. 8th Street, a p lace read ily acc es s ible to the general p ublic at all times , on the ______ d ay o f __________________, 2018, at __________, and remained so p o s ted fo r at leas t 72 c o ntinuo us ho urs p receding the sc heduled time o f s aid meeting. ____________________________________ S helley No wling, City Sec retary Page 2 of 62 City of Georgetown, Texas Utility System Advisory Board December 4, 2018 SUBJECT: Call to Ord er The Bo ard may, at any time, recess the Regular Ses s ion to c o nvene in Exec utive Ses s ion at the req uest of the Chair, a Bo ard Member, the City Manager, As s is tant City Manager, General Manager o f Utilities , City Counc il Memb er, or legal counsel fo r any purp o s e autho rized by the Op en Meetings Ac t, Texas Go vernment Code Chap ter 551, and are s ub jec t to ac tion in the Regular Ses s io n that fo llo ws. ITEM SUMMARY: FINANCIAL IMPACT: N/A SUBMITTED BY: Page 3 of 62 City of Georgetown, Texas Utility System Advisory Board December 4, 2018 SUBJECT: Dec emb er 2018 GUS CIP Projec t Updates Wes ley Wright, P.E., S ystems Engineering Direc to r/Mic hael Hallmark, CIP Manager ITEM SUMMARY: Berry Creek Wastewater Intercepto r – 3CJ (Airpo rt Ro ad to Sun City) Santa Clara Low Bidder - GUS Board Consideration 12/4/18 followed by City Council on 12/11/18. NT P to be issued early 2019 Berry Creek Wastewater Interceptor Phases 1, 2 & 3 (Airport Road to Pecan Branch WWTP) Presentatio n to C o mmis s io ners Court in Dec ember Braun Elevated Storage Tank (EST) Contract with Landmark Structures approved by GUS Board & City Council in October. P reConstruction Meeting 11/29/18 with NT P to be issued for 12/3/18 Cedar Breaks to Pasto r Dedicated Water Line Task Order approved by GUS Board on 6/6/18 & City Council on 6/26/18, realignment options being considered CR 255 Recommended by GUS 10/09/15, approved by CC on 10/27/15. P reliminary Construction P lans are near 80% complete & Easements 50% complete EARZ Area 1 - 2018 Task Order approved by GUS Board 4/3/18 & by City Council 4/24/18. Letter of Recommendation to P M Construction, goes to GUS Board 12/4/18 with Council consideration 12/11/18 Lake WTP Chemical Storage Improvements Task Order approved by GUS Board 12/8/17 & City Council 12/12/17. Tentatively out for Bid late Winter 2018 Lake WTP Raw Water Intake & Pump Station Improvements Recommendation of Award given to Huffman Contractors, approved by City Council 5/22/18. Huffman divers preformed the initial Exploratory Dive on 11/19/18 Park Lift Station Task Order recommended by GUS 2/10/17& approved by City Council 2/18/17. 100% Design P lans being reviewed by Staff, Bids in early 2019 Pasto r Pump Statio n NT P date Monday 4/16/18. Bypass pump on site crews installing wet taps for bypass pumping during shutdowns Page 4 of 62 Pecan Branch WWTP NT P 7/17/17, Installing wall forms for diversion box & wastewater drain line/manholes Ronald Reagan Water Line KPA Task Order approved by GUS Board & City Council on 8/28/18, Letter of Recommendation to Royal Vista Construction. Consideration by GUS Board 12/4/18 & City Council 12/11/18 San Gabriel Wastewater Treatment Plant – Belt Press Task Order approved by GUS Board 3/9/18 & by City Council 3/27/18. Tentatively out for Bid early 2019 Shell Road Water line Final Design P lans are 90% complete & Easements are 60% complete Sun City 2.0 MG Elevated Storage Tank Steel c rew wo rking to weld up s tank. Lo wer c o ne in p lace, wo rking o n s hell wall. Water Tank Rehab- 2018 CDM Task Order recommended by GUS Board 12/8/17 & approved by Council 12/12/17 Tentatively out for Bid Spring 2019 West University 2018 Waterline Improvements Cons id eration b y GUS Board 12/4/18 & City C o uncil 12/11/18 with NTP late 2018 to early ‘19 November Council actions -- GUS Board did not meet in No vember; no items fo rwarded to Counc il. FINANCIAL IMPACT: N/A SUBMITTED BY: Wes ley Wright, P.E., S ystems Engineering Direc to r/Mic hael Hallmark, CIP Manager. ATTACHMENTS: Description Type December 2018 GUS CIP Updates Cover Memo Page 5 of 62 GUS Item Update Coversheet December 2018 Berry Creek Wastewater Interceptor – 3CJ Santa Clara Low Bidder - GUS Board Consideration 12/4/18 followed by City Council on 12/11/18. NTP to be issued early 2019 Berry Creek Wastewater Interceptor Phases 1, 2 & 3 Presentation to Commissioners Court in December Braun Elevated Storage Tank (EST) Contract with Landmark Structures approved by GUS Board & City Council in October PreConstruction Meeting 11/29/18 with NTP to be issued for 12/3/18 Cedar Breaks to Pastor Dedicated Water Line Task Order approved by GUS Board on 6/6/18 & City Council on 6/26/18, realignment options being considered CR 255 Recommended by GUS 10/09/15, approved by CC on 10/27/15. Preliminary Construction Plans are near 80% complete & Easements 50% complete EARZ Area 1 - 2018 Task Order approved by GUS Board 4/3/18 & by City Council 4/24/18. Letter of Recommendation to PM Construction, goes to GUS Board 12/4/18 with Council consideration 12/11/18 Lake WTP Chemical Storage Improvements Task Order approved by GUS Board 12/8/17 & City Council 12/12/17. Tentatively out for Bid late Winter 2018 Lake WTP Raw Water Intake & Pump Station Improvements Recommendation of Award given to Huffman Contractors, approved by City Council 5/22/18. Huffman divers preformed the initial Exploratory Dive on 11/19/18 Park Lift Station Task Order recommended by GUS 2/10/17& approved by City Council 2/18/17. 100% Design Plans being reviewed by Staff, Bids in early 2019 Page 6 of 62 Pastor Pump Station NTP date Monday 4/16/18. Bypass pump on site crews installing wet taps for bypass pumping during shutdowns Pecan Branch WWTP NTP 7/17/17, Installing wall forms for diversion box & wastewater drain line/manholes Ronald Reagan Water Line KPA Task Order approved by GUS Board & City Council on 8/28/18, Letter of Recommendation to Royal Vista Construction. Consideration by GUS Board 12/4/18 & City Council 12/11/18 San Gabriel Wastewater Treatment Plant – Belt Press Task Order approved by GUS Board 3/9/18 & by City Council 3/27/18. Tentatively out for Bid early 2019 Shell Road Water line Final Design Plans are 90% complete & Easements are 60% complete Sun City 2.0 MG Elevated Storage Tank Steel crew working to weld up stank. Lower cone in place, working on shell wall. Water Tank Rehab- 2018 CDM Task Order recommended by GUS Board 12/8/17 & approved by Council 12/12/17 Tentatively out for Bid Spring 2019 West University 2018 Waterline Improvements Consideration by GUS Board 12/4/18 & City Council 12/11/18 with NTP late 2018 to early ‘19 Page 7 of 62 Project: Berry Creek Wastewater Interceptor Project# 3CJ Update – December 2018 Project Description: This project will consist of approximately 15,000 linear feet of wastewater interceptor ranging in diameter from 36-inch to 30-inch from the existing Berry Creek lift station to the existing Sun City lift station. The alignment of the interceptor will generally follow Berry Creek. Purpose: The purpose of this project is to add wastewater capacity in Sun City, provide wastewater service to the Shell road area, and will allow Sun City Lift Station to come off line when the future phases are complete. Project Manager: Ken Taylor Engineer: CDM Smith Contractor: Letter of Recommendation - Santa Clara Construction Phase Start Finish Status / Comments Preliminary Engineering May 2015 February 2016 Recommended by GUS 5/8/15 approved by CC 5/26/15. Final Design February 2016 March 2018 100% complete ROW / Easements June 2015 Complete Bid / Award Bid # Santa Clara Low Bidder - GUS Board Consideration 12/4/18 followed by City Council on 12/11/18 Construction NTP to be issued early 2019 Post Construction Page 8 of 62 Project: Berry Creek Wastewater Interceptor Phase 1,2, &3 Project# Update – December 2018 Project Description: This project will consist of approximately 21,500 linear feet of wastewater interceptor ranging in diameter from 36-inch to 48-inch from the existing Berry Creek lift station to the existing Pecan Branch Wastewater Plant. The alignment of the interceptor will generally follow Berry Creek. Purpose: The purpose of this project is to add wastewater capacity in Sun City, provide wastewater service to the Shell road area, and will allow Sun City Lift Station to come off line. Project Manager: Ken Taylor Engineer: Walker Partners, LLC Contractor: TBD Phase Start Finish Status / Comments Preliminary Engineering November 2017 November2018 Recommended by GUS 10/13/17 Approved by City Council 10/23/17. Boring samples being analyzed Final Design November 2018 January 2019 ROW / Easements Bid / Award Bid # Presentation to Commissioners Court in December Construction January 2019 April 2020 Post Construction Page 9 of 62 Project: Braun EST Project# 2JG Update – December 2018 Project Description: This project involves - Design, bidding and general services during construction for a 3 MG elevated storage tank (EST) at the Braun EST site Purpose: The purpose of this project is to add additional elevated water storage capacity and meet the demands of the water system in the 1178 pressure plane. Project Manager: Ken Taylor Engineer: CDM Contractor: Landmark Structures Phase Start Finish Status / Comments Preliminary Engineering January 2018 March 2018 Task Order approved by GUS Board 12/8/17 & by City Council 12/12/17 Final Design April 2018 July 2018 ROW / Easements Bid / Award Bid # September 2018 October 2018 Approved by GUS Board & Council in October Construction December ‘18 PreCon 11/29/18 with NTP 12/3/18 Post Construction Page 10 of 62 Page 11 of 62 Project: Cedar Breaks EST – Pastor 24 Inch Dedicated Water Line Project# 2JI Update – December 2018 Project Description: This project will consist of approximately 12,000 linear feet water line that will run from Cedar Breaks Elevated Storage Tank to the Pastor Ground Storage Tank. The water line will run in DB Woods Rd right-of-way for the northern portion of the alignment and around the north and western border of Wood Ranch for the southern portion. Purpose: The purpose of this project is to run a dedicated water line from Cedar Breaks EST to Pastor Pump Station, this dedicated 24-inch waterline will allow the Pastor Pump Station to fill without depleting the existing distribution system and effecting fire flow. This will also increase the capacity of the Pastor Pump Station to keep up with growth and demand in the Western District. Project Manager: Ken Taylor Engineer: CDM Smith Contractor: TBD Phase Start Finish Status / Comments Preliminary Engineering July 2018 September 2018 Task Order approved by GUS Board 6/6/18 & City Council 6/26/18 Final Design October 2018 November 2018 Preliminary Survey work starting ROW / Easements July 2018 November 2018 Realignment options being considered Bid / Award Bid # January 2019 February 2019 Construction Early 2019 Post Construction Page 12 of 62 Project: County Road 255 Waterline Improvements Project# 2JE Update – December 2018 Project Description: This project involves upgrading the existing 15-inch water main with 16-inch C-905 or DI pipe. This project will consist of approximately 44,500 LF of 16-inch water main replacement. Purpose: The purpose of this project is to upgrade the class pipe water mains to C-905 or DI pipe, and replace this existing main that has a large amount of water leaks. Project Manager: Ken Taylor Engineer: KPA Contractor: TBD Phase Start Finish Status / Comments Preliminary Engineering October 2015 March 2016 Recommended by GUS 10/09/15, approved by City Council on 10/27/15. Final Design March 2016 February2018 80% Complete ROW / Easements October 2015 50% complete Bid / Award Bid # Construction Post Construction Page 13 of 62 Project: EARZ Area 1 - 2018 Project# 3CQ Update – December 2018 Project Description: This project will consist of pipe bursting, cured-in-place, open trench, & rehabbing manholes. Purpose: The purpose of this project is to make repairs on the wastewater collection system to be in compliance with TCEQ rules and regulations. Project Manager: Chris Logan Engineer: KPA Contractor: Letter of Recommendation - PM Construction Phase Start Finish Status / Comments Preliminary Engineering March 2017 June 2017 Task Order Recommended by GUS 2/10/17 Approved by CC 2/28/17 Final Design June 2017 August 2017 September 2018, reviewing 90% plans ROW / Easements N/A N/A N/A Bid / Award Bid # Bid opening Task Order approved by GUS Board 4/3/18 & City Council 4/24/18. Project to Bid late Fall 2018 Construction Letter of Recommendation to PM Construction, goes to GUS Board 12/4/18 with Council consideration 12/11/18 Post Construction Page 14 of 62 Project: Lake WTP – Chemical Storage Improvements Project# 2CW Update – December 2018 Project Description: This project involves - Design, bidding and general services during construction for the design of sodium permanganate storage and feed system improvements at the Lake WTP. Purpose: The purpose of this project is the sodium permanganate storage and feed system improvements will be bid so that small specialized, qualified chemical feed contractors can bid the project. Project Manager: Ken Taylor Engineer: CDM Contractor: TBD Phase Start Finish Status / Comments Preliminary Engineering January 2018 March 2018 Task Order approved by GUS Board 12/8/17 & City Council 12/12/17 Final Design April 2018 June 2018 ROW / Easements Bid / Award Bid # July 2018 September 2018 Tentatively out for Bid Winter 2018. Construction Post Construction Page 15 of 62 Project: Lake Water Treatment Plant Raw Water Intake & Pump Station Maintenance Improvements Project# 2CU Update – November 2018 Project Description: This project involves - Design bidding and general services during construction for the maintenance improvements consist of replacing the intake gates and other general maintenance on the 40-year-old intake. The maintenance improvements also consist of replacing some discharge piping at the Raw Water Pump Station Purpose: The purpose of this project is the replacing the intake gates and other general maintenance on the 40-year-old intake. There will also be revisions to the discharge piping that will reduce the pump head loss at the existing pump Project Manager: Ken Taylor Engineer: CDM Contractor: Huffman Contractors Phase Start Finish Status / Comments Preliminary Engineering October 2017 November 2017 Approved by GUS Board 9/17 & City Council September 17 Final Design November 2017 February 2018 ROW / Easements Bid / Award Bid # April 2018 May 2018 Recommendation of Award given to Huffman Contractors, approved by City Council 5/22/18 Submittals being processed Construction Fall 2018 NTP issued 6/25/18 with PreConstruction meeting 10/19/18 Post Construction Page 16 of 62 Project: San Gabriel Park Lift Station Improvements Project# 3CN Update – December 2018 Project Description: This project will consist of the construction a new wastewater lift station with appurtenant electrical and instrumentation improvements. Purpose: The purpose of this project is to provide wastewater service for growth and development in the San Gabriel Wastewater Basin. Project Manager: Ken Taylor Engineer: KPA Contractor: TBD Phase Start Finish Status / Comments Preliminary Engineering March 2017 June 2017 Recommended by GUS 2/10/17& City Council 2/18/17 Final Design July 2017 December 2017 90% Plans under review by Staff TCEQ variance under review ROW / Easements N/A N/A Bid / Award Bid # Tentatively Bids in early 2019 Construction Post Construction Page 17 of 62 Project: Pastor Pump Station Project# 2BZ Update – December 2018 Project Description: This project involves upgrading the existing pump station with two new motors, pumps, electrical, instrumentation & HVAC. Design of pipeline improvements to provide more water to the Pastor Pump Station and to complete the West Loop Water Line near SH 29 and DB Wood Road. Purpose: The purpose of this project is to upgrade pipeline improvements and to provide more water to the Pastor Pump Station and to complete the West Loop Water Line near SH 29 and DB Wood Road. Project Manager: Ken Taylor Engineer: CDM Contractor: Archer Western Phase Start Finish Status / Comments Preliminary Engineering May 2017 October 2017 Task Order recommended by GUS 4/14/17 and goes to Council 4/25/17. Final Design October 2017 February 2018 ROW / Easements Bid / Award Bid # GUS Board approved Contract with Archer Western 3/9/18 and Council approved 3/27/18 Construction April 2018 April 2019 Bypass pump on site crews installing wet taps for bypass pumping during shutdowns Post Construction Page 18 of 62 Project: Pecan Branch Wastewater Treatment Plant Expansion Project# 3CA Update – December 2018 Project Description: The project includes expanding the existing Pecan Branch WWTP from 1.5 to 3.0 MGD including the construction of an influent pump station, screening and grit removal facilities, aeration basins, secondary clarifiers, cloth disk filters, UV disinfection facility, sludge holding tanks facilities, site grading and paving, electrical improvements, and instrumentation improvements. Purpose: The purpose of this project is to provide wastewater treatment for future growth and development. Project Manager: Ken Taylor Engineer: CDM Smith Contractor: CSA Construction Phase Start Finish Status / Comments Preliminary Engineering November 2012 March 2013 Complete Final Design December 2015 January 2017 100% Set of Plans ROW / Easements Complete Bid / Award Bid # 201717 March 2017 May 2017 Bid Opening 3/28/17 GUS Board approved 4/14/17 City Council 4/25/17 Construction July 2017 August 2019 NTP 7/17/17, installing wall forms for diversion box & wastewater drain line/manholes Post Construction Page 19 of 62 Project: Ronald Reagan Waterline Improvements Project# 2JM Update – December 2018 Project Description: This project involves upgrading the existing 15-inch water main with 16-inch C-905 or DI pipe. This project will consist of approximately 44,500 LF of 16-inch water main replacement. Purpose: The purpose of this project is to install 21,300 LF of 30” water main on the west side of Ronald Reagan from FM 2338 (Williams dr) to FM 3405 Project Manager: Ken Taylor Engineer: KPA Contractor: TBD Phase Start Finish Status / Comments Preliminary Engineering October 2015 March 2016 KPA Task Order approved by GUS Board & City Council on 8/28/18 Final Design March 2016 February2018 80% Complete ROW / Easements October 2015 50% complete Bid / Award Bid # Letter of Recommendation to Royal Vista Construction. Consideration by GUS Board 12/4/18 & City Council 12/11/18 Construction Post Construction Page 20 of 62 Project: San Gabriel Wastewater Treatment Plant – Belt Press Project# 3CP Update –December 2018 Project Description: This project involves - Design, bidding and general services during construction for a new sludge dewatering building and the installation of dewatering equipment, a polymer system and a conveyor for the San Gabriel Wastewater Treatment Plant (WWTP) Purpose: The purpose of this project is to replace the existing drying beds with a new sludge dewatering building and the installation of dewatering equipment, a polymer system and a conveyor to load a roll-off dumpster. Project Manager: Ken Taylor Engineer: CDM Contractor: TBD Phase Start Finish Status / Comments Preliminary Engineering April 2018 August 2018 Task Order approved by GUS Board 3/9/18 & by City Council 3/27/18 Final Design August 2018 December 2018 ROW / Easements N/A Bid / Award Bid # February 2019 March 2019 Tentatively out for Bid early 2019 Construction Post Construction Page 21 of 62 Project: Shell Road Waterline Improvements Project# 3CI Update – December 2018 Project Description: This project will consist of approximately 13,500 LF of 16-inch water line and approximately 2300 LF of 12-inch waterline. Purpose: The purpose of this project is to provide secondary feed of water to Sun City. Project Manager: Ken Taylor Engineer: KPA Contractor: TBD Phase Start Finish Status / Comments Preliminary Engineering April 2015 August 2015 Task Order Recommended by GUS 3/13/15 Approved by CC 3/24/15. Final Design August 2015 March 2018 90% complete ROW / Easements June 2015 October 2017 60% complete Bid / Award Bid Construction Post Construction Page 22 of 62 Project: Sun City Elevated Water Storage Tank Project# 2CP Update – December 2018 Project Description: This project will consist of the replacement of the existing .4 million gallon Elevated Water Storage Tank with a 2 million gallon Elevated Water Storage Tank. Purpose: The purpose of this project is to increase elevated water storage in the Sun City 1015 pressure plan from .4 MG to 2MG to meet the demands of the water system in the 1015 pressure plane. Project Manager: Chris Pousson Engineer: Dunham Engineering, Inc. Contractor: CB&I Phase Start Finish Status / Comments Preliminary Engineering November 2016 May 2017 Task Order recommended by GUS 11/11/16, Approved by CC 11/22/16. Final Design May 2017 June 2017 100% complete ROW / Easements N/A N/A N/A Bid / Award Bid # July 2017 September 2017 GUS Board and Council Approved Construction December 2017 March 2019 Steel crew working to weld up stank. Lower cone in place, working on shell wall. Post Construction Page 23 of 62 Project: Water Tank Rehab - 2018 Project# 2CX Update – December 2018 Project Description: This project involves - Design bidding and general services during construction for the demolition of the steel ground storage tank (GST) and steel lime silo at the Park Water Treatment Plant (WTP), demolition of the Woods GST, and rehabilitation of the 1 MG GST at the Southside WTP; and design Purpose: The purpose of this project is the demolition of the steel structures at the Park WTP and the Woods sites and rehabilitation of the 1 MG GST at the Southside WTP site will be bid so that qualified demolition and tank rehab contractors can bid the project. Project Manager: Ken Taylor Engineer: CDM Contractor: TBD Phase Start Finish Status / Comments Preliminary Engineering January 2018 March 2018 Task Order recommended by GUS Board 12/8/17 & approved by Council 12/1/2/17 Final Design April 2018 June 2018 ROW / Easements Bid / Award Bid # July 2018 September 2018 Tentatively out for Bid early 2019 Construction Post Construction Page 24 of 62 Project: West University 2018 Waterline Improvements Project# 2JJ Update – December 2018 Project Description: This project will consist of approximately 1,220 LF of 12-inch water line and approximately 150 LF of 8-inch waterline. Purpose: The purpose of this project is to provide adequate flows & pressure to the University/IH 35 area Project Manager: Ken Taylor Engineer: CDM Contractor: Letter of Recommendation to Smith Contracting Phase Start Finish Status / Comments Preliminary Engineering April 2015 August 2015 Task Order Recommended by GUS 3/13/15 Approved by CC 3/24/15. Final Design August 2015 March 2018 October 2018 ROW / Easements June 2015 October 2017 Complete Bid / Award Bid Consideration by GUS Board 12/4/18 & City Council 12/11/18 Construction NTP late 2018 to early ‘19 Post Construction Page 25 of 62 City of Georgetown, Texas Utility System Advisory Board December 4, 2018 SUBJECT: Presentatio n of FY2018 4th Quarter Financial S c hed ules fo r Electric Fund and Water F und . – Leigh Wallace, Financ e Directo r ITEM SUMMARY: The 4th Quarter report is a preliminary year-end rep o rt use to keep management, boards and Counc il aware o f the general p ic ture o f financ ial c o nditio ns. T hes e figures are unaudited , preliminary, and s ubjec t to change as s taff wo rk to complete the year-end external audit. When the City’s C o mp rehens ive Annual Financ ial Report (C AF R) is c o mp lete, final s c hed ules will b e presented to the b o ard . Elec tric sales revenue through the fo urth q uarter o f F Y2018 totals $69.2 millio n, up 2.3% c o mp ared to b udget. The inc reas e is d ue to growth in the c us to mer base and the impac t of the power c o s t ad justment. Total operating revenues ended FY2018 at $73.6 millio n, or $1.4 million mo re than bud geted . Elec tric exp end itures exceed b udget d ue to higher than projec ted p urc hase power c o s ts. The net o f p urc hased p ower and c o nges tion revenue rights (CR Rs) exc eed bud get by $11.6 million. Due to the o verage in purc has ed p o wer, the fund will require a FY2018 year-end b udget amend ment. T he fund is anticipated to end FY2018 will a fund balanc e of $1.97 millio n, a variance to projec tion of $6.84 millio n. Staff is p rep aring a F Y2019 Budget Amendment for Counc il to further addres s the fund ’s positio n. Water revenue is up 9.5% while was tewater revenue is up 1.4% compared to las t year. The increases are d ue to growth in the s ys tem and imp act fees. Imp act fee revenue came in $5.45 million higher than p ro jectio ns. Sys tem fee revenues (water and was tewater fees ) finis hed the year at $40.7 millio n. Water expens es total $50.83 millio n. No n-op erational exp enses total $18.3 millio n. Thes e no n-operatio nal expens es are c ap ital imp ro vement p ro jects that normally span multiple years . A CIP Rollforward Bud get amendment to reautho rize these p ro jects for s pend ing in F Y2019 is planned in December. FINANCIAL IMPACT: N/A SUBMITTED BY: Leigh Wallace, Financ e Directo r (skm) ATTACHMENTS: Description Type Electric and Water Funds Backup Material Page 26 of 62 APRROVED BUDGET CURRENT PERIOD YEAR TO DATE (W/ENCUMB) YEAR-END PROJECTION YEAR-END VARIANCE FAV(UNFAV) % YEAR-END VARIANCE FAV(UNFAV) BEGINNING FUND BALANCE 6,758,275 6,758,275 6,758,275 - 0.00% Operating Revenue Electric Revenue 67,595,139 9,323,738 69,170,340 69,416,907 (246,567) -0.36% Interest 48,318 13,646 79,733 47,632 32,100 67.39% Other Revenue 4,569,955 547,762 4,354,058 5,017,865 (663,808) -13.23% Operating Revenue Total 72,213,412 9,885,146 73,604,130 74,482,405 (878,275) -1.18% Operating Expenditures CRR Credits (2,000,000) (3,707,789) (9,975,855) (7,000,000) 2,975,855 -42.51% Georgetown Utility Systems 18,465,971 1,965,833 18,248,400 18,433,826 185,426 1.01% Purchased Power 44,000,000 10,250,969 63,633,139 52,000,000 (11,633,139) -22.37% Transfer Out-Interfund Transfers 92,600 - 92,600 92,600 - 0.00% Transfer Out-ROI 5,493,707 608,194 5,344,952 5,235,000 (109,952) -2.10% Operating Expenditures Total 66,052,278 9,117,207 77,343,236 68,761,426 (8,581,810) -12.48% Total Net Operations 6,161,134 767,939 (3,739,105) 5,720,979 (9,460,085) -165.36% Non-Operating Revenue Bond Proceeds 6,537,000 - 6,727,776 6,537,000 190,776 2.92% Transfers in 540,981 - 540,981 540,981 - 0.00% Non-Operating Revenue Total 7,077,981 - 7,268,757 7,077,981 190,776 2.70% Non-Operating Expenditures CIP 9,880,487 1,246,933 3,907,079 6,508,565 2,601,486 39.97% Interest Expense 1,697,769 (197) 1,259,120 1,259,116 (4) 0.00% Debt Issuance Cost 15,000 - 190,776 15,000 (175,776) -1171.84% Debt Service 2,539,258 - 2,960,260 2,959,731 (529) -0.02% Non-Operating Expenditures Total 14,132,514 1,246,736 8,317,235 10,742,412 2,425,177 22.58% Total Net Non-Operations (7,054,533) (1,246,736) (1,048,478) (3,664,431) 2,615,953 71.39% EXCESS (DEFICIENCY) OF TOTAL REVENUE OVER TOTAL REQUIREMENTS (893,399) (478,796) (4,787,584) 2,056,548 (6,844,132) -332.80% ENDING FUND BALANCE 5,864,876 1,970,691 8,814,823 (6,844,132) -77.64% RESERVED ENDING BALANCE 5,125,000.00 5,125,000.00 Electric Fund Preliminary Actuals to Year-End Projection: Sep FY2018 7 Page 27 of 62 APRROVED BUDGET CURRENT PERIOD YEAR TO DATE (W/ENCUMB) YEAR-END PROJECTION YEAR-END VARIANCE FAV(UNFAV) % YEAR-END VARIANCE FAV(UNFAV) BEGINNING FUND BALANCE 74,958,152 74,958,152 74,958,152 - 0.00% Operating Revenue Capital Recovery Fee 6,672,500 1,608,530 17,875,414 12,416,521 5,458,893 43.96% Interest 192,385 141,163 1,329,526 794,596 534,930 67.32% Irrigation Utility Revenue 225,000 83,989 367,206 214,891 152,315 70.88% Other Revenue 2,176,250 411,064 6,693,908 3,851,044 2,842,864 73.82% Raw Water Revenue 178,500 31,935 139,468 141,089 (1,621) -1.15% Transfer In, Debt 116,613 116,613 116,613 116,613 - 0.00% Wastewater Utility Revenue 10,850,000 973,093 10,761,484 11,007,305 (245,821) -2.23% Water Utility Revenue 27,748,195 3,472,682 29,553,572 28,756,997 796,575 2.77% Operating Revenue Total 48,159,443 6,839,069 66,837,191 57,299,056 9,538,134 16.65% Operating Expenditures Irrigation 204,300 40,452 173,014 205,000 31,986 15.60% Transfer Out, Fleet/Joint Service 62,000 - 62,000 62,000 - 0.00% Transfer Out, General 425,000 218,750 425,000 425,000 - 0.00% Transfer Out, ROI 2,686,505 276,503 2,711,029 2,993,788 282,759 9.44% Transfer Out, Utilities 540,981 - 540,981 540,981 - 0.00% Wastewater Distribution 613,000 465,047 1,017,634 592,810 (424,824) -71.66% Wastewater Plant Management 2,437,025 244,435 2,349,674 2,412,396 62,722 2.60% Water Administration 18,602,018 1,774,374 18,685,656 18,313,695 (371,961) -2.03% Water Distribution 2,273,300 236,478 2,094,643 2,194,442 99,799 4.55% Water Operations 3,769,545 301,917 3,884,906 3,682,263 (202,643) -5.50% Water Plant Management 2,548,726 276,079 2,372,061 2,319,630 (52,431) -2.26% Operating Expenditures Total 34,162,400 3,834,035 34,316,598 33,742,005 (574,593) -1.70% TOTAL NET OPERATIONS 13,997,043 3,005,035 32,520,593 23,557,051 8,963,541 38.05% Non-Operating Revenue Bond Proceeds - - - - - 0.00% Non-Operating Revenue Total - - - - - 0.00% Non-Operating Expenditures CIP 65,090,414 2,607,807 11,822,061 65,500,836 53,678,775 81.95% Debt Service 5,344,535 - 6,496,981 5,344,535 (1,152,446) -21.56% Non-Operating Expenditures Total 70,434,949 2,607,807 18,319,042 70,845,371 52,526,329 74.14% TOTAL NET NON-OPERATIONS (70,434,949) (2,607,807) (18,319,042) (70,845,371) 52,526,329 74.14% EXCESS (DEFICIENCY) OF TOTAL REVENUE OVER TOTAL REQUIREMENTS (56,437,906) 397,228 14,201,551 (47,288,320) 61,489,870 130.03% ENDING FUND BALANCE 18,520,246 89,159,703 27,669,832 61,489,870 222.23% RESERVED ENDING BALANCE 6,000,000 6,000,000 Water Fund Preliminary Actuals to Year-End Projection: Sep FY2018 8 Page 28 of 62 City of Georgetown, Texas Utility System Advisory Board December 4, 2018 SUBJECT: Indus try Up dates ITEM SUMMARY: FINANCIAL IMPACT: N/A SUBMITTED BY: Page 29 of 62 City of Georgetown, Texas Utility System Advisory Board December 4, 2018 SUBJECT: Review and pos s ible actio n to ap p ro ve the minutes fro m the regular GUS Board meeting held o n Octo b er 12, 2018 and the regular GUS Board meeting s c heduled for Novemb er 9, 2018. - Sheila K. Mitc hell, GUS Bo ard Liais on ITEM SUMMARY: Bo ard to review, revis e and /or ap p ro ve the minutes fro m the regular GUS Board meeting held o n Octo b er 12, 2018 and the regular GUS Board meeting s c heduled for Novemb er 9, 2018. FINANCIAL IMPACT: N/A SUBMITTED BY: Sheila K. Mitc hell/GUS Bo ard Liais o n ATTACHMENTS: Description Type Oct 12 2018 DRAFT Minutes Backup Material Nov 9 2018 DRAFT Minutes - no meeting Backup Material Page 30 of 62 Minutes of the Meeting of the Georgetown Utility Systems Advisory Board and the Governing Body of the City of Georgetown, Texas October 12, 2018 at 2:00PM at Georgetown Municipal Complex, 300-1 Industrial Avenue, Georgetown, TX The City of Georgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you require assistance in participation at a public meeting due to a disability, as defined under the ADA, reasonable assistance, adaptations, or accommodations will be provided upon request. Please contact the City Secretary’s Office, at least three (3) days prior to the scheduled meeting date, at (512) 930-3652 or City Hall at 113 East 8th Street for additional information: TTY users route through Relay Texas at 711. Board Members Present: Mike Cunningham – Chair, John Copelan – Vice Chair, David Maserang, Ed Pastor, Arthur Yaeger Board Members Absent: Edward Wiley – Secretary, Steve Fought Staff Members Present: Jim Briggs, Mike Babin, Wesley Wright, Leticia Zavala, Chris Foster, Michael Hallmark, Mike Westbrook, Chelsea Solomon, Rosemary Ledesma, Roy Torrez, Brian Mikulencak, Sheila Mitchell, Debbie Mitchell (joined at 2:05pm) Others Present: none Regular Session (This Regular Session may, at any time, be recessed to convene an Executive Session for any purpose authorized by the Open Meetings Act, Texas Government Code 551.) A. Call to Order – called to order by Chair at 2:00 PM The Board may, at any time, recess the Regular Session to convene an Executive Session at the request of the Chair, a Board Member, the City Manager, Assistant City Manager, General Manager of Utilities, City Council Member, or legal counsel for any purpose authorized by the Open Meetings Act, Texas Government Code Chapter 551, and are subject to action in the Regular Session that follows. B. Introduction of Visitors -- none Employee Recognition – --Chelsea Solomon, Control Center Manager Briggs introduced Solomon and announced her job transition as Electric Engineer in Systems Engineering to Manager of our Systems Control Center. Solomon has been with the City for approximately four years, working with David Munk. The Board congratulated Solomon o n her new position and thanked her for her hard work. C. October 2018 GUS Board Project Updates and September Council Action Wesley Wright, P.E., Systems Engineering Director/Michael Hallmark, CIP Manager Wright gave updates on all projects included in packet. Briggs spoke on Berry Creek Wastewater Interceptor Open House and the work done regarding routing the line to protect the Berry Springs Park and coordination with County Commissioners and Judges to assist moving project forward. Wright reviewed remaining project reports with board. He is working on future bids for several projects which staff would like to hold a special board meeting in December in order to move items on to the only Council meeting in December. Consideration of December 4th. Maserang is unavailable due to travel. Others seemed available and would check calendars. Cunningham recommended moving forward. Board present agreed. Mitchell will follow up with communication to full board to determine a quorum. D. Financial FY18 Update / Water and Electric – Chris Foster, Manager of Resource Planning & Integration Foster informed board financial year-end numbers not available at this time. Will bring to a future meeting. E. Industry Updates Page 31 of 62 Briggs spoke on next legislative session and coordinating information with Council. After elections are over, November is pre-file of bills. Some discussion of possible electric prices increasing in the industry, possible coal plants coming offline and recent increase in gas prices. Regarding Water updates, Brazos River Authority (BRA’s) new General Manager, Collinsworth has been meeting with city regarding BRA’s future activities; possibility of moving forward on pipeline between Belton and Stillhouse Hollow. Council is set to approve the land purchase for South Lake Water Treatment Plant; plans will then move along on the project working with the Corp of Engineers to identify raw waterline route. Future discussion will come to the board in 2019 regarding Aquifer Storage and Recovery (ASR) in the local area, coordinating with BRA for future water plans. Legislative Regular Agenda The Board will individually consider and possibly take action on any or all of the following items: F. Review and possible action to approve the minutes from the Regular GUS Board meeting held on September 14, 2018. – Sheila K. Mitchell, GUS Board Liaison No discussion. Motion by Copelan, seconded by Yaeger to approve the minutes from the Regular GUS Board meeting held on September 14, 2018. Approved 5-0-2 (Wiley, Fought absent) G. Consideration and possible recommendation to renew the Tree Trimming and Vegetation Management Contract to Townsend Tree Service Company, LLC dba National Tree Expert Company, Inc., of Burnet, Texas, in the estimated amount of $280,000.00. – Mike Westbrook, Electric Operations Manager Westbrook provided update on renewal of agreement. Pastor expressed concerns with Oak Wilt and Westbrook explained stipulation in contract for vendor to have an arborist on staff to assist with any concerns and timing of trimming. Motion by Yaeger, seconded by Pastor to renew the Tree Trimming and Vegetation Management Contract to Townsend Tree Service Company, LLC dba National Tree Expert Company, Inc., of Burnet, Texas, in the estimated amount of $280,000.00. Approved 5-0-2 (Wiley, Fought absent) H. Consideration and possible recommendation to renew the contract for labor services for Outside Plant Fiber Optic Infrastructure Construction to JC Communications of Cedar Park, Texas, in the not to exceed amount of $300,000.00. – Wesley Wright, P.E., Systems Engineering Director Wright provided update on the yearly renewal, noting city owns and maintains our own fiber communications network for our facilities, lift stations, pump stations, signals, etc. Installation services performed by JC Communications are used on demand. Wright gave usage numbers for previous years. This is the fourth renewal of the contract. Motion by Pastor, seconded by Maserang to renew the contract for labor services for Outside Plant Fiber Optic Infrastructure Construction to JC Communications of Cedar Park, Texas, in the not to exceed amount of $300,000.00. Approved 5-0- 2 (Wiley, Fought absent) I. Consideration and possible recommendation for the award of the Annual Electric System Underground Construction and Maintenance Bid for labor services to Pedro S.S. Services, Inc., of Austin, Texas, in the estimated amount of $3,500,000.00. – Wesley Wright, P.E., Systems Engineering Director Wright stated underground service contractor work went out for bid this year as current contractor Pedro S.S. Services chose not to renew their prior contract, as they felt their prices were below market levels. Contract went out for bid and two bids were received; one did not have all items bid. However, in comparing like items, Pedro came in as most competitive and low bidder (22% lower). Their pricing increased approximately 9% from last year’s contract. Pedro has installed the majority of our systems, have performed well for the City and staff desires to continue working with them. Motion by Pastor, seconded by Copelan for the award of the Annual Electric System Underground Construction and Maintenance Bid for labor services to Pedro S.S. Serv ices, Inc., of Austin, Texas, in the estimated amount of $3,500,000.00. Approved 5-0-2 (Wiley, Fought absent) J. Consideration and possible recommendation to approve Task Order CDM-18-006 with CDM Smith Inc., of Austin, Texas for professional services related to the San Gabriel Wastewater Treatment Plant Thickener Rehabilitation in the amount of $58,500.00. – Wesley Wright, P.E., Systems Engineering Director Page 32 of 62 Wright explained process used at treatment plant to dewater sludge. Thickener needs some rehabilitation to repair leaks, breaks, etc. Cunningham commented on this need for many years now. Wright stated we would like to pair this work with the belt press being designed as well . Belt press planned to bid out after beginning of new year. Motion by Pastor, seconded by Copelan to approve Task Order CDM-18-006 with CDM Smith Inc., of Austin, Texas for professional services related to the San Gabriel Wastewater Treatment Plant Thickener Rehabilitation in the amount of $58,500.00. Approved 5-0-2 (Wiley, Fought absent) K. Consideration and possible recommendation on Task Order CDM-18-007 to CDM Smith of Austin, TX in the amount of $55,000.00 for utility evaluations. – Wesley Wright, P.E., Systems Engineering Director Wright informed the board of need for water and wastewater utility evaluations regarding proposed projects as development continues. This is a yearly request for services. Motion by Cunningham, seconded by Maserang to approve Task Order CDM-18-007 to CDM Smith of Austin, TX in the amount of $55,000.00 for utility evaluations. Approved 5-0-2 (Wiley, Fought absent) L. Consideration and possible recommendation to approve a contract with Landmark Structures I, LP. of Fort Worth, Texas for the Braun 3MG Elevated Storage Tank project in the amount of $3,485,000.00. – Wesley Wright, P.E., Systems Engineering Director Wright provided information on the Elevated Storage Tank (EST) in Western District just past Ronald Reagan Blvd. Critical need to meet infrastructure demands and needs to be online by September 2019. Cunningham asked why critical need and Wright stated increased development in area ; has doubled in last several years. Location is Santa Rita Ranch area. Developer is assisting by donating lank for the tank. Three bids received. Braun tank will remain in place and both will be operational. Yaeger asked and Solomon responded regarding connections in relation to number of people served; approximately 3 people per meter. Motion by Pastor, seconded by Copelan to approve a contract with Landmark Structures I, LP. of Fort Worth, Texas for the Braun 3MG Elevated Storage Tank project in the amount of $3,485,000.00. Approved 5-0-2 (Wiley, Fought absent) Motion by Yaeger seconded by Pastor to enter into Executive Session at approximately 2:52pm. M. EXECUTIVE SESSION In compliance with the Open Meetings Act, Chapter 551, Government Code, Vernon’s Texas Codes, Annotated, the item listed below will be discussed in closed session and is subject to action in the regular session. Sec. 551.086 Competitive Matters Quarterly Electric Financials and Power Supply planning discussion. – Chris Foster, Manager of Resource Planning & Integration (no action required) N. Action from Executive Session – Quarterly Electric Financials/Power Supply planning discussion. – (no action required) Adjournment Motion by Pastor, seconded by Maserang to adjourn. Adjourned at 3:00PM __________________________ _____________________________ Mike Cunningham – Chair Edward Wiley -- Secretary _________________________________ Sheila K. Mitchell, GUS Board Liaison Page 33 of 62 Minutes of the Meeting of the Georgetown Utility Systems Advisory Board and the Governing Body of the City of Georgetown, Texas November 9, 2018 at 2:00PM at Georgetown Municipal Complex, 300-1 Industrial Avenue, Georgetown, TX The City of Georgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you require assistance in participation at a public meeting due to a disability, as defined under the ADA, reasonable assistance, adaptations, or accommodations will be provided upon request. Please contact the City Secretary’s Office, at least three (3) days prior to the scheduled meeting date, at (512) 930-3652 or City Hall at 113 East 8th Street for additional information: TTY users route through Relay Texas at 711. No items were submitted for the November meeting, therefore, the November 9, 2018 meeting was cancelled. __________________________ _____________________________ Mike Cunningham – Board Chair Edward Wiley – Secretary _________________________________ Sheila K. Mitchell, GUS Board Liaison Page 34 of 62 City of Georgetown, Texas Utility System Advisory Board December 4, 2018 SUBJECT: Cons id eration and p o s s ib le rec o mmendation to approve the p urc hase o f Enviros ight sewer ins p ectio n camera s ystem fro m Green Eq uipment Co., Inc ., o f F o rt Wo rth, TX, in the amount of $73,296.00. – David W. Thomison, Water S ervic es Manager ITEM SUMMARY: Chap ter 213 – Edward s Aquifer Recharge Zo ne (EARZ) rules of the Texas Adminis trative Code (TAC) req uires the tes ting of the was tewater collec tio n s ys tem mains once every five years to lo cate struc tural d amage and defec ts that p o tentially pose a threat to the Ed wards Aq uifer. T he City was notified by the Texas Co mmis s ion on Enviro nmental Quality to vid eo tes t all c o llectio n mains s tarting in Octo b er 2011. Due to sys tem gro wth and to have redundanc y fo r the EARZ tes ting the ad d itional equip ment is needed to enable the staff to c ond uc t the required tes ting and meet the regulatory requirements . SPECIAL CONSIDERATIONS: Und er Buy HG AC C o ntract #S C01-18. Green Equip ment Co ., Inc. c an provid e both the c amera sys tem’s and req uired s oftware with lo cal tec hnical s up p o rt. This c amera equip ment is c o mp atible with the d ep artment’s c urrent eq uipment which wo uld make this the best optio n and value to the City. STAFF RECOMMENDATIONS: Staff rec o mmend s the p urc hase o f the Enviro s ight s ewer inspec tion c amera s ys tem from Green Equip ment Co., Inc ., of F o rt Wo rth, Texas , in the amount o f $73,296.00. FINANCIAL IMPACT: Funds fo r this additio nal expend iture are availab le in the Water Services Bud get. Fund Ac tual Budget 660-5-0530-51-599 Maint Regulato ry $73,296.00 $89,979.98 SUBMITTED BY: David W. Thomis on, Water Services Manager (s km) ATTACHMENTS: Description Type Quote Backup Material Page 35 of 62 Q U O T ECorporate Address: 2563 Gravel Drive, Fort Worth, TX 76118 t. 817-595-1276 f. 817-284-1107 Number DYLDQ1406 Date Nov 13, 2018 Bill To Ship To Georgetown Utility SystemGeorgetown Utility System John McElroy John McElroy 300-1 Industrial Ave Georgetown, TX 78626 Phone (512) 931-7747 Phone (512) 931-7747 Fax (512) 930-0232 Fax (512) 930-0232 E-Mail john.mcelroy@georgetown.org E-Mail john.mcelroy@georgetown.org Ship ViaTerms BestW ay - GECNET 10 Salesperson E-mail Phone Number Derek Dickens derekdickens@greenequipco.com Qty Part Number Description Unit Price Ext. Price 1 $72,396.00 $72,396.00RovverX Crawler system - Basic Truck System includes VC300 Controller with Vision Report Software installed, RAX300 Automatic Cable Reel with 300M (1000ft) cable, wireless remote controller, reel mounting frame, emergency stop cable, RX130 Quick Change version crawler with 3 sets of rubber wheels for 6” to 12” pipe diameter. RCX90 pan, tilt, zoom camera, Pressurization Kit, and Wincan VX entry license. Quotation is valid for orders placed on, or up to, December 21 calling for immediate delivery on/before December 28, 2018. Orders placed after the 21st or that call for delivery after the 28th are subject to a price increase. Green Equipment is a participating member of: HGAC SC01-18 SubTotal $72,396.00Thank you for the opportunity to work with you. Please contact me if I can be of further assistance. Derek A. Dickens, MBA 210-410-7589 cell derekdickens@greenequipco.com Tax $0.00 Shipping $900.00 Total $73,296.00 QUOTE GOOD FOR 30 DAYS Thank you for the opportunity. We offer free training at the time of product delivery, loaner equipment is available on most products we sell. My contact information is listed above and if I can assist you in any way please, contact me. HGAC MEMBER BUY BOARD MEMBER 11/13/18 11:06:35 Page 1 of 1 1 of 1 Page 36 of 62 City of Georgetown, Texas Utility System Advisory Board December 4, 2018 SUBJECT: Cons id eration and p o s s ib le rec o mmendation to award a contrac t fo r the Ed wards Aq uifer Rec harge Zo ne (EARZ) Wastewater Sys tem Rehab ilitatio n Area 1 - 2018, to P M Co nstruc tio n & Rehab , LLC o f Pasadena, TX, fo r the amo unt o f $749,306.00. – Wes ley Wright, P.E., Sys tems Engineering Direc tor/Michael Hallmark, CIP Manager ITEM SUMMARY: The Texas C o mmis s io n o n Environmental Quality (TC EQ) requires the utility to tes t all wastewater lines o ver the EARZ in a five year p erio d . The res ults o f the EARZ Area 1 – 2018 required the remediatio n of wastewater lines that indic ated exfiltration. We als o repair any infiltratio n problems within the s ystem. The Edward s Aq uifer Rec harge Zone Was tewater Sys tem Rehab ilitatio n Area 1 - 2018, generally lo cated s o uth o f SH29 and eas t of IH35, p rimarily c o nsists of 7,500 linear feet of mechanic al root cleaning of existing was tewater lines , 772 linear feet o f p ip e burs ting from 8" to 12", 385 linear feet of pipe b ursting 21" to 24", 182 linear feet Cured -In-P lace P ip e (C IPP ) o f 21 ", 1097 linear feet CIP P 6", 3,261 linear feet CIP P 8", 40 p o int rep airs , 3 replac ement of entire manho les , 152 vertic al feet of interior c oating existing manho les , refo rm exis ting b enc h and inverts fo r ap p roximately 11 existing manho les , remo ve and replac e ring, c over, ris er and cone for appro ximately 6 manholes, installing 256 linear feet o f 8" was tewater line, installing 35 linear feet o f 16" steel encasement, demolishing an existing lift s tatio n and vario us o ther bid items or ac tivities relating to forc e ac count, traffic safety, trenc h safety, prec o ns truc tio n & pos t- cons tructio n vid eo s , s ite p rep aration, p o s t-c ons tructio n testing, s ite res toration and c lean-up ac tivities. The pro jec t was public ly advertised o n Oc tober 14, 2018 and Oc tober 21, 2018 with 10 firms o b taining p lans. On Oc tober 30, 2018 at 2 PM Two (2) competitive bids were received . T he lo w q ualified b id d er for this p ro jec t was PM Co nstruc tio n & Rehab , LLC with a total bid of $749,306.00. Kas berg, P atric k & Assoc iates, LP has reviewed their related wo rk exp erienc e and references fo r PM Co nstruc tion & Rehab ; as a res ult, KPA rec ommend s award to PM Cons tructio n and Rehab , LLC. STAFF RECOMMENDATION: Staff rec o mmend s approval of the c o ntract with PM Cons tructio n and Rehab, LLC . FINANCIAL IMPACT: Funds fo r this add itional expenditure are available in the 2018 Wastewater Cap ital fund s . 660-9-0581-90- 166 SUBMITTED BY: Chris Po usso n ATTACHMENTS: Description Type Letter of Recommendation Backup Material Bid Tab Backup Material Page 37 of 62 Page 38 of 62 Page 39 of 62 City of Georgetown, Texas Utility System Advisory Board December 4, 2018 SUBJECT: Cons id eration and p o s s ib le rec o mmendation to approve a contrac t with Santa C lara Co nstruc tion, Ltd , of Aus tin, Texas fo r the Berry Creek Wastewater Intercepto r projec t in the amo unt o f $5,544,473.00. - Wesley Wright, P.E., Systems Engineering Director/Michael Hallmark, CIP Manager ITEM SUMMARY: T he Berry Creek Wastewater Interceptor is a master planned wastewater line intended to provide gravity wastewater service to the P ecan Branch Wastewater Treatment P lant (which is currently being expanded) for areas along Berry Creek, including Sun City, Georgetown Village, and Berry Creek Subdivision, as well as future developments along Shell Road and the P armer Ranch MUD. This p o rtion o f the Berry Creek Interc ep tor begins at Airp o rt Road, c o ntinues alo ng Berry Creek thro ugh the Berry Creek C o untry Club Go lf Co urse, p as t Shell Ro ad and terminates at the exis ting Sun City Lift Station. The remainder of the Berry Creek Interceptor (fro m Airport Ro ad to the Pec an Branch Wastewater Treatment Plant) is s till under d es ign and in the eas ement acquis ition phas e. When both p ro jects are complete, the line will p ro vide wastewater c apac ity for o ver 25,000 ho mes and allo w the c ity to remove multip le lift statio ns fro m the o verall wastewater c ollec tion sys tem. The p ro ject was ad vertis ed for p ublic bids on Oc tober 28, 2018 and No vemb er 4, 2018 in the Williamson Cou n ty S u n . Thro ugh o ur o ffice, we provided p lans and s p ecific ations to twenty (20) interested parties , inc luding general c ontrac tors and p lan ro o ms . On No vember 20, at 2 p .m. b id s were rec eived at the Purchas ing Department for the c o nstruc tion o f the Berry Creek Wastewater Intercepto r projec t and then o p ened and pub lic ly read alo ud. Out o f the s eventeen (17) general contrac tors that req ues ted p lans and s p ecific ations , s even (7) b id s were rec eived. The names of the bidders and total base b id amo unts are summarized below. 1. S anta Clara Cons tructio n, Ltd $5,544,473.00 2. M.A. Smith Contrac ting Company, Inc . $5,681,374.00 3. Whitesto ne C ivil Cons tructio n, LLC $6,372,788.00 4. Cas h Cons truc tion Co mp any, Inc. $7,645,427.00 5. Mc Lean Cons tructio n, Inc. $8,218,219.50 6. P atin Co ns truc tio n LLC $8,679,934.00 7. Aaron Co nc rete C o ntracto rs , LP $9,378,828.00 A bid tabulatio n o f all the bid items is attac hed . T he lo w b id d er on the p rojec t b as ed on the total base b id, is S anta Clara Cons tructio n, Ltd, Aus tin, Texas (Santa Clara). The engineer ’s es timate for the projec t was $6.5 millio n. STAFF RECOMMENDATIONS: Staff and CDM S mith rec o mmends exec uting this c o ntract for the Berry Creek Was tewater Interc ep tor p ro ject with Santa Clara Cons tructio n, Ltd, Aus tin, Texas in the amount of $5,544,473.00. Page 40 of 62 FINANCIAL IMPACT: Funds fo r this exp enditure are bud geted in the Was tewater CIP. SUBMITTED BY: Wes ley Wright, P.E., S ystems Engineering Direc to r/Mic hael Hallmark, CIP Manager ATTACHMENTS: Description Type Recommendation of Award Backup Material Berry Creek Interceptor Location Map Res olution Letter Page 41 of 62 9430 Research Boulevard Building 1, Suite 200 Austin, Texas 78759 Tel: (512) 346-1100 Fax: (512) 345-1483 November 26, 2018 Mr. Michael Hallmark City of Georgetown 300 Industrial Avenue Georgetown, TX 78626 RE: Berry Creek Wastewater Interceptor Project No. 3CJ Recommendation of Award Dear Mr. Hallmark: Berry Creek Wastewater Interceptor project was advertised for public bids on October 28, 2018 and November 4, 2018 in the Williamson County Sun. Through our office, we provided plans and specifications to twenty (20) interested parties, including general contractors and plan rooms. On November 20, at 2 p.m. bids were received at the Purchasing Department for the construction of the Berry Creek Wastewater Interceptor project and then opened and publicly read aloud. Out of the seventeen (17) general contractors that requested plans and specifications, seven (7) bids were received. The names of the bidders and total base bid amounts are summarized below. 1. Santa Clara Construction, Ltd $5,544,473.00 2. M.A. Smith Contracting Company, Inc. $5,681,374.00 3. Whitestone Civil Construction, LLC $6,372,788.00 4. Cash Construction Company, Inc. $7,645,427.00 5. McLean Construction, Inc. $8,218,219.50 6. Patin Construction LLC $8,679,934.00 7. Aaron Concrete Contractors, LP $9,378,828.00 A bid tabulation of all the bid items is attached. The low bidder on the project based on the total base bid, is Santa Clara Construction, Ltd, Austin, Texas (Santa Clara). The engineer’s estimate for the project was $6.5 million. Enclosed in the bid package, each of the bidders submitted a Statement of Bidder’s Experience (Section 00400). We have reviewed the information provided by Santa Clara, and we believe that they have the qualifications, experience, personnel and equipment to complete this project. We have also checked the references for Santa Clara and believe they are capable of completing the Berry Creek Wastewater Interceptor project within the project schedule. We recommend that the City of Page 42 of 62 Mr. Michael Hallmark November 26, 2018 Page 2 Georgetown award the Berry Creek Wastewater Interceptor contract in the amount of $5,544,473.00 (total base bid amount) to Santa Clara Construction, Ltd. Sincerely, Ana Karamalegos, P.E. CDM Smith Inc. TBPE Firm Registration No. F-3043 ATTACHMENT ENCLOSED cc: Wesley Wright, P.E. / City of Georgetown Ken Taylor / City of Georgetown Allen Woelke, P.E. / CDM Smith Alan Rhames, P.E. / CDM Smith Page 43 of 62 City of Georgetown Berry Creek Wastewater Interceptor Project No. 3CJ BID TABULATION November 20, 2018 √√√√√√√√√√√√√√ √√√√√√√√√√√√√√ √√√√√√√√√√√√√√ Base Bid Item Estimated Quantity Unit Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount No 1: Insurance, Bonds and Mobilization/Demobilization Related Expenses not to exceed 5% of Total Bid.1 LS $275,000.00 $275,000.00 $270,000.00 $270,000.00 $250,000.00 $250,000.00 $230,000.00 $230,000.00 $195,279.00 $195,279.00 $435,000.00 $435,000.00 $410,000.00 $410,000.00 No 2: Storm Water Pollution Prevention Plan (SWPPP) and SWPPP Implementation, including installing the stabilized construction entrance, silt fence, and other required temporary sedimentation and erosion control best management practices as required by the SWPPP plan, complete in place as detailed and specified. 1 LS $65,000.00 $65,000.00 $50,000.00 $50,000.00 $65,000.00 $65,000.00 $50,000.00 $50,000.00 $72,563.00 $72,563.00 $80,000.00 $80,000.00 $60,000.00 $60,000.00 No 3: Site and Right-of-Way Preparation, including tree removal and tree trimming for equipment clearance, complete in place as detailed and specified. 1 LS $90,000.00 $90,000.00 $300,000.00 $300,000.00 $120,000.00 $120,000.00 $250,000.00 $250,000.00 $180,780.00 $180,780.00 $230,000.00 $230,000.00 $53,000.00 $53,000.00 No 4: Furnish, Install, and Maintain Tree Protection Fencing, complete in place as detailed and specified.1,100 LF $4.00 $4,400.00 $3.25 $3,575.00 $4.00 $4,400.00 $3.00 $3,300.00 $5.70 $6,270.00 $18.50 $20,350.00 $3.00 $3,300.00 No 5: Traffic Control Plan and Implementation, complete in place as detailed and specified.1 LS $5,000.00 $5,000.00 $12,000.00 $12,000.00 $5,000.00 $5,000.00 $6,000.00 $6,000.00 $15,022.00 $15,022.00 $4,000.00 $4,000.00 $27,000.00 $27,000.00 No 6: Furnish and Install Temporary Improvements to provide temporary access gate(s) and fencing to keep the site, materials, and equipment secure, complete in place as detailed and specified. 1 LS $5,000.00 $5,000.00 $20,000.00 $20,000.00 $6,200.00 $6,200.00 $12,000.00 $12,000.00 $25,522.00 $25,522.00 $5,000.00 $5,000.00 $27,000.00 $27,000.00 No 7: Trench Safety Plan and Implementation, as required for all pipe trenches deeper than 5 feet, complete in place as detailed and specified. 15,714 LF $1.00 $15,714.00 $1.00 $15,714.00 $1.00 $15,714.00 $1.00 $15,714.00 $3.50 $54,999.00 $6.00 $94,284.00 $5.00 $78,570.00 No 8: Furnish and Install 6-inch D3034 SDR26 PVC Pipe for Wastewater Service Connections On Line C (Open Trench Construction), including fittings, excavation, dewatering, bedding, backfill, and trench surface restoration, complete in place as detailed and specified. 20 LF $39.00 $780.00 $100.00 $2,000.00 $60.00 $1,200.00 $40.00 $800.00 $44.00 $880.00 $85.00 $1,700.00 $144.00 $2,880.00 No 9: Furnish and Install 8-inch D3034 SDR26 PVC Pipe (Open Trench Construction), including fittings, excavation, dewatering, bedding, backfill, and trench surface restoration, complete in place as detailed and specified. 677 LF $41.00 $27,757.00 $50.00 $33,850.00 $62.00 $41,974.00 $45.00 $30,465.00 $46.00 $31,142.00 $90.00 $60,930.00 $127.00 $85,979.00 No 10: Furnish and Install 12-inch D3034 SDR26 PVC Pipe (Open Trench Construction), including fittings, excavation, dewatering, bedding, backfill, and trench surface restoration, complete in place as detailed and specified. 40 LF $111.00 $4,440.00 $70.00 $2,800.00 $75.00 $3,000.00 $65.00 $2,600.00 $112.50 $4,500.00 $225.00 $9,000.00 $172.00 $6,880.00 No 11: Furnish and Install 15-inch D3034 SDR26 PVC Pipe (Open Trench Construction), including fittings, excavation, dewatering, bedding, backfill, and trench surface restoration, complete in place as detailed and specified. 79 LF $108.00 $8,532.00 $80.00 $6,320.00 $130.00 $10,270.00 $240.00 $18,960.00 $212.50 $16,787.50 $250.00 $19,750.00 $170.00 $13,430.00 No 12: Furnish and Install 27-inch F679 PS 72 PVC Pipe or 27-Inch D3262 PS 72 FRP Pipe (Open Trench Construction), including fittings, excavation, dewatering, bedding, backfill, and trench surface restoration, complete in place as detailed and specified. 47 LF $172.00 $8,084.00 $150.00 $7,050.00 $200.00 $9,400.00 $250.00 $11,750.00 $212.50 $9,987.50 $330.00 $15,510.00 $255.00 $11,985.00 No 13: Furnish and Install 30-inch F679 PS 72 PVC Pipe or 30-Inch D3262 PS 72 FRP Pipe (Open Trench Construction), including fittings, excavation, dewatering, bedding, backfill, and trench surface restoration, complete in place as detailed and specified. 12,308 LF $163.00 $2,006,204.00 $150.00 $1,846,200.00 $215.00 $2,646,220.00 $311.00 $3,827,788.00 $308.00 $3,790,864.00 $300.00 $3,692,400.00 $381.00 $4,689,348.00 No 14: Furnish and Install 30-inch F679 PS 72 PVC Pipe or 30-Inch D3262 PS 72 FRP Pipe inside steel casing pipe or inside bore hole, including fittings, casing spacers, grout restraint and appurtenances, complete in place as detailed and specified. 657 LF $143.00 $93,951.00 $290.00 $190,530.00 $210.00 $137,970.00 $240.00 $157,680.00 $115.50 $75,883.50 $350.00 $229,950.00 $250.00 $164,250.00 No 15: Furnish and Install 36-inch F679 PS 72 PVC Pipe or 36-Inch D3262 PS 72 FRP Pipe (Open Trench Construction), including fittings, excavation, dewatering, bedding, backfill, and trench surface restoration, complete in place as detailed and specified. 2,157 LF $195.00 $420,615.00 $190.00 $409,830.00 $230.00 $496,110.00 $280.00 $603,960.00 $309.50 $667,591.50 $400.00 $862,800.00 $400.00 $862,800.00 No 16: Furnish and Install 36-inch F679 PS 72 PVC Pipe or 36-Inch D3262 PS 72 FRP Pipe inside steel casing pipe or inside bore hole, including fittings, casing spacers, grout, restraint and appurtenances, complete in place as detailed and specified. 486 LF $361.00 $175,446.00 $330.00 $160,380.00 $280.00 $136,080.00 $320.00 $155,520.00 $144.50 $70,227.00 $450.00 $218,700.00 $300.00 $145,800.00 No 17: Furnish and Install 6-Foot Diameter Precast Manhole or a 6-Foot by 6-Foot Cast-in-Place Manhole, 8.0-Foot Depth to less than 16.0-Foot Depth, Including Drop Entries and Vents, complete in place as detailed and specified. 18 EA $16,000.00 $288,000.00 $14,600.00 $262,800.00 $19,000.00 $342,000.00 $14,000.00 $252,000.00 $15,026.00 $270,468.00 $20,000.00 $360,000.00 $14,000.00 $252,000.00 No 18: Furnish and Install 6-Foot Diameter Precast Manhole or a 6-Foot by 6-Foot Cast-in-Place Manhole, 16.0-Foot Depth to less than 20.0-Foot Depth, Including Drop Entries and Vents, complete in place as detailed and specified. 16 EA $16,000.00 $256,000.00 $17,900.00 $286,400.00 $22,000.00 $352,000.00 $16,000.00 $256,000.00 $19,432.00 $310,912.00 $25,000.00 $400,000.00 $19,000.00 $304,000.00 No 19: Furnish and Install 6-Foot Diameter Precast Manhole or a 6-Foot by 6-Foot Cast-in-Place Manhole, 20.0-Foot and Greater Depth, Including Drop Entries and Vents, complete in place as detailed and specified. 9 EA $20,000.00 $180,000.00 $22,500.00 $202,500.00 $25,000.00 $225,000.00 $18,000.00 $162,000.00 $21,782.00 $196,038.00 $30,000.00 $270,000.00 $28,000.00 $252,000.00 No 20: Furnish and Install a 6-Foot by 6-Foot Base Cast-in-Place Manhole with a 5-Foot Diameter Riser on Existing 18’ Wastewater Line including connection to Existing Line, and including pump around as required, complete in place as detailed and specified. 1 EA $20,000.00 $20,000.00 $23,700.00 $23,700.00 $16,500.00 $16,500.00 $19,000.00 $19,000.00 $27,156.00 $27,156.00 $15,000.00 $15,000.00 $15,000.00 $15,000.00 No 21: Furnish and Install a 4-Foot Diameter Precast Manhole, All Depths Including Drop Entries, complete in place as detailed and specified. 3 EA $5,000.00 $15,000.00 $13,400.00 $40,200.00 $7,000.00 $21,000.00 $7,000.00 $21,000.00 $8,115.00 $24,345.00 $750.00 $2,250.00 $8,700.00 $26,100.00 No 22: Furnish and Install 42-inch Bore, including grouting, including Steel Casing Pipe if required, complete in place as detailed and specified. 673 LF $950.00 $639,350.00 $815.00 $548,495.00 $850.00 $572,050.00 $850.00 $572,050.00 $1,009.50 $679,393.50 $1,000.00 $673,000.00 $882.00 $593,586.00 No 23: Furnish and Install 48-inch Bore for Tree Retention, including grouting, including Steel Casing Pipe if required, complete in place as detailed and specified. 220 LF $1,000.00 $220,000.00 $855.00 $188,100.00 $925.00 $203,500.00 $910.00 $200,200.00 $1,035.00 $227,700.00 $925.00 $203,500.00 $882.00 $194,040.00 No 24: Furnish and Install 48-inch Bore for Road and Creek Crossings, including grouting, including Steel Casing Pipe if required, complete in place as detailed and specified. 266 LF $1,000.00 $266,000.00 $855.00 $227,430.00 $925.00 $246,050.00 $970.00 $258,020.00 $1,031.00 $274,246.00 $925.00 $246,050.00 $880.00 $234,080.00 No 25: Connect 27-Inch Pipe to Existing Manhole at Sta. 0+37.00 (27-Inch Line), including coring, invert modification, coating, temporary plug, wastewater pump around and appurtenances, complete in place as detailed and specified 1 EA $5,000.00 $5,000.00 $11,100.00 $11,100.00 $25,000.00 $25,000.00 $11,000.00 $11,000.00 $15,062.00 $15,062.00 $8,000.00 $8,000.00 $5,000.00 $5,000.00 No 26: Connect 15-Inch Pipe to Existing Manhole 15-inch WW pipeline system at Sta. 156+87, including coring, invert modification, coating, temporary plug, wastewater pump around and appurtenances complete in place as detailed and specified. 1 EA $5,000.00 $5,000.00 $11,700.00 $11,700.00 $22,000.00 $22,000.00 $10,000.00 $10,000.00 $9,859.00 $9,859.00 $7,500.00 $7,500.00 $5,000.00 $5,000.00 No 27: Provide and install an adjustment in existing wastewater service line to avoid a direct conflict with new pipe, including temporary cleanouts, temporary and permanent pipe and fittings, maintenance and abandonment, all pipe sizes, complete in place as detailed and specified. 12 EA $2,500.00 $30,000.00 $4,200.00 $50,400.00 $4,000.00 $48,000.00 $1,500.00 $18,000.00 $10,854.00 $130,248.00 $3,500.00 $42,000.00 $12,000.00 $144,000.00 No 28: Provide and install a wastewater standard service connection fitting with a temporary plug and connect existing wastewater service lines to the connection fitting after testing of the interceptor pipe and manholes is complete, including cut and plug of existing pipe, all pipe sizes, complete in place as detailed and specified. 12 EA $5,000.00 $60,000.00 $6,400.00 $76,800.00 $2,500.00 $30,000.00 $5,000.00 $60,000.00 $4,782.00 $57,384.00 $10,000.00 $120,000.00 $1,600.00 $19,200.00 No 29: Leak Testing of ASTM D3034 SDR26 PVC wastewater pipe, all sizes including 6”, 8”, and 12”, complete in place as detailed and specified. 1 LS $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $1,000.00 $300.00 $300.00 $1,989.00 $1,989.00 $1,200.00 $1,200.00 $1,800.00 $1,800.00 No 30: Leak Testing of 15-inch wastewater pipeline, complete in place as detailed and specified.1 LS $500.00 $500.00 $500.00 $500.00 $150.00 $150.00 $40.00 $40.00 $1,326.00 $1,326.00 $500.00 $500.00 $200.00 $200.00 No 31: Leak Testing of 27-inch wastewater pipeline, complete in place as detailed and specified.1 LS $500.00 $500.00 $800.00 $800.00 $150.00 $150.00 $20.00 $20.00 $1,591.00 $1,591.00 $750.00 $750.00 $200.00 $200.00 No 32: Leak Testing of 30-inch wastewater pipeline, complete in place as detailed and specified.1 LS $13,000.00 $13,000.00 $10,000.00 $10,000.00 $20,000.00 $20,000.00 $6,000.00 $6,000.00 $99,429.00 $99,429.00 $12,310.00 $12,310.00 $162,000.00 $162,000.00 No 33: Leak Testing of 36-inch wastewater pipeline, complete in place as detailed and specified.1 LS $3,000.00 $3,000.00 $3,000.00 $3,000.00 $5,000.00 $5,000.00 $1,400.00 $1,400.00 $7,954.00 $7,954.00 $5,000.00 $5,000.00 $41,000.00 $41,000.00 No 34: Mandrel Testing of 15-inch wastewater pipeline, complete in place as detailed and specified.1 LS $500.00 $500.00 $1,000.00 $1,000.00 $200.00 $200.00 $40.00 $40.00 $1,326.00 $1,326.00 $500.00 $500.00 $200.00 $200.00 No 35: Mandrel Testing of 27-inch wastewater pipeline, complete in place as detailed and specified.1 LS $500.00 $500.00 $2,400.00 $2,400.00 $200.00 $200.00 $20.00 $20.00 $1,591.00 $1,591.00 $1,000.00 $1,000.00 $200.00 $200.00 No 36: Mandrel Testing of 30-inch wastewater pipeline, complete in place as detailed and specified.1 LS $6,500.00 $6,500.00 $11,500.00 $11,500.00 $8,000.00 $8,000.00 $6,000.00 $6,000.00 $59,657.00 $59,657.00 $12,000.00 $12,000.00 $64,000.00 $64,000.00 No 37: Mandrel Testing of 36-inch wastewater pipeline, complete in place as detailed and specified.1 LS $1,500.00 $1,500.00 $5,000.00 $5,000.00 $2,200.00 $2,200.00 $1,400.00 $1,400.00 $7,954.00 $7,954.00 $3,000.00 $3,000.00 $16,000.00 $16,000.00 No 38: Testing of new manholes, complete in place as detailed and specified.47 EA $100.00 $4,700.00 $400.00 $18,800.00 $250.00 $11,750.00 $200.00 $9,400.00 $2,651.00 $124,597.00 $1,000.00 $47,000.00 $1,000.00 $47,000.00 No 39: Concrete Trench Cap, in locations identified by the Owner, per linear foot of trench, all trench widths, complete in place as detailed and specified. 2,500 LF $31.00 $77,500.00 $45.00 $112,500.00 $15.00 $37,500.00 $26.00 $65,000.00 $39.60 $99,000.00 $20.00 $50,000.00 $30.00 $75,000.00 No 40: Provide Re-vegetation, complete in place as detailed and specified.1 LS $45,000.00 $45,000.00 $55,000.00 $55,000.00 $35,000.00 $35,000.00 $140,000.00 $140,000.00 $170,696.00 $170,696.00 $20,000.00 $20,000.00 $85,000.00 $85,000.00 No 41: Allowance to be used for additional site improvements, landscaping and miscellaneous modifications.1 LS $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 $200,000.00 Total - Base Bid (Item Nos. 1-41)---$5,544,473.00 -$5,681,374.00 -$6,372,788.00 -$7,645,427.00 -$8,218,219.50 -$8,679,934.00 -$9,378,828.00 Bidders Acknowledged all Addenda Provide Bid Security (5%) Provide Information from 00400 * Refer to Patin Construction LLC Bid Item 21 for a math error. McLean Construction, Inc.Whitestone Civil Construction, LLCM.A. Smith Contracting Company, Inc. Cash Construction Company, Inc.Aaron Concrete Contractors, LPSanta Clara Construction, Ltd Patin Construction LLC Page 44 of 62 CITY OF GEORGETOWN JMK TRIPLE S LTD BARTELL, NICHOLAS & BEEBEE HU BECKM A N BEVER L Y A & THE R O N A L D R BECKM A N ESTAT E SHEL L S T E P H E N M & MAR L A ( L E ) & JMK T R I P L E S L T D BOND, BRUCE W & SHIRLEY MARIE LONG-BOND SCHNEIDER, JOHN B & W CHARLES SCHNEIDER & ET AL GEORGETOWN, CITY OF BURDE T T , THOMA S L ET A L BURDE T T , THOMA S L ET A L SE V E N O F F LL C SUN CITY GEORGETOWN COMMUNITY ASSOCIATION INC YCZ SHELL INVESTMENTS LTD JMK TRIPLE S LTD B O N D , B R U C E W & S H I R L E Y M A R I E L O N G - B O N D SUN C I T Y GEOR G E T O W N COMM U N I T Y ASSO C I A T I O N INC JMK TRIPLE S LTDJ M K T R I P L E S L T D B E R R Y C R E E K D R CH A M P I O N S D R BR I A R C R E S T D R SH E L L R D SU N C I T Y B L V D T R A I L R I D E R W Y RIO G R A N D E L O O P mask CITY OF GEORGETOWN BERRY CREEK WASTEWATER INTERCEPTOR S: \ A C A D \ C I T Y O F G E O R G E T O W N \ B E R R Y C R E E K - W W I N T E R C E P T O R \ F I G W W _ I N T _ N O R T H S E G M E N T B y : sa n d e f u r d w S a v e d : 2/ 1 8 / 2 0 1 5 1 0 : 2 7 : 3 0 A M P l o t t e d : 2/ 1 8 / 2 0 1 5 2 : 3 6 : 5 8 P M ‹     ALIGNMENT . N PROPOSED ALIGNMENT S: \ A C A D \ C i t y o f G e o r g e t o w n \ B e r r y C r e e k - W W I n t e r c e p t o r \ F i g W W _ I n t _ N o r t h S e g m e n t . d w g , 1 - 1 0 0 0 , 2 / 1 8 / 2 0 1 5 2 : 3 6 : 5 2 P M , s a n d e f u r d w , D W G T o P D F . p c 3 Page 45 of 62 City of Georgetown, Texas Utility System Advisory Board December 4, 2018 SUBJECT: Cons id eration and p o s s ib le rec o mmendation to approve a contrac t with Ro yal Vis ta, Inc. of Liberty Hill, Texas for the Ronald Reagan and Mission O aks Waterline Improvements p ro jec t in the amo unt o f $6,149,425.00. - Wesley Wright, P.E., Systems Engineering Director/Michael Hallmark, CIP Manager ITEM SUMMARY: The Ronald Reagan Water Line is a 30" water line running fro m Williams Drive to F M 3405 and will help d eliver water to the Wes tern District, s p ecific ally the Braun Elevated Storage Tank. The Mis s io n Oaks Water Line is a 12" (and 24") water line needed to meet c o ntinued gro wth d emands o f the Mission O aks s ubdivis io n just no rth of R o nald Reagan and CR 245. A p o rtion of thes e c o s ts ($250,000) has b een fund ed by the d eveloper of Mis s io n Oaks p er an exis ting C his ho lm Trail Water Agreement. The Pressure Reducing Value (P RV) removals are to remove restrictio n and help operatio nal efficiencies in the water s ystem in and aro und S un City resulting from recent imp ro vements made to the Do mel Pump Station. T he Ronald Reagan and Mission Oaks Waterline Improvements project was advertised for public bids on November 4, 2018 and November 11, 2018 in the Wi lli amson County Sun. T hrough our office, we provided plans and specifications to eleven (11) interested parties, including general contractors and plan rooms. On November 21, at 10 a.m. bids were received at the P urchasing Department for the construction of the Ronald Reagan and Mission Oaks Waterline Improvements project and then opened and publicly read aloud. Out of the eleven 11) general contractors that requested plans and specifications, ten (10) bids were received. T he names of the bidders and total base bid amounts are summarized below. 1. Royal Vis ta Inc . $6,149,425.00 2. M.A Smith C o ntracting $6,204,265.00 3. Cash Cons tructio n $6,268,660.00 4. DeNuc c i C o ns truc tors $6,474,450.00 5. Patin C o ns truc tion $6,477,360.00 6. Aus tin Engineering $6,631,125.00 7. McLean C o ns truc tion $7,085,354.00 8. Liberty C ivil Cons tructo rs $7,625,870.00 9. S & J C o ns truc tion $7,750,616.98 10. Aaron Conc rete $7,811,115.00 STAFF RECOMMENDATIONS: Staff and Kas berg, Patrick & Assoc iates rec o mmends exec uting this contrac t with Ro yal Vis ta, Inc. of Liberty Hill, Texas fo r the Ronald Reagan and Mis s io n Oaks Waterline Imp ro vements p ro ject in the amo unt o f $6,149,425.00. Page 46 of 62 FINANCIAL IMPACT: Funds fo r this exp enditure are bud geted in the Water CIP. SUBMITTED BY: Wes ley Wright, P.E., S ystems Engineering Direc to r/Mic hael Hallmark, CIP Manager ATTACHMENTS: Description Type Bid Tabulation Cover Memo Letter of Recommendation Cover Memo Waterline Location Map Cover Memo Page 47 of 62 BID TABULATION CITY OF GEORGETOWN TEXAS Ronald Reagan Mission Oaks Water Line Improvements November 21, 2018; 10:00 AM 2018-136-40 Item Estimated Unit Bid Data Unit Extended Unit Extended Unit Extended Unit Extended Unit Extended Unit Extended No. Quantity Description Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount PART A: Ronald Reagan Water Line Improvements 1 100% LS Insurance, Bonds and Mobilization, not to exceed 5% of Total Part A Bid Amount , Complete for $ 125,000.00 125,000.00 225,000.00 225,000.00 170,000.00 170,000.00 200,000.00 200,000.00 123,000.00 123,000.00 250,000.00 250,000.00 2 210 STA Right of Way Preparation along the Project Route for Part A 250.00 52,500.00 500.00 105,000.00 300.00 63,000.00 600.00 126,000.00 500.00 105,000.00 1,000.00 210,000.00 3 100% LS For Providing a Video DVD of the Project Area Prior to and After Construction for Part A, Complete For 3,000.00 3,000.00 1,200.00 1,200.00 6,000.00 6,000.00 4,500.00 4,500.00 2,500.00 2,500.00 2,500.00 2,500.00 4 100% LS For Preparation and Implementation of Traffic Control Plan for Part A. Plan is to be prepared and signed by P.E. Licensed in the State of Texas, Complete For 15,000.00 15,000.00 20,000.00 20,000.00 27,000.00 27,000.00 2,500.00 2,500.00 8,000.00 8,000.00 5,000.00 5,000.00 5 100% LS Submit Trench Safety Plan prepared and signed by P.E., in Conformance with State Law and OSHA for All Parts 2,000.00 2,000.00 1,400.00 1,400.00 2,000.00 2,000.00 2,500.00 2,500.00 1,200.00 1,200.00 1,500.00 1,500.00 6 100% LS Prepare Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ) for Part A, Complete For 5,000.00 5,000.00 4,000.00 4,000.00 2,000.00 2,000.00 4,000.00 4,000.00 3,000.00 3,000.00 5,000.00 5,000.00 7 4 EA Furnish, Install and Remove Temporary Construction Entrance 2,000.00 8,000.00 1,500.00 6,000.00 2,100.00 8,400.00 1,500.00 6,000.00 1,500.00 6,000.00 1,100.00 4,400.00 8 21,000 LF Furnish, Install, Maintain and Remove Silt Fence as required in the Stormwater Pollution Prevention Plan, Complete For 2.50 52,500.00 2.25 47,250.00 3.00 63,000.00 2.00 42,000.00 2.50 52,500.00 3.00 63,000.00 9 200 LF Furnish, Install, Maintain and Remove Rock Berm as required in the Stormwater Pollution Prevention Plan, Complete For 50.00 10,000.00 40.00 8,000.00 30.00 6,000.00 35.00 7,000.00 35.00 7,000.00 30.00 6,000.00 10 55,000 SY Furnish and Install Hydro Mulch Seeding with Flexible Growth Media (Flexterra) For Permanent Erosion Control, Including water to establish & sustain growth, Complete For 1.50 82,500.00 2.15 118,250.00 1.20 66,000.00 1.00 55,000.00 1.00 55,000.00 1.00 55,000.00 11 21,000 LF Implement and Follow Trench Safety Plan (Pipe) 1.00 21,000.00 1.00 21,000.00 0.50 10,500.00 1.00 21,000.00 2.20 46,200.00 1.00 21,000.00 12 6,000 SF Implement and Follow Trench Safety Plan (Bore Pit) 1.00 6,000.00 2.25 13,500.00 0.30 1,800.00 1.00 6,000.00 1.00 6,000.00 3.00 18,000.00 13 21,000 LF Furnish and Install 30" Diameter Ductile Iron Pipe Water Line 155.00 3,255,000.00 150.00 3,150,000.00 163.60 3,435,600.00 153.00 3,213,000.00 158.00 3,318,000.00 150.00 3,150,000.00 14 1 EA Connect to Existing 24" Diameter Water Line, Complete For 6,500.00 6,500.00 4,500.00 4,500.00 3,000.00 3,000.00 12,500.00 12,500.00 15,000.00 15,000.00 6,000.00 6,000.00 15 1 EA Furnish and Install 18" Diameter Wet Tap with 18" Gate Valve 31,500.00 31,500.00 34,000.00 34,000.00 25,000.00 25,000.00 34,000.00 34,000.00 17,500.00 17,500.00 31,000.00 31,000.00 16 8 EA Furnish and Install 30" Gate Valve, Including Mechanical Joint Restraints and Thrust Blocking, Complete For 31,500.00 252,000.00 33,300.00 266,400.00 30,000.00 240,000.00 35,000.00 280,000.00 42,000.00 336,000.00 36,000.00 288,000.00 17 1 EA Furnish and Install 30" x 18" Reducer,Including Mechanical Joint Restraints, Complete For 2,805.00 2,805.00 2,500.00 2,500.00 2,400.00 2,400.00 5,500.00 5,500.00 5,000.00 5,000.00 3,000.00 3,000.00 18 1 EA Furnish and Install 30" x 24" Reducer, Including Mechanical Joint Restraints, Complete For 3,000.00 3,000.00 2,300.00 2,300.00 2,500.00 2,500.00 4,000.00 4,000.00 5,000.00 5,000.00 3,000.00 3,000.00 19 1 EA Furnish and Install 30" x 30" Tee, Including Mechanical Joint Restraints and Thrust Blocking, Complete For 5,800.00 5,800.00 5,500.00 5,500.00 5,000.00 5,000.00 6,500.00 6,500.00 10,000.00 10,000.00 6,800.00 6,800.00 20 1 EA Furnish and Install 30" Mechanical Joint Plug, Including Mechanical Joint Restraints and Thrust Blocking 1,990.00 1,990.00 1,800.00 1,800.00 2,000.00 2,000.00 3,500.00 3,500.00 3,000.00 3,000.00 2,000.00 2,000.00 21 8 EA Furnish and Install Air Release Valve Assembly, Including Vault, Complete For 4,100.00 32,800.00 3,200.00 25,600.00 4,000.00 32,000.00 4,200.00 33,600.00 4,500.00 36,000.00 6,500.00 52,000.00 22 1,100 LF Furnish and Install 48" Diameter Steel Encasement by Bore 805.00 885,500.00 815.00 896,500.00 850.00 935,000.00 850.00 935,000.00 820.00 902,000.00 900.00 990,000.00 23 25 EA Furnish and Install Restrained 11 -1/4° Bends, 30" Diameter, Including Mechanical Joint Restraints and Thrust Blocking 3,300.00 82,500.00 3,000.00 75,000.00 3,000.00 75,000.00 5,500.00 137,500.00 4,400.00 110,000.00 3,600.00 90,000.00 24 40 EA Furnish and Install Restrained 22 -1/2° Bends, 30" Diameter, Including Mechanical Joint Restraints and Thrust Blocking 3,300.00 132,000.00 2,900.00 116,000.00 3,000.00 120,000.00 3,500.00 140,000.00 4,400.00 176,000.00 3,600.00 144,000.00 25 18 EA Furnish and Install Restrained 45° Bends, 30" Diameter, Including Mechanical Joint Restraints and Thrust Blocking 3,400.00 61,200.00 3,100.00 55,800.00 3,000.00 54,000.00 3,800.00 68,400.00 4,500.00 81,000.00 4,000.00 72,000.00 26 100% LS Furnish and Install Temporary Flush Assembly 3,100.00 3,100.00 4,500.00 4,500.00 4,000.00 4,000.00 6,500.00 6,500.00 3,000.00 3,000.00 5,000.00 5,000.00 27 11 EA Furnish and Install Standard Fire Hydrant Assembly 6,500.00 71,500.00 9,300.00 102,300.00 9,000.00 99,000.00 9,000.00 99,000.00 9,300.00 102,300.00 5,500.00 60,500.00 28 15 EA Furnish and Install Georgetown Utility System (GUS) Signage, Complete in Place For 200.00 3,000.00 325.00 4,875.00 300.00 4,500.00 400.00 6,000.00 450.00 6,750.00 400.00 6,000.00 29 100% LS Materials, Equipment, Tools and Labor Necessary for Pressure Testing Water Pipe, Including Any Necessary Repairs 10,000.00 10,000.00 20,000.00 20,000.00 20,000.00 20,000.00 3,000.00 3,000.00 5,000.00 5,000.00 3,000.00 3,000.00 30 350 SY Remove and Replace Existing Large Diameter Rock Rip Rap 50.00 17,500.00 75.00 26,250.00 30.00 10,500.00 105.00 36,750.00 25.00 8,750.00 25.00 8,750.00 31 100% LS Allowance for Purchase of Fire Hydrant Meter for Construction Use, to be turned over to the City once Construction is Completed, Complete For 1,325.00 1,325.00 1,325.00 1,325.00 1,325.00 1,325.00 1,325.00 1,325.00 1,325.00 1,325.00 1,325.00 1,325.00 32 100% LS City of Georgetown Force Account, Complete For 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 TOTAL BID PART A - (Items 1 - 32) BIDDER INFORMATION Austin Engineering Co, Inc. PO Box 342349 Royal Vista, Inc. 350 County Road 260 Liberty Hill, TX 78624 5,316,520.00$ M.A. Smith Contracting, Inc. Austin, TX 78734-2349 5,638,775.00$ Cash Construction Co, Ltd 15308 Ginger Street PO Box 1279 Austin TX 78728 Pflugerville, TX 78691 5,440,750.00$ 5,571,525.00$ DeNucci Constructors, LLC Patin Construction LLC 8310-1 Capital of Texas Hwy. N., Ste 275 3800 W 2nd Street Austin, TX 78731 Taylor TX 76574 5,577,575.00$ 5,632,025.00$ Page 1 of 6Page 48 of 62 BID TABULATION CITY OF GEORGETOWN TEXAS Ronald Reagan Mission Oaks Water Line Improvements November 21, 2018; 10:00 AM 2018-136-40 Item Estimated Unit Bid Data Unit Extended Unit Extended Unit Extended Unit Extended Unit Extended No. Quantity Description Price Amount Price Amount Price Amount Price Amount Price Amount PART A: Ronald Reagan Water Line Improvements 1 100% LS Insurance, Bonds and Mobilization, not to exceed 5% of Total Part A Bid Amount , Complete for 161,795.00 161,795.00 108,000.00 108,000.00 300,000.00 300,000.00 285,000.00 285,000.00 2 210 STA Right of Way Preparation along the Project Route for Part A 77.00 16,170.00 650.00 136,500.00 350.00 73,500.00 265.00 55,650.00 3 100% LS For Providing a Video DVD of the Project Area Prior to and After Construction for Part A, Complete For 4,565.00 4,565.00 4,200.00 4,200.00 10,000.00 10,000.00 11,000.00 11,000.00 4 100% LS For Preparation and Implementation of Traffic Control Plan for Part A. Plan is to be prepared and signed by P.E. Licensed in the State of Texas, Complete For 32,117.00 32,117.00 18,000.00 18,000.00 10,000.00 10,000.00 14,000.00 14,000.00 5 100% LS Submit Trench Safety Plan prepared and signed by P.E., in Conformance with State Law and OSHA for All Parts 1,946.00 1,946.00 1,600.00 1,600.00 9,000.00 9,000.00 1,500.00 1,500.00 6 100% LS Prepare Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ) for Part A, Complete For 3,181.00 3,181.00 3,500.00 3,500.00 11,500.00 11,500.00 5,000.00 5,000.00 7 4 EA Furnish, Install and Remove Temporary Construction Entrance 2,549.00 10,196.00 1,400.00 5,600.00 3,000.00 12,000.00 2,000.00 8,000.00 8 21,000 LF Furnish, Install, Maintain and Remove Silt Fence as required in the Stormwater Pollution Prevention Plan, Complete For 2.20 46,200.00 3.00 63,000.00 4.00 84,000.00 3.00 63,000.00 9 200 LF Furnish, Install, Maintain and Remove Rock Berm as required in the Stormwater Pollution Prevention Plan, Complete For 39.20 7,840.00 28.00 5,600.00 78.00 15,600.00 30.00 6,000.00 10 55,000 SY Furnish and Install Hydro Mulch Seeding with Flexible Growth Media (Flexterra) For Permanent Erosion Control, Including water to establish & sustain growth, Complete For 2.70 148,500.00 2.00 110,000.00 1.25 68,750.00 1.00 55,000.00 11 21,000 LF Implement and Follow Trench Safety Plan (Pipe) 3.20 67,200.00 1.00 21,000.00 2.00 42,000.00 1.00 21,000.00 12 6,000 SF Implement and Follow Trench Safety Plan (Bore Pit) 1.90 11,400.00 0.50 3,000.00 2.00 12,000.00 5.00 30,000.00 13 21,000 LF Furnish and Install 30" Diameter Ductile Iron Pipe Water Line 180.00 3,780,000.00 196.00 4,116,000.00 188.82 3,965,220.00 215.00 4,515,000.00 14 1 EA Connect to Existing 24" Diameter Water Line, Complete For 5,214.00 5,214.00 6,600.00 6,600.00 7,239.50 7,239.50 6,000.00 6,000.00 15 1 EA Furnish and Install 18" Diameter Wet Tap with 18" Gate Valve 34,998.00 34,998.00 32,000.00 32,000.00 33,985.00 33,985.00 19,000.00 19,000.00 16 8 EA Furnish and Install 30" Gate Valve, Including Mechanical Joint Restraints and Thrust Blocking, Complete For 30,231.00 241,848.00 36,000.00 288,000.00 31,503.94 252,031.52 30,000.00 240,000.00 17 1 EA Furnish and Install 30" x 18" Reducer,Including Mechanical Joint Restraints, Complete For 2,963.00 2,963.00 5,000.00 5,000.00 3,805.00 3,805.00 2,600.00 2,600.00 18 1 EA Furnish and Install 30" x 24" Reducer, Including Mechanical Joint Restraints, Complete For 2,804.00 2,804.00 4,700.00 4,700.00 3,635.00 3,635.00 3,300.00 3,300.00 19 1 EA Furnish and Install 30" x 30" Tee, Including Mechanical Joint Restraints and Thrust Blocking, Complete For 5,735.00 5,735.00 11,000.00 11,000.00 6,657.00 6,657.00 5,600.00 5,600.00 20 1 EA Furnish and Install 30" Mechanical Joint Plug, Including Mechanical Joint Restraints and Thrust Blocking 2,328.00 2,328.00 5,500.00 5,500.00 5,506.00 5,506.00 2,000.00 2,000.00 21 8 EA Furnish and Install Air Release Valve Assembly, Including Vault, Complete For 4,119.00 32,952.00 5,000.00 40,000.00 11,034.35 88,274.80 3,800.00 30,400.00 22 1,100 LF Furnish and Install 48" Diameter Steel Encasement by Bore 871.10 958,210.00 810.00 891,000.00 1,035.19 1,138,709.00 800.00 880,000.00 23 25 EA Furnish and Install Restrained 11 -1/4° Bends, 30" Diameter, Including Mechanical Joint Restraints and Thrust Blocking 3,669.00 91,725.00 6,300.00 157,500.00 3,472.20 86,805.00 3,200.00 80,000.00 24 40 EA Furnish and Install Restrained 22 -1/2° Bends, 30" Diameter, Including Mechanical Joint Restraints and Thrust Blocking 3,649.00 145,960.00 6,300.00 252,000.00 3,471.25 138,850.00 3,200.00 128,000.00 25 18 EA Furnish and Install Restrained 45° Bends, 30" Diameter, Including Mechanical Joint Restraints and Thrust Blocking 3,866.00 69,588.00 6,600.00 118,800.00 3,808.78 68,558.04 3,400.00 61,200.00 26 100% LS Furnish and Install Temporary Flush Assembly 2,872.00 2,872.00 8,400.00 8,400.00 4,000.00 4,000.00 2,500.00 2,500.00 27 11 EA Furnish and Install Standard Fire Hydrant Assembly 7,371.00 81,081.00 13,000.00 143,000.00 8,795.16 96,746.76 7,200.00 79,200.00 28 15 EA Furnish and Install Georgetown Utility System (GUS) Signage, Complete in Place For 572.00 8,580.00 480.00 7,200.00 810.00 12,150.00 265.00 3,975.00 29 100% LS Materials, Equipment, Tools and Labor Necessary for Pressure Testing Water Pipe, Including Any Necessary Repairs 40,897.00 40,897.00 45,000.00 45,000.00 16,000.00 16,000.00 115,000.00 115,000.00 30 350 SY Remove and Replace Existing Large Diameter Rock Rip Rap 54.00 18,900.00 170.00 59,500.00 85.00 29,750.00 106.00 37,100.00 31 100% LS Allowance for Purchase of Fire Hydrant Meter for Construction Use, to be turned over to the City once Construction is Completed, Complete For 1,325.00 1,325.00 1,325.00 1,325.00 1,325.00 1,325.00 1,325.00 1,325.00 32 100% LS City of Georgetown Force Account, Complete For 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 75,000.00 TOTAL BID PART A - (Items 1 - 32) BIDDER INFORMATION N O N R E S P O N S I V E B I D - I N C O M P L E T E B I D F O R M 6,842,350.00$ -$ Liberty Civil Construction, LLC S & J Construction Co., Inc. Aaron Concrete Contractors, LP 3555 Highway 29 West PO Box 5003 4108 Nixon Ln Georgetown, TX 78628 McLean Construction Inc 4101 Trimmier Rd Killeen TX 76542 Bruce Flanigan Const., Inc. 5114 Lampasas Lane Jacksonville, AR 72078 Austin, TX 78725 Belton, TX 76513 6,114,090.00$ 6,747,525.00$ 6,682,597.62$ Page 2 of 6Page 49 of 62 BID TABULATION CITY OF GEORGETOWN TEXAS Ronald Reagan Mission Oaks Water Line Improvements November 21, 2018; 10:00 AM 2018-136-40 BIDDER INFORMATION Austin Engineering Co, Inc. PO Box 342349 Royal Vista, Inc. 350 County Road 260 Liberty Hill, TX 78624 M.A. Smith Contracting, Inc. Austin, TX 78734-2349 Cash Construction Co, Ltd 15308 Ginger Street PO Box 1279 Austin TX 78728 Pflugerville, TX 78691 DeNucci Constructors, LLC Patin Construction LLC 8310-1 Capital of Texas Hwy. N., Ste 275 3800 W 2nd Street Austin, TX 78731 Taylor TX 76574 Item Estimated Unit Bid Data Unit Extended Unit Extended Unit Extended Unit Extended Unit Extended Unit Extended No. Quantity Description Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount PART B: Mission Oaks Water Line Improvements 1 100% LS Insurance, Bonds and Mobilization, not to exceed 5% of Part B Bid Amount , Complete for $ 30,000.00 30,000.00 25,000.00 25,000.00 29,000.00 29,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 30,000.00 247STAFor Right of Way Preparation along the Project Route for Part B, Complete For 700.00 32,900.00 600.00 28,200.00 800.00 37,600.00 600.00 28,200.00 350.00 16,450.00 1,000.00 47,000.00 3 100% LS For Providing a Video DVD of the Project Area Prior to and After Construction for Part B, Complete For 2,500.00 2,500.00 1,200.00 1,200.00 3,000.00 3,000.00 4,500.00 4,500.00 250.00 250.00 1,000.00 1,000.00 4 100% LS For Preparation and Implementation of Traffic Control Plan for Part B. Plan is to be prepared and signed by P.E. Licensed in the State of Texas, Complete For 9,000.00 9,000.00 5,000.00 5,000.00 2,000.00 2,000.00 2,500.00 2,500.00 8,000.00 8,000.00 100.00 100.00 5 100% LS Prepare Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ) for Part B, Complete For 4,000.00 4,000.00 4,000.00 4,000.00 2,000.00 2,000.00 4,500.00 4,500.00 3,000.00 3,000.00 100.00 100.00 6 4,700 LF Implement and Follow Trench Safety Plan (Pipe), Complete For 1.00 4,700.00 1.00 4,700.00 0.50 2,350.00 3.00 14,100.00 2.20 10,340.00 1.00 4,700.00 7 1,100 SF Implement and Follow Trench Safety Plan (Bore Pit), Complete For 1.00 1,100.00 3.00 3,300.00 0.30 330.00 6.00 6,600.00 1.00 1,100.00 3.00 3,300.00 8 100% LS Furnish and Install Temporary Flush Assembly, Complete For 3,100.00 3,100.00 3,500.00 3,500.00 4,000.00 4,000.00 6,000.00 6,000.00 2,200.00 2,200.00 5,000.00 5,000.00 9 1,925 LF Furnish and Install 12" Diameter DI Pipe Water Line, Complete For 65.00 125,125.00 50.00 96,250.00 47.00 90,475.00 65.00 125,125.00 75.00 144,375.00 90.00 173,250.00 10 2,440 LF Furnish and Install 24" Diameter Ductile Iron Pipe Water Line, Complete For 125.00 305,000.00 115.00 280,600.00 112.00 273,280.00 130.00 317,200.00 138.00 336,720.00 150.00 366,000.00 11 88 LF Furnish and Install 42" Diameter Steel Encasement by Bore, Complete in Place For 685.00 60,280.00 650.00 57,200.00 700.00 61,600.00 800.00 70,400.00 750.00 66,000.00 775.00 68,200.00 12 2 EA Furnish and Install Restrained 90° Bends, 12" Diameter, Including Mechanical Joint Restraints and Thrust Blocking, Complete For 450.00 900.00 500.00 1,000.00 500.00 1,000.00 900.00 1,800.00 450.00 900.00 800.00 1,600.00 13 3 EA Furnish and Install Restrained 45° Bends, 12" Diameter, Including Mechanical Joint Restraints and Thrust Blocking, Complete For 465.00 1,395.00 475.00 1,425.00 500.00 1,500.00 800.00 2,400.00 550.00 1,650.00 800.00 2,400.00 14 2 EA Furnish and Install Restrained Ductile Iron Cap, 24" Diameter, Including Mechanical Joint Restraints and Thrust Blocking, Complete For 935.00 1,870.00 845.00 1,690.00 500.00 1,000.00 1,200.00 2,400.00 1,200.00 2,400.00 1,000.00 2,000.00 15 4 EA Furnish and Installing 12" Gate Valve, Including Mechanical Joint Restraints and Thrust Blocking, Complete in Place, for 2,750.00 11,000.00 3,000.00 12,000.00 2,000.00 8,000.00 2,200.00 8,800.00 3,000.00 12,000.00 3,000.00 12,000.00 16 2 EA Furnish and Installing 24" Gate Valve,Including Mechanical Joint Restraints and Thrust Blocking, Complete in Place, for 19,500.00 39,000.00 20,800.00 41,600.00 20,000.00 40,000.00 20,000.00 40,000.00 22,500.00 45,000.00 21,000.00 42,000.00 17 1 EA Furnish & Installing 12" Wet Tap with Gate Valve, Complete For 8,500.00 8,500.00 18,000.00 18,000.00 7,000.00 7,000.00 6,500.00 6,500.00 5,700.00 5,700.00 14,000.00 14,000.00 18 2 EA Furnish & Install 24" x 12" Tee, Including Mechanical Joint Restraints and Thrust Blocking, Complete For 2,150.00 4,300.00 1,900.00 3,800.00 2,000.00 4,000.00 2,800.00 5,600.00 2,600.00 5,200.00 3,000.00 6,000.00 19 1 EA Tie into Existing 12" Water Line, Complete For 2,000.00 2,000.00 3,400.00 3,400.00 1,500.00 1,500.00 1,200.00 1,200.00 4,000.00 4,000.00 4,000.00 4,000.00 20 2 EA Furnish and Install Standard Fire Hydrant Assembly 4,850.00 9,700.00 6,000.00 12,000.00 5,000.00 10,000.00 9,000.00 18,000.00 6,800.00 13,600.00 5,500.00 11,000.00 21 11 EA Furnish and Install Georgetown Utility System (GUS) Signage, Complete in Place For 200.00 2,200.00 325.00 3,575.00 300.00 3,300.00 400.00 4,400.00 450.00 4,950.00 400.00 4,400.00 22 100% LS Furnish All Materials, Equipment, Tools and Labor Necessary for Pressure Testing Water Pipe, Including Any Necessary Repairs, Complete For 7,000.00 7,000.00 4,500.00 4,500.00 4,000.00 4,000.00 3,000.00 3,000.00 4,000.00 4,000.00 4,000.00 4,000.00 23 4,500 LF Furnish, Install, Maintain and Remove Silt Fence as required in the Stormwater Pollution Prevention Plan, Complete For 2.50 11,250.00 2.25 10,125.00 3.00 13,500.00 3.00 13,500.00 2.50 11,250.00 3.00 13,500.00 24 3 EA Furnish and Install a Temporary Construction Entrance 2,000.00 6,000.00 1,500.00 4,500.00 2,100.00 6,300.00 1,200.00 3,600.00 1,500.00 4,500.00 1,100.00 3,300.00 25 10,500 SY Furnish and Install Hydro Mulch Seeding with Flexible Growth Medium (Flexterra) For Permanent Erosion Control, Including water to establish & sustain growth, Complete For 1.50 15,750.00 2.40 25,200.00 1.20 12,600.00 1.00 10,500.00 1.00 10,500.00 1.00 10,500.00 TOTAL PART B - (Items 1 - 25)698,570.00$ 651,765.00$ 829,350.00$ 619,335.00$ 730,825.00$ 744,085.00$ Page 3 of 6Page 50 of 62 BID TABULATION CITY OF GEORGETOWN TEXAS Ronald Reagan Mission Oaks Water Line Improvements November 21, 2018; 10:00 AM 2018-136-40 BIDDER INFORMATION Liberty Civil Construction, LLC S & J Construction Co., Inc. Aaron Concrete Contractors, LP 3555 Highway 29 West PO Box 5003 4108 Nixon Ln Georgetown, TX 78628 McLean Construction Inc 4101 Trimmier Rd Killeen TX 76542 Bruce Flanigan Const., Inc. 5114 Lampasas Lane Jacksonville, AR 72078 Austin, TX 78725 Belton, TX 76513 Item Estimated Unit Bid Data Unit Extended Unit Extended Unit Extended Unit Extended Unit Extended No. Quantity Description Price Amount Price Amount Price Amount Price Amount Price Amount PART B: Mission Oaks Water Line Improvements 1 100% LS Insurance, Bonds and Mobilization, not to exceed 5% of Part B Bid Amount , Complete for 32,598.00 32,598.00 18,500.00 18,500.00 40,000.00 40,000.00 35,000.00 35,000.00 247STAFor Right of Way Preparation along the Project Route for Part B, Complete For 381.00 17,907.00 940.00 44,180.00 350.00 16,450.00 215.00 10,105.00 3 100% LS For Providing a Video DVD of the Project Area Prior to and After Construction for Part B, Complete For 2,157.00 2,157.00 3,000.00 3,000.00 2,000.00 2,000.00 3,000.00 3,000.00 4 100% LS For Preparation and Implementation of Traffic Control Plan for Part B. Plan is to be prepared and signed by P.E. Licensed in the State of Texas, Complete For 4,090.00 4,090.00 1,800.00 1,800.00 5,000.00 5,000.00 5,300.00 5,300.00 5 100% LS Prepare Stormwater Pollution Prevention Plan, Including Submission to and Receiving Permits from Texas Commission on Environmental Quality (TCEQ) for Part B, Complete For 2,549.00 2,549.00 3,700.00 3,700.00 4,000.00 4,000.00 3,800.00 3,800.00 6 4,700 LF Implement and Follow Trench Safety Plan (Pipe), Complete For 1.90 8,930.00 1.00 4,700.00 5.00 23,500.00 1.00 4,700.00 7 1,100 SF Implement and Follow Trench Safety Plan (Bore Pit), Complete For 1.00 1,100.00 0.50 550.00 2.00 2,200.00 5.00 5,500.00 8 100% LS Furnish and Install Temporary Flush Assembly, Complete For 2,667.00 2,667.00 5,500.00 5,500.00 16,500.00 16,500.00 2,500.00 2,500.00 9 1,925 LF Furnish and Install 12" Diameter DI Pipe Water Line, Complete For 73.60 141,680.00 55.00 105,875.00 94.77 182,432.25 85.00 163,625.00 10 2,440 LF Furnish and Install 24" Diameter Ductile Iron Pipe Water Line, Complete For 119.80 292,312.00 134.00 326,960.00 131.53 320,933.20 150.00 366,000.00 11 88 LF Furnish and Install 42" Diameter Steel Encasement by Bore, Complete in Place For 701.50 61,732.00 670.00 58,960.00 963.74 84,809.12 665.00 58,520.00 12 2 EA Furnish and Install Restrained 90° Bends, 12" Diameter, Including Mechanical Joint Restraints and Thrust Blocking, Complete For 923.00 1,846.00 1,000.00 2,000.00 1,304.50 2,609.00 600.00 1,200.00 13 3 EA Furnish and Install Restrained 45° Bends, 12" Diameter, Including Mechanical Joint Restraints and Thrust Blocking, Complete For 892.00 2,676.00 1,000.00 3,000.00 1,477.00 4,431.00 700.00 2,100.00 14 2 EA Furnish and Install Restrained Ductile Iron Cap, 24" Diameter, Including Mechanical Joint Restraints and Thrust Blocking, Complete For 1,198.00 2,396.00 4,000.00 8,000.00 2,488.00 4,976.00 1,800.00 3,600.00 15 4 EA Furnish and Installing 12" Gate Valve, Including Mechanical Joint Restraints and Thrust Blocking, Complete in Place, for 2,442.00 9,768.00 2,600.00 10,400.00 11,084.75 44,339.00 2,300.00 9,200.00 16 2 EA Furnish and Installing 24" Gate Valve,Including Mechanical Joint Restraints and Thrust Blocking, Complete in Place, for 14,795.00 29,590.00 24,000.00 48,000.00 20,251.00 40,502.00 16,000.00 32,000.00 17 1 EA Furnish & Installing 12" Wet Tap with Gate Valve, Complete For 10,202.00 10,202.00 8,400.00 8,400.00 5,949.00 5,949.00 8,800.00 8,800.00 18 2 EA Furnish & Install 24" x 12" Tee, Including Mechanical Joint Restraints and Thrust Blocking, Complete For 2,296.00 4,592.00 4,600.00 9,200.00 4,174.00 8,348.00 2,400.00 4,800.00 19 1 EA Tie into Existing 12" Water Line, Complete For 1,949.00 1,949.00 2,700.00 2,700.00 6,316.00 6,316.00 2,300.00 2,300.00 20 2 EA Furnish and Install Standard Fire Hydrant Assembly, Complete in Place For 5,997.00 11,994.00 9,700.00 19,400.00 4,515.00 9,030.00 7,200.00 14,400.00 21 11 EA Furnish and Install Georgetown Utility System (GUS) Signage, Complete in Place For 460.00 5,060.00 520.00 5,720.00 410.00 4,510.00 265.00 2,915.00 22 100% LS Furnish All Materials, Equipment, Tools and Labor Necessary for Pressure Testing Water Pipe, Including Any Necessary Repairs, Complete For 4,819.00 4,819.00 10,000.00 10,000.00 4,250.00 4,250.00 25,000.00 25,000.00 23 4,500 LF Furnish, Install, Maintain and Remove Silt Fence as required in the Stormwater Pollution Prevention Plan, Complete For 4.50 20,250.00 3.00 13,500.00 5.00 22,500.00 3.00 13,500.00 24 3 EA Furnish and Install a Temporary Construction Entrance, Complete For 4,144.00 12,432.00 1,400.00 4,200.00 4,500.00 13,500.00 2,000.00 6,000.00 25 10,500 SY Furnish and Install Hydro Mulch Seeding with Flexible Growth Medium (Flexterra) For Permanent Erosion Control, Including water to establish & sustain growth, Complete For 5.30 55,650.00 2.00 21,000.00 1.25 13,125.00 1.00 10,500.00 TOTAL PART B - (Items 1 - 25) N O N R E S P O N S I V E B I D - I N C O M P L E T E B I D F O R M 739,245.00$ 882,209.57$ 794,365.00$ -$ 740,946.00$ Page 4 of 6Page 51 of 62 BID TABULATION CITY OF GEORGETOWN TEXAS Ronald Reagan Mission Oaks Water Line Improvements November 21, 2018; 10:00 AM 2018-136-40 BIDDER INFORMATION Austin Engineering Co, Inc. PO Box 342349 Royal Vista, Inc. 350 County Road 260 Liberty Hill, TX 78624 M.A. Smith Contracting, Inc. Austin, TX 78734-2349 Cash Construction Co, Ltd 15308 Ginger Street PO Box 1279 Austin TX 78728 Pflugerville, TX 78691 DeNucci Constructors, LLC Patin Construction LLC 8310-1 Capital of Texas Hwy. N., Ste 275 3800 W 2nd Street Austin, TX 78731 Taylor TX 76574 Item Estimated Unit Bid Data Unit Extended Unit Extended Unit Extended Unit Extended Unit Extended Unit Extended No. Quantity Description Price Amount Price Amount Price Amount Price Amount Price Amount Price Amount PART C: PRV Removals 1 100% LS Insurance, Bonds and Mobilization, not to exceed 5% of Part C Bid Amount , Complete for $ 5,000.00 5,000.00 5,000.00 5,000.00 2,000.00 2,000.00 6,000.00 6,000.00 5,000.00 5,000.00 6,500.00 6,500.00 2 100% LS For Right of Way Preparation along the for All Areas 5,000.00 5,000.00 6,000.00 6,000.00 2,000.00 2,000.00 10,000.00 10,000.00 5,000.00 5,000.00 5,000.00 5,000.00 3 100% LS For Providing a Video DVD of the Project Area Prior to and After Construction for Part C, Complete For 1,500.00 1,500.00 1,200.00 1,200.00 800.00 800.00 2,500.00 2,500.00 250.00 250.00 1,500.00 1,500.00 4 100% LS For Preparation and Implementation of Traffic Control Plan for Part C. Plan is to be prepared and signed by P.E. Licensed in the State of Texas, Complete For 4,000.00 4,000.00 4,500.00 4,500.00 3,000.00 3,000.00 2,500.00 2,500.00 8,000.00 8,000.00 5,000.00 5,000.00 5 1 EA Cut and Cap Existing 12" Water Line, Complete For 935.00 935.00 3,300.00 3,300.00 800.00 800.00 1,200.00 1,200.00 1,000.00 1,000.00 4,500.00 4,500.00 6 1 EA Cut and Cap Existing 16" Water Line, Complete For 1,500.00 1,500.00 3,500.00 3,500.00 1,500.00 1,500.00 1,600.00 1,600.00 1,500.00 1,500.00 5,500.00 5,500.00 7 4 EA Remove Existing PRV and Fittings and Install 8" Solid Sleeve 5,500.00 22,000.00 1,700.00 6,800.00 2,500.00 10,000.00 6,500.00 26,000.00 2,500.00 10,000.00 3,000.00 12,000.00 8 1 EA Remove Existing PRV and Fittings and Install 12" Solid Sleeve 7,500.00 7,500.00 1,900.00 1,900.00 2,800.00 2,800.00 8,000.00 8,000.00 3,000.00 3,000.00 3,500.00 3,500.00 9 3 EA Remove Existing PRV and Fittings and Install 4" Solid Sleeve 3,500.00 10,500.00 1,600.00 4,800.00 1,400.00 4,200.00 6,000.00 18,000.00 3,500.00 10,500.00 2,500.00 7,500.00 10 1 EA Furnish and Install 16" x 18" Wet Tap with 16" Gate Valve 28,000.00 28,000.00 27,000.00 27,000.00 20,000.00 20,000.00 19,000.00 19,000.00 16,000.00 16,000.00 25,000.00 25,000.00 11 1 EA Furnish and Installing 16" Gate Valve, Including Mechanical Joint Restraints and Thrust Blocking Complete in Place, for 8,500.00 8,500.00 7,300.00 7,300.00 6,000.00 6,000.00 8,500.00 8,500.00 8,500.00 8,500.00 15,000.00 15,000.00 12 50 LF Furnish and Installing 16" Ductile Iron Pipe 125.00 6,250.00 100.00 5,000.00 110.00 5,500.00 225.00 11,250.00 120.00 6,000.00 320.00 16,000.00 13 1 EA Relocate Existing Fire Hydrant, Complete in Place for 3,000.00 3,000.00 3,100.00 3,100.00 5,000.00 5,000.00 3,800.00 3,800.00 4,500.00 4,500.00 4,500.00 4,500.00 14 20 LF Remove Existing 30" Steel Encasement Pipe 150.00 3,000.00 60.00 1,200.00 40.00 800.00 105.00 2,100.00 50.00 1,000.00 250.00 5,000.00 15 5 EA Furnish and Install Restrained 45° Bends, 16" Diameter, Including Mechanical Joint Restraints and Thrust Blocking 800.00 4,000.00 800.00 4,000.00 800.00 4,000.00 2,200.00 11,000.00 1,000.00 5,000.00 2,000.00 10,000.00 16 3 EA Furnish and Install Restrained 22-1/2° Bends, 16" Diameter, Including Mechanical Joint Restraints and Thrust Blocking 800.00 2,400.00 800.00 2,400.00 800.00 2,400.00 2,200.00 6,600.00 1,000.00 3,000.00 2,000.00 6,000.00 17 8 EA For Removing PRV Vault Cover/Top and Backfilling with Select Material, Complete For 1,750.00 14,000.00 2,000.00 16,000.00 500.00 4,000.00 3,000.00 24,000.00 1,000.00 8,000.00 2,750.00 22,000.00 18 100% LS Furnish All Materials, Equipment, Tools and Labor Necessary for Pressure Testing Water Pipe, Including Any Necessary Repairs, Complete For 5,000.00 5,000.00 5,000.00 5,000.00 1,200.00 1,200.00 2,500.00 2,500.00 3,500.00 3,500.00 7,000.00 7,000.00 19 1,500 SY Furnish and Install Hydro Mulch Seeding with Flexible Growth Medium (Flexterra) For Permanent Erosion Control, Including water to establish & sustain growth, Complete For 1.50 2,250.00 2.50 3,750.00 1.20 1,800.00 1.00 1,500.00 1.00 1,500.00 1.00 1,500.00 TOTAL PART C - (Items 1 - 19) PROJECT SUMMARY 5,316,520.00$ 5,440,750.00$ 5,571,525.00$ 5,577,575.00$ 5,632,025.00$ 5,638,775.00$ 698,570.00$ 651,765.00$ 619,335.00$ 730,825.00$ 744,085.00$ 829,350.00$ 134,335.00$ 111,750.00$ 77,800.00$ 166,050.00$ 101,250.00$ 163,000.00$ 6,149,425.00$ 6,204,265.00$ 6,268,660.00$ 6,474,450.00$ 6,477,360.00$ 6,631,125.00$ Did Bidder Acknowledge Addenda No. 1 through 3? YES YES YES YES YES YES Did Bidder provide Section #00400?YES YES YES YES YES YES Did Bidder provide Section #00410?YES YES YES YES YES YES BIDDER INFORMATION PART B: Mission Oaks Water Line Improvements PART C: PRV Removals TOTAL BID PART A: Ronald Reagan Water Line Improvements Liberty Hill, TX 78624 134,335.00$ 163,000.00$ Austin, TX 78734-2349 Royal Vista, Inc.Austin Engineering Co, Inc. 350 County Road 260 PO Box 34234915308 Ginger Street PO Box 1279 DeNucci Constructors, LLC Patin Construction LLC 111,750.00$ 77,800.00$ M.A. Smith Contracting, Inc. Cash Construction Co, Ltd Austin TX 78728 Pflugerville, TX 78691 8310-1 Capital of Texas Hwy. N., Ste 275 3800 W 2nd Street Austin, TX 78731 Taylor TX 76574 166,050.00$ 101,250.00$ Page 5 of 6Page 52 of 62 Page 53 of 62 November 21, 2018 Mr. Ken Taylor Systems Engineering Project Manager City of Georgetown 300-1 Industrial Avenue Georgetown, Texas 78626-8445 Re: City of Georgetown Ronald Reagan & Mission Oaks Water Line Improvements Georgetown, Texas Mr. Taylor, Bids were received by the City of Georgetown until 10:00 A.M. on Wednesday, November 21, 2018 for the above referenced project. There were eleven (11) competitive bids received. A detailed bid tabulation of this bid is attached for your use. This project includes three (3) parts. Part A is the Ronald Reagan Water Line Extension. This project consists of the installation of 21,000 LF of 30” Ductile Iron Water Line along Ronald Reagan Boulevard from FM 3405 to Williams Drive. Part B is the Mission Oaks Water Line Improvements, which extends 24” Ductile Iron Water Line along Ronald Reagan Boulevard from Somerset Hills Drive, south approximately 2,500 LF, and then extends 1,925 LF of 12-inch PVC Water Line cross country and connects to the existing water line located in Mission Oaks Subdivision. Part C consists of the removal of eight (8) existing PRV’s ranging in size from 4” to 12” and connection to an existing 18” Water Line near the Sun City Boulevard/Hwy 195 Intersection. The bid amounts submitted by the low bidder for each part are listed below: • Part A – Ronald Reagan Boulevard Water Line Improvements - $5,316,520.00; • Part B – Mission Oaks Water Line Improvements - $698,570.00; • Part C – PRV Removals - $134,335.00; KASBERG, PATRICK & ASSOCIATES, LP CONSULTING ENGINEERS Texas Firm F-510 Temple RICK N. KASBERG, P.E. Georgetown One South Main Street R. DAVID PATRICK, P.E., CFM 1008 South Main Street Temple, Texas 76501 THOMAS D. VALLE, P.E. Georgetown, Texas 78626 (254) 773-3731 GINGER R. TOLBERT, P.E. (512) 819-9478 ALVIN R. “TRAE” SUTTON, III, P.E., CFM JOHN A. SIMCIK, P.E., CFM Page 54 of 62 Mr. Ken Taylor November 21, 2018 Page Two The low qualified bidder for the project is Royal Vista, Inc. of Liberty Hill, Texas. Royal Vista, Inc. has successfully completed several water utility improvements for the City of Georgetown and other local municipalities in the recent past. We have reviewed the current workload, references and construction history of Royal Vista, Inc. and their subcontractors. As a result of our findings, we recommend that a contract be awarded to Royal Vista, Inc. in the amount of $6,149,425.00. Sincerely, Alvin R. (Trae) Sutton III, P.E., CFM ARS/ xc: Mr. Michael Hallmark, City of Georgetown Mr. Wesley Wright, PE, City of Georgetown Ms. Nicole Abrego, City of Georgetown Mr. Larry Foust, Royal Vista, Inc. 2018-136-40 Page 55 of 62 Page 56 of 62 City of Georgetown, Texas Utility System Advisory Board December 4, 2018 SUBJECT: Cons id eration and p o s s ib le rec o mmendation to approve a contrac t with M.A.Smith Contrac ting o f Aus tin, Texas for the Wes t University Avenue 2018 Waterline Imp ro vements p ro jec t in the amount of $546,510.00. - Wesley Wright, P.E., Sys tems Engineering Direc tor/Michael Hallmark, CIP Manager ITEM SUMMARY: The Wes t Univers ity Avenue Water Line is a 12" water line intended to p rovid e domes tic and fire flow water to the S H29 c orridor eas t o f IH35, p artic ularly the HEB and Wo lf Cros s ing areas . Current lines in the area are und ers ized for the forthc o ming d emand. The Wes t Univers ity Avenue 2018 Water Line Improvement projec t was advertis ed fo r pub lic b id s on Octo b er 28, 2018 and No vember 4, 2018 in the Williamson Cou n ty S u n . Thro ugh o ur o ffice, we provid ed p lans and s pec ific atio ns to thirteen (13) interes ted parties , inc luding general c ontrac tors and p lan ro o ms . On Novemb er 20, at 3:00 p .m. bids were rec eived at the P urc hasing Department fo r the cons tructio n o f the Wes t University Avenue 2018 Water Line Improvement projec t and then o pened and publicly read aloud. Out of the ten (10) general contractors that requested plans and specifications, six (6) bids were received. T he names of the bidders and total base bid amounts are summarized below. 1. M.A. Smith Contrac ting Company, Inc . $546,510.00 2. JKB Cons truc tion C o mp any, LLC $553,337.00 3. Aus tin Engineering Co ., Inc. $602,290.00 4. P ROTA Co ns truc tion Inc and Prota Inc, JV $629,709.00 5. Ro yal Vis ta, Inc . $677,355.00 6. P atin Co ns truc tio n LLC $694,963.00 The lo w b id der o n the projec t b as ed on the to tal b as e bid is M.A. Smith Contrac ting Co, Inc., Austin, TX (MA Smith). STAFF RECOMMENDATIONS: Staff and CDM S mith rec o mmends exec uting this c o ntract for the West Univers ity Avenue 2018 Waterline Imp ro vements projec t with M.A.S mith Co ntrac ting o f Aus tin, Texas in the amount of $546,510.00. FINANCIAL IMPACT: Funds fo r this exp enditure are bud geted in the Water CIP. SUBMITTED BY: Wes ley Wright, P.E., S ystems Engineering Direc to r/Mic hael Hallmark, CIP Manager ATTACHMENTS: Description Type Letter of Recommendation and Bid Tab Backup Material W. Univers ity Waterline Location Map Backup Material Page 57 of 62 9430 Research Boulevard Building 1, Suite 200 Austin, Texas 78759 Tel: (512) 346-1100 Fax: (512) 345-1483 November 27, 2018 Mr. Michael Hallmark City of Georgetown 300 Industrial Avenue Georgetown, TX 78626 RE: West University Avenue 2018 Water Line Improvement Project No. 2JJ Recommendation of Award Dear Mr. Hallmark: The West University Avenue 2018 Water Line Improvement project was advertised for public bids on October 28, 2018 and November 4, 2018 in the Williamson County Sun. Through our office, we provided plans and specifications to thirteen (13) interested parties, including general contractors and plan rooms. On November 20, at 3:00 p.m. bids were received at the Purchasing Department for the construction of the West University Avenue 2018 Water Line Improvement project and then opened and publicly read aloud. Out of the ten (10) general contractors that requested plans and specifications, six (6) bids were received. The names of the bidders and total base bid amounts are summarized below. 1. M.A. Smith Contracting Company, Inc. $546,510.00 2. JKB Construction Company, LLC $553,337.00 3. Austin Engineering Co., Inc. $602,290.00 4. PROTA Construction Inc and Prota Inc, JV $629,709.00 5. Royal Vista, Inc. $677,355.00 6. Patin Construction LLC $694,963.00 A bid tabulation of all the bid items is attached. The low bidder on the project based on the total base bid is M.A. Smith Contracting Co, Inc., Austin, TX (MA Smith). The engineer’s estimate for the project was $450k. Enclosed in the bid package, each of the bidders submitted a Statement of Bidder’s Experience (Section 00400). We have reviewed the information provided by MA Smith, and we believe that they have the qualifications, experience, personnel and equipment to complete this project. The firm successfully completed construction of a public sector project for one of our staff members several years ago. We also checked several recent references for MA Smith Contracting and believe that they Page 58 of 62 Mr. Michael Hallmark November 27, 2018 Page 2 are capable of completing the West University Avenue 2018 Water Line Improvements project within the project schedule. We recommend that the City of Georgetown award the West University Avenue 2018 Water Line Improvement contract in the amount of $546,510.00 to M.A. Smith Contracting Company, Inc. Sincerely, Ana Karamalegos, P.E. CDM Smith Inc. TBPE Firm Registration No. F-3043 ATTACHMENT ENCLOSED cc: Wesley Wright, P.E. / City of Georgetown Ken Taylor / City of Georgetown Allen Woelke, P.E. / CDM Smith Alan Rhames, P.E. / CDM Smith Page 59 of 62 City of Georgetown West University Avenue Project No. 2JJ BID TABULATION November 20, 2018 √√√√√√√√√√√√ √√√√√√√√√√√√ √√√√√√√√√√√√ Base Bid Items Estimated Quantity Unit Unit Amount Unit Amount Unit Amount Unit Amount Unit Amount Unit Amount Base Bid No.1: Insurance, Bonds and Mobilization/ Demobilization Related Expenses not to exceed 5% of Total Bid. 1 LS $25,000.00 $25,000.00 $27,224.00 $27,224.00 $20,000.00 $20,000.00 $31,186.00 $31,186.00 $30,000.00 $30,000.00 $34,000.00 $34,000.00 Base Bid No.2: Storm Water Pollution Prevention Plan (SWPPP) and SWPPP Implementation, including installing the stabilized construction entrance, silt fence, and other required temporary sedimentation and erosion control best management practices as required by the SWPPP plan, complete in place as detailed and specified. 1 LS $5,500.00 $5,500.00 $4,345.00 $4,345.00 $5,000.00 $5,000.00 $1,264.00 $1,264.00 $15,000.00 $15,000.00 $5,000.00 $5,000.00 Base Bid No.3: Site and Right-of-Way Preparation, including clearing, grubbing, and tree protection, complete in place as detailed and specified. 2,270 SY $6.00 $13,620.00 $11.00 $24,970.00 $5.00 $11,350.00 $4.00 $9,080.00 $10.00 $22,700.00 $33.00 $74,910.00 Base Bid No.4: Traffic Control Plan and Implementation, complete in place as detailed and specified. 1 LS $20,000.00 $20,000.00 $3,840.00 $3,840.00 $4,500.00 $4,500.00 $1,271.00 $1,271.00 $10,000.00 $10,000.00 $4,500.00 $4,500.00 Base Bid No.5: Furnish and Install Temporary Improvements to provide temporary access gate(s) and fencing to keep the site, materials, and equipment secure, complete in place as detailed and specified. 1 LS $10,000.00 $10,000.00 $5,685.00 $5,685.00 $5,000.00 $5,000.00 $3,811.00 $3,811.00 $10,000.00 $10,000.00 $4,200.00 $4,200.00 Base Bid No.6: Trench Safety Plan and Implementation, as required for all pipe trenches deeper than 5 feet, complete in place as detailed and specified. 815 LF $1.00 $815.00 $3.00 $2,445.00 $3.00 $2,445.00 $4.00 $3,260.00 $1.00 $815.00 $2.00 $1,630.00 Base Bid No.7: Furnish and Install 12-inch Class 350 DIP or 12-inch C900 DR-18 PVC Pipe (Open Trench Construction), including fittings, restraints as specified, excavation, dewatering, bedding, backfill, trench surface restoration, and fittings, complete in place as detailed and specified. 785 LF $110.00 $86,350.00 $85.00 $66,725.00 $110.00 $86,350.00 $105.00 $82,425.00 $95.00 $74,575.00 $150.00 $117,750.00 Base Bid No.8: Furnish and Install 12-inch Gate Valve and associated appurtenances, as shown in Detail A on Sheet CZ-1, complete in place as detailed and specified. 3 EA $2,600.00 $7,800.00 $2,435.00 $7,305.00 $4,000.00 $12,000.00 $2,520.00 $7,560.00 $3,000.00 $9,000.00 $3,500.00 $10,500.00 Base Bid No.9: Connect new 12-inch Water Pipe to existing 12-inch Water Pipe, including fittings and adapters, complete in place as detailed and specified. 1 LS $1,200.00 $1,200.00 $1,656.00 $1,656.00 $3,000.00 $3,000.00 $2,085.00 $2,085.00 $4,000.00 $4,000.00 $15,000.00 $15,000.00 Base Bid No.10: Furnish and Install 4-Foot Diameter Manhole and 1-inch Combination Air/Vacuum Valve, and associated appurtenances, as shown in Details F and G on Sheet CZ-1, complete in place as detailed and specified. 1 LS $7,000.00 $7,000.00 $4,925.00 $4,925.00 $2,500.00 $2,500.00 $5,185.00 $5,185.00 $4,000.00 $4,000.00 $5,000.00 $5,000.00 Base Bid No.11: Furnish and Install 8-inch Class 350 Restrained Joint DIP or 8-inch C900 DR-18 PVC Pipe (Open Trench Construction), including fittings, restraints, excavation, dewatering, bedding, backfill, trench surface restoration, and end plug, complete in place as detailed and specified. 10 LF $100.00 $1,000.00 $120.00 $1,200.00 $70.00 $700.00 $150.00 $1,500.00 $90.00 $900.00 $125.00 $1,250.00 Base Bid No.12: Furnish and Install 8-inch Gate Valve and associated appurtenances, as shown in Detail A on Sheet CZ-1, complete in place as detailed and specified. 2 EA $1,600.00 $3,200.00 $1,425.00 $2,850.00 $1,700.00 $3,400.00 $1,885.00 $3,770.00 $1,750.00 $3,500.00 $1,800.00 $3,600.00 Base Bid No.13: Furnish and Install 6-inch Class 350 Joint DIP or 6-inch PVC C900 DR-18 PVC Pipe (Open Trench Construction), including fittings, restraints, excavation, dewatering, bedding, backfill, trench surface restoration, and end plug, complete in place as detailed and specified. 20 LF $95.00 $1,900.00 $64.00 $1,280.00 $60.00 $1,200.00 $71.00 $1,420.00 $90.00 $1,800.00 $125.00 $2,500.00 Base Bid No.14: Furnish and Install 6-inch Gate Valve and associated appurtenances, as shown in Detail A on Sheet CZ-1, complete in place as detailed and specified. 1 EA $1,300.00 $1,300.00 $1,048.00 $1,048.00 $1,300.00 $1,300.00 $1,332.00 $1,332.00 $1,250.00 $1,250.00 $1,200.00 $1,200.00 Base Bid No.15: Connect new 6-inch Water Pipe to existing 6-inch Water Pipe, including fittings and adapters, complete in place as detailed and specified. 1 LS $1,100.00 $1,100.00 $1,654.00 $1,654.00 $2,500.00 $2,500.00 $2,365.00 $2,365.00 $2,000.00 $2,000.00 $7,500.00 $7,500.00 Base Bid No.16: Furnish and Install 12-inch Class 350 Restrained Joint DIP or Restrained 12-inch C900 DR-18 PVC Pipe, including restraints, in casing, complete in place as detailed and specified. 435 LF $45.00 $19,575.00 $102.00 $44,370.00 $85.00 $36,975.00 $85.00 $36,975.00 $115.00 $50,025.00 $125.00 $54,375.00 Base Bid No.17: Furnish and Install 8-inch Class 350 Restrained Joint DIP or Restrained 8-inch C900 DR-18 PVC Pipe, including restraints, in casing, complete in place as detailed and specified. 104 LF $35.00 $3,640.00 $77.00 $8,008.00 $75.00 $7,800.00 $91.00 $9,464.00 $110.00 $11,440.00 $125.00 $13,000.00 Base Bid No.18: Furnish and Install 24-inch Steel Casing Pipe (Jack and Bore Construction), complete in place as detailed and specified. 540 LF $380.00 $205,200.00 $382.00 $206,280.00 $500.00 $270,000.00 $519.00 $280,260.00 $495.00 $267,300.00 $400.00 $216,000.00 Base Bid No.19: Testing of Water pipelines, complete in place as detailed and specified. 1 LS $2,000.00 $2,000.00 $1,591.00 $1,591.00 $1,500.00 $1,500.00 $3,967.00 $3,967.00 $5,000.00 $5,000.00 $2,500.00 $2,500.00 Base Bid No.20: Disinfection Water pipelines, complete in place as detailed and specified. 1 LS $3,500.00 $3,500.00 $2,841.00 $2,841.00 $2,500.00 $2,500.00 $2,545.00 $2,545.00 $5,000.00 $5,000.00 $2,500.00 $2,500.00 Base Bid No.21: Provide Re-vegetation, complete in place as detailed and specified. 2,270 SY $3.00 $6,810.00 $4.00 $9,080.00 $1.00 $2,270.00 $8.00 $18,160.00 $15.00 $34,050.00 $2.40 $5,448.00 Base Bid No.22: Allowance to be used for additional site improvements, landscaping and miscellaneous modifications. 1 LS $70,000.00 $70,000.00 $70,000.00 $70,000.00 $70,000.00 $70,000.00 $70,000.00 $70,000.00 $70,000.00 $70,000.00 $70,000.00 $70,000.00 Base Bid No.23: Pressure Reducing Valve Station, including site mobilization, excavation, backfill, vault, hatch, concrete, pipe, system connections, valves, tapping sleeves, fittings, restraints, thrust blocks, erosions controls, revegetation, excavation safety, safety fencing, testing, disinfection and appurtenances, complete in place as detailed and specified. 1 LS $50,000.00 $50,000.00 $54,015.00 $54,015.00 $50,000.00 $50,000.00 $50,824.00 $50,824.00 $45,000.00 $45,000.00 $42,600.00 $42,600.00 Total - Base Bid (Item Nos. 1-23)---$546,510.00 -$553,337.00 -$602,290.00 -$629,709.00 -$677,355.00 -$694,963.00 Austin Engineering Co., Inc. Patin Construction LLC JKB Construction Company, LLC PROTA Construction Inc and Prota Inc, JV Royal Vista, Inc.Bidders Acknowledged all Addenda Provide Bid Security (5%) Provide Information from 00400 M.A. Smith Contracting Company, Inc. Page 60 of 62 CITY OF GEORGETOWN, TEXAS WEST UNIVERSITY AVENUE 2018 WATER LINE IMPROVEMENTS LOCATION MAP PROPOSED 12" WATER LINE N C: \ c d m e x t \ d a v i d @ k 2 p a r t n e r s . c o m \ d 0 2 3 6 8 4 4 \ F - W E S T U N I V L O C A T I O N M A P . d w g , L a y o u t 1 , 1 1 / 2 7 / 2 0 1 8 1 2 : 1 3 : 2 2 P M , s a n d e f u r d w Page 61 of 62 City of Georgetown, Texas Utility System Advisory Board December 4, 2018 SUBJECT: EXECUTIVE SESSION In compliance with the Op en Meetings Act, C hapter 551, Go vernment Code, Vernon's Texas Codes, Annotated, the item lis ted below will be d is cus s ed in closed s es s io n and is s ubjec t to actio n in the regular s es s io n. Sec. 551.086 Competitive Matters Power Supply p lanning disc ussion. -- Jim Briggs , General Manager Utilities (no action required) ITEM SUMMARY: N/A STAFF RECOMMENDATION: N/A FINANCIAL IMPACT: N/A SUBMITTED BY: Chris Fo s ter, Manager o f Res o urc e Planning & Integratio n Page 62 of 62