HomeMy WebLinkAboutAgenda_GVPID_10.14.2019Notice of Meeting for the
Georgetown Village P ublic I mprov ement District
of the City of Georgetown
October 14, 2019 at 6:00 P M
at West Side Serv ice Center, located at 5501 Williams Dr Georgetown, T X 78633
T he C ity of G eorgetown is committed to compliance with the Americans with Disabilities Act (ADA). If you
require as s is tance in partic ipating at a public meeting due to a disability, as defined under the ADA, reas onable
as s is tance, adaptations , or ac commodations will be provided upon request. P leas e c ontact the C ity S ec retary's
O ffic e, at leas t three (3) days prior to the sc heduled meeting date, at (512) 930-3652 or C ity Hall at 808 Martin
Luther King Jr. S treet, G eorgetown, T X 78626 for additional information; T T Y users route through R elay
Texas at 711.
Regular Session
(T his R egular S es s ion may, at any time, be rec es s ed to c onvene an Exec utive S es s ion for any purpose
authorized by the O pen Meetings Act, Texas G overnment C ode 551.)
A C all to O rder
B C hange in financ ial reporting and P resentation of the G eorgetown Village P ublic Improvement District
(G VP I D) monthly financ ial report for the month of S eptember 2019. - P aul Diaz
C Update and presentation from the Augus t S ub-C ommittee Meeting. (S eptember meeting was cancelled) --
Eric Nuner, Assistant P arks Direc tor
L egislativ e Regular Agenda
D P ublic Wishing to Address the Board
O n a subject that is posted on this agenda: P leas e fill out a s peaker registration form which c an be
found on the table at the entranc e to the Board Meeting. C learly print your name and the letter of the item
on whic h you wis h to s peak and pres ent it to the S taff Liais on, prior to the start of the meeting. You
will be called forward to s peak when the Board c onsiders that item. O nly persons who have delivered the
speaker form prior to the meeting being called to order may speak.
On a subject not posted on the agenda: P ers ons may add an item to a future R egular sc heduled Board
agenda by filing a written reques t with the S taff Liaison no later than one week prior to the Board
meeting. T he reques t must include the s peaker ’s name and the s pecific topic to be addressed with
sufficient information to inform the board and the public. Only those persons who have submitted a
timely request will be allowed to speak. F or Board Liais on contac t information, please logon to
https://governm ent.georgetow n.org/gvpid/
-At time of posting, no person/s had signed up to address T he B oard
E C ons ideration and possible action to approve the Updated Minutes for R egular June 2019 & July 2019
Meeting and the Minutes of the R egular Meeting for August 12, 2019, - Tina Davis, Board Liaison
F C ons ideration and possible action to approve the Corrected Minutes of the S ub-C ommittee for May
2019 & Minutes of the S ub C ommittee for June 2019 & August 2019- Tina Davis, Board Liaison
Page 1 of 49
Adjournment
Ce rtificate of Posting
I, R obyn Densmore, C ity S ecretary for the C ity of G eorgetown, Texas, do hereby c ertify that this Notic e of
Meeting was posted at C ity Hall, 808 Martin Luther King Jr. S treet, G eorgetown, T X 78626, a plac e readily
acc es s ible to the general public as required by law, on the _____ day of _________________, 2019, at
__________, and remained s o posted for at leas t 72 c ontinuous hours prec eding the s cheduled time of said
meeting.
__________________________________
R obyn Dens more, C ity S ec retary
Page 2 of 49
City of Georgetown, Texas
Georgetown Village Improvement District
October 14, 2019
S UB J E C T:
C hange in financial reporting and P res entation of the G eorgetown Village P ublic Improvement Dis tric t
(G VP I D) monthly financial report for the month of S eptember 2019. - P aul Diaz
IT E M S UMMARY:
C hange in financial reporting and pres entation of the financ ial report for the month S eptember, 2019
F IN AN C IAL IMPAC T:
.
S UB MIT T E D B Y:
P aul Diaz, Budget Manager
AT TAC H ME N T S:
Description Type
GVPID Aug Financial Backup Material
GVPID Sept Monthly Fund Schedule Expens e Backup Material
GVPID Sept Monthly Fund Schedule Revenue Backup Material
GVPID Sept Monthly Fund Schedule Backup Material
Page 3 of 49
18/19 Budget YTD Activity Variance
Revenues:
Ad Valorem Taxes 426,392$ 427,009$ 617$
Interest Earned 4,000 16,548 12,548
Total Revenues 430,392 443,558 13,166
Expenditures:
Administrative Fee- General Fund 38,210 28,738 9,472
Office Supplies 300 275 25
Brochures, Advertising 142 142 0
Insurance 500 - 500
Contracts & Leases, Primary 90,160 87,611 2,549
Contracts & Leases, Secondary 15,000 - 15,000
Special Services 4,858 2,550 2,308
Utilities/Irrigation 41,000 34,844 6,156
Maintenance, Sidewalks 30,000 29,897 103
Maintenance, Irrigation 6,000 2,950 3,050
Maintenance, Ponds 6,300 6,300
Maintenance, Repairs 10,000 10,000
Maintenance, Alleys 500 500
Maintenance, Street Trees 50,000 50,000
Administrative Fee - Joint Service 15,924 11,943 3,981
Total Expenditures 308,894 198,951 109,943
Capital:
Park Improvements - Madrone Park 160,000 103,250 56,750
Park Improvements - Shell Rd 195,227 - 195,227
Park Improvements - Parklets 279,794 - 279,794
Park Improvements - Rowan Park 143,141 - 143,141
Total Expenditures 778,162 103,250 674,912
Current Year Variance (656,664) 141,357 798,021
Beginning Fund Balance 763,359 797,650 [A]34,291
Current Funds Available 106,695$ 939,007$ 832,312$
Contingency
Reserve 106,000 106,000 -
Current Funds Available 695$ 833,007$ 832,312$
Notes:
•The majority of property tax collections occur in January.
•YTD activity includes encumbrances.
•Year End YTD activity becomes audited activity each following January.
•Fiscal year is from October 1 to September 30.
•Unaudited financial statements prepared by the City of Georgetown, as of 9/03/19
[A]Unaudited beginning fund balance.
Financial Statement
Village PID
August 31, 2019
Page 4 of 49
9-04-2019 12:40 PM C I T Y O F G E O R G E T O W N PAGE: 1
FINANCIAL STATEMENT (UNAUDITED)
AS OF: AUGUST 31ST, 2019
234-VILLAGE PID
ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET
REVENUES BUDGET PERIOD ACTUAL BUDGET ENCUMB.BALANCE
_____________________________________________________________________________________________________________________________
REVENUE
=======
PRIMARY REVENUE
4-0001-40-100 AD VALOREM TAX 426,392.00 0.00 427,009.47 100.14 0.00 ( 617.47)
TOTAL PRIMARY REVENUE 426,392.00 0.00 427,009.47 100.14 0.00 ( 617.47)
INTEREST
4-0001-42-100 ALLOCATED INTEREST 4,000.00 0.00 16,185.50 404.64 0.00 ( 12,185.50)
4-0001-42-152 GISD TAX (PID) INTEREST 0.00 0.00 362.91 0.00 0.00 ( 362.91)
TOTAL INTEREST 4,000.00 0.00 16,548.41 413.71 0.00 ( 12,548.41)
DEVELOPMENT FEE _____________ _____________ _____________ ______ ______________ _______________
____________________________________________________________________________________
TOTAL REVENUE 430,392.00 0.00 443,557.88 103.06 0.00 ( 13,165.88)
VILLAGE PID
===========
OTHER _____________ _____________ _____________ ______ ______________ _______________
____________________________________________________________________________________
_____________________________________________________________________________________________________________________________
*** TOTAL REVENUES ***430,392.00 0.00 443,557.88 103.06 0.00 ( 13,165.88)
============= ============= ============= ====== ============== ===============
Page 5 of 49
9-04-2019 12:40 PM C I T Y O F G E O R G E T O W N PAGE: 2
FINANCIAL STATEMENT (UNAUDITED)
AS OF: AUGUST 31ST, 2019
234-VILLAGE PID
REVENUE
ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET
EXPENSES BUDGET PERIOD ACTUAL BUDGET ENCUMB. BALANCE
_____________________________________________________________________________________________________________________________
_____________________________________________________________________________________________________________________________
Page 6 of 49
9-04-2019 12:40 PM C I T Y O F G E O R G E T O W N PAGE: 3
FINANCIAL STATEMENT (UNAUDITED)
AS OF: AUGUST 31ST, 2019
234-VILLAGE PID
COMMUNITY SERVICES
ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET
EXPENSES BUDGET PERIOD ACTUAL BUDGET ENCUMB. BALANCE
_____________________________________________________________________________________________________________________________
VILLAGE PID
===========
OPERATIONS
5-0211-51-110 GENERAL FUND ALLOCATION 38,210.00 0.00 28,738.44 75.21 0.00 9,471.56
5-0211-51-111 OFFICE SUPPLIES 300.00 0.00 199.98 91.66 75.00 25.02
5-0211-51-130 BROCHURES, ADVERTISING 142.00 0.00 141.90 99.93 0.00 0.10
5-0211-51-200 INSURANCE 500.00 0.00 0.00 0.00 0.00 500.00
5-0211-51-310 CONTRACT & LEASES, PRIMARY 90,160.00 7,273.75 73,063.54 97.17 14,547.54 2,548.92
5-0211-51-311 CONTRACT & LEASES, SECONDA 15,000.00 0.00 0.00 0.00 0.00 15,000.00
5-0211-51-330 SPECIAL SERVICES 4,858.00 0.00 1,912.50 52.49 637.50 2,308.00
5-0211-51-430 UTILITIES 41,000.00 3,873.53 34,844.14 84.99 0.00 6,155.86
5-0211-51-501 MAINT, SIDEWALKS 30,000.00 0.00 39,794.09 99.66 ( 9,897.20) 103.11
5-0211-51-502 MAINT, IRRIGATION 6,000.00 545.00 1,738.75 49.17 1,211.50 3,049.75
5-0211-51-503 MAINT , PONDS 6,300.00 0.00 0.00 0.00 0.00 6,300.00
5-0211-51-504 MAINT, REPAIRS 10,000.00 0.00 0.00 0.00 0.00 10,000.00
5-0211-51-506 MAINT, ALLEYS 500.00 0.00 0.00 0.00 0.00 500.00
5-0211-51-507 MAINT, STREET TREES 50,000.00 0.00 0.00 0.00 0.00 50,000.00
5-0211-51-950 JOINT SERVICES ALLOCATION 15,924.00 0.00 11,943.00 75.00 0.00 3,981.00
TOTAL OPERATIONS 308,894.00 11,692.28 192,376.34 64.41 6,574.34 109,943.32
CAPITAL
5-0211-52-820 PARK IMPROVEMENTS- MADRONE 160,000.00 23,280.00 41,330.00 64.53 61,920.00 56,750.00
5-0211-52-821 PARK IMPROVEMENTS PARKLETS 279,794.00 0.00 0.00 0.00 0.00 279,794.00
5-0211-52-822 PARK IMPROVEMENTS-ROWAN PA 143,141.00 0.00 0.00 0.00 0.00 143,141.00
5-0211-52-823 IMPROVEMENT - SHELL RD 195,227.00 0.00 0.00 0.00 0.00 195,227.00
TOTAL CAPITAL 778,162.00 23,280.00 41,330.00 13.27 61,920.00 674,912.00
____________________________________________________________________________________
TOTAL VILLAGE PID 1,087,056.00 34,972.28 233,706.34 27.80 68,494.34 784,855.32
_____________________________________________________________________________________________________________________________
TOTAL COMMUNITY SERVICES 1,087,056.00 34,972.28 233,706.34 27.80 68,494.34 784,855.32
_____________________________________________________________________________________________________________________________
*** TOTAL EXPENSES *** 1,087,056.00 34,972.28 233,706.34 27.80 68,494.34 784,855.32
============= ============= ============= ====== ============== ===============
*** REVENUES OVER/(UNDER) EXPENSES( 656,664.00)( 34,972.28 209,851.54 21.53-( 68,494.34)( 798,021.20)
*** END OF REPORT ***
Page 7 of 49
Expenses Detail
Row Labels FY2019 Budget FY2019 YTD % of Budget FY2019 Projected
234-5-0211-51-110 GENERAL FUND ALLOCATION 38,210 38,291 100.21%38,210
234-5-0211-51-111 OFFICE SUPPLIES 300 279 93.12%300
234-5-0211-51-130 BROCHURES, ADVERTISING 142 142 99.93%-
234-5-0211-51-200 INSURANCE 500 - 0.00%500
234-5-0211-51-310 CONTRACT & LEASES, PRIMARY LAN 90,160 87,611 97.17%90,160
234-5-0211-51-311 CONTRACT & LEASES, SECONDARY L 15,000 - 0.00%15,000
234-5-0211-51-330 SPECIAL SERVICES 4,858 2,550 52.49%2,550
234-5-0211-51-430 UTILITIES 41,000 41,201 100.49%41,000
234-5-0211-51-501 MAINT, SIDEWALKS 30,000 29,897 99.66%30,000
234-5-0211-51-502 MAINT, IRRIGATION 6,000 3,152 52.54%6,000
234-5-0211-51-503 MAINT , PONDS 6,300 - 0.00%6,300
234-5-0211-51-504 MAINT, REPAIRS 10,000 - 0.00%10,000
234-5-0211-51-506 MAINT, ALLEYS 500 - 0.00%500
234-5-0211-51-507 MAINT, STREET TREES 50,000 3,120 6.24%50,000
234-5-0211-51-950 JOINT SERVICES ALLOCATION 15,924 15,924 100.00%15,924
234-5-0211-52-820 PARK IMPROVEMENTS- MADRONE PAR 355,227 103,250 29.07%355,227
234-5-0211-52-821 PARK IMPROVEMENTS PARKLETS 279,794 - 0.00%279,794
234-5-0211-52-822 PARK IMPROVEMENTS-ROWAN PARK 143,141 - 0.00%143,141
Grand Total 1,087,056 325,418 29.94%1,084,606
Page 8 of 49
Revenue Detail
Row Labels FY2019 Budget FY2019 YTD % Of Budget FY2019 Projected
234-4-0001-40-100 AD VALOREM TAX 426,392 427,709 100.3%426,392
234-4-0001-42-100 ALLOCATED INTEREST 4,000 18,469 461.7%12,000
234-4-0001-42-152 GISD TAX (PID) INTEREST - 496 0.0%200
Grand Total 430,392 446,673 103.8%438,592
Page 9 of 49
Fund Schedule
FY2019
Budget
FY2019 Year
to Date
FY2019
Projected
Beginning Fund Balance 797,650 797,650 100%797,650
Revenues
FY2019
Budget
FY2019 Year
to Date % Of Budget
FY2019
Projected
Tax Revenue 426,392 427,709 100.31%426,392
Interest 4,000 18,964 474.11%12,200
Grand Total 430,392 446,673 103.78%438,592
Expenses
FY2019
Budget
FY2019 Year
to Date % of Budget
FY2019
Projected
Capital 778,162 103,250 13.27%778,162
Contract & Leases 105,160 87,611 83.31%105,160
Maintenance 102,800 36,169 35.18%102,800
Administrative Charges 54,134 54,215 100.15%54,134
Operations 46,800 44,173 94.39%44,350
Grand Total 1,087,056 325,418 29.94%1,084,606
FY2019
Budget
FY2019 Year
to Date FY2019 YTD2
FY2019
Projected
Ending Fund Balance 140,986 918,905 918,905 151,636
CAFR Adjustment - - - -
Contingency Reserve 106,000 106,000 106,000 106,000
Shell Landscape - - - -
Available Fund Balance 34,986 812,905 812,905 45,636
Page 10 of 49
City of Georgetown, Texas
Georgetown Village Improvement District
October 14, 2019
S UB J E C T:
Update and pres entation from the August S ub-C ommittee Meeting. (S eptember meeting was c anc elled) --
Eric Nuner, As s is tant P arks Director
IT E M S UMMARY:
C ity staff and C ovey Landsc ape Architec ts will provide an update on the progress of design process for
the proposed G VP I D c apital improvement projects .
F IN AN C IAL IMPAC T:
.
S UB MIT T E D B Y:
Eric Nuner - Assistant P arks & R ec Direc tor
AT TAC H ME N T S:
Description Type
GVPID October Board Meeting Backup Material
GVPID-OPCC Backup Material
Page 11 of 49
Georgetown Village PID | Key Map Page 1 of 9
Large Parks
Shell Road &
Enchanced Entries
Parklets
City Parks-
Rowan
Madrone (Alternate)
Adkins Park
Greenside
Green Grove
Hanover
Fairfield
Westbury
Shell
Chestnut
Village Glen
Spring Court
Cedar Elm
1
1
2
3
4
4
5
6
7
8
9
10
11
2
Sh
e
l
l
R
o
a
d
1
2
3
6
5
7
9
8
11
10
1
2
ROWAN
CHESTNUT
CEDAR ELMVILLAGE GLEN
SPRING COURT
WESTBURY
SHELL
HANOVER
GREENSIDE
ADKINS
FAIRFIELD
GREEN
GROVE
MADRIDMADRONE
Page 12 of 49
Georgetown Village PID | Materials | Concepts Board Page 2 of 9
Page 13 of 49
Georgetown Village PID | Adkins & Greenside Parklets Page 3 of 9
0 1020 40
SHADE TR
E
E
SHADE TR
E
E
SHADE TR
E
E
EXISTING
T
U
R
F
BOULDER
BOULDERRIVER ROC
K
DG
ORNAMEN
T
A
L
T
R
E
E
PERSPECTIVE
ORNAMEN
T
A
L
T
R
E
E
RELOCATE MUTT MITT & TRASH CAN
MOVE MUTT MITT
MOVE TRASH CAN
EXISTING BENCH
PLANTING
SIGNAGE
EXISTING MULCH
EXISTING WHITE
FENCE
EXISTING
TURF
CONTINUE
SIDEWALK
REMOVE BENCH TO RELOCATE
Page 14 of 49
Georgetown Village PID | Fairfield Parklet Page 4 of 9
0 1020 40
MUTT MITT
TRASH CAN
PARKLET SIGN
SIGN NODES OFFER
OPPORTUNITY FOR
NATURAL SEATING/
LANDSCAPE BOULDERS
MOVE MUTT MITT BEHIND
& AWAY FROM PERIMETER
LOCATE SIGN IN DG
AREAS TO HELP
IDENTIFICATION
-MINIMAL PLANTING
CRUSHED GRANITE
PATHWAY
DG PATH
MAIL BOX
EXISTING SHADE TREES
MAKE TABLE ACCESSIBLE
EXPAND SEATING
NODE
PERSPECTIVE
Page 15 of 49
Georgetown Village PID | Westbury - Shell Parklet Page 5 of 9
0 1020 40
SCREEN
O
F
ORNAME
N
T
A
L
TREES
MULCH U
N
D
E
R
TREES
MULCH U
N
D
E
R
TREES
PARK SIG
N
PARK SIG
N
DG
BOULDER
S
MULCH
TRASH CA
N
MUTT MIT
T
DG TRAIL
DG
RELOCAT
E
EXISTING
B
E
N
C
H
RELOCAT
E
E
X
I
S
T
I
N
G
BENCH
STEEL ED
G
I
N
G
DG TRAIL
&
SEATING
A
R
E
A
S
PERSPECTIVE
Page 16 of 49
Georgetown Village PID | Chestnut Parklet Page 6 of 9
0 1020 40
HIDE UTILITIES
DG SEATING AREA
NEW PARK SIGN
STONE RETAINING
WALL
RELOCATE MUTT MITT
RELOCATE BENCHES & TABLES
QUARRY BLOCK SEATING
MULCH AREA
STEEL EDGING
RELOCATE TRASH CAN
MAILBOX
PERSPECTIVE
Page 17 of 49
Georgetown Village PID | Spring Court Parklet Page 7 of 9
0 1020 40
EXISTING
TURFMULCH
MULCH W/
QUARRY BLOCK
SEATING
NEW SIGN
STONE WALL
DG PERSPECTIVE
Page 18 of 49
Georgetown Village PID | Rowan Parklet Page 8 of 9
0 1020 40
BENCH & TRASH CAN
BERM W/ ORNAMENTAL
TREES
IRRIGATED
PLAY LAWN
IRRIGATED
LAWN
SHADED SEATING
PICNIC AREA
EXISITNG
PLAYGROUND
BERM
4 FOOT SIDEWALK
Page 19 of 49
Georgetown Village PID | Madrone Parklet Page 9 of 9
0 1020 40
EXISTING METAL FENCE
EXISTING
SIGN
EXTEND PICNIC
AREA
TURF BERM
EXISTING ENTRY COLUMNS
PROPOSED TURF BERM
PROPOSED SHADE TREE
PROPOSED SHADE TREES
PROPOSED SHADE TREE
NEW TURF LAWN
PROPOSED TURF
ENHANCED SEATING WALLS
W/ ACCESSIBLE PAVING
PROPOSED IRRIGATED TURF
TODDLER PLAYGOUND
EXISTING NATIVE GRASS
Page 20 of 49
1 4228 LF $ 6.00 # $ 25,368.00
2 11 CY $ 250.00 $ 2,642.50
3 865 SF $ 6.00 $ 5,190.00
4 13 each $ 3,000.00 $ 39,000.00
5 14 each $ 400.00 $ 5,600.00
6 18 each $ 800.00 $ 14,400.00
7 14 each $ 600.00 $ 8,400.00
8 592 FF $ 40.00 $ 23,680.00
9 5 SF $ 125.00 $ 625.00
10 2 each $ 1,400.00 $ 2,800.00
11 6 each $ 500.00 $ 3,000.00
12 146 CY $ 60.00 $ 8,740.20
13 6 each $ 500.00 $ 3,000.00
14 219 CY $ 120.00 $ 26,227.20
15 19 each $ 500.00 $ 9,500.00
16 8 each 1,000.00 8,000.00
17 3 each $ 1,000.00 $ 3,000.00
18 415 CY $ 65.00 $ 26,975.00
19 620 CY $ 65.00 $ 40,302.19
20 100 CY $ 65.00 $ 6,500.00
21 105402 SF $ 1.50 $ 158,103.00
TOTAL SITEWORK: (Items 1 ‐ 21) $
RELOCATED PICNIC TABLE
LARGE BOULDER
DECOMPOSED GRANITE
RELOCATED CHESS TABLE
421,053.09
TOP SOIL
BED PREP (12ʺ DEEP)
IRRIGATION
BERMS
LIMESTONE BLOCK
ACCESSIBLE RAMP
MEDIUM BOULDER
SHREDDED HARDWOOD MULCH
EXISTING TRASH RECEPTACLE
RETAINING WALL
FILTER FABRIC
MONUMENT SIGN
EXISTING MUTT MITT STATION
EXISTING BENCH
STEEL EDGING
RIVER ROCK
5ʹ WIDTH SIDEWALK
Opinion of Probable Cost
Georgetown Village PID Improvements
ITEM NO.ESTIMATED
QUANTITY UNIT COMMON NAME UNIT PRICE TOTAL PRICE
1 of 2Page 21 of 49
Opinion of Probable Cost
Georgetown Village PID Improvements
ITEM NO.ESTIMATED
QUANTITY UNIT COMMON NAME UNIT PRICE TOTAL PRICE
1 3 each $ 1,400.00 # $ 4,200.00
2 28 each $ 1,200.00 $ 33,600.00
5 235 s.f. $ 35.00 $ 8,225.00
8 25 l.f. $ 15.00 $ 375.00
16 50273 SF $ 0.15 $ 7,540.95
TOTAL PLANTS: (Items 1 ‐ 16) $53,940.95
TOTAL SITEWORK: $421,053.09
TOTAL PLANTS: $53,940.95
Sub‐Total: $‐ 474,994.04
Excavation and Hauloff Allowance: $‐ 25,000.00
Traffic Control: $‐ 20,000.00
Tree Protection: $‐ 15,000.00
Complete Electrical and Lighting at Entries: $‐ 30,000.00
Sub‐Total: $‐ 564,994.04
Mobilzation, Insurance, Bonds (not to exceed 5% of bid): $‐ 28,249.70
Grand Total: $‐ 593,243.74
HYDROMULCH
1‐GALLON SHRUBS
3‐GALLON SHRUBS
ORNAMENTAL TREES
SHADE TREE
2 of 2Page 22 of 49
City of Georgetown, Texas
Georgetown Village Improvement District
October 14, 2019
S UB J E C T:
Public Wishing to Address the Board
O n a subject that is posted on this agenda: P lease fill out a speaker regis tration form whic h can be
found on the table at the entrance to the Board Meeting. C learly print your name and the letter of the item
on which you wish to speak and present it to the S taff Liaison, prior to the start of the meeting. You will
be c alled forward to speak when the Board cons iders that item. O nly pers ons who have delivered the
s peaker form prior to the meeting being called to order may s peak.
On a subject not posted on the agenda: P ersons may add an item to a future R egular s cheduled Board
agenda by filing a written request with the S taff Liais on no later than one week prior to the Board
meeting. T he request mus t inc lude the speaker’s name and the spec ific topic to be addres s ed with
s uffic ient information to inform the board and the public . Only those persons who have submitted a
timely request will be allowed to speak. F or Board Liaison c ontact information, pleas e logon to
https://government.georgetow n.org/gvpid/
-At time of posting, no person/s had signed up to address T he B oard
IT E M S UMMARY:
F IN AN C IAL IMPAC T:
.
S UB MIT T E D B Y:
Marlene Mc Michael, C hair P ers on
Page 23 of 49
City of Georgetown, Texas
Georgetown Village Improvement District
October 14, 2019
S UB J E C T:
C onsideration and pos s ible ac tion to approve the Updated Minutes for R egular June 2019 & July 2019
Meeting and the Minutes of the R egular Meeting for Augus t 12, 2019, - Tina Davis , Board Liais on
IT E M S UMMARY:
Updated Minutes for R egular June 2019 & July 2019 Meeting and the Minutes of the R egular Meeting for
August 12, 2019
F IN AN C IAL IMPAC T:
.
S UB MIT T E D B Y:
Tina Davis, Board Liaison
AT TAC H ME N T S:
Description Type
GVPID Minutes 06.10.2019 and update Backup Material
GVPID Minutes 07.15.2019 and updates Backup Material
GVPID Minutes 08.12.2019 Backup Material
Page 24 of 49
Page 25 of 49
Page 26 of 49
Page 27 of 49
Page 28 of 49
Page 29 of 49
Page 30 of 49
Page 31 of 49
Page 32 of 49
Page 33 of 49
Page 34 of 49
Page 35 of 49
Page 36 of 49
Page 37 of 49
Georgetown Village PID Page 1 of 3
August 12, 2019
City of Georgetown, Texas
Georgetown Village Public Improvement District Advisory Board Meeting
Minutes
Monday, August 12, 2019 at 6:00 p.m.
West Side Service Center located at 5501 Williams Dr. Georgetown, TX 78633
Board Members Present: Marlene McMichael - Chair; Norma Baker; Marsi Liddell; Gary
Newman - Developer Rep.; Penny Evans; Cara McKinney; Steve Taylor – Alternate; Michael
Charles (arrived at 6:03 pm)
Board Members Absent: NONE
Staff Members Present: Wayne Reed – Assistant City Manager; Ray Miller – Transportation
Planning Coordinator; Seth Gibson – Management Analyst; Travis Baird – Real Estate Services
Manager; Laci Grobler - Senior Accountant; Laura Wilkins, Executive Assistant
Staff Members Absent: Eric Nuner – Assistant Parks Director, Christi Rawls – Assistant
Controller
Others Present: NONE
Regular Session
(This Regular Session may, at any time, be recessed to convene an Executive Session for any
purpose authorized by the Open Meetings Act, Texas Government Code 551.)
A. Call to Order - called to order at 6:00 PM by McMichael
B. Presentation of the Georgetown Village Public Improvement District (GVPID) monthly
financial reports for the month of July 2019. - Laci Grobler
Ms. Grobler presented the budget report for the month of July, 2019. Notes: 62.7% of
the budget has been spent with 83% of the budget year completed. Available fund
balance of $834,233.00. Question from Liddell – what was the Year-to-Date expense of
$103,250 for? Reed explained that Eric Nuner is out today - he has been approving the
invoices so would know this answer. Question if Eric would be at the Subcommittee
meeting on Wednesday? He is expected to be there. Liddell asked that we follow up
with them with those details.
Legislative Regular Agenda
C. Public Wishing to Address the Board
On a subject that is posted on this agenda: Please fill out a speaker registration form
which can be found on the table at the entrance to the Board Meeting. Clearly print your
name and the letter of the item on which you wish to speak and present it to the Staff
Page 38 of 49
Georgetown Village PID Page 2 of 3
August 12, 2019
Liaison, prior to the start of the meeting. You will be called forward to speak when the
Board considers that item. Only persons who have delivered the
speaker form prior to the meeting being called to order may speak.
On a subject not posted on the agenda: Persons may add an item to a future Regular
scheduled Board agenda by filing a written request with the Staff Liaison no later than
one week prior to the Board meeting. The request must include the speaker’s name and
the specific topic to be addressed with sufficient information to inform the board and the
public. Only those persons who have submitted a timely request will be allowed to
speak. For Board Liaison contact information, please logon to
https://government.georgetown.org/gvpid/
-At time of posting, no person/s had signed up to address The Board
D. Consideration and possible action to recommend acceptance of 5 lots in Phases 1, 2, & 3
the Georgetown Village, including water quality, drainage, and open space lots, located
along Bowline Drive, Crown Anchor Bend, and Sheepshank Drive. - Travis Baird, Real
Estate Services Manager
Baird presented the item. Continuation of work being done as development occurs.
Acceptance of lots by the City for maintenance. Most often these lots are drainage related
– also include some parklets/pocket parks. Mowing and on-going maintenance. Worked
with KB Homes to make certain the lots the City accepts are at acceptable standards and
in good condition. McKinney - question on lot on Sheepshank was in poor condition –
asked if that been resolved? Baird responded that yes – City worked with KB and that
one received extra work to be brought up to acceptable level. All have been inspected.
McMichael – has the one at Crown Anchor been upgraded to our standard? Answered
by Baird – it was inspected by Jaime Beran in the Parks Department. Other discussion for
clarification – parklets, access/maintenance ways, drainage ways, etc. Baird – we will
apply a different terminology, other than parklet, to those areas to avoid confusion.
Charles – asked that Mr. Taylor give feedback as he lives in Creekside. Taylor says he
believes it is fine – has been improved with plantings, etc. – looks like part of the
neighborhood. Likes the buffer near where the new proposed subdivision is going in.
Liddell – question that is related but possibly off-topic: Rosedale backs up against the
detention pond at Serenada – the large lot – has not been mowed. Newman – they have
paid to have that mowed – it should have been done. Baird – City took over the ponds
near the ponds at Rosedale at Naranjo and Rosedale at. Madrid – have not taken over
Rosedale and Bellaire or the large one Naranjo in the SE quadrant. Baird – will follow-up
on this. Question from Newman – how are the lots transferred to the City? Answered
by Baird – these are done by deed. McKinney – when does actual mowing pick up by the
City once deeded? Baird – have started picking up the maintenance once they reached an
acceptable condition so it would not fall back. MOTION by Charles, second by Liddell –
to accept the 5 lots in Phases 1,2, and 3 of Georgetown Village, including water quality
drainage and open space lots, located along Bowline Drive, Crown Anchor Bend, and
Page 39 of 49
Georgetown Village PID Page 3 of 3
August 12, 2019
Sheepshank Drive, following confirmation that KB Homes has conveyed the last lot.
APPROVED 7-0 (none opposed/ none absent)
E. Consideration and possible action to approve the Minutes of the regular meeting
July 15, 2019 – Tina Davis, Board Liaison
Mr. Charles raised a question about the listing of the vote on minutes. ITEM H.
Would like for more information to be included (who voted for; who voted
against; who was absent or abstained). Also, if any voted against or abstained,
list that person’s reasoning for voting against or abstaining. Specifically, a
notation on this item about his concern of the use of PID dollars in an area that
had previously been deemed private property. Mr. Charles voted against on
Items H, I and J. He was opposed for the same reason (use of PID dollars on
private property) on those items. Discussion for clarification followed. Charles
would like the minutes revised to include his reasoning for voting against on
these items to provide full disclosure. The minutes will be revised to reflect this
request. Question by McKinney on item B – last sentence: Have we checked on
this to be certain everyone is on the same page? Reed responded that since Parks
representatives are not here tonight, we will follow-up with Parks on that.
MOTION by Baker, second by Evans to approve the July 15 minutes with the
corrections noted. APPROVED 6-0-1 (none opposed - Liddell abstained as she
was not present at the July 15, 2019 meeting)
Adjournment
MOTION to adjourn by Liddell, second by Baker. APPROVED 7-0 (none opposed) The
meeting adjourned at 6:29 p.m.
__________________________________ ______________________________
Marlene McMichael, Chair Cara McKinney
___________________________________
Board Liaison
Page 40 of 49
City of Georgetown, Texas
Georgetown Village Improvement District
October 14, 2019
S UB J E C T:
C onsideration and pos s ible ac tion to approve the Corrected Minutes of the S ub-C ommittee for May
2019 & Minutes of the S ub C ommittee for June 2019 & Augus t 2019- Tina Davis , Board Liais on
IT E M S UMMARY:
Corrected Minutes of the S ub-C ommittee for May 2019 & Minutes of the S ub C ommittee for June 2019
& Augus t 2019
F IN AN C IAL IMPAC T:
.
S UB MIT T E D B Y:
Tina Davis, Board Liaison
AT TAC H ME N T S:
Description Type
GVPID Sub Committee Minutes 5.10.2019 Backup Material
GVPID Sub Committee 6.25.2019 Backup Material
GVPID Sub Committee Minutes 8.14.2019 Backup Material
Page 41 of 49
Page 42 of 49
Page 43 of 49
Page 44 of 49
Page 45 of 49
Page 46 of 49
Page 47 of 49
Page 48 of 49
Page 49 of 49