HomeMy WebLinkAboutAgenda_GUS_01.10.2020Notice of Meeting for the
Georgetown Utility System Adv isory Board and the Gov erning Body
of the City of Georgetown
January 10, 2020 at 2:00 P M
at Georgetown Municipal Complex, 300-1 I ndustrial Av enue, Georgetown T X
T he C ity of G eorgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you
require as s is tance in partic ipating at a public meeting due to a disability, as defined under the ADA, reas onable
as s is tance, adaptations , or ac commodations will be provided upon request. P leas e c ontact the C ity S ec retary's
O ffic e, at leas t three (3) days prior to the sc heduled meeting date, at (512) 930-3652 or C ity Hall at 808 Martin
Luther King Jr. S treet, G eorgetown, T X 78626 for additional information; T T Y users route through R elay
Texas at 711.
Regular Session
(T his R egular S es s ion may, at any time, be rec es s ed to c onvene an Exec utive S es s ion for any purpose
authorized by the O pen Meetings Act, Texas G overnment C ode 551.)
A C all to O rder
T he Board may, at any time, recess the R egular S es s ion to convene in Executive S ession at the request of
the C hair, a Board Member, the C ity Manager, As s is tant C ity Manager, G eneral Manager of Utilities, C ity
C ounc il Member, or legal counsel for any purpose authorized by the O pen Meetings Act, Texas
G overnment C ode C hapter 551, and are subject to ac tion in the R egular S ession that follows .
B Introduc tion of Visitors
Employee R ec ognition --
-- None s ubmitted at time of posting
C January 2020 Utility Advis ory Board - C I P Updates and November 2019 C ounc il Actions -- Wes ley
Wright, P.E., S ystems Engineering Direc tor
D P resentation of the 4th Q uarter F inanc ials for Water and Elec tric – P aul Diaz, Budget Manager
E Elec tric Utility Update -- Daniel Bethapudi, Electric G eneral Manager
F Water Utility Update -- G lenn W. Dis hong, Water Utilities Direc tor
L egislativ e Regular Agenda
G P ublic Wishing to Address the Board
O n a subject that is posted on this agenda: P leas e fill out a s peaker registration form which c an be found
on the table at the entrance to the Board Meeting. C learly print your name and the letter of the item on
whic h you wis h to s peak and pres ent it to the S taff Liais on, prior to the start of the meeting. You will
be called forward to s peak when the Board c onsiders that item. O nly persons who have delivered the
speaker form prior to the meeting being called to order may speak.
O n a subject not posted on the agenda: P ers ons may add an item to a future R egular sc heduled Board
agenda by filing a written reques t with the S taff Liaison no later than one week prior to the Board
meeting. T he request mus t inc lude the speaker’s name and the spec ific topic to be addres s ed with
Page 1 of 105
sufficient information to inform the board and the public. Only those persons who have submitted a
timely request will be allowed to speak. F or Board Liais on contac t information, please logon to
https ://government.georgetown.org/georgetown-utility-sys tem-advis ory-board-gus/.
-- At time of pos ting, no persons had signed up to addres s the Board.
H R eview and pos s ible ac tion to approve the minutes from the regular G US Board meeting held on
November 8, 2019 and the regular G US Board meeting sc heduled for December 13, 2019. - S heila K.
Mitc hell, G US Board Liaison
I C ons ideration and possible recommendation to approve the contrac t with Environmental Improvements ,
Inc . for purchas e and ins tall of c hemic al storage tank, in the amount of $54,200.65 – Mike Welc h, P lant
O perations S uperintendent/G lenn W. Dishong, Water Utilities Director
J C ons ideration and pos s ible rec o mmendatio n to approve renewal #2 of c ontrac t 17-054-S C with Elk
R idge C ons tructio n, L L C (Water & Was tewater Treatment P lants) in the amount of $53,139.90 - Mike
Welch, P lant O perations S uperintendent/G lenn W. Dishong, Water Utilities Director
K C ons ideration and possible recommendation to approve amendment #1 and renewal #2 of c ontract 18-
0017-S C with Elk R idge C onstruc tion, LLC (Water & Wastewater C ollection and Dis tribution S tations)
in the amo unt o f $67,767.41 per year - David T homis on, Water S ervic es Manager/G lenn W. Dishong,
Water Utilities Direc tor
L C ons ideration and possible recommendation to approve the purc hase of pump repairs from
W EI S I NG ER I NC . from C onroe Texas in an amount not to exc eed $173,170.00, for F isc al Year --
David W. T homis on, Water S ervic es Manager/Mike Welc h, P lant O perations S uperintendent/G lenn W.
Dishong, Water Utilities Director
M C ons ideration and possible recommendation to approve a contrac t for the Lake Water Treatment P lant
980 High S ervic e P ump S tation Improvements project with P rota C ons truction, Inc . & P rota Inc., Joint
Venture, in the amount of $3,476,420.00 - Michael Hallmark, C I P Manager/Wes ley Wright, P.E., S ys tems
Engineering Direc tor
Adjournment
Ce rtificate of Posting
I, R obyn Densmore, C ity S ecretary for the C ity of G eorgetown, Texas, do hereby c ertify that this Notic e of
Meeting was posted at C ity Hall, 808 Martin Luther King Jr. S treet, G eorgetown, T X 78626, a plac e readily
acc es s ible to the general public as required by law, on the _____ day of _________________, 2020, at
__________, and remained s o posted for at leas t 72 c ontinuous hours prec eding the s cheduled time of said
meeting.
__________________________________
R obyn Dens more, C ity S ec retary
Page 2 of 105
City of Georgetown, Texas
Utility System Advisory Board
January 10, 2020
S UB J E C T:
C all to O rder
T he Board may, at any time, rec es s the R egular S ession to c onvene in Exec utive S es s ion at the reques t of
the C hair, a Board Member, the C ity Manager, Assistant C ity Manager, G eneral Manager of Utilities , C ity
C ouncil Member, or legal c ouns el for any purpos e authorized by the O pen Meetings Ac t, Texas
G overnment C ode C hapter 551, and are s ubjec t to action in the R egular S es s ion that follows.
IT E M S UMMARY:
F IN AN C IAL IMPAC T:
N/A
S UB MIT T E D B Y:
Page 3 of 105
City of Georgetown, Texas
Utility System Advisory Board
January 10, 2020
S UB J E C T:
January 2020 Utility Advisory Board - C I P Updates and November 2019 C ouncil Ac tions -- Wesley
Wright, P.E., S ys tems Engineering Director
IT E M S UMMARY:
G US Item Update C oversheet January 2020
Berry Creek Wastewater Interceptor – 3C J
S anta C lara crews are completing C amera Testing & c ontinue with c leanup
Berry Creek Wastewater Interceptor Phases 1, 2 & 3
Alternative routing around Berry S prings P ark near Market S t. under review and redes ign
Braun Elevated S torage Tank (E S T)
C rews ins talling center tube and bowl to be rais ed late January 2020
Cedar Breaks to P astor Dedicated Water Line
24” waterline has been tested and on line, trench repair paving complete with C hip S eal s cheduled
for early S pring 2020
C R 255
R ec ommended by G US 10/09/15, approved by C C on 10/27/15. P reliminary C onstruc tion P lans
are near 80% c omplete & Eas ements 50% complete
Lake 980 High S ervice Pump Station
Bid O pening on 12/10/19 with five Bids being evaluated
Lake WT P Chemical S torage Improvements
Tas k O rder approved by G US Board 12/8/17 & C ity C ounc il 12/12/17. P ossibly c ombined with
another P rojec t
Lake WT P Raw Water Intake & Pump Station Improvements
Divers have installed all 9 s lide gates & gate c ontrol stems /brac kets . P ipe work to be ins talled after
first of the year in 2020
Park Lift S tation
Tas k O rder recommended by G US 2/10/17& approved by C ity C ounc il 2/18/17. 100% Des ign
P lans & S pec s being reviewed by S taff, Bids early 2020
Pastor Pump Station
P ump# 1 had to be pulled and s ent bac k to factory due to s eal leaking. P ump expec ted back in
F ebruaray
Pecan Branch WWT P
P unc hlist Items nearing completion. R AS pump replacement s cheduled
Ronald Reagan Water Line
R onald R eagan waterline in s ervic e, crews ins talling waterline from Main eas t on 7th street
S an Gabriel Wastewater Treatment P lant – Belt Press
Electric duc t banks ins talled crews to start exc avating Belt P res s slab 1/6/20
S hell Road Water line
F inal Design P lans are 90% complete & Easements are 60% complete
S outh Lake Water Treatment Plant – Intake & Raw Waterline
Task O rder approval by G US Board 1/11/19 & C ity C ounc il 1/22/19
S un City 2.0 MG Elevated S torage Tank
P ainting touch-up completed & new tank put bac k on line 12/18/19
Water Tank Rehab- 2018
Page 4 of 105
C DM Tas k O rder recommended by G US Board 12/8/17 & approved by C ounc il 12/12/17
Tentatively out for Bid early 2020
Westloop Waterline Improvements
24” waterline ins talled up to S H29, bore under 29 – R iver C hase s tarts after 1/2/20
November 2019 Council Actions (no Dec ember meeting held) -- attached
F IN AN C IAL IMPAC T:
N/A
S UB MIT T E D B Y:
Wesley Wright, P.E., S ystems Engineering Direc tor/Mic hael Hallmark, C I P Manager
AT TAC H ME N T S:
Description Type
January 2020 CIP Updates Backup Material
Council Rpt Nov 2019 mtg for Jan GUS Backup Material
Page 5 of 105
GUS Item Update Coversheet January 2020
Berry Creek Wastewater Interceptor – 3CJ
Santa Clara crews are completing Camera Testing & continue with cleanup
Berry Creek Wastewater Interceptor Phases 1, 2 & 3
Alternative routing around Berry Springs Park near Market St. under review and redesign
Braun Elevated Storage Tank (EST)
Crews installing center tube and bowl to be raised late January 2020
Cedar Breaks to Pastor Dedicated Water Line
24” waterline has been tested and on line, trench repair paving complete with Chip Seal
scheduled for early Spring 2020
CR 255
Recommended by GUS 10/09/15, approved by CC on 10/27/15. Preliminary
Construction Plans are near 80% complete & Easements 50% complete
Lake 980 High Service Pump Station
Bid Opening on 12/10/19 with five Bids being evaluated
Lake WTP Chemical Storage Improvements
Task Order approved by GUS Board 12/8/17 & City Council 12/12/17. Possibly
combined with another Project
Lake WTP Raw Water Intake & Pump Station Improvements
Divers have installed all 9 slide gates & gate control stems/brackets. Pipe work to be
installed after first of the year in 2020
Park Lift Station
Task Order recommended by GUS 2/10/17& approved by City Council 2/18/17. 100%
Design Plans & Specs being reviewed by Staff, Bids early 2020
Pastor Pump Station
Pump# 1 had to be pulled and sent back to factory due to seal leaking. Pump expected back in
Februaray
Page 6 of 105
Pecan Branch WWTP
Punchlist Items nearing completion. RAS pump replacement scheduled
Ronald Reagan Water Line
Ronald Reagan waterline in service, crews installing waterline from Main east on 7th
street
San Gabriel Wastewater Treatment Plant – Belt Press
Electric duct banks installed crews to start excavating Belt Press slab 1/6/20
Shell Road Water line
Final Design Plans are 90% complete & Easements are 60% complete
South Lake Water Treatment Plant – Intake & Raw Waterline
Task Order approval by GUS Board 1/11/19 & City Council 1/22/19
Sun City 2.0 MG Elevated Storage Tank
Painting touch-up completed & new tank put back on line 12/18/19
Water Tank Rehab- 2018
CDM Task Order recommended by GUS Board 12/8/17 & approved by Council 12/12/17
Tentatively out for Bid early 2020
Westloop Waterline Improvements
24” waterline installed up to SH29, bore under 29 – River Chase starts after 1/2/20
Page 7 of 105
Project: Berry Creek Wastewater Interceptor
Project# 3CJ
Update – January 2020
Project Description: This project will consist of approximately 15,000 linear feet of
wastewater interceptor ranging in diameter from 36-inch to 30-inch from the existing
Berry Creek lift station to the existing Sun City lift station. The alignment of the
interceptor will generally follow Berry Creek.
Purpose: The purpose of this project is to add wastewater capacity in Sun City, provide
wastewater service to the Shell road area, and will allow Sun City Lift Station to come
off line when the future phases are complete.
Project Manager: Ken Taylor
Engineer: CDM Smith
Contractor: Santa Clara Construction
Phase Start Finish Status / Comments
Preliminary
Engineering
May 2015 February 2016 Recommended by GUS
5/8/15 approved by CC
5/26/15.
Final Design February 2016 March 2018 100% complete
ROW / Easements June 2015 Complete
Bid / Award
Bid #
Approved by City Council
on 12/11/18, NTP issued
1/24/19
Construction January 2019 February 2020 Santa Clara crews are
completing Camera Testing
& continue with cleanup
Post Construction
Page 8 of 105
Project: Berry Creek Wastewater Interceptor
Phase 1,2, &3
Project#
Update – January 2020
Project Description: This project will consist of approximately 21,500 linear feet of
wastewater interceptor ranging in diameter from 36-inch to 48-inch from the existing
Berry Creek lift station to the existing Pecan Branch Wastewater Plant. The alignment of
the interceptor will generally follow Berry Creek.
Purpose: The purpose of this project is to add wastewater capacity in Sun City, provide
wastewater service to the Shell road area, and will allow Sun City Lift Station to come
off line.
Project Manager: Ken Taylor
Engineer: Walker Partners, LLC
Contractor: TBD
Phase Start Finish Status / Comments
Preliminary
Engineering
Recommended by GUS
10/13/17 Approved by City
Council 10/23/17. Boring
samples being analyzed
Final Design Fall 2019 Spring 2020
ROW / Easements
Bid / Award
Bid #
Alternative routing around
Berry Springs Park near
Market St. under review and
redesign
Construction
Post Construction
Page 9 of 105
Project: Braun EST
Project# 2JG
Update – January 2020
Project Description: This project involves - Design, bidding and general services during
construction for a 3 MG elevated storage tank (EST) at the Braun EST site
Purpose: The purpose of this project is to add additional elevated water storage capacity and
meet the demands of the water system in the 1178 pressure plane.
Project Manager: Ken Taylor
Engineer: CDM
Contractor: Landmark Structures
Phase Start Finish Status / Comments
Preliminary
Engineering
January 2018 March 2018 Task Order approved by
GUS Board 12/8/17 & by
City Council 12/12/17
Final Design April 2018 July 2018
ROW / Easements
Bid / Award
Bid #
September
2018
October 2018 Approved by GUS Board &
Council in October
Construction January 2019 June 2020 Crews installing center tube
and bowl to be raised late
January 2020
Post Construction
Page 10 of 105
Page 11 of 105
Project: Cedar Breaks EST – Pastor 24 Inch Dedicated Water Line
Project# 2JI
Update – January 2020
Project Description: This project will consist of approximately 12,000 linear feet water
line that will run from Cedar Breaks Elevated Storage Tank to the Pastor Ground Storage
Tank. The waterline will run in DB Woods Rd right-of-way for the northern portion and
around the north and western border of Wood Ranch for the southern portion.
Purpose: The purpose of this project is to run a dedicated water line from Cedar Breaks
EST to Pastor Pump Station, this dedicated 24-inch waterline will allow the Pastor Pump
Station to fill without depleting the existing distribution system and effecting fire flow.
This will also increase the capacity of the Pastor Pump Station to keep up with growth
and demand in the Western District.
Project Manager: Ken Taylor
Engineer: CDM Smith
Contractor: Prota Construction
Phase Start Finish Status / Comments
Preliminary
Engineering
July 2018 September 2018 Task Order approved by
GUS Board 6/6/18 & City
Council 6/26/18
Final Design October 2018 November 2018 Preliminary Survey work
starting
ROW / Easements July 2018 November 2018 Complete
Bid / Award
Bid #
January 2019 February 2019 Approved by Council 2/19
Construction Early 2019 February 2020 24” waterline has been
tested and on line, trench
repair paving complete with
Chip Seal scheduled for
early Spring
Post Construction
Page 12 of 105
Project: County Road 255 Waterline Improvements
Project# 2JE
Update – January 2020
Project Description: This project involves upgrading the existing 15-inch water main with
16-inch C-905 or DI pipe. This project will consist of approximately 44,500 LF of 16-inch
water main replacement.
Purpose: The purpose of this project is to upgrade the class pipe water mains to C-905 or DI
pipe, and replace this existing main that has a large amount of water leaks.
Project Manager: Ken Taylor
Engineer: KPA
Contractor: TBD
Phase Start Finish Status / Comments
Preliminary
Engineering
October 2015 March 2016 Recommended by GUS
10/09/15, approved by City
Council on 10/27/15.
Final Design March 2016 Winter 2019 80% Complete
ROW / Easements October 2015 50% complete
Bid / Award
Bid #
Construction
Post Construction
Page 13 of 105
Project: Lake 980 High Service Pump Station
Project# 2CH
Update – January 2020
Project Description: This project includes installing 4 vertical turbine pumps, 1,245 linear
feet of 30-inch waterline, electrical & instrumentation building and new flowmeter with vault.
Purpose: The purpose of this project is to upgrade pumping capacity into the 980 pressure
plane to meet peak water demands and growth in this pressure plane area.
Project Manager: Ken Taylor
Engineer: CDM
Contractor: TBD
Phase Start Finish Status / Comments
Preliminary
Engineering
March 2019 August 2019 Project out for Bid early
November 2019
Final Design August 2019 October 2019
ROW / Easements
Bid / Award
Bid #
Bid Opening on 12/10/19
with five Bids being
evaluated
Construction February 2020 October 2020 Substantial Completion is
270 days from NTP
Page 14 of 105
Project: Lake WTP – Chemical Storage Improvements
Project# 2CW
Update – January 2020
Project Description: This project involves - Design, bidding and general services during
construction for the design of sodium permanganate storage and feed system improvements at
the Lake WTP.
Purpose: The purpose of this project is the sodium permanganate storage and feed system
improvements will be bid so that small specialized, qualified chemical feed contractors can
bid the project.
Project Manager: Ken Taylor
Engineer: CDM
Contractor: TBD
Phase Start Finish Status / Comments
Preliminary
Engineering
January 2018 March 2018 Task Order approved by
GUS Board 12/8/17 & City
Council 12/12/17
Final Design April 2018 June 2018
ROW / Easements
Bid / Award
Bid #
Possibly combined with
another Project
Construction
Post Construction
Page 15 of 105
Project: Lake Water Treatment Plant Raw Water Intake & Pump Station Maintenance
Improvements
Project# 2CU
Update – January 2020
Project Description: This project involves - Design bidding and general services during
construction for the maintenance improvements consist of replacing the intake gates and other
general maintenance on the 40-year-old intake. The maintenance improvements also consist
of replacing some discharge piping at the Raw Water Pump Station
Purpose: The purpose of this project is the replacing the intake gates and other general
maintenance on the 40-year-old intake. There will also be revisions to the discharge piping
that will reduce the pump head loss at the existing pump
Project Manager: Ken Taylor
Engineer: CDM
Contractor: Huffman Contractors
Phase Start Finish Status / Comments
Preliminary
Engineering
October 2017 November 2017 Approved by GUS Board
9/17 & City Council
September 17
Final Design November
2017
February 2018
ROW / Easements
Bid / Award
Bid #
April 2018 May 2018 Approved by City Council
5/22/18
Construction Fall 2018 Spring 2020 Divers have installed all 9
slide gates & gate control
stems/brackets. Pipe work to
be installed after first of
year in 2020
Post Construction
Page 16 of 105
Project: San Gabriel Park Lift Station Improvements
Project# 3CN
Update – January 2020
Project Description: This project will consist of the construction a new wastewater lift
station with appurtenant electrical and instrumentation improvements.
Purpose: The purpose of this project is to provide wastewater service for growth and
development in the San Gabriel Wastewater Basin.
Project Manager: Ken Taylor
Engineer: KPA
Contractor: TBD
Phase Start Finish Status / Comments
Preliminary
Engineering
March 2017 June 2017 Recommended by GUS 2/10/17&
City Council 2/18/17
Final Design July 2017 December
2017
90% Plans under review by Staff
TCEQ variance under review
ROW / Easements N/A N/A
Bid / Award
Bid #
Tentatively Bids early 2020
Reviewing 100% Plans & Specs
prior to Bid
Construction
Post Construction
Page 17 of 105
Project: Pastor Pump Station
Project# 2BZ
Update – January 2020
Project Description: This project involves upgrading the existing pump station with two new
motors, pumps, electrical, instrumentation & HVAC. Design of pipeline improvements to
provide more water to the Pastor Pump Station and to complete the West Loop Water Line
near SH 29 and DB Wood Road.
Purpose: The purpose of this project is to upgrade pipeline improvements and to provide
more water to the Pastor Pump Station and to complete the West Loop Water Line near SH 29
and DB Wood Road.
Project Manager: Ken Taylor
Engineer: CDM
Contractor: Archer Western
Phase Start Finish Status / Comments
Preliminary
Engineering
May 2017 October 2017 Task Order recommended
by GUS 4/14/17 and goes to
Council 4/25/17.
Final Design October 2017 February 2018
ROW / Easements
Bid / Award
Bid #
GUS Board approved
Contract with Archer
Western 3/9/18 and Council
approved 3/27/18
Construction April 2018 Winter 2019 Pump# 1 had to be pulled
and sent back to factory due
to seal leaking. Pump
expected back in Februaray
Page 18 of 105
Project: Pecan Branch Wastewater Treatment Plant Expansion
Project# 3CA
Update – January 2020
Project Description: The project includes expanding the existing Pecan Branch WWTP
from 1.5 to 3.0 MGD including the construction of an influent pump station, screening
and grit removal facilities, aeration basins, secondary clarifiers, cloth disk filters, UV
disinfection facility, sludge holding tanks facilities, site grading and paving, electrical
improvements, and instrumentation improvements.
Purpose: The purpose of this project is to provide wastewater treatment for future
growth and development.
Project Manager: Ken Taylor
Engineer: CDM Smith
Contractor: CSA Construction
Phase Start Finish Status / Comments
Preliminary
Engineering
November
2012
March 2013 Complete
Final Design December
2015
January 2017 100% Set of Plans
ROW / Easements Complete
Bid / Award
Bid # 201717
March 2017 May 2017 Bid Opening 3/28/17
GUS Board approved 4/14/17
City Council 4/25/17
Construction July 2017 January 2020 Punchlist Items nearing
completion. RAS pump
replacement scheduled
Post Construction
Page 19 of 105
Project: Ronald Reagan Waterline Improvements
Project# 2JM
Update – January 2020
Project Description: This project involves upgrading the existing 15-inch water main with
16-inch C-905 or DI pipe. This project will consist of approximately 44,500 LF of 16-inch
water main replacement.
Purpose: The purpose of this project is to install 21,300 LF of 30” water main on the west
side of Ronald Reagan from FM 2338 (Williams dr) to FM 3405
Project Manager: Ken Taylor
Engineer: KPA
Contractor: Royal Vista
Phase Start Finish Status / Comments
Preliminary
Engineering
October 2015 March 2016 KPA Task Order approved
by GUS Board & City
Council on 8/28/18
Final Design March 2016 February2018 80% Complete
ROW / Easements October 2015 50% complete
Bid / Award
Bid #
Approved by City Council
12/11/18
Construction January 2019 February 2020 Royal Vista installing water
& wastewater lines along 7th
street east of Main
Post Construction
Page 20 of 105
Project: San Gabriel Wastewater Treatment Plant – Belt Press
Project# 3CP
Update – January 2020
Project Description: This project involves - Design, bidding and general services during
construction for a new sludge dewatering building and the installation of dewatering
equipment, a polymer system and a conveyor for the San Gabriel Wastewater Treatment Plant
(WWTP)
Purpose: The purpose of this project is to replace the existing drying beds with a new sludge
dewatering building and the installation of dewatering equipment, a polymer system and a
conveyor to load a roll-off dumpster.
Project Manager: Ken Taylor
Engineer: CDM
Contractor: TBD
Phase Start Finish Status / Comments
Preliminary
Engineering
April 2018 August 2018 Task Order approved by
GUS Board 3/9/18 & by
City Council 3/27/18
Final Design August 2018 December 2018
ROW / Easements N/A
Bid / Award
Bid #
February 2019 August 2019 NTP issued 11/4/19
Construction Nov. 2019 August 2020 Electric duct banks installed
crews to start excavating
Belt Press slab 1/6/20
Post Construction
Page 21 of 105
Project: Shell Road Waterline Improvements
Project# 3CI
Update – January 2020
Project Description: This project will consist of approximately 13,500 LF of 16-inch
water line and approximately 2300 LF of 12-inch waterline.
Purpose: The purpose of this project is to provide secondary feed of water to Sun City.
Project Manager: Ken Taylor
Engineer: KPA
Contractor: TBD
Phase Start Finish Status / Comments
Preliminary
Engineering
April 2015 August 2015 Task Order Recommended
by GUS 3/13/15
Approved by CC 3/24/15.
Final Design August 2015 March 2018 90% complete
ROW / Easements June 2015 October 2017 60% complete
Bid / Award
Bid
Construction
Post Construction
Page 22 of 105
Project: South Lake Water Treatment Plant Intake & Raw Waterline
Project# 2BN
Update – January 2020
Project Description: This project will consist of design/engineering for a 22 MGD raw
water intake & pump station with future expansion to 44 MGD and 3,800 LF if raw water
pipeline to carry water to the SLWTP.
Purpose: The purpose of this project is to provide the supply & demand for future water
needs for the City of Georgetown and Western District
Project Manager: Ken Taylor
Engineer: CDM
Contractor: TBD
Phase Start Finish Status / Comments
Preliminary
Engineering
February 2019 August 2019 Task Order approval by
GUS Board 1/11/19 & City
Council 1/22/19
Final Design August 2019 April 2020
ROW / Easements
Bid / Award
Bid
Summer 2020
Construction Fall 2020
Post Construction
Page 23 of 105
Project: Sun City Elevated Water Storage Tank
Project# 2CP
Updated – January 2020
Project Description: This project will consist of the replacement of the existing .4
million gallon Elevated Water Storage Tank with a 2 million gallon Elevated Water
Storage Tank.
Purpose: The purpose of this project is to increase elevated water storage in the Sun
City 1015 pressure plan from .4 MG to 2MG to meet the demands of the water system in
the 1015 pressure plane.
Project Manager: Chris Pousson
Engineer: Dunham Engineering, Inc.
Contractor: CB&I
Phase Start Finish Status / Comments
Preliminary
Engineering
November
2016
May 2017 Task Order recommended
by GUS 11/11/16,
Approved by CC 11/22/16.
Final Design May 2017 June 2017 100% complete
ROW / Easements N/A N/A N/A
Bid / Award
Bid #
July 2017 September 2017 GUS Board and Council
Approved
Construction December
2017
June 2019 Painting touch-up
completed & new tank put
back on line 12/18/19
Post Construction
Page 24 of 105
Project: Water Tank Rehab - 2018
Project# 2CX
Update – January 2020
Project Description: This project involves - Design bidding and general services during
construction for the demolition of the steel ground storage tank (GST) and steel lime silo at
the Park Water Treatment Plant (WTP), demolition of the Woods GST, and rehabilitation of
the 1 MG GST at the Southside WTP; and design
Purpose: The purpose of this project is the demolition of the steel structures at the Park WTP
and the Woods sites and rehabilitation of the 1 MG GST at the Southside WTP site will be bid
so that qualified demolition and tank rehab contractors can bid the project.
Project Manager: Ken Taylor
Engineer: CDM
Contractor: TBD
Phase Start Finish Status / Comments
Preliminary
Engineering
January 2018 March 2018 Task Order recommended
by GUS Board 12/8/17 &
approved by Council
12/1/2/17
Final Design April 2018 June 2018
ROW / Easements
Bid / Award
Bid #
Early 2020 Tentatively out for Bid early
2020
Construction
Post Construction
Page 25 of 105
Project: West Loop Waterline Improvements
Project# 2JJ
Update – January 2020
Project Description: The project consists of furnishing, installing, and providing all labor and
materials required to install approximately 2,410 linear feet of new 24‐inch diameter water
pipeline and approximately 425 linear feet of 8-inch diameter water pipeline
Purpose: The purpose of this project is to provide adequate flows & pressure to the West
University and River Chase areas
Project Manager: Ken Taylor
Engineer: CDM
Contractor: Santa Clara Construction
Phase Start Finish Status / Comments
Preliminary
Engineering
Feb March 2019 Task Order Issued 1/24/19
Final Design March 2019 May 2019 Complete
ROW / Easements June 2015 October 2017 Complete
Bid / Award
Bid
Approved by City Council
6/25/19, PreConstruction
Meeting held 8/12/19 &
NTP issued for 9/6/19
Construction September 2019 April 2020 24” waterline installed up to
SH29, bore under 29 –
River Chase starts after
1/2/20
Post Construction
Page 26 of 105
GUS BOARD ITEMS FORWARDED TO COUNCIL
November 26, 2019
(No December meeting held)
G
Forwarded from Georgetown Utility Systems Advisory Board (GUS):
Consideration and possible action to execute Task Order No. CDM-19-006-TO with CDM Smith Inc. and to
execute an Inter-local Agreement between the City of Georgetown and the Brazos River Authority for the
sharing of costs of an Aquifer Storage and Recovery (ASR) Assessment Project in the amount of
$165,000.00 -- Glenn W. Dishong, Water Utilities Director
H
Forwarded from Georgetown Utility Advisory Board (GUS):
Consideration and possible action to approve Task Order CDM-20-001-TO with CDM Smith, Inc. for
American Water Infrastructure Act Risk and Resilience Evaluation in the amount of $150,000.00 -- Glenn
W. Dishong, Water Utilities Director
I
Forwarded from Georgetown Utility Systems Advisory Board (GUS):
Consideration and possible action to approve a Second Renewal with Wesco Distribution, Inc. to provide
Honeywell electric meters and related items for the Advanced Metering Infrastructure system in an amount
not to exceed $420,000.00 -- Leticia Zavala, Customer Care Director
ALL ITEMS PASSED
Page 27 of 105
City of Georgetown, Texas
Utility System Advisory Board
January 10, 2020
S UB J E C T:
P res entation of the 4th Q uarter F inancials for Water and Electric – P aul Diaz, Budget Manager
IT E M S UMMARY:
Electric Fund: T he total annual operating revenue in the Electric F und totals $85.7 million through the
fourth quarter, or 101% o f bud get, and 0.3% variance fro m projec tion. Electric revenue s ales , the larges t
component o f o p erating revenue, totals $80.2 million. T he P ower C o s t Adjus tment (P C A) was increased
in F eb ruary and June. O ther o p erating revenues , which is c o mp ris ed o f the metering allo catio n, developer
contributions , and other c omponents, totals $5.3 million through the quarter.
Total annual operating expens es in the Electric F und total $78.4 million thro ugh the q uarter. P urc hase
power exp enses total $58.5 million, while c onges tion revenue rights (C R R s) credits total -$2.8 million. Net
purc hase power to tals $55.6 million, which is $5.5 millio n higher than bud geted or 10.8%. T he primary
factors are trans mis s io n congestio n and curtailment, late summer pric e spikes in the market, and a c hange
to acc ruals for purchas e power invoic es .
In additio n to the P C A increase mentio ned above, s taff rec ommend s the following ad justments to mitigate
purc hased power cos ts as part o f the year-end bud get amendment. T he year-to-date c olumn o f the fund
s chedule pres ented in this report is reflec tive of thes e proposed amendments. S taff has not adjusted the
budget column becaus e at the time of this report C ouncil has not ac ted on the proposed amendment.
F irs t, the amendment rec o gnizes $1.2 millio n in revenue from s ale o f energy to cus tomers and c harges to
cus tomers.
S econd, s taff p ro p o s es to s ell land owned by the Electric fund to the F leet F und. T his land will be the
future s ite o f the new F leet S ervice C enter envis ioned in the fac ilities assessment. T his amo unt totals
$481,927 and is s hown in the fund s chedule under “S ale of Assets ” in non-operating revenue.
T hird, the Water F und will purchas e the Electric F und ’s portio n o f the Wests id e S ervice C enter (W S S C ),
as well as rep ay the d eb t s ervice payments mad e fo r the fac ility in the p as t. T he center is p rimarily us ed to
s erve the large western water cus tomer area. In F Y2020, s o me electric p ers o nnel will mo ve from the center
to the G eorgetown Munic ip al C omplex (G MC ), and water staff at the G MC will reloc ate to the W S S C .
T he p urc has e o f Elec tric ’s s hare o f the b uilding to tals $356,894. T his s hown in non-o p erating revenue
under “S ale o f Assets ”. T he p revious ly paid debt s ervice principal and interes t totaled $470,000 and
$305,234 res p ectively (net of hand ling fees $1,275 o n the s ched ule under d eb t s ervic e and interes t
expens e). Ad d itionally, s taff p ro p o s es to reclas s the remaining liab ility of 2013 C ertific ate o f O bligation
Bonds fo r the Wes ts id e S ervice C enter to taling $1.56 million fro m Elec tric to Water. T his is s hown in the
fund sc hedule as a transfer in under non-operating revenue.
F ourth, s taff propos es s elling a p o rtion of the fiber network o wned b y Electric to the Information
Tec hnology F und . T he Elec tric F und installed and operates the network that is us ed b y departments
across the C ity. T his transac tion will purchas e all the fiber infras truc ture ins talled fro m 2003 to 2011 at a
cost o f $645,044. In F Y 2020, s taff will develop a multi-year p lan for the I T F und to b uy the remaind er of
the fiber as s ets, and alloc ate operation and maintenanc e c os ts to all us ing funds.
F inally, o ther amendments includ e: T he S outh G eorgetown Tax Increment R einvestment Zo ne F und will
reimburse $633K of infras tructure investments made by the Elec tric F und. T his is shown as a trans fer in
under non-o p erating revenue. O ther c hanges under no n-operating revenue includ e the s ale o f R enewable
Energy C red its for $722K, and refund ing the $100K Blo o mb erg G rant revenue after C ounc il ac tion to not
move fo rward with the grant. O p erating exp enditures are red uc ed thro ughout the utility, inc luding
reallocating the cos t of c o nservation p ro grams that primarily b enefit water us e to the Water F und . R eturn
on Investment transfer to the G eneral F und was also reduc ed an additional $500K. C apital expenditures are
Page 28 of 105
als o reduced.
P ending the approval of the year-end budget amendment, it is anticipated the fund will finis h the year with
an end ing fund balance of $6.3 millio n. T his b alanc e c o vers the 90-day operating contingency res erve and
begins to rec over the rate stabilization reserve.
Water F und: O verall water operating revenue totals $67.8 million, or 113.5% of budget. T he C ity
experienced higher than projec ted water s ales in the fis cal year. T his fact als o has a pos itive imp act on R O I
and F ranchis e F ees in the G eneral F und. C ap ital R ec o very F ees finis hed F Y2019 higher than b udget and
higher than projec ted. O ver the las t three fis cal years , the C ity has s een stro ng gro wth in this revenue
s tream. T here were no no n-operating revenues in the water fund in F Y2019 while staff worked on exis ting
multi-year debt and cash funded projects .
Water operating exp ens es to tal $37 million, o r 99% of b udget. T he fund exp erienc ed some operational
s avings in utilities, legal services, and c ontracts .
Non-operating expens es total $37.4 millio n. T he C apital Improvement bud get in the Water F und totals
$85.6 millio n. S taff will be bringing forward a C I P rollforward amend ment in Dec emb er to mo ve funds
uns pent in F Y2019 into the F Y2020 Budget for multi-year p ro jects s uc h as the Berry C reek Interc eptor
and Lake Water Treatment P lant.
T he debt service actuals for F Y2019 exc eed budget due to the reimbursement of debt principal and interes t
payment made b y Electric fo r the Wests id e S ervice C enter. T he year-end b udget amendment inc ludes
corresponding amendments to the Water F und as desc ribed for Electric.
Ending available fund balance of $47.5 million is $15 million higher than projected. However, this balanc e is
used to cash fund 50% of water c apital projects next year.
F IN AN C IAL IMPAC T:
N/A
S UB MIT T E D B Y:
P aul Diaz, Budget Manager (skm)
AT TAC H ME N T S:
Description Type
Water and Electric 4th Quarter Update Pres entation
610-Electric Q4 2019 Backup Material
660-Water Q4 2019 Backup Material
Page 29 of 105
FY2019 Annual Budget
Water and Electric 4th Quarter Update
Page 30 of 105
FY2019 Annual Budget
Electric Fund Revenues
•Operating revenue in the Electric Fund totals $85.7 million
through the fiscal year, or 101.4% of budget and 0.33%
projections.
•Electric revenue sales, the largest component of operating
revenue, totals $80.2 million.
–The Power Cost Adjustment increase occurred in February and June.
•Other revenues, which is comprised of the AMR allocation,
developer contributions, and other components, totals $5.3
million.
Page 31 of 105
FY2019 Annual Budget
Electric Fund Expenses
•Operating expenses in the Electric Fund total $78.4 million
through the quarter.
–Purchase power expenses total $58.5 million.
–While congestion revenue rights (CRRs) credits total -$2.8 million.
–Net purchase power totals $55.6 million, which is $5.45 million higher
than budgeted or 10.8%.
•Congestion and curtailment
•Late summer price spikes
•Corrected accounting accruals process to improve the matching of revenues
and expenses.
Page 32 of 105
FY2019 Annual Budget
Electric Amendment
•Staff is proposing several amendments to the Electric Fund –
both in revenues and expenses.
•The next item on the agenda will be a detailed explanation of
these proposed amendments.
•The budget column in the fund schedule does not reflect these
proposed changes as they have not been approved by Council.
•The Year-To -Date column is shown as though these
amendments have been approved.
Page 33 of 105
FY2019 Annual Budget
Electric Amendment
•Adjust purchased power and CRRs ($5.4 M)
•Sell assets
–Fiber network installed from 2003 to 2011 to the IT fund ($645K -
Multi-year process)
–Land to the Fleet Fund ($481K)
–Electric’s share of the Westside Service Center ($356K)
–Renewable Energy Credits in the amount of ($722K)
•Increase the transfer from the South Georgetown TIRZ for capital
infrastructure investment from previous fiscal years. ($85K)
Page 34 of 105
FY2019 Annual Budget
Electric Amendment
•Recognizing additional utility revenue ($1.2M)
•Reduce operating expenses ($440K)
•Reduce the Return on Investment transfer to the General Fund
($500K)
•Not moving forward with Bloomberg Grant ($100K)
•Reduce capital expenses by ($160K)
•Reimburse debt expenses for Westside Service Center ($775K)
and reduce remaining debt liability ($1.5 million)
Page 35 of 105
FY2019 Annual Budget
Electric Summary
Projected Actuals Variance
Beginning Fund Balance 2,103,922 2,103,922 -
Revenues 89,171,943 90,100,404 928,461
Expenses 86,336,198 85,870,914 (465,284)
Ending Fund Balance 4,939,667 6,333,412 1,393,745
Contingency 4,082,999 4,082,999 -
Rate Stabilization 856,668 2,250,413 1,393,745
Available Fund Balance ---
Page 36 of 105
FY2019 Annual Budget
Water Fund
•Overall water operating revenue totals $67.8 million, or 113.6%
of budget.
–Higher than projected water sales. A positive impact on ROI and
Franchise Fees in the General Fund.
•Capital Recovery Fees finished FY2019 higher than budget and
higher than projected. Over the last three fiscal years, the City
has seen strong growth in this revenue stream.
•There were no non-operating revenues (bond proceeds) in the
water fund in FY2019.
Page 37 of 105
FY2019 Annual Budget
Water Fund
•Water operating expenses total $37 million, or 99% of budget.
•Non-operating expenses total $37.4 million.
–The Capital Improvement budget in the Water Fund totals $85.66 million.
Staff will be bringing forward a CIP rollforward amendment in December to
move funds unspent in FY2019 into the FY2020 Budget
–Projects such as the Berry Creek Interceptor and Lake Water Treatment
Plant.
•The debt service actuals for FY2019 exceed budget due to the
reimbursement of debt principal and interest payment made by
Electric for Westside Service Center.
Page 38 of 105
FY2019 Annual Budget
Water Fund Summary
Projected Actuals Variance
Beginning Fund Balance 89,128,534 89,128,534 -
Revenues 63,079,016 67,878,047 4,799,031
Expenses 84,691,071 74,495,412 (10,195,659)
Ending Fund Balance 67,516,479 82,511,169 14,994,690
90 Day Contingency 7,498,183 7,498,183 -
Non-Operational Con. 9,500,000 9,500,000 -
Bond Proceed Reserve 18,000,000 18,000,000 -
Available Fund Balance 32,518,296 47,512,986 14,994,690
Page 39 of 105
FY2019 Annual Budget
Water Fund and CIP
•FY2020 Capital Improvement Plan
–New Water Projects total $18.6 million.
–New Wastewater Projects total $17 million.
–$45 Million of FY2019 Water/Wastewater were pre-rolled in the
FY2020 Budget process.
–Staff will bring the FY2020 Rollforward Amendment in Dec with
additional projects that were not rolled in the budget process.
Page 40 of 105
APRROVED
BUDGET CURRENT PERIOD
YEAR TO DATE
(W/ENCUMB)
YEAR‐END
PROJECTION
YEAR‐END
VARIANCE
FAV(UNFAV)
% YEAR‐END
VARIANCE
FAV(UNFAV)
BEGINNING FUND BALANCE 2,103,922 2,103,922 2,103,922 ‐ 0.00%
Operating Revenue
Electric Revenue 79,100,000 9,368,227 80,255,956 80,100,000 155,956 0.19%
Interest 38,000 2,968 78,214 78,214 ‐ ‐
Other Revenue 5,233,546 827,032 5,343,637 5,216,177 127,460 2.44%
Transfer In 95,787 ‐ ‐ ‐ ‐ NA
Operating Revenue Total 84,467,333 10,198,227 85,677,807 85,394,391 283,416 0.33%
Operating Expenditures
CRR Credits (3,000,000) (532,188) (2,821,759) (2,821,759) ‐ ‐
Georgetown Utility Systems 19,337,779 1,870,561 18,897,528 19,347,922 450,394 2.33%
Purchased Power 53,185,477 11,879,286 58,465,559 58,465,559 ‐ ‐
Transfers Out ‐ROI 4,325,000 153,497 3,825,000 3,825,000 ‐ ‐
Operating Expenditures Total 73,848,256 13,371,156 78,366,328 78,816,722 450,394 0.57%
Total Net Operations 10,619,077 (3,172,929) 7,311,479 6,577,669 733,810 11.16%
Non‐Operating Revenue
Renewable Energy Credits ‐ 722,381 722,381 722,381 ‐ ‐
Grant Revenue 100,000 ‐ ‐ ‐ ‐ NA
Transfers In 548,104 2,196,009 2,196,009 2,196,009 ‐ ‐
Sale of Assets 10,000 1,483,867 1,504,207 859,162 645,045 75.08%
Non‐Operating Revenue Total 658,104 4,402,257 4,422,597 3,777,552 645,045 17.08%
Non‐Operating Expenditures
CIP 4,017,007 744,586 3,857,165 3,872,055 14,890 0.38%
Interest Expense 1,386,781 (305,234) 1,081,547 1,081,547 ‐ ‐
Debt Service 3,035,374 (468,725) 2,565,874 2,565,874 ‐ ‐
Non‐Operating Expenditures Total 8,439,162 (29,373) 7,504,586 7,519,476 14,890 0.20%
Total Net Non‐Operations (7,781,058) 4,431,630 (3,081,989) (3,741,924) 659,935 17.64%
EXCESS (DEFICIENCY) OF TOTAL REVENUE OVER TOTAL REQUIREMENTS 2,838,019 1,258,702 4,229,490 2,835,745 1,393,745 49.15%
ENDING FUND BALANCE 4,941,941 6,333,412 4,939,667 1,393,745 28.22%
RESERVES
Contingency 4,082,999 4,082,999 4,082,999
Rate Stabilization Reserve 147,079 2,250,413 856,668
Reserves Total 4,230,078 6,333,412 4,939,667
AVAILABLE FUND BALANCE 711,863 0 0 ‐ ‐
Electric Fund
Preliminary Actuals to Year‐End Projection: Sep FY2019
Page 41 of 105
APRROVED
BUDGET CURRENT PERIOD
YEAR TO DATE
(W/ENCUMB)
YEAR-END
PROJECTION
YEAR-END
VARIANCE
FAV(UNFAV)
% YEAR-END
VARIANCE
FAV(UNFAV)
BEGINNING FUND BALANCE 89,159,703 89,128,534 89,128,534 - 0.00%
Operating Revenue
Capital Recovery Fee 14,250,000 1,163,198 15,803,197 15,139,255 663,942 4.39%
Interest 569,400 160,456 2,080,718 1,482,998 597,720 40.30%
Irrigation Utility Revenue 301,557 89,338 302,818 301,578 1,241 0.41%
Other Revenue 2,262,146 321,202 5,316,144 3,546,274 1,769,870 49.91%
Raw Water Revenue 140,000 132,603 353,873 140,000 213,873 152.77%
Transfer In, Debt 103,725 103,725 103,725 103,725 - 0.00%
Wastewater Utility Revenue 12,975,345 (40,868) 12,026,638 13,015,186 (988,548) -7.60%
Water Utility Revenue 29,116,931 5,547,482 31,890,934 29,350,000 2,540,934 8.66%
Operating Revenue Total 59,719,104 7,477,137 67,878,047 63,079,016 4,799,031 7.61%
Operating Expenditures
Irrigation 270,324 21,318 167,875 270,000 102,125 37.82%
Transfer Out, Fleet/Joint Service 245,000 - 245,000 245,000 - 0.00%
Transfer Out, General 275,000 68,750 275,000 275,000 - 0.00%
Transfer Out, ROI 3,200,000 1,842,036 3,286,284 3,200,000 (86,284) -2.70%
Transfer Out, Utilities 95,787 - - - - N/A
Wastewater Distribution 904,415 206,395 713,376 795,050 81,674 10.27%
Wastewater Plant Management 2,705,069 345,293 2,843,610 2,687,676 (155,934) -5.80%
Water Administration 19,923,733 3,272,624 20,251,416 20,981,179 729,763 3.48%
Water Distribution 2,707,265 550,231 2,450,121 2,598,600 148,479 5.71%
Water Operations 4,157,528 384,377 4,241,261 4,252,288 11,027 0.26%
Water Plant Management 2,948,733 399,701 2,588,735 2,909,309 320,573 11.02%
Operating Expenditures Total 37,432,854 7,090,725 37,062,678 38,214,102 1,151,424 3.01%
Total Net Operations 22,286,250 386,412 30,815,368 24,864,914 5,950,455 23.93%
Non-Operating Revenue
Bond Proceeds - - - - - N/A
Non-Operating Revenue Total
Non-Operating Expenditures
Transfer Out - 1,562,500 1,562,500 - (1,562,500) N/A
CIP 90 85,667,940 2,247,266 28,783,245 40,226,858 11,443,613 28.45%
CIP 91 - - 62,218 - (62,218) N/A
Debt Service 6,250,111 777,759 7,024,771 6,250,111 (774,660) -12.39%
Non-Operating Expenditures Total 91,918,051 4,587,524 37,432,734 46,476,969 9,044,236 19.46%
Total Net Non-Operations (91,918,051) (4,587,524) (37,432,734) (46,476,969) 9,044,236 19.46%
EXCESS (DEFICIENCY) OF TOTAL REVENUE OVER TOTAL
REQUIREMENTS (69,631,801) (4,201,112) (6,617,365) (21,612,055) 14,994,690 69.38%
ENDING FUND BALANCE 19,527,902 82,511,169 67,516,479 14,994,690 22.21%
Reserves
Reserved Bond Proceeds 18,000,000 18,000,000
90 Day Operational Contingency 7,498,183 7,498,183 7,498,183
Non-Operational Contingency 9,500,000 9,500,000 9,500,000
Reserves Total 16,998,183 34,998,183 34,998,183
AVAILABLE FUND BALANCE 2,529,719 47,512,986 32,518,296 14,994,690 46.11%
Water Fund
Preliminary Actuals to Year-End Projection: Sep FY2019
Page 42 of 105
City of Georgetown, Texas
Utility System Advisory Board
January 10, 2020
S UB J E C T:
Electric Utility Update -- Daniel Bethapudi, Elec tric G eneral Manager
IT E M S UMMARY:
F IN AN C IAL IMPAC T:
.
S UB MIT T E D B Y:
Daniel Bethapudi, Electric G eneral Manager
Page 43 of 105
City of Georgetown, Texas
Utility System Advisory Board
January 10, 2020
S UB J E C T:
Water Utility Update -- G lenn W. Dishong, Water Utilities Director
IT E M S UMMARY:
F IN AN C IAL IMPAC T:
.
S UB MIT T E D B Y:
G lenn W. Dishong, Water Utilities Director
Page 44 of 105
City of Georgetown, Texas
Utility System Advisory Board
January 10, 2020
S UB J E C T:
R eview and possible action to approve the minutes from the regular G US Board meeting held on
November 8, 2019 and the regular G US Board meeting s cheduled for Dec ember 13, 2019. - S heila K.
Mitchell, G US Board Liais on
IT E M S UMMARY:
Board to review, revis e and/or approve the minutes from the regular G US Board meeting held on
November 8, 2019 and the regular G US Board meeting s cheduled for Dec ember 13, 2019.
F IN AN C IAL IMPAC T:
N/A
S UB MIT T E D B Y:
S heila K. Mitchell/G US Board Liaison
AT TAC H ME N T S:
Description Type
GUS November 8 2019 DRAFT Minutes Backup Material
GUS December 13 2019 DRAFT Minutes Backup Material
Page 45 of 105
Minutes of the Meeting of the
Georgetown Utility Systems Advisory Board and the
Governing Body of the City of Georgetown, Texas
November 8, 2019 at 2:00PM
at Georgetown Municipal Complex, 300-1 Industrial Avenue, Georgetown, TX
The City of Georgetown is committed to compliance with the Americans with Disabilities Act (ADA). If
you require assistance in participation at a public meeting due to a disability, as defined under the ADA,
reasonable assistance, adaptations, or accommodations will be provided upon request. Please contact the
City Secretary’s Office, at least three (3) days prior to the scheduled meeting date, at (512) 930-3652 or
City Hall at 808 Martin Luther King, Jr. Street, Georgetown, TX 78626 for additional information: TTY
users route through Relay Texas at 711.
Board Members Present: Ed Pastor – Chair, John Copelan – Vice Chair, Edward Wiley –
Secretary, Mike Cunningham, Steve Fought (Arrived at 2:01pm)
Board Members Absent: Arthur Yaeger
Staff Members Present: Daniel Bethapudi, Glenn Dishong, Wesley Wright, Leticia Zavala, Mike
Maldonado, James Foutz, Laurie Brewer, Sheila Mitchell, David Morgan (arrived at 2:01pm),
Chelsea Solomon (arrived at 2:03pm)
Others Present: Allan Woelke/CDM
Regular Session
(This Regular Session may, at any time, be recessed to convene an Executive Session for any purpose
authorized by the Open Meetings Act, Texas Government Code 551.)
A. Call to Order – Called to order by Chair at 2:00p.m.
The Board may, at any time, recess the Regular Session to convene an Executive Session at the
request of the Chair, a Board Member, the City Manager, Assistant City Manager, General Manager
of Utilities, City Council Member, or legal counsel for any purpose authorized by the Open Meetings
Act, Texas Government Code Chapter 551, and are subject to action in the Regular Session that
follows.
B. Introduction of Visitors
– Allan Woelke, CDM Smith
Employee Recognition –
-- None submitted at time of posting
C. November 2019 GUS CIP Project Updates and October Council Actions – Wesley Wright, P.E.,
Systems Engineering Director/Michael Hallmark, CIP Manager
Wright noted reports in packets, gave brief updates on each. No questions.
D. Electric Utility Update – Daniel Bethapudi, Electric General Manager
Bethapudi gave update on hot weather nearing end. They are working on the QSE Contract.
Cunningham asked and Bethapudi responded his primary objective is for the electric fund to be
balanced and to provide reliable service at competitive rates. Morgan stated we plan to sell debt this
spring. Morgan noted updates on board structure and Council directive ; continuing to work through
process. Possible update at next meeting.
E. Water Utility Update – Glenn W. Dishong, Water Utilities Director
Dishong spoke on new information/format regarding these updates. He touched on regulatory
updates: Lt. Governor issued a charge to the Senate to look at water topics, groundwater, etc.; broad
charge, no specific details as of yet. City held first Water Summit last month and had a nice turn out.
Pastor commended staff on Summit, Woelke on his presentation, great information was presented.
We plan to hold an Annual Summit. Dishong gave brief update on attending the Bell County Water
Symposium. New Braunfels Utilities broke ground on an Aquifer Storage and Recovery Program;
there are not a lot of examples of use in Texas. Cunningham stated been doing in El Paso for a long Page 46 of 105
time, with some discussion following. TCEQ approved permit renewal of Pecan Branch; there were
some concerns from people regarding our discharge. Have been working on resolving an inspection
issue at San Gabriel Plant. Water Financials will be presented at future meeting. Zavala commented
on customer growth and provided current customer counts; 77% come in on AMI system. Internal
reorganization now has Metering Services under Customer Care Department, effective October 1st.
Maldonado is Metering Services Manager. Transitioning Administrative support into Customer Care.
We are working on plans for building remodel which will change reception and utility cashier areas
at front of building and provide more secure areas for employees; to be approved by Council. Gave
update on UMAX Project. Billing accuracy is over 99% accurate; 1% to clean up from system designs.
Overall process is much better than when released a year ago. Copelan asked and Zavala responded
regarding his question if AquaAlert would be mandatory to customers. Western District meters are
being integrated over time. Dishong spoke about winter production levels, down fro m peak of
summer. Round Rock Interconnect not in use now due to low production. Stillhouse Lake
transferring water to Georgetown. Dishong gave some updates on staffing due to reorganization. We
issued 367 meters in October. Need to look at when plant capacity is being brought online; if
increases are still the norm? Dishong noted Electric staff housed at Westside Service Center will be
moving back to the GMC building and Water staff at GMC will be moving out to Wes tside, along
with himself. We will try the new arrangement and see how things work. Piloting new membranes
for Lake Water Treatment Plant, as parts are no longer available due to age. Copelan asked and
Dishong responded about goals for amount of water each resident can use; focusing on new lots to
meet goals not necessarily expecting current users to make all the changes. Morgan spoke on new
housing starts and growth as a response to Copelan’s concerns about water resources and
conservation. Cunningham commented and Morgan spoke on bond issues. Dishong asked for
feedback on information/format presented today and Board feels information is appropriate and
informative.
Legislative Regular Agenda.
The Board will individually consider and possibly take action on any or all of the following items:
F. Public Wishing to Address the Board
On a subject that is posted on this agenda: Please fill out a speaker registration form which can be found on the
table at the entrance to the Board Meeting. Clearly print your name and the letter of the item on which you wish
to speak and present it to the Staff Liaison, prior to the start of the meeting. You will be called forward to
speak when the Board considers that item. Only persons who have delivered the speaker form prior to the
meeting being called to order may speak.
On a subject not posted on the agenda: Persons may add an item to a future Regular scheduled Board agenda
by filing a written request with the Staff Liaison no later than one week prior to the Board meeting. The
request must include the speaker’s name and the specific top ic to be addressed with sufficient information to
inform the board and the public. Only those persons who have submitted a timely request will be allowed to
speak. For Board Liaison contact information, please logon to https://government.georgetown.org/georgetown-
utility-system-advisory-board-gus/.
- No persons signed up to address the board.
G. Review and possible action to approve the minutes from the Regular GUS Board meeting held on
October 11, 2019. – Sheila K. Mitchell, GUS Board Liaison
Minutes were considered for approval. No questions or revisions. Motion by Copelan, seconded by
Pastor to approve the minutes from the Regular GUS Board meeting held on October 11, 2019.
Approved 5-0-1 (Yaeger absent)
H. Consideration and possible recommendation to approve a Second Renewal with Wesco Distribution,
Inc. to provide Honeywell electric meters and related items for the Advanced Metering Infrastructure
system in an amount not to exceed $420,000. – Mike Maldonado, Metering Manager/Leticia Zavala,
Customer Care Director
Maldonado presented item stating our meters are purchased from Wesco. This was a 2017 contract
with (4) 1 year renewal options and he gave update on May council approval. Staff would like to
wave limit and accept new pricing. Cunningham asked where Wesco/Honeywell products are
manufactured and Dishong provided background history of Honeywell, Elster, etc. to update board. Page 47 of 105
Dishong commented on former lead time delays, etc. Cunningham asked and Zavala responded on
how costs/bills will be impacted for customers. Morgan spoke about future plans for handling high
demand times. Motion by Wiley, seconded by Cunningham to approve a Second Renewal with
Wesco Distribution, Inc. to provide Honeywell electric meters and related items for the Advanced
Metering Infrastructure system in an amount not to exceed $420,000. Approved 5-0-1 (Yaeger absent)
I. Consideration and possible recommendation to execute Task Order No . CDM-19-006-TO with CDM
Smith, Inc. and to execute an Inter-local Agreement between the City of Georgetown and the Brazos
River Authority for the sharing of costs of an Aquifer Storage and Recovery (ASR) Assessment
Project in the amount of $165,000.00. – Glenn W. Dishong, Water Utilities Director
Dishong presented item, noting there were two contracts presented for consideration. Task Order
CDM-19-006 carries out identifying a location suitable for ASR project. Gave additional details;
possible location eastern Williamson County. Cunningham feels it is coming so should get on boar d
with this process and prepare. Wiley asked and Dishong responded there is currently no control in
Williamson County; possibility for a groundwater conservation district. Some further discussion.
Motion by Wiley, seconded by Cunningham to execute Task Order No. CDM-19-006-TO with CDM
Smith, Inc. and to execute an Inter-local Agreement between the City of Georgetown and the Brazos
River Authority for the sharing of costs of an Aquifer Storage and Recovery (ASR) Assessment
Project in the amount of $165,000.00. Approved 5-0-1 (Yaeger absent)
J. Consideration and possible recommendation to approve Task Order CDM-20-001-TO with CDM
Smith, Inc., for American Water Infrastructure Act Risk and Resilience Evaluation in the amount of
$150,000.00. – Glenn W. Dishong, Water Utilities Director
Dishong explained the law now requires every utility of a certain size to take on a risk and resilience
evaluation to determine weaknesses and improvements for less risk. A Vulnerability assessment, for
malevolent acts, was done after 9-11; this evaluation will be much broader. Woelke provided
additional details noting requirements due to EPA by March 2020 and follow ups within 6 months.
Motion by Cunningham, seconded by Wiley to approve Task Order CDM-20-001-TO with CDM
Smith, Inc., for American Water Infrastructure Act Risk and Resilience Evaluation in the amount of
$150,000.00. Approved 5-0-1 (Yaeger absent)
Adjournment
Motion by Fought, seconded by Copelan to adjourn. Meeting adjourned at 2:54PM
__________________________ _____________________________
Ed Pastor – Chair Ed Wiley – Secretary
_________________________________
Sheila K. Mitchell, GUS Board Liaison
Page 48 of 105
Minutes of the Meeting of the
Georgetown Utility Systems Advisory Board and the
Governing Body of the City of Georgetown, Texas
December 13, 2019 at 2:00PM
at Georgetown Municipal Complex, 300-1 Industrial Avenue, Georgetown, TX
The City of Georgetown is committed to compliance with the Americans with Disabilities Act (ADA). If
you require assistance in participation at a public meeting due to a disability, as defined under the ADA,
reasonable assistance, adaptations, or accommodations will be provided upon request. Please contact the
City Secretary’s Office, at least three (3) days prior to the scheduled meeting date, at (512) 930-3652 or
City Hall at 808 Martin Luther King, Jr. Street, Georgetown, TX 78626 for additional information: TTY
users route through Relay Texas at 711.
No items were submitted for the December meeting, therefore, the
December 13, 2019 meeting was cancelled.
__________________________ _____________________________
Ed Pastor – Board Chair Edward Wiley – Secretary
_________________________________
Sheila K. Mitchell, GUS Board Liaison
Page 49 of 105
City of Georgetown, Texas
Utility System Advisory Board
January 10, 2020
S UB J E C T:
C onsideration and pos s ible rec ommendation to approve the c ontract with Environmental Improvements,
Inc. for purc hase and install of chemical s torage tank, in the amount of $54,200.65 – Mike Welch, P lant
O perations S uperintendent/G lenn W. Dis hong, Water Utilities Direc tor
IT E M S UMMARY:
T he purpos e of this purchas e is to provide a turnkey replac ement of a bulk bleach tank. S everal tank,
chemical, and engineering and c onstruc tion c ompanies were contac ted. O nly EI2 could provide the tank
and installation services within the maximum ac ceptable time frame.
Around the firs t of O ctober a leak was detec ted in one of two s odium hypochlorite (bleach) tanks at the
Lake Water Treatment P lant, whic h was taken out of s ervic e, greatly inc reas ing diffic ulty in maintaining
s upply and applic ation, and thereby decreasing the maximum water production for the plant. A full
replacement must be acc omplis hed before spring demand inc reas es .
S P E C IAL C O N S ID E R AT ION S :
T he tank has already been replac ed.
S TAF F R E C O MME N D AT IO N:
S taff recommends awarding Environmental Improvements, Inc . $51,446.00 for parts and s ervic es
rendered.
F IN AN C IAL IMPAC T:
F unds for this additional expenditure will impac t the Water S ervic es Budget.
F und Actual Budget
660-5-0529-52-165 P lant Upgrade $51,446.00 $350,000.00
S UB MIT T E D B Y:
Mike Welch, P lant O perations S uperintendent (s km)
AT TAC H ME N T S:
Description Type
New Bleach Tank - EI2 - 2019 Quote Backup Material
Page 50 of 105
Page 51 of 105
Page 52 of 105
City of Georgetown, Texas
Utility System Advisory Board
January 10, 2020
S UB J E C T:
C onsideration and possible recommend ation to ap p ro ve renewal #2 of contrac t 17-054-S C with Elk R idge
C onstruc tion, L L C (Water & Was tewater Treatment P lants ) in the amo unt of $53,139.90 - Mike Welc h,
P lant O perations S uperintendent/G lenn W. Dishong, Water Utilities Director
IT E M S UMMARY:
C ity C ounc il approved c ontracting mowing services with Elk R idge C onstruc tion, LLC , with a provis ion
for up to three (3) annual renewals . T he O riginal Agreement was renewed on O ctober 9, 2018 for a first
renewal period ending on S eptember 30, 2019. T he mowing services will inc lude 4 Water Treatment
F acilities , 5 Wastewater Treatment F ac ilities, and 4 Water Wells. C ontrac ted mowing is to oc cur on a
monthly basis and a list of thes e areas are attac hed.
Elk R idge has performed well for the c ity or two years and staff rec ommends continuing s ervic es with this
vendor.
S TAF F R E C O MME N D AT IO N:
S taff recommends approval of renewal #2 of contrac t 17-054-S C with Elk R idge C onstruc tion, LLC
(Water & Was tewater Treatment P lants ) in the amount of $53,139.90.
F IN AN C IAL IMPAC T:
F unds for this expenditure are budgeted in the Water/Was tewater landsc ape maintenanc e fund:
F und Actual Budget
660-5-0529-51-525
660-5-0531-51-509
Mowing C ontrac t
Maintenanc e-Landsc ape
$31,000.00
$22,000.00
$31,000.00
$22,000.00
S UB MIT T E D B Y:
Mike Welch, P lant O perations S uperintendent/G lenn W. Dishong, Water Utilities Director
AT TAC H ME N T S:
Description Type
Renewal #2 with Location List Backup Material
Page 53 of 105
{00011007 / v2 / RSAUCIER / PURCHASING / SERVICES / 11/4/2019}
Contract No. 17-054-SC-R2
Renewal No. 2
to the Agreement between
Elk Ridge Construction, LLC.
and the
City of Georgetown, Texas
This Renewal Agreement is entered into by and between CITY OF GEORGETOWN, a Texas
Home-Rule Municipal Corporation (the “City”), and ELK RIDGE CONSTRUCTION, LLC.
(the “Contractor”), collectively the “Parties”, as follows:
WHEREAS, the Parties entered into an Agreement on May 1, 2017 for Landscaping,
Grounds Maintenance and Right-of-Way Mowing Services for Water and Wastewater Treatment
Facilities (the “Services”), Contract No. 17-054-SC, (the “Original Agreement”),
WHEREAS, the Original Agreement provided an initial term of eighteen months (18)
months and provided for three (3) additional one (1) year renewal terms,
WHEREAS, the Original Agreement was amended on September 15, 2017 to include
additional locations to the Services,
WHEREAS, the Original Agreement was renewed on October 9, 2018 for a first renewal
period ending on September 30, 2019,
WHEREAS, the Parties wish to renew the Original Agreement for a Second Renewal
Term,
WHEREAS, the Parties hereby agree to renew the Original Agreement in accordance
with the terms of the Original Agreement as well as any terms provided herein,
NOW THEREFORE, in consideration of the mutual covenants contained herein, the
Parties agree as follows:
1. The Parties agree to renew the Original Agreement for an additional term, which will
begin immediately upon the expiration of the first renewal term and will end on
September 30, 2020, this being the Second Renewal Term.
2. During the Second Renewal Term, the not to exceed amount shall be fifty-three thousand
one hundred thirty-nine dollars and ninety cents ($53,139.90) as set forth in Exhibit A to
this Second Renewal.
3. This Second Renewal term binds and benefits the Parties and their successors or assigns.
This document, including and incorporating the Original Agreement as amended and the
First Renewal, is the entire agreement between the Parties.
4. All other terms and conditions of the Original Agreement remain in full force and effect.
5. This Second Renewal is effective on the date executed by the City.
Page 54 of 105
{00011007 / v2 / RSAUCIER / PURCHASING / SERVICES / 11/4/2019}
ELK RIDGE CONSTRUCTION, LLC.
CITY OF GEORGETOWN
By: ______________________________ By: ______________________________
Printed Name: _____________________ Printed Name: _____________________
Title: ____________________________ Title: _____________________________
Date: ____________________________ Date: _____________________________
ATTEST:
__________________________________
Robyn Densmore, City Secretary
APPROVED AS TO FORM:
__________________________________
James Kachelmeyer, Assistant City Attorney
Page 55 of 105
Attachement F - Water & Wastewater Treatment Facilities Schedule & Bid Form
Water Treatment Plants:
1. Park WTP
2. Lake WTP
3. Domel
4. Soutside WTP
Wastewater Treatment Plants:
1. San Gabriel WWTP
2. Dove Spring WWTP
3. Pecan Brand WWTP
4. Cimmaron Hills WWTP
5. Berry Creek WWTP
Wells - added 9/15/2017
6. Well 1
7. Well 2
8. Well 5
9. Well 9
Lawn Mowing 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 48.87 30,788.10$
Lawn Pest Control 1 1 1 1 1 1 1 1 1 9 -$ -$
Lawn Post-Emergent 1 1 1 1 1 1 1 1 1 9 -$ -$
Granular Fire Ant Preventative 1 1 1 1 1 1 1 1 1 9 10.00$ 9 810.00$
Walkaway and Curb Edging 1 1 2 2 2 2 2 2 2 2 2 1 21 50.00$ 9 9,450.00$
Tree Trimming 1 1 90.00$ 48.87 4,398.30$
Shrub Trimming 1 1 2 25.00$ 48.87 2,443.50$
Clean UP - Trash, Debris 1 1 2 2 2 2 2 2 2 2 2 1 21 10.00$ 9 1,890.00$
49,779.90$
Lawn Mowing 1 1 2 2 2 2 2 2 2 2 2 1 21 40.00$ 0.05$ 4 3,360.00$
3,360.00$
53,139.90$
Estimated
AcreageALL Water and Wastewater
Treatment Plants - 9 facilities
Jan Feb Mar Apr
Jan Feb Mar Apr
Annual CostMayJun# of LocationsJulAugSepOctNovDecFrequencyUnit Cost
Total Annual Cost
# of Locations Annual CostEstimated
Acreage
EXHIBIT A - RENEWAL NO. 2
Oct Nov Dec Frequency Unit CostMayJunJulAugSepWells - Added -2017
Page 56 of 105
City of Georgetown, Texas
Utility System Advisory Board
January 10, 2020
S UB J E C T:
C onsideration and possible rec ommend ation to approve amend ment #1 and renewal #2 of c o ntract 18-
0017-S C with Elk R id ge C ons tructio n, L L C (Water & Was tewater C ollec tion and Dis trib utio n S tations) in
the amount of $67,767.41 p er year - David T homison, Water S ervic es Manager/G lenn W. Dis hong, Water
Utilities Direc tor
IT E M S UMMARY:
O n April 25, 2017 C ity C ounc il approved c ontracting mowing services with Elk R idge C onstruc tion, LLC .
O n O ctober 10, 2017, C ounc il approve a one (1) year contrac t with a provis ion for up to three (3) annual
renewals . T his c ontract is for the s econd annual renewal of a four year contrac t agreement with Elk R idge
C onstruc tion, LLC . T he mowing services will inc lude 35 Was tewater C ollection s ystem fac ilities and 31
Water Distribution s ystem fac ilities. C ontrac ted mowing is to oc cur on a monthly basis and a list of thes e
areas are attached.
T his years renewal has inc reas ed $4,752.49 from las t year ’s services due to additional fac ilities added in the
s ystem.
Elk R idge has done an exc eptionally good job for the C ity this past c ontract year and S taff would like to
continue s ervic es with this vendor.
S TAF F R E C O MME N D AT IO N :
S taff recommend s approval of amendment #1 and renewal #2 of c ontrac t 18-0017-S C for the 2017
water/was tewater c o llectio n and d is tribution mowing contrac t with Elk R idge C ons tructio n, LLC in the
amount not to exceed $67,767.41.
F IN AN C IAL IMPAC T:
F unds for this expenditure are budgeted in the Water/Was tewater landsc ape maintenanc e fund:
F und Actual Budget
660-5-0528-51-509
660-5-0530-51-509
Maintenanc e-Landsc ape
Maintenanc e-Landsc ape
$65,000.00
$55,000.00
$65,000.00
$55,000.00
S UB MIT T E D B Y:
David T homis on / G lenn Dis hong
AT TAC H ME N T S:
Description Type
Renewal #2 with Location List Backup Material
Page 57 of 105
{00010993 / v3 / RSAUCIER / PURCHASING / SERVICES / 10/1/2019}
Contract No. 18-0017-SC-A1-R2 Page 1 of 2
Amendment No. 1 and Renewal No. 2
to the Agreement between
Elk Ridge Construction, LLC
and the
City of Georgetown, Texas
This is the First Amendment and Second Renewal (“Amendment and Renewal”) of the Agreement,
Contract No. 18-0017-SC, (the “Original Agreement”) between the City of Georgetown, Texas and Elk
Ridge Construction, LLC, collectively (the “Parties”), entered into on November 21, 2017,
WHEREAS, on November 21, 2017, the Parties entered into the Original Agreement for Mowing
Services for the Water and Wastewater Collection/Distribution Stations (the “Services”);
WHEREAS, the Original Agreement included three one-year renewal periods and the Parties renewed
the Original Agreement for a First Renewal Term on November 1, 2018;
WHEREAS, the Parties wish to renew the Original Agreement for a Second Renewal and establish the
prices for Services during the Second Renewal Term beginning November 21, 2019;
WHEREAS, the Parties wish to amend the Original Agreement to include additional locations, this
being the First Amendment;
NOW THEREFORE, in consideration for the mutual benefits to be derived by the Parties from this
Amendment and Renewal and other good and valuable consideration, the City of Georgetown, Texas
and Elk Ridge Construction, LLC agree as follows:
1. The Parties agree to renew the Original Agreement for a Second Renewal term which will begin
immediately upon the expiration of the current term and will end on November 20, 2020.
2. The Parties agree to amend the Original Agreement to include additional locaitons show in
Exhibit A, attached hereto.
3. During the Second Renewal Term, the prices shown in Exhibit A, attached hereto, shall apply
to the mowing services for the water and wastewater collection/distribution stations.
4. During the Second Renewal Term, the not to exeed amount shall be $67,767.41.
5. All other terms of the Original Agreement not inconsistent with this Amendment and Renewal
shall apply. Except as expressly modified by this Amendment and Renewal, the Original
Agreement remains unchanged and in full force and effect, subject to its terms.
6. This Amendment and Renewal is effective on the date executed by the City.
[Signature page to follow]
Page 58 of 105
{00010993 / v3 / RSAUCIER / PURCHASING / SERVICES / 10/1/2019}
Contract No. 18-0017-SC-A1-R2 Page 2 of 2
BY THE SIGNATURES affixed below, this Amendment and Renewal are hereby incorporated into
and made a part of the above-referenced Original Agreement.
ELK RIDGE CONSTRUCTION, LLC CITY OF GEORGETOWN
By: ______________________________ By: ______________________________
Printed Name: _____________________ Printed Name: _____________________
Title:____________________________ Title: _____________________________
Date:____________________________ Date: _____________________________
ATTEST:
__________________________________
Robyn Densmore, City Secretary
APPROVED AS TO FORM:
__________________________________
James Kachelmeyer, Assistant City Attorney
Page 59 of 105
LIFT STATIONS
ACM LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
877 Westinghouse Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.032 $ 630.00 630.00$ 1.05 31.35$ 658.42$
Airport Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
2038 Airport Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 46.00$ 0.54 $ 960.00 $ 966.00 1.05 48.08$ 1,009.58$
Berry Creek LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
7551 Airport Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.21 $ 630.00 $ 630.00 1.05 31.35$ 658.42$
Blue Hole LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
500 Blue Hole Park Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.014 $ 630.00 $ 630.00 1.05 31.35$ 658.42$
EXHIBIT A
Water and Wastewater Collection & Distribution Station
Contract 18-0017-SC Renewal 2 - Elk Ridge
11/21/19 - 11/20/20
CPI
CPI
CPI
CPI
Page 60 of 105
Brushy Creek Meter Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
3701 W SH 29 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 40.00$ 0.037 $ 840.00 $ 840.00 1.05 41.80$ 877.90$
Cimarron Hills LS #1 Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
102 Green Leaf Ln Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.049 $ 630.00 $ 630.00 1.05 31.35$ 376.24$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
Cimarron Hills LS #2 Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
801 W Cimarron Hills Trl Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 35.00$ 0.054 $ 735.00 $ 735.00 1.05 36.58$ 438.95$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
Cimarron Hills Raw Water
Meter 1 Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
8701 W SH 29 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.021 $ 630.00 $ 630.00 1.05 31.35$ 658.42$
Country Club LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
1312 Country Club Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.016 $ 630.00 $ 630.00 1.05 31.35$ 376.24$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
CPI
CPI
CPI
CPI
CPI
Page 61 of 105
Crystal Knoll LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
76 CR 152 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 46.00$ 0.14 $ 960.00 $ 966.00 1.05 48.08$ 1,009.58$
Daniels 1 Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
3280 CR 255 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 475.00$ 1.9 $ 9,975.00 $ 9,975.00 1.05 496.43$ 10,425.03$
Ft. Cobb Way Firebreak Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
356 Ft Cobb Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 12 50.00$ $ - $ 600.00 1.01 50.68$ 608.12$
Gatlin Creek Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
2109 Limestone Lake Dr.Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 45.00$ $ - $ 945.00 1.01 45.61$ 547.31$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
Gatlin Crossing LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
3822 Maple St Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 74.00$ 0.22 $ - 1,554.00$ 70.00$ 840.00$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12 70.00$
GT Meadows LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
3698 SH 130 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.064 $ 630.00 630.00$ 1.05 31.35$ 376.24$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
Highlands at Mayfield LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
3870 Arterial H Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 40.00$ 0.03 $ 840.00 $ 840.00 1.05 41.80$ 501.66$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12 45.00$
Indian Creek LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
CPI
CPI
CPI
CPI
CPI
CPI
CPI
Page 62 of 105
50111 Paleface Dr Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.00088 $ 630.00 $ 630.00 1.05 31.35$ 376.24$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
Intercetor LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
25 Waters Edge Cir Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.043 $ 630.00 $ 630.00 1.05 31.35$ 658.42$
Katy Crossing LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
261 Claris Ln Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.017 $ 630.00 $ 630.00 1.05 31.35$ 658.42$
Lakeside LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
4852 Williams Dr Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.036 $ 630.00 $ 630.00 1.05 31.35$ 376.24$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12 35.00$
Lakeside #2 Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
928 Cedar Lake Blvd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 45.00$ $ - $ 945.00 1.05 47.03$ 564.36$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12 60.00$
Mayfield Ranch LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
1577 Cr 176 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 45.00$ 0.13 $ 940.00 $ 945.00 1.05 47.03$ 564.36$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
Northlake PS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
6498 RM 2338 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 35.00$ 0.062 $ 735.00 $ 735.00 1.05 36.58$ 768.16$
CPI
CPI
CPI
CPI
CPI
CPI
CPI
Page 63 of 105
Oaks at San Gabriel Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
10621 Vista Heights Dr.Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.2 $ 630.00 $ 630.00 1.05 31.35$ 376.24$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12 40.00$
Parks LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
211 Chamber Way Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.017 $ 630.00 $ 630.00 1.05 31.35$ 658.42$
Park Reclaim Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
335 E Morrow St Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 35.00$ 0.36 $ 735.00 $ 735.00 1.05 36.58$ 768.16$
Pleasant Valley LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
2909 Sunrise Valley Ln Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 35.00$ 0.021 $ 730.00 $ 735.00 1.05 36.58$ 768.16$
Rabbit Hill EST Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
1021 Westinghouse Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 82.50$ 1.1 $ 1,732.50 $ 1,732.50 1.05 86.22$ 1,810.66$
Rabbit Hill PS GS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
980 Rabbit Hill Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 35.00$ 0.38 $ 735.00 $ 735.00 1.05 36.58$ 768.16$
Rail Road LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
710 W 15th St Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.008 $ 630.00 $ 630.00 1.05 31.35$ 376.24$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
River Rd LS #1 and #2 Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
145 River Road Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
CPI
CPI
CPI
CPI
CPI
CPI
CPI
CPI
Page 64 of 105
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 35.00$ 0.012 $ 735.00 $ 735.00 1.05 36.58$ 438.95$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
River Vista Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 35.00$ 420.00$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12 35.00$
Rosedale Lot Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
510 Rosedale Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 12 65.00$ -$ 65.00$ 780.00$
Saddle Creek Lift Station Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
3892 SH 130 Toll Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 65.00$ 0.45 $ 780.00 $ 1,365.00 1.05 67.93$ 1,426.58$
San Gabriel Way/Rivers
Edge Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
500 San Gabriel River Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 40.00$ $ - 40.00$ 480.00$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
Scenic LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
700 Scenic Dr.Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.0098 $ 630.00 $ 630.00 1.05 31.35$ 376.24$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
Serenada Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
1013 Shinnecock Hills Dr.Acreage Annual Cost Annual Cost
Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 40.00$ -$ $ 840.00 1.01 40.54$ 486.50$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
Smith Branch LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
2201 E University Ave Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
CPI
CPI
CPI
CPI
CPI
CPI
CPI
Page 65 of 105
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 65.00$ 0.23 $ 735.00 $ 1,365.00 1.05 67.93$ 1,426.58$
Southwestern LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
698 Smith Creek Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.17 $ 630.00 $ 630.00 1.05 31.35$ 658.42$
Stonehenge LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
50002 Paleface Dr Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.11 $ 630.00 $ 630.00 1.05 31.35$ 658.42$
Stonewall PSLS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
223 Drystone Trl Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 71.50$ 1.1 $ 1,501.50 $ 1,501.50 1.05 74.73$ 1,569.24$
Sun City EST Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
451 Sun City Blvd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 50.00$ 0.98 $ 1,050.00 $ 1,050.00 1.05 52.26$ 1,097.37$
Sun City LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
155 Stetson Trl Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 40.00$ 0.35 $ 840.00 $ 840.00 1.05 41.80$ 877.90$
Sunny Trail LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
20089 sunny Trail Dr Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 35.00$ 0.054 $ 735.00 $ 735.00 1.05 36.58$ 438.95$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
Terravista LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
2900 FM 1460 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.097 $ 630.00 $ 630.00 55.00$ 660.00$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12 55.00$
addtl
acreage
added
CPI
CPI
CPI
CPI
CPI
CPI
CPI
Page 66 of 105
Westinghouse LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
7503 S IH 35 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.044 $ 730.00 $ 630.00 1.05 31.35$ 658.42$
Westinghouse #2 Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
5401 N. Mays St.Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 55.00$ 0.044 $ 1,155.00 1.01 55.74$ 668.93$
R2 Revised Schedule 1 1 1 1 1 1 1 1 1 1 1 1 12
Wolf Ranch LS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
1610 S IH 35 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.0015 $ 630.00 $ 630.00 1.05 31.35$ 658.42$
LIFT STATION SUBTOTAL 38,994.00$ 46,170.00$ 43,293.75$
PUMP STATIONS & ELEVATED STORAGE TANKS (EST)
Andice PS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
6533 FM 970 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 60.00$ 0.0028 $ 1,260.00 $ 1,260.00 1.05 62.71$ 1,316.85$
Braun EST Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
9550 W SH 29 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 91.50$ 1.1 $ 1,501.50 $ 1,921.50 130.00$ 2,730.00$
R2 Revised Acreage/Cost 130.00$
addt'l
acreage
added
CPI
CPI
CPI
CPI
CPI
Page 67 of 105
Carriage Oaks EST Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
1751 CR 200 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 52.00$ 0.52 $ 1,092.00 $ 1,092.00 1.05 54.35$ 1,141.27$
Cedar Breaks EST Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
807 Cedar Breaks Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 92.15$ 0.57 $ - 1,935.15$ 1.01 93.40$ 1,961.33$
Central EST Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
202 W Central Dr Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 30.00$ 0.33 $ 630.00 $ 630.00 1.05 31.35$ 658.42$
Escalera EST Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
6400 RM 2243 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 35.00$ 0.38 $ 735.00 $ 735.00 1.05 36.58$ 768.16$
Hoover OS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
2675 CR 223 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 85.50$ 1.1 $ 1,732.50 $ 1,795.50 1.05 89.36$ 1,876.51$
Irving PS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
651 CR 143 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 50.00$ 1.9 $ 1,050.00 $ 1,050.00 1.05 52.26$ 1,097.37$
James St EST Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
1301 James St Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 35.00$ 0.28 $ 735.00 $ 735.00 1.05 36.58$ 768.16$
Jennings Branch EST Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
1015 Jennings Branch Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 125.00$ 1.5 $ 2,625.00 $ 2,625.00 1.05 130.64$ 2,743.43$
CPI
CPI
CPI
CPI
CPI
CPI
CPI
CPI
Page 68 of 105
Leander EST PS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
2012 Leander Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 60.00$ 0.91 $ 1,243.00 $ 1,260.00 1.05 62.71$ 1,316.85$
Pastor PS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
1716 W University Ave Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 40.00$ 0.77 $ 840.00 $ 840.00 1.05 41.80$ 877.90$
RR 1869 PS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
745 RM 1869 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 60.00$ 0.64 $ 1,260.00 $ 1,260.00 1.05 62.71$ 1,316.85$
Schneider Well Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
851 CR 142 Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 65.00$ 1 $ 1,365.00 $ 1,365.00 1.05 67.93$ 1,426.58$
Sequoia PS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
302 W. Sequoia Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 110.00$ 2 $ 2,310.00 $ 2,310.00 1.05 114.96$ 2,414.22$
Well 8 Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
4200 Airport Rd Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 47.85$ 0.25 $ 1,005.00 $ 1,004.85 1.05 50.01$ 1,050.19$
Woods PS Jan Feb Mar April May June July Aug Sept Oct Nov Dec Frequency Unit Cost Estimated Original Renewal 1 Renewal 2 Renewal 2
6605 S Lakewood Dr Acreage Annual Cost Annual Cost Revised
Unit Cost Annual Cost
Mowing Services 1 1 2 2 2 2 2 2 2 2 2 1 21 46.00$ 0.6 $ 960.00 $ 966.00 1.05 48.08$ 1,009.58$
PUMP STATION SUBTOTAL 20,344.00$ 22,785.00$ 24,473.66$
GRAND TOTAL: LIFT STATION + PUMP STATIONS 59,338.00$ 68,955.00$ 67,767.41$
CPI
CPI
CPI
CPI
CPI
CPI
CPI
Page 69 of 105
City of Georgetown, Texas
Utility System Advisory Board
January 10, 2020
S UB J E C T:
C onsideration and pos s ible rec ommendation to approve the purchas e of pump repairs from
W EI S I NG ER I NC . from C onroe Texas in an amount not to exceed $173,170.00, for F is cal Year -- David
W. T homison, Water S ervices Manager/Mike Welch, P lant O perations S uperintendent/G lenn W. Dishong,
Water Utilities Director
IT E M S UMMARY:
In O c tober o f this year the C ity Water Dep artment had c o nducted a full assessment on distrib utio n high
s ervic es pump s and treatment bac kwas h pump s alo ng with a failure o f o ne of the productio n wells . T he
following is a lis t of pump rebuilds needed before peak demand begins :
Treatment P lant Backwash P ump, P roduc tion Well #9, High S ervice P ump #2 and High S ervice P ump
#4. W EI S I NG ER I NC . submitted a quotation in ac cordance with BuyBoard c ontract #589-19.
S TAF F R E C O MME N D AT IO N:
S taff recommends the purc hase of pump repairs from W EI S I NG ER I NC . in an amount not to exc eed
$173,170.00.
F IN AN C IAL IMPAC T:
F unds for this additional expenditure are available in the Water S ervic es Budget.
F und Actual Budget
660-5-0530-51-544
660-5-0529-51-544
Maintenance - P umps $140,000.00
$40,000.00
$140,000.00
$40,000.00
S UB MIT T E D B Y:
David W. T homison, Water S ervices Manager (s km)
AT TAC H ME N T S:
Description Type
Georgetown TIR backwas h (002)Backup Material
Georgetown Walden Backwas h Pump 2502-2 Backup Material
Georgetown Ins pection Report_City of Well 9_2019-11-25 Backup Material
Georgetown Well 9_2019-12-10 Quote Backup Material
Georgtown TIR walden boos ter Backup Material
Georgetown Walden Booster Pump 2502-1 Backup Material
Georgetown TIR booster DB Wood Backup Material
Georgetown DB Wood Pump 1 2502-3 (003)Backup Material
Page 70 of 105
FORM NO RECEIVING REPORT
Date:
Job #:
PUMP RECEIVING REPORT
Customer:City of Georgetown 11/27/2019
1,180
PUMP #:Walden Park Plant Backwash 2502‐2
MOTOR DATA
Manufacturer:Serial #:Horsepower:75
Frame:Volts:RPM:
PUMP DATA
Manufacturer:Peabody‐Floway Serial #:87‐01243 Model:14 MAM 1
1Design Point:4,200 gpm @ 42 ft. TDH # of Stages:
Peabody Floway 14MAM‐1 RECEIVING_TIR_2502‐2.xlsx Page 71 of 105
Form # TIR_VTP_PRODUCT LUBE
Bowl shaft size (in):
Bowl bearing size:
Suction case bearing:
Wear rings:
Impeller type:
Impeller trim:
Collet type:
Intermediate bowls:
Discharge case:
Suction case:
Column adapter (bowl):
Suction coupling/adapter:
Intermediate bowl bolting:
Discharge case bolting:
Sand collar:
Bowl shaft coupling:
Stuffing box bearing:
Spider bearing:
Bearing inserts:
Discharge column adapter:
Discharge head type:Manufacturer:
Discharge head size:
17"
CLEAN & POLISH
CLEAN & POLISH
REPLACE
REPLACE
STAINLESS
CLEAN & POLISH
PEABODY‐FLOWAY
14 X 14 X 20
Pass Fail
A B C D E F CD MOTOR
12 1/8"
1 5/8" x 44 1/4"
.010 CLEARANCE
.011 CLEARANCE
NONE
OPEN
Pass
# of Stages:g.p.m. @
Serial #:
1 5/8"
Volts:
Model:
4,200 42
RPM:
XPass
TPL:
X
X
Manufacturer:
Design Point:
Column Size:
Customer:
Pump #
TYPE:
87‐01243
City of Georgetown
Walden Park Plant Backwash
Shaft (in.)
Frame:
14"
Peabody‐Floway
Job #:
Date:
ft. TDH
TIR VERTICAL TURBINE PUMP
PRODUCT LUBE
11/27/2019
2502‐2
MOTOR DATA
75Serial #:Horsepower:
X
1
144"
x
Fail
Fail
Fail
Fail
Fail
FailX
PUMP
INSTALLATION
DIMENSIONS
H
Fail
Fail
Fail
Fail
Fail
1,180
WELL PUMP DATA
14 MAM 1
I
144"120 1/2"23 1/2"39 1/2"
TPL=B+C
X
X
X
X
Fail
Fail
Fail
Fail
X
X
Fail
Fail
Fail
REPLACE
.010 CLEARANCE
REPLACE
Pass
Pass
17 1/2"
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Peabody Floway 14MAM‐1 RECEIVING_TIR_2502‐2.xlsx Page 72 of 105
Form # TIR_VTP_PRODUCT LUBE
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Suction strainer/type:Pass Fail
Length:Quantity: Pass Fail
Length:Quantity: Pass Fail
Pass Fail
Length:Quantity: Pass Fail
Size:Quantity: Pass Fail
Length:Quantity: Pass Fail
Head shaft nut & keyway:Pass Fail
Gear drive:Type:Pass Fail
Bore size:Pass Fail
PIPE PROJECTION WITH HANGAR FLANGE INSTALLED = 35"
PIPE PROJECTION WITHOUT HANGAR FLANGE = 35 1/2"
SAND COLLAR 6 3/4"
FIRST IMPELLOR 8 1/4"
X
X
X
X
X
X
X
5'
5'
1
1
60"/82 1/8"
45"
2
X
2502‐2
Line shaft: Size:
Line shaft couplings:
Motor Shaft Size:
Customer:City of Georgetown
Column pipe: Size:
Column pipe: Size:
Line shaft TPI:
Packing:INSTALL MECHANICAL SEAL
WORN
Model Number:
2
Adapter stud & nuts:
COMMENTS:
J
K
L
BOWL
DIMENSIONS
CORRODED
CORRODED
14"
14"
10
1 5/8"
1/ 5/8"
1 1/2"
Length:
Packing gland & screws:
Nuts for packing gland:
Spider Bearing:
Suction pipe:Y N
Lantern ring:
Stuffing box:
Mechanical Seal Manufacture:
Pump #Walden Park Plant Backwash Job #:
VERTICAL TURBINE PUMP INSPECTION REPORT PRODUCT
LUBE
Date:11/27/2019
Peabody Floway 14MAM‐1 RECEIVING_TIR_2502‐2.xlsx Page 73 of 105
Form # TIR_VTP_PRODUCT LUBE
INITIAL OBSERVATIONS:
REPLACE BOWL SHAFT
REPLACE LINE SHAFTS
REPLACE SHAFT COUPLINGS
REPLACE BOWL BEARINGS, SUCTION BEARING, AND STUFFING BOX BEARING REFURBISH STUFFING BOX
INSTALL NEW MECHANICAL SEAL PER DAVE LAVORA
BLAST AND COAT HEAD OD AND ID
BLAST AND COAT COLUMNS OD AND ID
REPLACE SPIDER BEARING
REPLACE ALL HARDWARE
VERTICAL TURBINE PUMP
INSPECTION REPORT
Customer:CITY OF GEORGETOWN Date:11/27/2019
Pump #WALDEN PARK BACKWASH Job #:2502‐2
Peabody Floway 14MAM‐1 RECEIVING_TIR_2502‐2.xlsx Page 74 of 105
Form # TIR_VTP_PRODUCT LUBE
Peabody Floway 14MAM‐1 RECEIVING_TIR_2502‐2.xlsx Page 75 of 105
TO: DATE: 16-Dec-2019
COMPANY: PROPOSAL SENT: Email
JOB REFERENCE:
Item No Qty Sell Price
1 1
1 $430.00
$610.00 1 $610.00
$610.00 1 $610.00
$110.40 1 $111.00
#######1 $1,600.00
#######1 $1,727.00
#######1 $1,350.00
#######1 $8,100.00
#######$3,304.00
1
#######$1,500.00
1
#######$3,600.00
1
#######1 $5,625.00
#######$10,875.00
$600.00
$34,132.00
#######
$725.00
Shipment: F.O.B. Jobsite
PROPOSAL
Walden Park Plant - Backwash
Replace Motor Drive Shaft 1 1/2"
Replace Line Shaft Couplings 1 5/8"
Replace Bowl Bearings
Replace Suction Bearings
Replace Discharge Bearings
Replace 14" Column Pipe and Spider with Rubber Insert Bearings
Rebuild Stuffing Box.
Remachine Face, Fits, and Replace Bearing.
Reuse existing head
Blast and Coat Head,Bowl Assembly and Column Pipe with PPG Amerlock 2/400.
Total with Option 1, New EV05 Cartridge Seal $37,225.00
Weisinger Incorporated
PO Box 2848 - Conroe, TX 77305
936-756-7721 - 281-353-8484 - 936-756-7723 fax
Peabody-Floway 14MAM1
Jeff De Leon
City of Georgetown
Water Services Supervisor
Call or email us if you require additional information regarding this proposal.
Replace Line Shaft 1 5/8" X 10'
Total:
Option 2
New 1.625” EV05 Cartridge Seal
Lead time: 3-4 Weeks, Excluding Holidays.
In lieu of rebuilding stuffing box:
Description
Peabody-Floway 14MAM-1
Repairs to 1-Stage Backwash Pumping Unit
Replace Pump Shaft 1 5/8" x 44 1/4
Mobilize to job site
Perform start up
Misc. Hardware
Pump Assembly
Per diem
Regulated by the Texas Dept. of Licensing Regulation: P.O. Box 12157 Austin, TX 78711 (800)803-9202 or (512)463-7880 TDLR: 1992 AI
Page 76 of 105
Projection:10"Lateral (in):
Discharge column adapter:Internal butt Pass X Fail
Design Point:g.p.m. @ ft. TDH # of Stages:
Column Size:10"Shaft (in.)1 1/4 w/ 7/16 sleeve Setting (ft):
Pass
Pass
Pass
Pass
Pass
Pass
Carbon steel
ID pitted and rusty
Bronze
Fail
Fail
Fail
Unknown
Fail
Pass
Pass
Pass
XPass
X
X
X
Customer:
Pump #
TYPE:
Fail
Fail
Fail
Fail
Fail
Fail
Fail
Fail
Fail
Fail
Fail
Fail
-
Pass
Pass
Pass
Model:
RPM:
PUMP DATA
12ENL
Spider bearing:
VERTICAL TURBINE PUMP INSPECTION
REPORT | PRODUCT LUBE
11/25/2019
MOTOR DATA
Serial #:Horsepower:
X
X
X
X
City of Georgetown
Water Well No. 9
Frame:
Job #:
Date:
Manufacturer:Flowserve Serial #:0907XGT74965
Discharge case bolting:
Sand collar:
Bowl shaft coupling:
Discharge case:
Pass
Closed bronze, pitted and rough
N/A
X
Pass
Pass
Pass
Pass
Bowl shaft size (in):
Bowl bearing size:
Suction case bearing:
Wear rings:
Impeller type:
Impeller trim:
Collet type:
Intermediate bowls:
Volts:
Manufacturer:CI
Suction case:
Column adapter (bowl):
Suction coupling/adapter:
Intermediate bowl bolting:
Bearing inserts:
Discharge head type:
Discharge head size:
top of imp. - 7 9/16, bottom of imp 9 11/16
10 x 16 1/2
2
140'
5/8
Fail
Fail
X
X
X
X
X
X
X
-
X
A B
C
DE
F
US 60
1650 100
Page 77 of 105
Customer:
Pump #
VERTICAL TURBINE PUMP INSPECTION
REPORT | PRODUCT LUBE
11/25/2019City of Georgetown
Water Well No. 9 Job #:
Date:
Top special shaft:
Dimensions:BA
-
0
0
0
0
0
Length:Pass Fail X60"
Stuffing box bearing:Pass Fail X
FailStuffing box:Packing:graphite Pass X
Length:
119 1/4
59 1/4
10'
5'
Quantity:
Quantity:
N/A
Pass
Pass
Pass
Pass
Pass
Pass
Pass
D
Fail
Fail
Fail
Fail
Fail
Fail
-
1 1/4
1 1/4
Length:
Length:
Length:
Length:
Quantity:
-
13
X
-
-
X
-
X
-
-
Pass
Pass
Pass
Pass
Fail
13
1
-
1
14
Fail
Fail
Column pipe:
Line shaft
Line shaft:
Suction pipe:n/a
Cone, threaded/ coated CS
Lantern ring:
Packing gland & screws:
Size:
Size:
Size:
10"
10"
Column pipe:
Type of mechanical seal:
Adapter stud & nuts:
Size:
Mechanical Seal:-
Nuts for packing gland:
Suction strainer/type:
Size:
PVC:
Pass Fail
Quantity:
13
1
13
1
Fail
Fail
Fail
PassLine shaft couplings:Quantity: Size:1 1/4
X
X
-Type:Gear drive:
Motor Shaft Size:Length:1 1/4 37 1/2 1
14
Head shaft nut & keyway:
Quantity:
Pass Fail
Pass Fail
Bore size:-Pass -Fail
HGFEC
Size:Yes 1"Pass Fail X
G
H
Page 78 of 105
Customer:
Pump #
VERTICAL TURBINE PUMP INSPECTION
REPORT | PRODUCT LUBE
11/25/2019City of Georgetown
Water Well No. 9 Job #:
Date:
INITIAL OBSERVATIONS:
Airline Poly, bad
Column 10" x 119 1/4, qty: 13
All bad pits in faces
Very rusty, thin faces
1 has hole
Shafts 1 1/4 with 1 7/16 stainless sleeve
All bad
Very rusty
Couplings carbon steel, very rusty
Pump Enamal coating is intact
All uncoated surfaces very pitted
Impellors very pitted and rough
Down hole probe
Head C.I is filthy, needs blast and paint
Page 79 of 105
Page 80 of 105
Page 81 of 105
Page 82 of 105
Page 83 of 105
Page 84 of 105
Page 85 of 105
Page 86 of 105
Page 87 of 105
PO Box 909 Willis, TX 77378
936-756-7721 281-353-8484 936-756-7723 fax
www.weisingerinc.com
Regulated by the Texas Dept. of Licensing & Regulation: P.O. Box 12157 Austin, TX 78711 (800)803-9202 or (512)463-7880 www.tdlr.texas.gov. TDLR: 1992 AI
December 10, 2019
Georgetown Utility Systems
300-1 Industrial Ave.
Georgetown, TX 78626
Attn: Jeffrey De Leon
jeffrey.deleon@georgetown.org
Ref: Water Well No. 9
Dear Jeffrey:
The existing Flowserve 12ENL/2 stage pump was found to contain heavy pitting in the cast iron surfaces
and the bronze impellers. All of the 10" column has rust pitting on their ID &OD surfaces and in their
sealing faces, one joint of column pipe has a hole in it about 1/2" in diameter. The 1 1/4" line shafts are
very rusty and the stainless-steel sleeves have over tolerance wear. All of the drop-in spiders contain
galling on their sealing faces and the rubber inset bearings are worn above acceptable tolerances. The
stuffing box bearing is worn above acceptable tolerances and it is missing the lantern ring. The existing
discharge head and downhole probe are both in fair condition and may be reused. The existing motor was
not brought in for inspection.
A TV Survey was performed on 12/03/19 after removing the pumping equipment from the well. The
static water level was 15’ and the total depth viewed was 164’. There were no structural issues noted
at this time. Based on the review of the TV Survey, we recommend jetting the fill from the bottom
of the well and re-surveying the well.
Scope of Services – Well Rehabilitation
- Haul work-pipe to the well site
- Service rig and crew to jet the fill/debris from the bottom of the well
- Perform a TV Survey of the well and present a report of findings
Estimated Subtotal for Well Rehabilitation Outlined ............................................... $18,880.00
Recommended Pumping Equipment and Services
1
140’
140’
1
1
1
145’
1
- New 1,650 GPM @ 100’ TDH open line shaft bowl assembly with 416 S.S. collets
- New 10” x 1 ¼” product lubricated column assemblies with 416 S.S. line shafts and a 10”
304 S.S. cone strainer
- New 1” PVC sounding tube
- Rebuild the existing stuffing box with a new bronze bearing and graphite packing
- Sandblast, prime and paint the existing discharge head and parts
- New 1 ¼” motor drive shaft, complete with head shaft nut, gib key, and lock bolt
- New ¼” PVC coated S.S. airline complete with water level detector kit
- Miscellaneous Items to Make Operational
- Shop Labor to load the New Equipment for Shipment
- Haul pumping equipment to the well site
- Service rig and crew to install pumping equipment in the well
- Startup and test the well
Page 88 of 105
December 10, 2019
Attn: Jeffrey De Leon
Re: Water Well No. 9
Page -2-
-Collect (1) bacteriological sample
Estimated Subtotal for Equipment and Services outlined ........................................ $51,866.00
Estimated Grand Total Outlined ................................................................................. $70,746.00
Thank you for the opportunity to offer you our services as we await your response.
Sincerely,
Charlie McCulloch
Weisinger Incorporated
BuyBoard Contract # 589-19
Page 89 of 105
FORM NO RECEIVING REPORT
Date:
Job #:
PUMP RECEIVING REPORT
Customer:City of Georgetown 11/27/2019
1,780
PUMP #:Walden Park Plant Booster 2 2502‐1
MOTOR DATA
Manufacturer: Serial #: Horsepower:200
Frame: Volts: RPM:
PUMP DATA
Manufacturer:Peabody‐Floway Serial #:87‐01239 Model:14 FKH 3
COMMENTS
3Design Point:2,500 gpm @ 216 ft. TDH # of Stages:
Peabody Floway 14FKH‐3 RECEIVING_TIR_2502‐1.xlsx Page 90 of 105
Form # TIR_VTP_PRODUCT LUBE
Bowl shaft size (in):
Bowl bearing size:
Suction case bearing:
Wear rings:
Impeller type:
Impeller trim:
Collet type:
Intermediate bowls:
Discharge case:
Suction case:
Column adapter (bowl):
Suction coupling/adapter:
Intermediate bowl bolting:
Discharge case bolting:
Sand collar:
Bowl shaft coupling:
Stuffing box bearing:
Spider bearing:
Bearing inserts:
Discharge column adapter:
Discharge head type: Manufacturer:
Discharge head size:
TPL=B+C
146" (Threaded Head)
PUMP
INSTALLATION
DIMENSIONS
Replace
Visually Fair Condition
Galded
Worn
Worn
Worn Rubber Insert
HI
146" 83.5" 64"25"12" 14" Bell
Visually Fair Condition
Visually Fair Condition
Replace
Pass
ABC D E FCD MOTOR
Visually Fair Condition
J
16 5/8"
1 15/16" x 74 3/4"
1.965"
1.952"
.028" Clearance
Closed Bronze
9.5" x 11.5"
SS Tapered
Peabody‐Floway
12"x12"x20"
Pass
Cast Iron
# of Stages:g.p.m. @
Serial #:
1 15/16" x 1 5/8" x 1 1/2"
Volts:
Model:
2,500 216
RPM:
XPass
TPL:
X
X
X
X
Pass
Pass
Manufacturer:
Design Point:
Column Size:
Customer:
Pump #
TYPE:
87‐01239
City of Georgetown
Walden Park Plant Booster 2
Shaft (in.)
Frame:
12"
Peabody‐Floway
Job #:
Date:
ft. TDH
TIR VERTICAL TURBINE PUMP
PRODUCT LUBE
11/27/2019
2502‐1
MOTOR DATA
200
1,780
WELL PUMP DATA
14 FKH 3
Serial #: Horsepower:
X
3
146"
X
X
X
Fail
Fail
Fail
Fail
Fail
Fail
X
Fail
Fail
Fail
Fail
Fail
Fail
Fail
Fail
X
X
X
X
X
X
Fail
Fail
Fail
Fail
Fail
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Peabody Floway 14FKH‐3 RECEIVING_TIR_2502‐1.xlsx Page 91 of 105
Form # TIR_VTP_PRODUCT LUBE
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Suction strainer/type: Pass Fail
Length: Quantity: Pass Fail
Length: Quantity: Pass Fail
Pass Fail
Length: Quantity: Pass Fail
Size: Quantity: Pass Fail
Length: Quantity: Pass Fail
Head shaft nut & keyway: Pass Fail
Gear drive: Type: Pass Fail
Bore size:Pass Fail
Pipe is heavily corroded. Needs replaced.
Shafting and bearings are worn. Need replaced.
Stickdown: 5 3/8"
Top Column Projection: 17"
Lateral 1"
Sand Collar 6 5/8"
X
X
X
X
X
Replace
X
X
X
24.5"
59.25"
1
1
88.375"
1.5"
50.75"
1
Model Number:
2
1
Line shaft: Size:
Line shaft couplings:
Motor Shaft Size:
12"
12"
10
1.625"
1.5"
1.5"
Customer:
VERTICAL TURBINE PUMP INSPECTION REPORT
PRODUCT LUBE
City of Georgetown Date:11/27/2019
None
Column pipe: Size:
Column pipe: Size:
Line shaft TPI:
Packing: Rebuild Stuffing Box
COMMENTS:
J
K
L
12"
64"
Water Lube
BOWL
DIMENSIONS
Lantern ring:
Packing gland & screws:
Nuts for packing gland:
Stuffing box:
Mechanical Seal Manufacture:
Adapter stud & nuts:
Spider Bearing:
Suction pipe:
Pump #Walden Park Plant Booster 2 Job #:2502‐1
Length:Y N X
X
Peabody Floway 14FKH‐3 RECEIVING_TIR_2502‐1.xlsx Page 92 of 105
Form # TIR_VTP_PRODUCT LUBE
Recommendations:
Replace Pump Shaft.
Replace Line Shaft.
Replace Motor Drive Shaft.
Replace Line Shaft Couplings.
Replace Bowl Bearings, Discharge Bearing, and Suction Bearing.
Replace Column Pipe and Spider with Rubber Insert Bearing.
Rebuild Stuffing Box. Remachine Face, Fits, and Replace Bearing.
Blast and Coat Head, Bowl Assembly and Pipe ID/OD.
Replace Hardware.
Offer Mechanical Seal.
VERTICAL TURBINE PUMP
INSPECTION REPORT
Customer:City of Georgetown Date:11/27/2019
Pump #Walden Park Plant Booster 2 Job #:2502‐1
Peabody Floway 14FKH‐3 RECEIVING_TIR_2502‐1.xlsx
Page 93 of 105
TO: DATE: 16-Dec-2019
COMPANY:
PROPOSAL SENT: Email
JOB REFERENCE:
Item No Qty Sell Price
1 Peabody-Floway 14FKH-3
1 $4,970.00
1 $1,350.00
1 $8,100.00
1 $5,554.00
1 $1,500.00
1 $3,600.00
1 $5,625.00
1 $10,875.00
$600.00
1 $36,264.00
Shipment:
THIS SYSTEM QUOTED USING INFORMATION SUPPLIED AT THE TIME OF PRICING Submitted by: Charlie McCulloch (713)248-7453.
Weisinger Job No. 2502-1
Total with Option 1, New EV05 Cartridge Seal $39,357.00
Installation included
Lead time: 3-4 Weeks - Excluding Holidays.
Option 1
New 1.625” EV05 Cartridge Seal
Mobilize to job site
Install and Perform start up
TOTAL:
In lieu of rebuilding stuffing box:
Per diem
Misc. Hardware
Pump Assembly
Weisinger Incorporated
PO Box 909 - Willis, TX 77378
936-756-7721 - 281-353-8484 - 936-756-7723 fax
Peabody-Floway 14FKH-3
Jeff De Leon
City of Georgetown
Water Services Supervisor
Call or email us if you require additional information regarding this proposal.
Description
Repairs to 3-Stage Pumping Unit
Re-use existing head provided by customer.
F.O.B. Jobsite
PROPOSAL
Walden Park Plant Booster 2
Replace Pump Shaft 1 15/16" x 74 3/4"
Replace Line Shaft 1 5/8"
Replace Motor Drive Shaft 1.5"
Replace Line Shaft Couplings 1.5"
Replace Bowl Bearings
Replace Suction Bearings
Replace Discharge Bearings
Replace 12" Column Pipe and Spider with Rubber Insert Bearings
Rebuild Stuffing Box.
Remachine Face, Fits, and Bearings.
Blast and Coat Head/Bowl Assembly and Column Pipe with PPG Amerlock 2/400.
Regulated by the Texas Dept. of Licensing Regulation: P.O. Box 12157 Austin, TX 78711 (800)803-9202 or (512)463-7880 TDLR: 1992 AI
Page 94 of 105
FORM NO RECEIVING REPORT
Date:
Job #:
PUMP RECEIVING REPORT
Customer:City of Georgetown 11/27/2019
1,765
PUMP #:DB Wood Booster Pump 4 2502‐3
MOTOR DATA
Manufacturer:Serial #:Horsepower:
Frame:Volts:RPM:
PUMP DATA
Manufacturer:Worthington Serial #:62811B Model:14HH276‐1
1Design Point:2,600 gpm @ 55 ft. TDH # of Stages:
Worthington 14HH276‐1 RECEIVING_TIR.xlsx 1Page 95 of 105
Form # TIR_VTP_PRODUCT LUBE
Bowl shaft size (in):
Bowl bearing size:
Suction case bearing:
Wear rings:
Impeller type:
Impeller trim:
Collet type:
Intermediate bowls:
Discharge case:
Suction case:
Column adapter (bowl):
Suction coupling/adapter:
Intermediate bowl bolting:
Discharge case bolting:
Sand collar:
Bowl shaft coupling:
Stuffing box bearing:
Spider bearing:
Bearing inserts:
Discharge column adapter:
Discharge head type: Manufacturer:
Discharge head size:
TPL=B+CPUMP
INSTALLATION
DIMENSIONS
CORRODED
CLEAN AND POLISH
WORN/CORRODED
1.750 CLEARANCE
RUBBER/WORN
HI
196 '162 1/4"33 3/4"32 1/2"13 7/8"28 1/4"
WORN EXCESSIVELY
BEARING WORN
A B C D E F CD MOTOR J
19 7/8"
1 1/2" to 1 1/4" x 45 3/4"
1 762 CLEARANCE
1. 755 CLEARANCE
.179 CLEARANCE
CLOSED
STAINLESS
Pass
Pass
# of Stages:g.p.m. @
Serial #:
1 1/2 to 1 1/4" x 45 3/4
Volts:
Model:
2,600 55
RPM:
Pass
TPL:
X
Pass
Pass
Manufacturer:
Design Point:
Column Size:
Customer:
Pump #
TYPE:
62811B
City of Georgetown
DB Wood Booster Pump 4
Shaft (in.)
Frame:
14"
Worthington
Job #:
Date:
ft. TDH
TIR VERTICAL TURBINE PUMP
PRODUCT LUBE
11/27/2019
2502‐3
MOTOR DATA
1,765
WELL PUMP DATA
14HH276‐1
Serial #:Horsepower:
X
1
196"
x
X
X
Fail
Fail
Fail
Fail
Fail
Fail
X
X
Fail
Fail
Fail
Fail
Fail
Fail
Fail
Fail
X
X
X
X
Fail
Fail
Fail
Fail
Fail
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Worthington 14HH276‐1 RECEIVING_TIR.xlsx 2Page 96 of 105
Form # TIR_VTP_PRODUCT LUBE
Pass Fail
Pass Fail
Pass Fail
Pass Fail X
Pass Fail
Pass Fail
Pass Fail
Pass Fail
Suction strainer/type: Pass Fail
Length: Quantity: Pass Fail
Length: Quantity: Pass Fail
Pass Fail
Length: Quantity: Pass Fail
Size: Quantity: Pass Fail
Length: Quantity: Pass Fail
Head shaft nut & keyway: Pass Fail
Gear drive: Type: Pass Fail
Bore size:Pass Fail
DISCHARGE BOWL BEARING FAILURE. TOP BEARING WAS THREADED ON AND SPUN OFF DISCHARGE END.
SHAFT WAS WOBBLINNG DURING OPERATION AND WORE SUCTION BELL BEARING DOWN TO ZERO.
X
X
X
X
X
X
X
X
119 1/2"
44 1/2"
1
1
10'
56"
1
Model Number:
X
Line shaft: Size:
Line shaft couplings:
Motor Shaft Size:
10"
10"
8
1 1/4"
1 1/4"
1 1/4"
Customer:
VERTICAL TURBINE PUMP INSPECTION REPORT
PRODUCT LUBE
City of Georgetown Date:11/27/2019
Column pipe: Size:
Column pipe: Size:
Line shaft TPI:
Packing:WORN
WORN
COMMENTS:
J
K
L
BOWL
DIMENSIONS
WORN/CORRODED
WORN/CORRODED
Lantern ring:
Packing gland & screws:
Nuts for packing gland:
Stuffing box:
Mechanical Seal Manufacture:
Adapter stud & nuts:
Spider Bearing:
Suction pipe:
Pump #DB Wood Booster Pump 4 Job #:2502‐3
Length:Y N
Worthington 14HH276‐1 RECEIVING_TIR.xlsx 3Page 97 of 105
Form # TIR_VTP_PRODUCT LUBE
INITIAL OBSERVATIONS:
REPLACE BOWL ASSEMBLY WITH NEW BOWL.
REPLACE LINE SHAFT X 2
REPLACE MOTOR SHAFT
BLAST AND COAT OD AND ID OFF COLUMNS AND HEAD
REWORK STUFFING BOX TO ACCOMMODATE A MECHANICAL SEAL
REPLACE RUBBER SPIDER
REPLACE SHAFT COUPLINGS
REPLACE WORN CORRODED HARDWARE
REPLACE DISCHARGE GASKET
INSTALL NEW MECHANICAL SEAL PER DAVE LAVORA
VERTICAL TURBINE PUMP
INSPECTION REPORT
Customer:City of Georgetown Date:11/27/2019
Pump #DB Wood Booster Pump 4 Job #:2502‐3
Worthington 14HH276‐1 RECEIVING_TIR.xlsx 4Page 98 of 105
Form # TIR_VTP_PRODUCT LUBE
Worthington 14HH276‐1 RECEIVING_TIR.xlsx 5Page 99 of 105
TO: DATE: 10-Dec-2019
COMPANY:
PROPOSAL SENT: Email
JOB REFERENCE:
JOB LOCATION:
Item No Qty Sell Price
1 Worthington 14HH276-1
1 $7,944.00
1 $336.00
1 $238.00
1 $3,940.00
1 $616.00
1 $50.00
3 $96.00
1 $60.00
1 $800.00
1 $3,600.00
1 $4,608.00
1 $900.00
$23,188.00
Payment Terms:
Shipment: F.O.B. Jobsite
PROPOSAL
DB Wood Booster
2600GPM at 55TDH
Replace line shaft 1 1/4" X 10'
Replace Motor Shaft 1 1/4"
Reuse Column Pipe and Head
Bast and Coat ID/OD of Column Pipe and Head with PPG Amerlock 2/400.
Re-machine Stuffing box
Replace Rubber Spider
Replace Shaft Couplings 1 1/4"
Replace Discharge Gasket
Misc. Hardware
Weisinger Incorporated
PO Box 909 - Willis, TX 77378
936-756-7721 - 281-353-8484 - 936-756-7723 fax
Worthington 14HH276-1
Net 30 days
City of Georgetown
Jeff De Leon
City of Georgetown
Water Services Supervisor
Call or email us if you require additional information regarding this proposal.
This proposal covers materials for the referenced project
Description
New F14MC 1-Stage
In lieu of rebuilding stuffing box:
Mobilize to jobsite
Install and perform start-up
Pump 4
Weisinger Job No. 2502-3
Total with Option 1, New EV05 Cartridge Seal $25,842.00
Installation included
Option 1
New 1.625” EV05 Cartridge Seal
Per diem
TOTAL:
Regulated by the Texas Dept. of Licensing Regulation: P.O. Box 12157 Austin, TX 78711 (800)803-9202 or (512)463-7880 TDLR: 1992 AI
Lead time: 3-4 Weeks - Excluding Holidays.
Page 100 of 105
City of Georgetown, Texas
Utility System Advisory Board
January 10, 2020
S UB J E C T:
C onsideration and pos s ible rec ommendation to approve a c ontract for the Lake Water Treatment P lant 980
High S ervice P ump S tation Improvements projec t with P rota C onstruc tion, Inc. & P rota Inc ., Joint
Venture, in the amount of $3,476,420.00 - Mic hael Hallmark, C I P Manager/Wesley Wright, P.E., S ystems
Engineering Director
IT E M S UMMARY:
T he purpos e of this projec t is to provide pumping C apac ity to the 980 P res s ure P lane. T his will help with
the filling of C edar Breaks (ES T ) Elevated S torage Tank. T he Lake W T P 980 High S ervic e P ump S tation
Improvements projec t was advertis ed for public bid on November 6 and November 13, 2019 in the
Williams on C ounty S un. T hrough our offic e, we provided plans and s pecific ations to seventeen interes ted
parties, including general contrac tors, subcontrac tors, suppliers and plan rooms.
O n Dec ember 10, 2019 at 2:00 p.m., bids were rec eived at the G eorgetown Municipal C omplex
P urc hasing Department, at 300-1 Industrial Avenue, G eorgetown, Texas 78626 for the c onstruc tion of the
Lake W T P 980 High S ervice P ump S tation Improvements . S ubmitted bids were then opened and publicly
read aloud. F ive bids were rec eived; the names of the bidders and total project base bid amounts are
s ummarized below:
1. P rota C ons truction, Inc . & P rota Inc., Joint Venture $3,476,420.00*
2. Archer Wes tern C ons truction, LLC $3,726,450.00
3. C unningham C onstruc tors & Assoc ., Inc . $3,788,800.00
4. Austin Engineering $4,120,000.00
5. Keys tone C ons truction $4,226,875.00
*Note: R efer to the attac hed bid tabulation reflecting the bid tab math calc ulation correc tions .
A bid tabulation of all the bid items is attac hed. T he low bidder on the project based on the base bid
amount is P rota C ons truction, Inc . & P rota Inc., Joint Venture (P rota). T he total project amount of
$3,476,420.00 s ubmitted by P rota the engineer’s es timate of $4 million.
S TAF F R E C O MME N D AT IO N S:
S taff and C DM S mith rec ommends exec uting this contrac t for the Lake W T P 980 High S ervice P ump
S tation Improvements projec t with P rota C onstruc tion, Inc. & P rota Inc ., Joint Venture in the amount of
$3,476,420.00
F IN AN C IAL IMPAC T:
F unds for this expenditure are budgeted in the Water C I P.
S UB MIT T E D B Y:
Wesley Wright, P.E., S ystems Engineering Direc tor/Mic hael Hallmark, C I P Manager
AT TAC H ME N T S:
Description Type
Bid Tabulation Backup Material
Letter of Recommendation Backup Material
Page 101 of 105
Page 102 of 105
CITY OF GEORGETOWN
LAKE WTP
980 HIGH SERVICE PUMP STATION IMPROVEMENTS
BID TABULATION
Attended Mandatory Pre-Bid Meeting
BASE BID AMOUNT (BASE BID ITEM Nos. 1 - 22)
Bid Item Item Description
Estimated
Quantity Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount Unit Price Amount
1
Furnish and install all necessary labor, materials, permits, tools, supplies
and equipment and incidentals necessary to complete in place the Lake
WTP 980 High Service Pump Station Improvements, as detailed and
specified; and not included in other base bid items.
1 $ 2,392,853.00 2,392,853.00$ $ 2,744,000.00 2,744,000.00$ $ 2,766,760.00 2,766,760.00$ $ 206,000.00 206,000.00$ $ 2,902,000.00 2,902,000.00$
2 Bonding, Insurance, and Mobilization/Demobilization Related Expenses
not to exceed Five (5) Percent of Total Bid.1 $ 20,882.00 20,882.00$ $ 60,000.00 60,000.00$ $ 25,000.00 25,000.00$ $ 2,710,750.00 2,710,750.00$ $ 200,000.00 200,000.00$
3
Storm Water Pollution Prevention Plan (SWPPP) and SWPPP
Implementation, including installing the stabilized construction
entrance, silt fence, and other required temporary sedimentation and
erosion control best management practices as required by the SWPPP
plan, complete in place as detailed and specified.
1 $ 23,202.00 23,202.00$ $ 10,000.00 10,000.00$ $ 10,000.00 10,000.00$ $ 12,000.00 12,000.00$ $ 10,000.00 10,000.00$
4 Site and Right-of-Way Preparation, complete in place as detailed and
specified.1 $ 2,443.00 2,443.00$ $ 1,000.00 1,000.00$ $ 20,000.00 20,000.00$ $ 50,000.00 50,000.00$ $ 9,000.00 9,000.00$
5 Traffic Control Plan and Implementation, complete in place as detailed
and specified.1 $ 9,770.00 9,770.00$ $ 5,000.00 5,000.00$ $ 20,000.00 20,000.00$ $ 6,500.00 6,500.00$ $ 4,000.00 4,000.00$
6 Excavation Safety Plan and Implementation complete in place as
detailed and specified.1 $ 1,588.00 1,588.00$ $ 1,000.00 1,000.00$ $ 2,000.00 2,000.00$ $ 10,000.00 10,000.00$ $ 10,000.00 10,000.00$
7 Trench Safety Plan and Implementation, as required for all pipe trenches
deeper than 5 feet, complete in place as detailed and specified.
1,100 $ 2.00 2,200.00$ $ 3.00 3,300.00$ $ 10.00 11,000.00$ $ 10.00 11,000.00$ $ 5.00 5,500.00$
8
Construction), including fittings, excavation, dewatering, bedding,
backfill, and trench surface restoration, complete in place as detailed
and specified.
1,100 $ 364.00 400,400.00$ $ 420.00 462,000.00$ $ 410.00 451,000.00$ $ 350.00 385,000.00$ $ 440.00 484,000.00$
9 Furnish and Install 30-inch Class 150 Restrained Joint DIP in casing,
complete in place as detailed and specified.145 $ 320.00 46,400.00$ $ 750.00 108,750.00$ $ 300.00 43,500.00$ $ 450.00 65,250.00$ $ 275.00 39,875.00$
10 Furnish and Install 48-inch Steel Casing Pipe (Boring and Jacking
Construction), completed in place as detailed and specified.145 $ 1,158.00 167,910.00$ $ 220.00 31,900.00$ $ 300.00 43,500.00$ $ 1,500.00 217,500.00$ $ 1,100.00 159,500.00$
11
Connect to existing 30-inch Water Pipe with tee, fittings, 30-inch
butterfly valve, and appurtenances, complete in place as detailed and
specified.
1 $ 25,888.00 25,888.00$ $ 18,000.00 18,000.00$ $ 33,000.00 33,000.00$ $ 35,000.00 35,000.00$ $ 43,000.00 43,000.00$
12
Assembly in manholes including excavation, piping, fittings, concrete
manhole, ring and cover, concrete apron, air piping extensions, pipe
supports, backfill and appurtenances, complete in place as detailed and
specified.
2 $ 9,586.00 19,172.00$ $ 6,500.00 13,000.00$ $ 34,000.00 68,000.00$ $ 10,000.00 20,000.00$ $ 10,000.00 20,000.00$
13
Furnish and Install Flow Meter in meter vault, including meter, vault,
electric service and equipment, fittings, valves, restraints, concrete,
excavation, bedding, backfill and appurtenances, complete in place as
detailed and specified.
1 $ 78,519.00 78,519.00$ $ 35,000.00 35,000.00$ $ 70,000.00 70,000.00$ $ 120,000.00 120,000.00$ $ 100,000.00 100,000.00$
14
Provide temporary water supply to Fire Department and Police Station
while the 30-inch supply water line is off-line to install the 30-inch tee
(referenced in Bid Item No. 11), complete in place as detailed and
specified.
1 $ 13,555.00 13,555.00$ $ 3,800.00 3,800.00$ $ 10,000.00 10,000.00$ $ 5,000.00 5,000.00$ $ 7,000.00 7,000.00$
15 Testing of 30-inch Water pipeline, complete in place as detailed and
specified.1 $ 6,472.00 6,472.00$ $ 2,000.00 2,000.00$ $ 2,000.00 2,000.00$ $ 8,500.00 8,500.00$ $ 4,000.00 4,000.00$
16
Disinfection of 30-inch Water pipeline and high service pump station
cans and associated pipelines, complete in place as detailed and
specified.
1 $ 5,496.00 5,496.00$ $ 1,000.00 1,000.00$ $ 3,000.00 3,000.00$ $ 3,000.00 3,000.00$ $ 6,000.00 6,000.00$
17
Furnish and Install Concrete Driveway including fill, subgrade prep, base
material (or equal), concrete pavement, and all appurtenances,
complete in place as detailed and specified.
280 $ 150.00 42,000.00$ $ 65.00 18,200.00$ $ 48.00 13,440.00$ $ 150.00 42,000.00$ $ 100.00 28,000.00$
18
Concrete Removal and Replacement, including saw cutting, subgrade
prep, base material (or equal), concrete pavement, and all
appurtenances, complete in place as detailed and specified.
140 $ 192.00 26,880.00$ $ 250.00 35,000.00$ $ 40.00 5,600.00$ $ 200.00 28,000.00$ $ 100.00 14,000.00$
19
Water Treatment Plant secure including materials, equipment, and
furnish permanent fencing and gate repairs, complete in place as
detailed and specified.
1 $ 10,258.00 10,258.00$ $ 5,000.00 5,000.00$ $ 10,000.00 10,000.00$ $ 8,500.00 8,500.00$ $ 5,000.00 5,000.00$
20 Provide Re-vegetation, complete in place as detailed and specified.1 $ 14,532.00 $ 14,532.00* $ 2,500.00 2,500.00$ $ 15,000.00 15,000.00$ $ 10,000.00 10,000.00$ $ 10,000.00 10,000.00$
21 Allowance to be used for additional site improvements, landscaping and
miscellaneous modifications.1 $ 150,000.00 150,000.00$ $ 150,000.00 150,000.00$ $ 150,000.00 150,000.00$ $ 150,000.00 150,000.00$ $ 150,000.00 150,000.00$
22 Allowance for electric utility work.1 $ 16,000.00 16,000.00$ $ 16,000.00 16,000.00$ $ 16,000.00 16,000.00$ $ 16,000.00 16,000.00$ $ 16,000.00 16,000.00$
-
* Corrected bid tab calculation.
$ 4,120,000.00 $ 4,226,875.00 $ 3,726,450.00
P P P PP
Acknowledged all Addenda
Provide Bid Security (5%)
Provide Information from 00400
Archer Western Keystone
$ 3,788,800.00
P
$ 3,476,420.00* Total Base Bid (Item Nos. 1-22)
P P P P P
December 10, 2019
Prota, Inc. CCA Austin EngineeringBidders
P
P P P
P P P P
P
Page 103 of 105
9430 Research Boulevard
Building I, Suite 200
Austin, Texas 78759
Tel: (512) 346-1100
Fax: (512) 345-1483
December 30, 2019
Mr. Michael Hallmark
City of Georgetown
300-1 Industrial Ave.
Georgetown, TX 78627
RE: Lake WTP 980 High Service Pump Station Improvements
Recommendation of Award
Dear Mr. Hallmark:
The Lake WTP 980 High Service Pump Station Improvements project was advertised for public bid on
November 6 and November 13, 2019 in the Williamson County Sun. Through our office, we provided
plans and specifications to seventeen interested parties, including general contractors,
subcontractors, suppliers and plan rooms.
On December 10, 2019 at 2:00 p.m., bids were received at the Georgetown Municipal Complex
Purchasing Department, at 300-1 Industrial Avenue, Georgetown, Texas 78626 for the construction of
the Lake WTP 980 High Service Pump Station Improvements. Submitted bids were then opened and
publicly read aloud. Five bids were received; the names of the bidders and total project base bid
amounts are summarized below:
1. Prota Construction, Inc. & Prota Inc., Joint Venture $3,476,420.00*
2. Archer Western Construction, LLC $3,726,450.00
3. Cunningham Constructors & Assoc., Inc. $3,788,800.00
4. Austin Engineering $4,120,000.00
5. Keystone Construction $4,226,875.00
*Note: Refer to the attached bid tabulation reflecting the bid tab math calculation corrections.
A bid tabulation of all the bid items is attached. The low bidder on the project based on the base bid
amount is Prota Construction, Inc. & Prota Inc., Joint Venture (Prota). The total project amount of
$3,476,420.00 submitted by Prota is below the engineer’s estimate of $4 million.
Each bid included a Statement of Bidder’s Experience (Section 00400). CDM Smith reached out to
their references, and the responses received were similar to our experience with Prota on past City of
Georgetown projects, such as the Cedar Breaks to Pastor waterline project. Prota provides quality
work; however, they often run behind the projected schedule. For this project (Lake WTP 980 High
Page 104 of 105
Mr. Michael Hallmark
December 30, 2019
Page 2
Service Pump Station Improvements), it is imperative that the proposed improvements are
implemented with high quality without negatively impacting the operation of the existing water
treatment plant. Based on our previous experience with Prota as well as feedback from City of
Georgetown personnel, we believe that Prota can successfully complete the Lake WTP 980 High
Service Pump Station Improvements project as designed and specified. However, given the critical
nature of this project, we recommend that the City contractually reserve the right to approve or deny
Prota’s designation of Project Manager and Project Superintendent to assure that the contractor is
committed to staffing the Lake WTP 980 Pump Station project with Prota’s most qualified personnel.
Assuming this provision is acceptable to the contractor, CDM Smith recommends awarding the project
to Prota in the amount of $3,476,420.00.
Sincerely,
Ana Karamalegos, P.E., BCEE
CDM Smith Inc.
TBPE Firm Registration No. F-3043
cc: Wesley Wright, P.E., City of Georgetown
Ken Taylor, City of Georgetown
Allen Woelke, P.E., CDM Smith
Danny Shannon, P.E., CDM Smith
Attachment Enclosed
Page 105 of 105