Loading...
HomeMy WebLinkAboutAgenda_GVPID_10.09.2017Notice of Meeting for the Georgetown Village Public Improv ement District of the City of Georgetown October 9, 2017 at 6:00 PM at West Side Serv ice Center located at 5501 Williams Dr. Georgetown, TX 78633 The City o f G eo rgeto wn is committed to comp lianc e with the Americans with Dis abilities Ac t (ADA). If yo u req uire as s is tanc e in participating at a p ublic meeting d ue to a disability, as d efined und er the ADA, reas onab le as s is tance, ad ap tatio ns , or acc o mmo d ations will b e provid ed up o n req uest. P leas e c o ntact the City Sec retary's Office, at leas t three (3) days prior to the sc hed uled meeting d ate, at (512) 930-3652 o r City Hall at 113 Eas t 8th Street fo r add itional info rmation; TTY us ers ro ute through Relay Texas at 711. Public Wishing to Address the Board On a sub ject that is pos ted on this agend a: Pleas e fill out a speaker regis tration form which c an b e found at the Bo ard meeting. C learly p rint yo ur name, the letter o f the item o n which yo u wis h to s p eak, and present it to the Staff Liais o n, p referab ly p rio r to the s tart of the meeting. You will be called forward to speak when the Board cons id ers that item. On a sub ject not pos ted on the agend a: Pers ons may add an item to a future Bo ard agenda b y filing a written req uest with the S taff Liaison no later than one week prior to the Board meeting. T he req uest mus t inc lude the s p eaker's name and the s p ecific to p ic to b e ad d res s ed with sufficient information to info rm the b o ard and the p ublic . For Board Liais on c o ntact info rmatio n, pleas e lo gon to http://go vernment.georgetown.o rg/category/b o ard s -commissions /. A At the time of th is posting, no citizens were sig n ed up to sp ea k. Legislativ e Regular Agenda B Co nsideration and possible actio n to approve the minutes o f the September 11, 2017 regular meeting - Karen Fro s t, R ecording Sec retary C Co nsideration and possible actio n related to improvements within the G eo rgeto wn Village P ublic Improvement Dis trict (GVPID) - Andreina Davila-Quintero, Current Planning Manager D Dis cus s ion regard ing the Contrac ts Progres s Report - Andreina Dávila-Q uintero, Current Planning Manager E Dis cus s ion and pos s ible actio n regarding the d raft Geo rgeto wn Village Pub lic Imp ro vement Dis tric t broc hure. Karen Frost, Rec o rding Sec retary. F Pres entatio n o f the Geo rgeto wn Village Pub lic Imp ro vement District (G VP ID) mo nthly financ ial reports for the mo nth o f S ep tember 2017 - La'Mar Kemp , Acc o untant G Developer's Up d ate - Gary Newman Adjournment CERTIFICATE OF POSTING Page 1 of 15 I, Shelley No wling, C ity S ecretary fo r the C ity of Geo rgeto wn, Texas , d o hereby c ertify that this Notice of Meeting was p o s ted at City Hall, 113 E. 8th Street, a p lace read ily acc es s ible to the general p ublic at all times , on the ______ d ay o f __________________, 2017, at __________, and remained so p o s ted fo r at leas t 72 c o ntinuo us ho urs p receding the sc heduled time o f s aid meeting. ____________________________________ S helley No wling, City Sec retary Page 2 of 15 City of Georgetown, Texas Georgetown Village Improvement District October 9, 2017 SUBJECT: Cons id eration and p o s s ib le ac tion to approve the minutes of the Sep tember 11, 2017 regular meeting - Karen Fro s t, Rec o rd ing S ecretary ITEM SUMMARY: FINANCIAL IMPACT: . SUBMITTED BY: Karen Fro s t, Rec o rd ing S ecretary ATTACHMENTS: Description Type Minutes _GVPID_09.11.2017 Backup Material Page 3 of 15 Georgetown Village PID Page 1 of 3 Meeting: September 11, 2017 City of Georgetown, Texas Georgetown Village Public Improvement District Advisory Board Meeting Minutes Monday, September 11, 2017 at 6:00 p.m. West Side Service Center located at 5501 Williams Dr. Georgetown, TX 78633 Members present: Melinda Marler, Chair; Norma Baker, Alternate; Richard Harrison; Cara McKinney, Alternate; Marlene McMichael; Brian Ortego, Vice-Chair; Gary Newman, Developer Rep; and Penny Evans, Developer Rep Members Absent: Katie Porter; Staff present: Jim Briggs, GM Utilities; Eric Nuner, Asst. Parks Director; La’Mar Kemp, Accountant; and Karen Frost, Planning Specialist. Meeting called to order by Chair Marler at 6:07 p.m. Regular Session (This Regular Session may, at any time, be recessed to convene an Executive Session for any purpose authorized by the Open Meetings Act, Texas Government Code 551.) A. Consideration and possible action to approve the minutes of the August 14, 2017 regular meeting – Karen Frost, Recording Secretary Corrections were made – correct the heading, the fence in Item C needs to be shown as around the circumference of the pond, and remove the “s” from McMichael in Item B. Motion by Newman, second by Harrison to approve the minutes as corrected. Approved 6 – 0. (Porter absent.) B. Consideration and possible action related to improvements within the Georgetown Village Public Improvement District (GVPID) - Jim Briggs, General Manager of Utilities Briggs reviewed the previous survey results with the board and reminded them that the five top rated items were funded in the budget: landscaping, enhanced maintenance for city parks, street tree trimming, sidewalk improvements and recreational amendments. The Board discussed ideas of items that could also be funded. Briggs asked for specifics so that staff could research and get costs to bring back for the boards further discussion. Board members discussed pond maintenance, there are currently six ponds covered in the maintenance budget; Shell Road entryways – Newman stated the Master Plan is being developed and should be available in 30 – 45 days. • They asked for information on the development of the city sidewalk and street trees along Bellaire and Rosedale and in front of the school. • Marler asked that the maintenance of all parks, whether city maintained or PID maintained, all be held to a higher standard. • They showed interest in a shade structure over the playground in Bedford Park, along with benches and irrigation. • They asked for cost of irrigation of the two city parks, Madrone and Rowan. Page 4 of 15 Georgetown Village PID Page 2 of 3 Meeting: September 11, 2017 • They discussed setting aside money for signage in all areas but realized that cannot be defined until the signage master plan is developed. • They asked for the informational brochure to be developed for review. Briggs explained that any additional expenditures would need to be recommended to council for approval as a budget amendment, which is due by January 2018. C. Discussion regarding the Contracts Progress Report - Jim Briggs, General Manager of Utilities Briggs reported the tree pruning bids were in and the estimated cost will be $23,200. The contractor will begin work along Westbury, Shell to Village Elementary and Village Commons. It was noted that 173 and 181 Village Commons have identified dead trees that will be removed and the stumps will be removed. The sidewalk maintenance contract had been rewarded and work was to begin in October. A map was provided showing the areas that would be improved. The Parks department is still looking for a contractor to fix the lighting at the roundabout. The aprons in the alleys are being repaired by the contractor that is repairing the sidewalks. It was noted that staff will take suggestions for plant types to replace the dead plants in the landscaped areas. Those will be forwarded to the parks department. D. Presentation of the Georgetown Village Public Improvement District (GVPID) monthly financial reports for the month of August 2017 - La'Mar Kemp, Accountant Briggs reviewed the financial reports. E. Developer's Update - Gary Newman Newman reported he expects to have a new Master Plan for Georgetown Village II in the next 2 to 3 months. They are looking at a 10 year build out of approximately 1000 houses and amenities. He showed a map and explained all the cave features that were shown and explained how those were being integrated into the development. He also noted that the ultimate plan is to connect all the trails within the subdivision to the city’s west side park that will be built along Shell Road. Public Wishing to Address the Board Dr. Tim Fleming, 604 Rosedale, spoke to the board about Section 9 not having the same amenities as the sections on the north side of Shell Road. He also complained about the maintenance of the pond behind the houses on Rosedale. He presented pictures and asked questions. Michael Charles, 244 Baretta Circle, also spoke to the board about the disparity between the two sections split by Shell Road. He asked the board to consider extra funding to add additional amenities that the developer did not provide. Briggs responded to them and gave them contact information for future complaints. Adjournment Page 5 of 15 Georgetown Village PID Page 3 of 3 Meeting: September 11, 2017 Motion by Ortego to adjourn. Second by Newman. The meeting was adjourned at 8:15 p.m. ______________________________ ______________________________ Approved, Melinda Marler, Chair Attest, Brian Ortego Page 6 of 15 City of Georgetown, Texas Georgetown Village Improvement District October 9, 2017 SUBJECT: Cons id eration and p o s s ib le ac tion related to imp ro vements within the Georgetown Village Pub lic Imp ro vement Dis tric t (GVP ID) - And reina Davila-Quintero , Current Planning Manager ITEM SUMMARY: The City o f G eo rgeto wn in partnership with the Georgetown Village Pub lic Improvement Dis tric t No. 1 (GVPID) Advis o ry Bo ard c o nducted a res ident s urvey in March 2017 to gather inp ut on enhanced imp ro vements that may be fund ed through the GVPID. T hese enhanc ements had b een id entified during the p ro cess o f the c urrent ad o p ted b udget b ut were s et as id e for future cons ideratio n. At their September 11, 2017 meeting, the GVPID Advis o ry Bo ard disc ussed new improvements that may be constructed and installed through the GVP ID assessment, including but not limited to: Planting o f new trees alo ng Bellaire Dr New improvements in Bedford P ark and Summers Green Park Irrigatio n imp ro vements in certain areas A list of the sp ec ific improvements , inc luding the es timated c ap ital and annual maintenanc e c o s ts are o utlined in the attac hed Exhib it. FINANCIAL IMPACT: None at this time. SUBMITTED BY: And reina Dávila-Quintero , Current Planning Manager ATTACHMENTS: Description Type Exhibit - Es timated Cos t for new Improvements Exhibit Page 7 of 15 Exhibit - Estimated Capital and Annual Maintenance costs for new improvements within the GVPID Printed on 10/3/2017 Item Park/Street Capital Annual Utilities Annual Maintenance Bench (3)Bedford 2,100.00$ NA NA Fabric Replacement Bedford 3,000.00$ NA NA Shade Structure Bedford 40,516.00$ NA NA Irrigation Bellaire (South side)11,963.00$ 1,000.00$ 300.00$ Irrigation Bellaire (North side)7,177.80$ 1,000.00$ 300.00$ Irrigation Madrone Park 14,522.00$ 3,000.00$ 350.00$ Irrigation Rowan Park 22,926.12$ 5,520.00$ 600.00$ Bench (3)Summers Green 2,100.00$ NA NA Irrigation Summers Green 2,815.00$ 3,120.00$ 350.00$ 52 trees (Oak) @ 40 ft spacing (S. side of Bellaire)1 Bellaire (South side)21,000.00$ NA $4,420 52 trees (Oak) @ 40 ft spacing (N. side of Bellaire) 1, 2 Bellaire (North side)21,000.00$ NA $4,420 165' x 5' of new sidewalk installation with 2 new ADA ramps for Summers Green Park Summers Green 7,556.25$ NA NA 300' x 5' misc. sidewalk removal and replacement 10,125.00$ NA NA Removal of 25' x 5' sidewalk and installation of 35' x 5' of new sidewalk to go around the installation of trees on the south side of Bellaire Dr. (52 trees)Bellaire (South side)56,875.00$ NA NA 1000' x 5' of new winding sidewalk around trees along the north side of Bellaire Dr.Bellaire (North side)31,250.00$ NA NA 1 $4420 for Year 2 Strucutral Pruning 2 Easements will be required from GISD for sidewalk/trees. Cost TBD Page 8 of 15 City of Georgetown, Texas Georgetown Village Improvement District October 9, 2017 SUBJECT: Disc ussion regarding the Co ntracts Pro gress R ep o rt - And reina Dávila-Quintero , Current P lanning Manager ITEM SUMMARY: Geo rgeto wn Village Pub lic Imp ro vement Dis tric t (GVP ID) Contrac ts Update (Exhibit): Land s c ap e Maintenanc e Parks and Land s cape Mas ter Plan Right-of-way Tree Pruning Roundab o ut Landsc ap e Renovation Sidewalk Maintenanc e and Rep air FINANCIAL IMPACT: None. SUBMITTED BY: And reina Dávila-Quintero , Current Planning Manager ATTACHMENTS: Description Type Exhibit - Contracts Progres s Report Oct 2017 Exhibit Page 9 of 15 Page 1 of 1 Printed on 10/3/2017 Georgetown Village Public Improvement District (GVPID) Contracts Progress Report FY2017/18 Project Name Description Update Status Project Budget Landscape Maintenance Landscaping services for the GVPID parks areas and road frontages. Contract terms are May 1, 2017 through September 30, 2018 with 3 one year renewal options. Heart of Texas continues to provide services based on the schedule. Installation of mulch began 9/25/2017 on the frontage along Shell Road. Beds were cleared of vines along fences, shrubs/grasses were shaped and dead vegetation was removed. Crews will continue to mulch all park areas. Mowing services were cancelled on 9/29/2017 due to heavy rains that morning. Turf pre-emerge is scheduled for the second week of October.Open 87,285.00$ Parks and Landscape Master Plan Develop a master plan to provide an assessment of current amenities and to develop future recommendations and priorities though public input. City staff met with a local design firm 10/3/2017 to develop a scope to initiate the development of a Georgetown Village Parks and Landscape Master Plan. A draft scope will be presented at the November board meeting Open 70,000.00$ Right of Way Tree Pruning Pruning of trees located between sidewalk and curb. Areas to be maintained are along portions of Village Commons and Westbury Lane. Tree pruning along Village Commons and Westbury began the week of 9/25/2017. Legacy Arbor Care was awarded the contract. Village Commons is completed with the exception of 2 dead tree removals. Anticipated date of completion is 10/10/2017 Open 29,194.41$ Roundabouts Landscape Renovation Landscape renovation of the two roundabouts along Village Commons Blvd Project completion is on hold to locate vendors to complete work. The lighting is the last portion to be completed.Open 88,622.44$ Sidewalk maintenance and repair Trip hazard remediation and replacement "Safe routes first" Contract has been awarded and work is scheduled to begin 10- 10-2017 with a scheduled completion of 10-8-2017.Open 30,000.00$ Page 10 of 15 City of Georgetown, Texas Georgetown Village Improvement District October 9, 2017 SUBJECT: Disc ussion and p o s s ib le ac tion regard ing the draft Georgetown Village Public Improvement District broc hure. Karen F ro s t, Recording S ec retary. ITEM SUMMARY: A draft printed broc hure will be p ro vided at the meeting fo r the b o ard 's review. FINANCIAL IMPACT: .. SUBMITTED BY: Karen Fro s t, Planning Spec ialis t Page 11 of 15 City of Georgetown, Texas Georgetown Village Improvement District October 9, 2017 SUBJECT: Presentatio n of the Georgetown Village Public Improvement Dis tric t (GVPID) monthly financial rep o rts for the month of S ep tember 2017 - La'Mar Kemp , Ac c o untant ITEM SUMMARY: For the Board 's review, attached are the Dis tric t's financ ial reports for the mo nth o f S ep tember 2017. FINANCIAL IMPACT: None. SUBMITTED BY: La'Mar Kemp , Ac c o untant ATTACHMENTS: Description Type Financial Summary for Sept 2017 Backup Material Financial Statement for Sept 2017 Backup Material Page 12 of 15 16/17 Budget YTD Activity Variance Revenues: Ad Valorem Taxes 334,713$ 334,450$ (263)$ Interest Earned 1,500 4,699 3,199 Total Revenues 336,213 339,150 2,937 Expenditures: Administrative Fee- General Fund 27,636 27,636 0 Administrative Fee - Joint Service 13,279 13,283 (4) Office Supplies 500 - 500 Insurance 2,000 967 1,033 Contracts & Leases, Primary 108,000 98,369 9,631 Contracts & Leases, Secondary 30,000 23,995 6,005 Special Services 9,550 1,725 7,825 Above Ground Improvements 52,800 - 52,800 Signs 10,000 - 10,000 Utilities/Irrigation 46,000 38,682 7,318 Maintenance, Sidewalks 31,300 [A]31,300 - Maintenance, Irrigation 22,000 5,319 16,681 Maintenance, Ponds 2,500 - 2,500 Pond Rehabilitation 108,432 102,665 5,767 Maintenance, Alleys 50,000 8,000 42,000 Total Expenditures 513,997 351,941 162,056 Current Year Variance (177,784) (12,791) 164,993 Beginning Fund Balance 667,654 679,556 [B]11,902 Current Funds Available 489,870$ 666,765$ 176,895$ Notes: •The majority of property tax collections occur in January. •YTD activity includes encumbrances. •Year End YTD activity becomes audited activity each following January. •Fiscal year is from October 1 to September 30. •Unaudited financial statements prepared by the City of Georgetown, as of October 02, 2017. [A]Account increased by $30,000 thru budget amendment. [B]Audited beginning fund balance. Financial Statement Village PID September 30, 2017 Page 13 of 15 10-02-2017 04:47 PM C I T Y O F G E O R G E T O W N PAGE: 1 FINANCIAL STATEMENT (UNAUDITED) 234-VILLAGE PID AS OF: SEPTEMBER 30TH, 2017 ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET REVENUES BUDGET PERIOD ACTUAL BUDGET ENCUMB. BALANCE _____________________________________________________________________________________________________________________________ REVENUE ======= PRIMARY REVENUE 4-0001-40-100 AD VALOREM TAX 334,713.00 0.00 334,450.39 99.92 0.00 262.61 TOTAL PRIMARY REVENUE 334,713.00 0.00 334,450.39 99.92 0.00 262.61 INTEREST 4-0001-42-100 ALLOCATED INTEREST 1,500.00 0.00 4,330.01 288.67 0.00 ( 2,830.01) 4-0001-42-152 GISD TAX (PID) INTEREST 0.00 0.00 369.18 0.00 0.00 ( 369.18) TOTAL INTEREST 1,500.00 0.00 4,699.19 313.28 0.00 ( 3,199.19) DEVELOPMENT FEE _____________ _____________ _____________ ______ ______________ _______________ TOTAL DEVELOPMENT FEE 0.00 0.00 0.00 0.00 0.00 0.00 ____________________________________________________________________________________ TOTAL REVENUE 336,213.00 0.00 339,149.58 100.87 0.00 ( 2,936.58) VILLAGE PID =========== OTHER _____________ _____________ _____________ ______ ______________ _______________ TOTAL OTHER 0.00 0.00 0.00 0.00 0.00 0.00 ____________________________________________________________________________________ TOTAL VILLAGE PID 0.00 0.00 0.00 0.00 0.00 0.00 _____________________________________________________________________________________________________________________________ *** TOTAL REVENUES *** 336,213.00 0.00 339,149.58 100.87 0.00 ( 2,936.58) ============= ============= ============= ====== ============== =============== _____________________________________________________________________________________________________________________________ TOTAL REVENUE 0.00 0.00 0.00 0.00 0.00 0.00 Page 14 of 15 10-02-2017 04:47 PM C I T Y O F G E O R G E T O W N PAGE: 2 FINANCIAL STATEMENT (UNAUDITED) 234-VILLAGE PID AS OF: SEPTEMBER 30TH, 2017 COMMUNITY SERVICES VILLAGE PID ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET EXPENSES BUDGET PERIOD ACTUAL BUDGET ENCUMB. BALANCE _____________________________________________________________________________________________________________________________ OPERATIONS 5-0211-51-110 GENERAL FUND ALLOCATION 27,636.00 2,303.00 27,635.94 100.00 0.00 0.06 5-0211-51-111 OFFICE SUPPLIES 500.00 0.00 0.00 0.00 0.00 500.00 5-0211-51-200 INSURANCE 2,000.00 0.00 966.67 48.33 0.00 1,033.33 5-0211-51-310 CONTRACT & LEASES, PRIMARY 108,000.00 560.50 173,366.80 91.08 ( 74,998.09) 9,631.29 5-0211-51-311 CONTRACT & LEASES, SECONDA 30,000.00 0.00 13,043.34 79.98 10,951.25 6,005.41 5-0211-51-330 SPECIAL SERVICES 9,550.00 0.00 1,724.88 18.06 0.00 7,825.12 5-0211-51-341 ABOVE GROUND IMPROVEMENTS 52,800.00 0.00 19,063.00 0.00 ( 19,063.00) 52,800.00 5-0211-51-342 SIGNS 10,000.00 0.00 0.00 0.00 0.00 10,000.00 5-0211-51-430 UTILITIES 46,000.00 6,232.10 38,682.15 84.09 0.00 7,317.85 5-0211-51-501 MAINT, ALLEYS/SIDEWALKS 31,300.00 0.00 0.00 100.00 31,300.00 0.00 5-0211-51-502 MAINT, IRRIGATION 22,000.00 462.50 8,193.03 23.62 ( 2,995.60) 16,802.57 5-0211-51-503 MAINT , PONDS 2,500.00 0.00 0.00 0.00 0.00 2,500.00 5-0211-51-505 POND REHABILITATION 108,432.00 0.00 55,524.50 51.21 0.00 52,907.50 5-0211-51-506 MAINT, ALLEYS 50,000.00 0.00 0.00 16.00 8,000.00 42,000.00 5-0211-51-950 JOINT SERVICES ALLOCATION 13,279.00 1,107.00 13,283.16 100.03 0.00 ( 4.16) TOTAL OPERATIONS 513,997.00 10,665.10 351,483.47 59.28 ( 46,805.44) 209,318.97 ____________________________________________________________________________________ TOTAL VILLAGE PID 513,997.00 10,665.10 351,483.47 59.28 ( 46,805.44) 209,318.97 _____________________________________________________________________________________________________________________________ TOTAL COMMUNITY SERVICES 513,997.00 10,665.10 351,483.47 59.28 ( 46,805.44) 209,318.97 _____________________________________________________________________________________________________________________________ *** TOTAL EXPENSES *** 513,997.00 10,665.10 351,483.47 59.28 ( 46,805.44) 209,318.97 ============= ============= ============= ====== ============== =============== *** REVENUES OVER/(UNDER) EXPENSES( 177,784.00)( 10,665.1( 12,333.89) 19.39- 46,805.44 ( 212,255.55) *** END OF REPORT *** Page 15 of 15