Loading...
HomeMy WebLinkAboutAgenda_GVPID_11.13.2017Notice of Meeting for the Georgetown Village Public Improv ement District of the City of Georgetown Nov ember 13, 2017 at 6:00 PM at West Side Serv ice Center, located at 5501 Williams Dr Georgetown, TX 78633 The City o f G eo rgeto wn is committed to comp lianc e with the Americans with Dis abilities Ac t (ADA). If yo u req uire as s is tanc e in participating at a p ublic meeting d ue to a disability, as d efined und er the ADA, reas onab le as s is tance, ad ap tatio ns , or acc o mmo d ations will b e provid ed up o n req uest. P leas e c o ntact the City Sec retary's Office, at leas t three (3) days prior to the sc hed uled meeting d ate, at (512) 930-3652 o r City Hall at 113 Eas t 8th Street fo r add itional info rmation; TTY us ers ro ute through Relay Texas at 711. Public Wishing to Address the Board On a sub ject that is pos ted on this agend a: Pleas e fill out a speaker regis tration form which c an b e found at the Bo ard meeting. C learly p rint yo ur name, the letter o f the item o n which yo u wis h to s p eak, and present it to the Staff Liais o n, p referab ly p rio r to the s tart of the meeting. You will be called forward to speak when the Board cons id ers that item. On a sub ject not pos ted on the agend a: Pers ons may add an item to a future Bo ard agenda b y filing a written req uest with the S taff Liaison no later than one week prior to the Board meeting. T he req uest mus t inc lude the s p eaker's name and the s p ecific to p ic to b e ad d res s ed with sufficient information to info rm the b o ard and the p ublic . For Board Liais on c o ntact info rmatio n, pleas e lo gon to http://go vernment.georgetown.o rg/category/b o ard s -commissions /. A At the time of th is posting, no citizens were sig n ed up to sp ea k. Legislativ e Regular Agenda B Co nsideration and possible actio n to approve the minutes o f the Octo ber 9, 2017 regular meeting - Karen Fro s t, Rec o rd ing S ecretary C Pres entatio n o f the Geo rgeto wn Village Pub lic Imp ro vement District (G VP ID) mo nthly financ ial reports for the mo nth o f Oc tober 2017 - La'Mar Kemp , Acc o untant D Dis cus s ion regard ing the Geo rgeto wn Village Pub lic Imp ro vement Distric t Mas ter Plan – Eric Nuner, As s is tant P arks and Rec reation Directo r E Co nsideration and possible actio n to reco mmend to Counc il approval o f Tas k Ord er KPA-18-005 to Kas b erg, Patric k, and As s o ciates , LP o f Geo rgeto wn, T X in the amount o f $59,490 for a land s cape, amenity, and wayfinding s ignage mas terp lan fo r the Geo rgeto wn Village Pub lic Imp ro vement District – Eric Nuner, As s is tant P arks and Rec reatio n Direc tor F Co nsideration and possible actio n related to improvements within the G eo rgeto wn Village P ublic Improvement Dis trict (GVPID) - Jim Briggs , General Manager o f Utilities G Dis cus s ion regard ing the Contrac ts Progres s Report - Jim Briggs , General Manager o f Utilities H Developer's Up d ate - Gary Newman Page 1 of 24 Adjournment CERTIFICATE OF POSTING I, Shelley No wling, C ity S ecretary fo r the C ity of Geo rgeto wn, Texas , d o hereby c ertify that this Notice of Meeting was p o s ted at City Hall, 113 E. 8th Street, a p lace read ily acc es s ible to the general p ublic at all times , on the ______ d ay o f __________________, 2017, at __________, and remained so p o s ted fo r at leas t 72 c o ntinuo us ho urs p receding the sc heduled time o f s aid meeting. ____________________________________ S helley No wling, City Sec retary Page 2 of 24 City of Georgetown, Texas Georgetown Village Improvement District November 13, 2017 SUBJECT: Cons id eration and p o s s ib le ac tion to approve the minutes of the Oc tober 9, 2017 regular meeting - Karen Frost, Rec o rding Sec retary ITEM SUMMARY: FINANCIAL IMPACT: . SUBMITTED BY: Karen Fro s t, Rec o rd ing S ecretary ATTACHMENTS: Description Type Minutes _GVPID_10.09.2017 Backup Material Page 3 of 24 Georgetown Village PID Page 1 of 2 Meeting: October 9, 2017 City of Georgetown, Texas Georgetown Village Public Improvement District Advisory Board Meeting Minutes Monday, October 9, 2017 at 6:00 p.m. West Side Service Center located at 5501 Williams Dr. Georgetown, TX 78633 Members present: Norma Baker, Alternate; Richard Harrison; Cara McKinney, Alternate; Marlene McMichael; Brian Ortego, Vice-Chair; Gary Newman, Developer Rep; Katie Porter; and Penny Evans, Developer Rep Members Absent: Melinda Marler, Chair; Staff present: Wayne Reed, Assistant City Manager; Eric Nuner, Asst. Parks Director; Octavio Garza, Public Works Director; Leticia Zavala, Customer Care Director; Cindy Pospisil, Customer Care Manager; La’Mar Kemp, Accountant; and Karen Frost, Planning Specialist. The meeting was called to order by Vice-Chair Ortego at 6:04 p.m. A. Public wishing to address the Board. At the time of posting, no one had signed up to speak. B. Consideration and possible action to approve the minutes of the September 11, 2017 regular meeting - Karen Frost, Recording Secretary Motion by McMichael to approve the minutes as corrected. Second by Newman. Approved 6 – 0. (Marler absent.) C. Consideration and possible action related to improvements within the Georgetown Village Public Improvement District (GVPID) - Andreina Davila-Quintero, Current Planning Manager Reed opened this item for discussion and Nuner provided the overview. The Board members discussed the items that had already been priced out, which included looking into providing street trees on the GISD portion of Bellaire, adding street trees and new sidewalk to the south and north sides of Bellaire, and providing enhancements to Madrone Park, Rowan Park and Summers’ Green. Additional request for staff to provide costs for were a bark park in the south section of the Village, a roundabout replaced at the intersection of Bellaire and Rosedale, and street trees placed along Rosedale to Naranjo where there are not currently any placed. Ortego called upon people who had asked to speak on this topic. Ron Moore, a Section 9 resident, asked for sidewalks along Shell Road and a park on Beretta. Newman responded that he will have an answer soon about the design of a possible park inside Beretta Circle. Timothy Fleming, 604 Rosedale, (additional 3 minutes donated by Marsi Liddell, 604 Rosedale) spoke about past finances and the perceived disparity among the north side of Shell Road and the south side of Shell Road and how many amenities were on each side. He wants more money spent on the south side of Shell Road. Michael Charles, 244 Beretta Circle, asked for the Board to consider funding more amenities for Section 9, agreeing with Mr. Fleming. Page 4 of 24 Georgetown Village PID Page 2 of 2 Meeting: October 9, 2017 Ortego thanked everyone for their comments. D. Discussion regarding the Contracts Progress Report - Andreina Dávila-Quintero, Current Planning Manager Nuner reported that the Landscape Maintenance Contract was on-going and the mulching had begun across the city. Mulching will continue for the next month. Nuner also reported on the Parks and Landscape Master Plan. He informed the Board that Covey Landscape Design consultants had been selected and a Master Services Agreement was being completed. He will be bringing this item to the Board in November to discuss specifics. The consultants will be present. They will be seeking public comments on wayfinding signage and gateway landscaping design. Garza reported that the ROW tree trimming contract was completed on October 11. The next phase of tree trimming will need to be discussed if the board wants to accelerate the budgeted amounts to include more trimming in the current fiscal year. He also reported there are five catch basins left to complete and those should be finished in the next week. E. Discussion and possible action regarding the draft Georgetown Village Public Improvement District brochure. Karen Frost, Recording Secretary. Frost opened the discussion for the brochure. Suggestions were made, including adding tree trimming and care information on the brochure, or as a separate brochure for the residents. They asked for the brochure to have clarification of who was responsible for the trees in the Village. Frost will work on the brochure and re-present it at another meeting. F. Presentation of the Georgetown Village Public Improvement District (GVPID) monthly financial reports for the month of September 2017 - La'Mar Kemp, Accountant Kemp explained the summary. G. Developer's Update - Gary Newman Newman reported the Arbors and Estates are coming, but no builder has been chosen at this time. Their design is not including alleys but overall is designed to be consistent with the original concept. Adjournment Motion by Harrison to adjourn. Second by McMichael. The meeting was adjourned at 7:27 p.m. ______________________________ ______________________________ Approved, Brian Ortego, Vice-Chair Attest, Katie Porter Page 5 of 24 City of Georgetown, Texas Georgetown Village Improvement District November 13, 2017 SUBJECT: Presentatio n of the Georgetown Village Public Improvement Dis tric t (GVPID) monthly financial rep o rts for the month of Oc tober 2017 - La'Mar Kemp, Ac c o untant ITEM SUMMARY: For the Board 's review, attached are the Dis tric t's financ ial reports for the mo nth o f Oc tober2017. FINANCIAL IMPACT: None. SUBMITTED BY: La'Mar Kemp , Ac c o untant ATTACHMENTS: Description Type 10.2017 Financial Summary Backup Material 10.2017 Financial Statement Backup Material Page 6 of 24 17/18 Budget YTD Activity Variance Revenues: Ad Valorem Taxes 388,128$ -$ (388,128)$ Interest Earned 2,000 - (2,000) Total Revenues 390,128 - (390,128) Expenditures: Administrative Fee- General Fund 47,858 3,988 43,870 Office Supplies 500 - 500 Brochures, Advertising 3,000 - 3,000 Insurance 2,000 - 2,000 Contracts & Leases, Primary 90,160 90,111 49 Contracts & Leases, Secondary 28,479 - 28,479 Park Master Plan 70,000 - 70,000 Above Ground Improvements 38,000 - 38,000 Signs 4,813 - 4,813 Utilities/Irrigation 36,000 5,612 30,388 Maintenance, Sidewalks 42,164 - 42,164 Maintenance, Irrigation 10,900 - 10,900 Maintenance, Ponds 3,000 - 3,000 Maintenance, Alleys 20,000 947 19,053 Maintenance, Street Trees 60,000 - 60,000 Administrative Fee - Joint Service 8,966 747 8,219 Total Expenditures 465,840 101,404 364,436 Current Year Variance (75,712) (101,404) (25,692) Beginning Fund Balance 677,161 684,915 [A]7,754 Current Funds Available 601,449$ 583,511$ (17,938)$ Notes: •The majority of property tax collections occur in January. •YTD activity includes encumbrances. •Year End YTD activity becomes audited activity each following January. •Fiscal year is from October 1 to September 30. •Unaudited financial statements prepared by the City of Georgetown, as of November 07, 2017. [A]Unaudited beginning fund balance. Financial Statement Village PID October 31, 2017 Page 7 of 24 11-07-2017 03:07 PM C I T Y O F G E O R G E T O W N PAGE: 1 FINANCIAL STATEMENT (UNAUDITED) 234-VILLAGE PID AS OF: OCTOBER 31ST, 2017 ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET REVENUES BUDGET PERIOD ACTUAL BUDGET ENCUMB. BALANCE _____________________________________________________________________________________________________________________________ REVENUE ======= PRIMARY REVENUE 4-0001-40-100 AD VALOREM TAX 388,128.00 0.00 0.00 0.00 0.00 388,128.00 TOTAL PRIMARY REVENUE 388,128.00 0.00 0.00 0.00 0.00 388,128.00 INTEREST 4-0001-42-100 ALLOCATED INTEREST 2,000.00 0.00 0.00 0.00 0.00 2,000.00 TOTAL INTEREST 2,000.00 0.00 0.00 0.00 0.00 2,000.00 DEVELOPMENT FEE _____________ _____________ _____________ ______ ______________ _______________ ____________________________________________________________________________________ TOTAL REVENUE 390,128.00 0.00 0.00 0.00 0.00 390,128.00 VILLAGE PID =========== OTHER _____________ _____________ _____________ ______ ______________ _______________ ____________________________________________________________________________________ _____________________________________________________________________________________________________________________________ *** TOTAL REVENUES *** 390,128.00 0.00 0.00 0.00 0.00 390,128.00 ============= ============= ============= ====== ============== =============== _____________________________________________________________________________________________________________________________ Page 8 of 24 11-07-2017 03:07 PM C I T Y O F G E O R G E T O W N PAGE: 2 FINANCIAL STATEMENT (UNAUDITED) 234-VILLAGE PID AS OF: OCTOBER 31ST, 2017 COMMUNITY SERVICES VILLAGE PID ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET EXPENSES BUDGET PERIOD ACTUAL BUDGET ENCUMB. BALANCE _____________________________________________________________________________________________________________________________ OPERATIONS 5-0211-51-110 GENERAL FUND ALLOCATION 47,858.00 3,988.00 3,988.00 8.33 0.00 43,870.00 5-0211-51-111 OFFICE SUPPLIES 500.00 0.00 0.00 0.00 0.00 500.00 5-0211-51-130 BROCHURES, ADVERTISING 3,000.00 0.00 0.00 0.00 0.00 3,000.00 5-0211-51-200 INSURANCE 2,000.00 0.00 0.00 0.00 0.00 2,000.00 5-0211-51-310 CONTRACT & LEASES, PRIMARY 90,160.00 7,599.54 7,599.54 99.95 82,511.28 49.18 5-0211-51-311 CONTRACT & LEASES, SECONDA 28,479.00 0.00 0.00 0.00 0.00 28,479.00 5-0211-51-315 PARK MASTER PLAN 70,000.00 0.00 0.00 0.00 0.00 70,000.00 5-0211-51-341 ABOVE GROUND IMPROVEMENTS 38,000.00 0.00 0.00 0.00 0.00 38,000.00 5-0211-51-342 SIGNS 4,813.00 0.00 0.00 0.00 0.00 4,813.00 5-0211-51-430 UTILITIES 36,000.00 5,611.57 5,611.57 15.59 0.00 30,388.43 5-0211-51-501 MAINT, ALLEYS/SIDEWALKS 42,164.00 0.00 0.00 0.00 0.00 42,164.00 5-0211-51-502 MAINT, IRRIGATION 10,900.00 0.00 0.00 0.00 0.00 10,900.00 5-0211-51-503 MAINT , PONDS 3,000.00 0.00 0.00 0.00 0.00 3,000.00 5-0211-51-506 MAINT, ALLEYS 20,000.00 4,206.00 4,206.00 4.74 ( 3,259.00) 19,053.00 5-0211-51-507 MAINT, STREET TREES 60,000.00 0.00 0.00 0.00 0.00 60,000.00 5-0211-51-950 JOINT SERVICES ALLOCATION 8,966.00 747.00 747.00 8.33 0.00 8,219.00 TOTAL OPERATIONS 465,840.00 22,152.11 22,152.11 21.77 79,252.28 364,435.61 ____________________________________________________________________________________ TOTAL VILLAGE PID 465,840.00 22,152.11 22,152.11 21.77 79,252.28 364,435.61 _____________________________________________________________________________________________________________________________ TOTAL COMMUNITY SERVICES 465,840.00 22,152.11 22,152.11 21.77 79,252.28 364,435.61 _____________________________________________________________________________________________________________________________ *** TOTAL EXPENSES *** 465,840.00 22,152.11 22,152.11 21.77 79,252.28 364,435.61 ============= ============= ============= ====== ============== =============== *** REVENUES OVER/(UNDER) EXPENSES( 75,712.00)( 22,152.1( 22,152.11) 133.93 ( 79,252.28) 25,692.39 *** END OF REPORT *** Page 9 of 24 City of Georgetown, Texas Georgetown Village Improvement District November 13, 2017 SUBJECT: Disc ussion regarding the Georgetown Village P ublic Improvement Dis tric t Mas ter P lan – Eric Nuner, Assistant Parks and R ecreatio n Direc tor ITEM SUMMARY: Funding fo r a mas ter plan for p ublic improvements within the Geo rgeto wn Village Pub lic Imp ro vement District (GVP ID) is includ ed in the FY18 budget. Input and informatio n gathered from the neighb o rhood s urvey, p revio us GVP ID b o ard meetings , and future board meetings will be utilized to develo p this mas ter p lan. The cons ultant will lead disc ussion items d uring future b o ard meeting to refine the plan. A final mas ter p lan is s c hed uled to b e presented to the b o ard in April fo r approval. T his will allo w any priorities to b e includ ed in the F Y19 b udget p ro cess. This p ro ject will invo lve p rep aring a mas ter plan and operatio nal and maintenanc e c o s ts fo r proposed and existing park fac ility imp ro vements within the GVPID. This projec t will als o inc lude wayfinding s ignage d es ign and imp lementation. By evaluating the exis ting cond itions , existing s urvey and working c lo s ely with the Board and C ity S taff, the d eliverable will inc lud e rend ered grap hic s for propos ed d es ign improvements and lo catio ns, o p inion of p ro b ab le c o s ts for imp ro vements, a 5-year phas ing p lan and o p inion of p ro b able o p erational and maintenance costs . This s co p e inc lud es proposed p ro fes s ional s ervices to b e provid ed by Covey Land s c ap e Arc hitects for this projec t. FINANCIAL IMPACT: NA SUBMITTED BY: Eric Nuner, As s is tant Parks and Recreatio n Direc to r Page 10 of 24 City of Georgetown, Texas Georgetown Village Improvement District November 13, 2017 SUBJECT: Cons id eration and p o s s ib le ac tion to rec o mmend to Co uncil ap p ro val o f Tas k Order KPA-18-005 to Kasberg, Patric k, and Assoc iates, LP of Georgetown, TX in the amo unt of $59,490 fo r a landsc ap e, amenity, and wayfind ing signage masterp lan for the Georgetown Village Public Improvement Dis tric t – Eric Nuner, As s is tant P arks and Rec reation Direc tor ITEM SUMMARY: This Task Ord er is fo r P ro fes s io nal Engineering and Land s cape Architec tural Services to complete a mas ter p lan for p ublic improvements in the Georgetown Village Pub lic Improvement Dis tric t. The master p lan will inc lud e identific ation and opportunities for landsc ap e improvements , amenity additio ns, and a wayfinding s ignage plan. STAFF RECOMMENDATION: Staff rec o mmend s executing Task Order KPA-18-005 fo r professional servic es related to the GVPID mas ter p lan with Kas b erg, P atric k, and Asso c iates , LP o f Georgetown, TX, in the amo unt o f $59,490. FINANCIAL IMPACT: Funds are available in GVP ID FY18 bud get fund 234-5-0211-51-315 in the amo unt o f $70,000. SUBMITTED BY: Eric Nuner, As s is tant Parks and Recreatio n Direc to r ATTACHMENTS: Description Type Exhibit A - Scope for Mas ter Plan Backup Material Exhibit B - Fee Schedule for Mas ter Plan Backup Material Page 11 of 24 EXHIBIT A – DETAILED PROJECT SCOPE SERVICES PROVIDED BY KPA ENGINEERS, LP GEORGETOWN, TEXAS Project Description: This project will involve preparing a master plan and operational and maintenance costs for proposed and existing park facility improvements within the Georgetown Village Public Improvement District (GVPID). This project will also include wayfinding signage design and implementation. By evaluating the existing conditions, existing survey and working closely with the Board and City Staff, the deliverable will include rendered graphics for proposed design improvements and locations, opinion of probable costs for improvements, a 5-year phasing plan and opinion of probable operational and maintenance costs. This scope includes proposed professional services to be provided by Covey Landscape Architects for this project. Scope of Services: The scope of services associated with creating a Masterplan for the Georgetown Village Public Improvement District (GVPID) includes: I. Project Management/Coordination: a. Meeting #1 November Meeting and project kick-off. i. The ENGINEER will attend the November board meeting for introduction. ii. The ENGINEER will assist the LANDSCAPE ARCHITECT in preparation for the meetings and provide support documentation. b. Meeting #2 December Meeting i. The ENGINEER will attend the December Board Meeting. ii. The ENGINEER will assist the LANDSCAPE ARCHITECT in preparation for the meetings and provide support documentation. c. Meeting #3 January Meeting i. The ENGINEER will attend the December Board Meeting. ii. The ENGINEER will assist the LANDSCAPE ARCHITECT in preparation for the meetings and provide support documentation. d. Meeting #4 February Meeting i. The ENGINEER will attend the December Board Meeting. ii. The ENGINEER will assist the LANDSCAPE ARCHITECT in preparation for the meetings and provide support documentation. Page 12 of 24 e. Meeting #5 March Meeting i. The ENGINEER will attend the December Board Meeting. ii. The ENGINEER will assist the LANDSCAPE ARCHITECT in preparation for the meetings and provide support documentation. f. Meeting #6 April Meeting i. The ENGINEER will attend the December Board Meeting. ii. The ENGINEER will assist the LANDSCAPE ARCHITECT in preparation for the meetings and provide support documentation. g. Staff Meetings i. The ENGINEER will attend up to six (6) Staff Meetings with the LANDSCAPE ARCHITECT. II. Site Analysis and Evaluation a. Meet with City staff to develop initial strategies i. The ENGINEER will meet with City staff to acquire existing maps, easements and utilities for working base maps for the Georgetown Village. b. Review all survey and public input information collected i. The ENGINEER will provide support to the LANDSCAPE ARCHITECT in review and evaluation of the survey findings. c. Organize existing electronic files and bases i. The ENGINEER will assist the LANDSCAPE ARCHITECT with organizing the existing base files and GIS data. d. Conduct existing site inventory and conditions of streetscapes and signage. i. The ENGINEER will assist the LANDSCAPE ARCHITECT with an on- site site inventory of Georgetown Village for all signage elements and street trees. III. .Development of Overall Landscape and Amenity Masterplan a. Organize site analysis, site inventory and all evaluation information. i. The ENGINEER will assist the LANDSCAPE ARCHITECT updating the existing base file to include information from the site survey and to evaluate the proposed improvement quantities and locations. b. Develop rehabilitation and propose new concepts. i. The ENGINEER will develop a proposed layout for a new round-a-bout and prepare an overall rendering and cost estimate to include in the Master Plan. c. Prepare cost estimates for all projects. Page 13 of 24 i. The ENGINEER will assist the LANDSCAPE ARCHITECT in preparing line items descriptions and opinions of probable costs for all proposed improvements. d. Make design revisions based on feedback i. The ENGINEER will assist the LANDSCAPE ARCHITECT in providing revisions to the proposed master plan based off feedback from City Staff and Board. e. Provide maintenance costs of all proposed and renovated items i. The ENGINEER will assist the LANDSCAPE ARCHITECT in providing O & M Costs. f. Prepare overall landscape masterplan / budget for final presentation to the Board i. The ENGINEER will assist the LANDSCAPE ARCHITECT in preparing the final master plan and opc’s for the project. IV. Wayfinding Signage Masterplan Layout a. The ENGINEER will assist the LANDSCAPE ARCHITECT in updating the base file to determine locations for wayfinding signage. b. The ENGINEER will assist the LANDSCAPE ARCHITECT in preparing Wayfinding Signage Plans/Schematics and Proposed OPC's for the Project . Page 14 of 24 EXHIBIT A – DETAILED PROJECT SCOPE SERVICES PROVIDED BY COVEY LANDSCAPE ARCHITECTS GEORGETOWN, TEXAS Scope of Services: The scope of services associated with creating a Masterplan for the Georgetown Village Public Improvement District (GVPID) includes: I. Project Management/Coordination: a. Meeting #1 November Meeting and project kick-off. i. The LANDSCAPE ARCHITECT will attend the November board meeting for introduction. ii. The LANDSCAPE ARCHITECT will gather input from the Board for the overall Masterplan and define Masterplan services. iii. The LANDSCAPE ARCHITECT will address wayfinding and signage as the first priority. b. Meeting #2 December Meeting i. The LANDSCAPE ARCHITECT will present wayfinding / signage locations and design concepts of for feedback from the Board. ii. The LANDSCAPE ARCHITECT will address the overall existing survey and site analysis findings with the Board. c. Meeting #3 January Meeting i. The LANDSCAPE ARCHITECT will present wayfinding / signage final concepts and locations. ii. The LANDSCAPE ARCHITECT will address and prioritize design improvements to be implemented into the overall Masterplan. d. Meeting #4 February Meeting i. The LANDSCAPE ARCHITECT will present the prioritized design improvements and locations with associated costs integrated into a 5 year plan. e. Meeting #3 March Meeting i. The LANDSCAPE ARCHITECT will present an overall preliminary design graphic integrating the final wayfinding / signage for feedback from the Board. f. Meeting #3 April Meeting Page 15 of 24 i. The LANDSCAPE ARCHITECT will present an overall final rendered Masterplan reflecting proposed design improvements and locations, estimate of cost, 5-year plan and estimate of maintenance costs to the Board. II. Site Analysis and Evaluation a. Meet with City staff to develop initial strategies i. The LANDSCAPE ARCHITECT will meet with City staff to acquire existing maps, easements and utilities for working base maps for the Georgetown Village. b. Review all survey and public input information collected i. The LANDSCAPE ARCHITECT will collect and import all files in order to utilize the most up to date base information. c. Provide graphic showing survey findings i. The LANDSCAPE ARCHITECT will use base map information collected in order to show existing and proposed features graphically. d. Organize existing electronic files and bases i. The LANDSCAPE ARCHITECT will compile all information collected into electronic files. e. Conduct existing site inventory and conditions of streetscapes and signage. i. The LANDSCAPE ARCHITECT will conduct an on-site site inventory of Georgetown Village for all signage elements and street trees. f. Evaluate existing inventory data from different areas within Georgetown Village i. The LANDSCAPE ARCHITECT will conduct an on-site site inventory of Georgetown Village for all park areas and amenities. g. Provide existing conditions and inventory report and overall graphic plan i. The LANDSCAPE ARCHITECT will utilize base maps and all collected site analysis information into one electronic file base map. III. .Development of Overall Landscape and Amenity Masterplan a. Organize site analysis, site inventory and all evaluation information. i. The LANDSCAPE ARCHITECT will utilize the collected existing base information to evaluate the proposed improvement quantities and locations. b. Develop rehabilitation and propose new concepts. Page 16 of 24 i. The LANDSCAPE ARCHITECT will utilize the collected existing base information to evaluate the proposed improvement designs and will be interpreted through graphic renderings. c. Develop technical specifications and recommendations for proposed items. i. The LANDSCAPE ARCHITECT will provide technical specifications for detailed descriptions of proposed or specific improvements not conveyed graphically. d. Graphically organize existing renovation items with proposed new items. i. The LANDSCAPE ARCHITECT will distinguish existing inventory from proposed improvements through graphic plans and perspectives. e. Prepare cost estimates for all projects. i. The LANDSCAPE ARCHITECT will prepare line items descriptions and estimate of probable cost for all proposed improvements. f. Prepare overall design development and schematic design graphic concepts i. The LANDSCAPE ARCHITECT will utilize the collected existing base information work through concept design to final design. g. Make design revisions based on feedback i. The LANDSCAPE ARCHITECT will present each phase of the design progression graphically at the monthly meetings and the will request feedback from the Board to revise. ii. The LANDSCAPE ARCHITECT will make (1) revision per feedback from each monthly meeting. The revision based on feedback will be presented at the following monthly meeting. h. Provide maintenance costs of all proposed and renovated items i. The LANDSCAPE ARCHITECT will prepare line items descriptions and estimate of probable cost for all proposed maintenance items. i. Prepare overall landscape masterplan / budget for final presentation to the Board i. The LANDSCAPE ARCHITECT will present a final plan graphic, associated graphic perspective views. ii. The LANDSCAPE ARCHITECT will present a final estimate of probable costs for improvements. iii. The LANDSCAPE ARCHITECT will present a final estimate of probable cost for maintenance IV. Wayfinding Signage Masterplan Layout a. The LANDSCAPE ARCHITECT will identify locations for Wayfinding Signage. Page 17 of 24 i. The LANDSCAPE ARCHITECT will utilize the collected existing base information to evaluate the proposed improvement quantities and locations. b. The LANDSCAPE ARCHITECT will develop Wayfinding Signage Concepts. i. The LANDSCAPE ARCHITECT will present up to three (3) concept designs at the December meeting based on input for signage improvements at the November meeting. c. The LANDSCAPE ARCHITECT review Wayfinding Signage Concepts with City Staff and Board. i. The LANDSCAPE ARCHITECT will present wayfinding / signage concepts and request feedback from the Board. ii. The LANDSCAPE ARCHITECT will make (1) revision per feedback from each monthly meeting. The revision based on feedback will be presented at the following monthly meeting. d. The LANDSCAPE ARCHITECT prepare Wayfinding Signage Plans/Schematics and Proposed OPC's for the Project. i. The LANDSCAPE ARCHITECT will present a final plan graphic, associated graphic perspective views. ii. The LANDSCAPE ARCHITECT will present a final estimate of probable costs for improvements. Page 18 of 24 Page 19 of 24 City of Georgetown, Texas Georgetown Village Improvement District November 13, 2017 SUBJECT: Cons id eration and p o s s ib le ac tion related to imp ro vements within the Georgetown Village Pub lic Imp ro vement Dis tric t (GVP ID) - Jim Briggs, General Manager of Utilities ITEM SUMMARY: The Bo ard may c ons id er and take actio n o n pos s ible imp ro vements that have b een id entified at previo us meetings. This item allows further disc ussio n o f thos e items and allo ws the b o ard to identify spec ific imp ro vements that they want to rec o mmend funding fo r in the future year. This d is cus s ion c an b e a companio n item with the Mas ter Plan that will also be d is cus s ed at this meeting. FINANCIAL IMPACT: None at this time. SUBMITTED BY: Karen Fro s t, Rec o rd ing S ecretary ATTACHMENTS: Description Type Exhibit - Es timated Cos t for new Improvements Exhibit Page 20 of 24 Exhibit - Estimated Capital and Annual Maintenance costs for new improvements within the GVPID Printed on 10/3/2017 Item Park/Street Capital Annual Utilities Annual Maintenance Bench (3)Bedford 2,100.00$ NA NA Fabric Replacement Bedford 3,000.00$ NA NA Shade Structure Bedford 40,516.00$ NA NA Irrigation Bellaire (South side)11,963.00$ 1,000.00$ 300.00$ Irrigation Bellaire (North side)7,177.80$ 1,000.00$ 300.00$ Irrigation Madrone Park 14,522.00$ 3,000.00$ 350.00$ Irrigation Rowan Park 22,926.12$ 5,520.00$ 600.00$ Bench (3)Summers Green 2,100.00$ NA NA Irrigation Summers Green 2,815.00$ 3,120.00$ 350.00$ 52 trees (Oak) @ 40 ft spacing (S. side of Bellaire)1 Bellaire (South side)21,000.00$ NA $4,420 52 trees (Oak) @ 40 ft spacing (N. side of Bellaire) 1, 2 Bellaire (North side)21,000.00$ NA $4,420 165' x 5' of new sidewalk installation with 2 new ADA ramps for Summers Green Park Summers Green 7,556.25$ NA NA 300' x 5' misc. sidewalk removal and replacement 10,125.00$ NA NA Removal of 25' x 5' sidewalk and installation of 35' x 5' of new sidewalk to go around the installation of trees on the south side of Bellaire Dr. (52 trees)Bellaire (South side)56,875.00$ NA NA 1000' x 5' of new winding sidewalk around trees along the north side of Bellaire Dr.Bellaire (North side)31,250.00$ NA NA 1 $4420 for Year 2 Strucutral Pruning 2 Easements will be required from GISD for sidewalk/trees. Cost TBD Page 21 of 24 City of Georgetown, Texas Georgetown Village Improvement District November 13, 2017 SUBJECT: Disc ussion regarding the Co ntracts Pro gress R ep o rt - Jim Briggs, General Manager of Utilities ITEM SUMMARY: Geo rgeto wn Village Pub lic Imp ro vement Dis tric t (GVP ID) Contrac ts Update (Exhibit): Land s c ap e Maintenanc e Parks and Land s cape Mas ter Plan Right-of-way Tree Pruning Roundab o ut Landsc ap e Renovation Sidewalk Maintenanc e and Rep air FINANCIAL IMPACT: None. SUBMITTED BY: And reina Dávila-Quintero , Current Planning Manager ATTACHMENTS: Description Type Contracts Progres s Report October 2017 Backup Material Page 22 of 24 Georgetown Village Public Improvement District (GVPID)Georgetown Village Public Improvement District (GVPID)Georgetown Village Public Improvement District (GVPID)Georgetown Village Public Improvement District (GVPID) Contracts Progress ReportContracts Progress ReportContracts Progress ReportContracts Progress Report Project BudgetProject BudgetProject BudgetProject Budget Project CostProject CostProject CostProject Cost AvailableAvailableAvailableAvailable Landscape Maintenance Landscaping services from July 1st to September 30th. Includes general grounds maintenance of all pocket parks, roundabouts and medians, and landscape easement lots, including irrigation repair Contract will continue with Bright View on a month to month basis until award of new contract is complete (Jan/Feb). Mowing was completed on Sept. 7, 14, 21 and 28. Mulch and fall application of fertilizer and pre-emerge in turf and beds were completed week of Oct. 2 Austin Landscape Supplies will be installing mulch week of Oct. 10 (Village Pool parking lot) - BrightView $13,000-ALS $8,750 Total $21,750 Mutt Mitts are being taken care of and ant mounds are being treated during site visits. Irrigation repairs complete. Irrigation timers were scaled back to a fall schedule. Complete monthly checks completed week of Sept. 26. Inspection Reports for the month of Aug are attached. As of the date of this report, Inspection Reports for the month of Sept have not been submitted.Open $24,204.00 $24,204.00 $0.00 Roundabouts Landscape Renovation Landscape renovation of the two roundabouts along Village Commons Blvd Meeting with Integrated Environmental week of Oct. 2. Work is scheduled to begin Oct. 12. Open $88,622.44 $88,622.44 Tree Trimming Tree trimming services of trees located in all pocket parks, roundabouts and medians, and landscape easement lots Legacy Arbor has started in a small section. Work will resume week of Oct. 3.Open $12,250.00 $12,250.00 Alley Repair Application of the Polymer Modified Masterseal (PMM) on alleys Work complete Closed $20,000.00 $20,145.00 -$145.00 Project to DateProject to DateProject to DateProject to Date Project NameProject NameProject NameProject Name DescriptionDescriptionDescriptionDescription StatusStatusStatusStatusUpdateUpdateUpdateUpdate Page 1 of 2 Printed on 11/8/2017 Page 23 of 24 Georgetown Village Public Improvement District (GVPID) Contracts Progress Report FY2017/18 Project Name Description Update Status Project Budget Landscape Maintenance Landscaping services for the GVPID parks areas and road frontages. Contract terms are May 1, 2017 through September 30, 2018 with 3 one year renewal options. As far as landscape maintenance goes all weekly services were completed. There is some minor mulching left to finish including the few large oak trees along Shell Road. Fire ant bait and pre-emerge fertilizer was broadcast the second week of October. Open 87,285.00$ Roundabouts Landscape Renovation Landscape renovation of the two roundabouts along Village Commons Blvd Lighting issue still outstanding. Heart of Texas looking at original specifications for installation.Open 88,622.44$ Sidewalk maintenance and repair Trip hazard remediation and replacement "Safe routes first" Precision Safe Sidewalks has completed repairs on 70% of the areas identified, with a scheduled completion date of 11-17- 2017.Open $30,000 Concrete sidewalk replacement Remove and replace concrete sidewalk sections adjacent to trees where damaged has occurred from tree roots. Work has been bid and is currently being scheduled for late November and early December.Open $31,000 Concrete repairs to alley stormdrains. Remove and replace concrete around alley stormdrain structures. Work is complete.Closed $7,920 Page 2 of 2 Printed on 11/8/2017 Page 24 of 24