Loading...
HomeMy WebLinkAboutAgenda_GVPID_12.11.2017Notice of Meeting for the Georgetown Village Public Improv ement District of the City of Georgetown December 11, 2017 at 6:00 PM at West Side Serv ice Center, located at 5501 Williams Dr Georgetown, TX 78633 The City o f G eo rgeto wn is committed to comp lianc e with the Americans with Dis abilities Ac t (ADA). If yo u req uire as s is tanc e in participating at a p ublic meeting d ue to a disability, as d efined und er the ADA, reas onab le as s is tance, ad ap tatio ns , or acc o mmo d ations will b e provid ed up o n req uest. P leas e c o ntact the City Sec retary's Office, at leas t three (3) days prior to the sc hed uled meeting d ate, at (512) 930-3652 o r City Hall at 113 Eas t 8th Street fo r add itional info rmation; TTY us ers ro ute through Relay Texas at 711. Regular Session (This Regular S es s io n may, at any time, b e rec es s ed to convene an Exec utive S es s io n fo r any p urpose authorized b y the Op en Meetings Act, Texas Go vernment Co d e 551.) A Co nsideration and possible actio n to approve the minutes o f the November 13, 2017 regular meeting - Karen Fro s t, R ecording Sec retary B Pres entatio n o f the Geo rgeto wn Village Pub lic Imp ro vement District (G VP ID) mo nthly financ ial reports for the mo nth o f No vember 2017 - La'Mar Kemp , Acc o untant C Dis cus s ion regard ing the Contrac ts Progres s Report - Jim Briggs , General Manager o f Utilities D Pres entatio n and d is cus s io n o n Geo rgetown Village Pub lic Imp ro vement Dis tric t landsc ap e, amenity, and wayfind ing s ignage mas terplan. Eric Nuner, As s is tant Parks and Recreation Directo r E Developer's Up d ate - Gary Newman Public Wishing to Address the Board On a sub ject that is pos ted on this agend a: Pleas e fill out a speaker regis tration form which c an b e found at the Bo ard meeting. C learly p rint yo ur name, the letter o f the item o n which yo u wis h to s p eak, and present it to the Staff Liais o n, p referab ly p rio r to the s tart of the meeting. You will be called forward to speak when the Board cons id ers that item. On a sub ject not pos ted on the agend a: Pers ons may add an item to a future Bo ard agenda b y filing a written req uest with the S taff Liaison no later than one week prior to the Board meeting. T he req uest mus t inc lude the s p eaker's name and the s p ecific to p ic to b e ad d res s ed with sufficient information to info rm the b o ard and the p ublic . For Board Liais on c o ntact info rmatio n, pleas e lo gon to http://go vernment.georgetown.o rg/category/b o ard s -commissions /. F At the time of th is posting, no citizens were sig n ed up to sp ea k. Adjournment CERTIFICATE OF POSTING Page 1 of 12 I, Shelley No wling, C ity S ecretary fo r the C ity of Geo rgeto wn, Texas , d o hereby c ertify that this Notice of Meeting was p o s ted at City Hall, 113 E. 8th Street, a p lace read ily acc es s ible to the general p ublic at all times , on the ______ d ay o f __________________, 2017, at __________, and remained so p o s ted fo r at leas t 72 c o ntinuo us ho urs p receding the sc heduled time o f s aid meeting. ____________________________________ S helley No wling, City Sec retary Page 2 of 12 City of Georgetown, Texas Georgetown Village Improvement District December 11, 2017 SUBJECT: Cons id eration and p o s s ib le ac tion to approve the minutes of the No vember 13, 2017 regular meeting - Karen Fro s t, Rec o rd ing S ecretary ITEM SUMMARY: FINANCIAL IMPACT: . SUBMITTED BY: Karen Fro s t, Rec o rd ing S ecretary ATTACHMENTS: Description Type Minutes _GVPID_11.13.2017 Backup Material Page 3 of 12 Georgetown Village PID Page 1 of 3 Meeting: November 13, 2017 City of Georgetown, Texas Georgetown Village Public Improvement District Advisory Board Meeting Minutes Monday, November 13, 2017 at 6:00 p.m. West Side Service Center located at 5501 Williams Dr. Georgetown, TX 78633 Members present: Melinda Marler, Chair; Norma Baker, Alternate; Richard Harrison; Cara McKinney, Alternate; Brian Ortego, Vice-Chair; Gary Newman, Developer Rep; Katie Porter; and Penny Evans, Developer Rep Members Absent: Marlene McMichael; Staff present: Jim Briggs, Utilities General Manager; Eric Nuner, Asst. Parks Director; Octavio Garza, Public Works Director; La’Mar Kemp, Accountant; and Karen Frost, Planning Specialist. The meeting was called to order by Chair Marler at 6:02 p.m. A. Public wishing to address the Board. At the time of posting, no one had signed up to speak. B. Consideration and possible action to approve the minutes of the October 9, 2017 regular meeting - Karen Frost, Recording Secretary Motion by Newman to approve the minutes. Second by Ortego. Approved 6 – 0. (McMichael absent.) C. Presentation of the Georgetown Village Public Improvement Distict (GVPID) monthly financial reports for the month of October 2017. La’Mar Kemp, Accountant Kemp reported that the taxes will be coming in for the next fiscal year over the next few months. D. Discussion regarding the GVPID Master Plan – Eric Nuner, Assistant Parks and Recreation Director Nuner introduced the consultants that will be working on this project. Trey Sutton, KPA; Travis Crow, Covey Landscape; and Ronnie Stafford, Covey Landscape. Nuner explained that the board can make a recommendation to the Council to hire the consultants for starting in December. The scope of work will include items like wayfinding signage, proposed design improvements and locations, opinion of probable costs, along with a proposed 5 year spending plan for the operational and maintenance costs. It is expected to take five months to develop the master plan and will be brought back to the board in April for possible FY 2019 funding. Marler asked for clarification about why the consultants were already chosen without going out for bid. Briggs explained that engineers and architects fall under professional services contracts and those professional services are based on qualifications, not bids. Marler also asked about development standards. Briggs explained the difference between the PUD standards versus eligible PID public improvement expenses. There was a discussion of whether to have the board lead the discussion of changes and standards or to wait for the developer to direct the improvement levels. Nuner explains that the intent of this plan is to have the plan lead the discussion. Page 4 of 12 Georgetown Village PID Page 2 of 3 Meeting: November 13, 2017 Ronnie Stafford, with Covey Landscaping reviewed the scope of work. They want to have the discussions with the board and citizens and then take that feedback to develop the plan. They will also have an inventory of existing amenities so that the existing features can be built upon. They explained their experience with public plans. There was a discussion of the process and how each month’s regular meeting will focus on a different topic for board input. They will bring suggestions for the board to work with. Newman says it will be important to get an overview established so that the developer can work with the plan. The board discussed having “one look and feel for the entire village”, with the consultant. They all want a cohesive look and think it is important. Newman says he wants to be involved with the graphics and plan because it will need to be carried forward in the next sections. The consultant will be taking an inventory of what is there, not necessarily what is approved and not built. A whole new plan will be developed. E. Consideration and possible action to recommend to Council approval of Task Order KPA- 18-005 to Kasberg, Patrick, and Associates, LP of Georgetown, TX in the amount of $59,490 for a landscape, amenity, and wayfinding signage masterplan for the GVPID – Eric Nuner, Assistant Parks and Recreation Director The Plan will include description of items, but not construction documents, including where amenities or plantings and signs are to be placed. The city is getting a rendering and layout, not construction documents. Motion by Ortego to recommend to council approval of the consultant to develop the GVPID Master Plan. Second by Harrison. Approved 6 – 0. (McMichael absent). F. Consideration and possible action related to improvements within the Georgetown Village Public Improvement District – Jim Briggs, General Manager of Utilities Briggs discussed gaps in amenities or improvements that were highlighted in prior meetings, primarily Bellaire street trees. Staff reviewed adding street trees, including talking to the school district, along this stretch of street. They do not want to participate so this total cost of irrigation, trees and sidewalk in this section would cost approximately $151,000 to add. Staff looked at the costs for adding other amenities as requested. The board can choose to do something prior to the master plan being developed. It is at their discretion. The Board reviewed the list of estimated costs for new improvements. Porter wants to start taking action on some of the items. Briggs explained that the list was developed from the board requesting it. The costs need to be reviewed as a possible part of the master plan so that there is consistency across the neighborhoods. There was discussion to consider the street trees, but not on the GISD side of Bellaire. These items will be included as pieces of the master plan design for possible consideration later. The consultants will also consider the possible constraints. Dr. Fleming – complained about mulch on Shell Road trees. Some trees are over street signs and need to be pruned. Rowan, Madrone and Summers Green are on the list to be considered for street trees and he wants them installed. He stated the Roundabout at Bellaire and Rosedale should be put back, with the gazebo. He asked for the board to Page 5 of 12 Georgetown Village PID Page 3 of 3 Meeting: November 13, 2017 consider funding a bark park in Bedford Park like Holly Street bark park. He reported mowing has improved over the last month and a half. He wants to take care of disparities between the two sides of Shell Road. Marler asked about irrigation on Shell Road and said it should be part of the master plan. If anyone wants something else on the agenda for December contact Jim. He stated staff will modify the street trees for Bellaire to take out the school district side. G. Discussion regarding the Contracts Progress Report - Jim Briggs, General Manager of Utilities Briggs reviews report. The roundabout lighting issue is still outstanding. Nuner reports that they will have to rework the bid to get it to work. The trip hazard work is wrapping up. H. Developer's Update - Gary Newman Newman reported the Concept Plan for the second section of the Georgetown has not changed. They are talking to builders. They are considering a new PID, structured differently. They are considering two traffic circles in the community and are a month away from announcing contract with builders. Arbors and Hills sections are under review. A large cave area, 37 acres is being dedicated to the Williamson County Conservancy. There will also be trails and parks. The west side park will be just north of that which is 91 acres owned by the city of Georgetown. There were suggestions to connect all the parks through trails. Newman asked that Beretta Park be maintained by the city if they pick up the rocks. Nuner confirmed it can be added to the contract. It was just accepted as a city park. There is not a current plan for irrigation or development as a park at this time. Michael Charles, appreciates this board, and the north side park. Wants to talk about safety. He is concerned that the city took roundabout out at Bellaire and Rosedale. The pool at Village Commons slows down the traffic. He wants the same for the other side to slow the traffic and make it safer. He doesn’t want speed bumps. He suggests adding what the PID is responsible for in the brochure. Adjournment Motion by Ortego to adjourn. Second by Porter. The meeting was adjourned at 8:21 p.m. ______________________________ ______________________________ Approved, Melinda Marler, Chair Attest, Katie Porter Page 6 of 12 City of Georgetown, Texas Georgetown Village Improvement District December 11, 2017 SUBJECT: Presentatio n of the Georgetown Village Public Improvement Dis tric t (GVPID) monthly financial rep o rts for the month of No vember 2017 - La'Mar Kemp , Ac c o untant ITEM SUMMARY: For the Board 's review, attached are the Dis tric t's financ ial reports for the mo nth o f Oc tober2017. FINANCIAL IMPACT: None. SUBMITTED BY: La'Mar Kemp , Ac c o untant ATTACHMENTS: Description Type 11.2017 Financial Summary Backup Material 11.2017 Financial Statement Backup Material Page 7 of 12 17/18 Budget YTD Activity Variance Revenues: Ad Valorem Taxes 388,128$ 9,128$ (379,000)$ Interest Earned 2,000 418 (1,582) Total Revenues 390,128 9,546 (380,582) Expenditures: Administrative Fee- General Fund 47,858 7,976 39,882 Office Supplies 500 - 500 Brochures, Advertising 3,000 - 3,000 Insurance 2,000 - 2,000 Contracts & Leases, Primary 90,160 90,112 48 Contracts & Leases, Secondary 28,479 - 28,479 Park Master Plan 70,000 - 70,000 Above Ground Improvements 38,000 - 38,000 Signs 4,813 - 4,813 Utilities/Irrigation 36,000 10,819 25,181 Maintenance, Sidewalks 42,164 - 42,164 Maintenance, Irrigation 10,900 - 10,900 Maintenance, Ponds 3,000 - 3,000 Maintenance, Alleys 20,000 947 19,053 Maintenance, Street Trees 60,000 - 60,000 Administrative Fee - Joint Service 8,966 1,494 7,472 Total Expenditures 465,840 111,348 354,492 Current Year Variance (75,712) (101,802) (26,090) Beginning Fund Balance 677,161 684,915 [A]7,754 Current Funds Available 601,449$ 583,113$ (18,336)$ Notes: •The majority of property tax collections occur in January. •YTD activity includes encumbrances. •Year End YTD activity becomes audited activity each following January. •Fiscal year is from October 1 to September 30. •Unaudited financial statements prepared by the City of Georgetown, as of December 05, 2017. [A]Unaudited beginning fund balance. Financial Statement Village PID November 30, 2017 Page 8 of 12 12-05-2017 03:30 PM C I T Y O F G E O R G E T O W N PAGE: 1 FINANCIAL STATEMENT (UNAUDITED) 234-VILLAGE PID AS OF: NOVEMBER 30TH, 2017 ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET REVENUES BUDGET PERIOD ACTUAL BUDGET ENCUMB. BALANCE _____________________________________________________________________________________________________________________________ REVENUE ======= PRIMARY REVENUE 4-0001-40-100 AD VALOREM TAX 388,128.00 0.00 9,128.02 2.35 0.00 378,999.98 TOTAL PRIMARY REVENUE 388,128.00 0.00 9,128.02 2.35 0.00 378,999.98 INTEREST 4-0001-42-100 ALLOCATED INTEREST 2,000.00 0.00 402.87 20.14 0.00 1,597.13 4-0001-42-152 GISD TAX (PID) INTEREST 0.00 0.00 14.64 0.00 0.00 ( 14.64) TOTAL INTEREST 2,000.00 0.00 417.51 20.88 0.00 1,582.49 DEVELOPMENT FEE _____________ _____________ _____________ ______ ______________ _______________ ____________________________________________________________________________________ TOTAL REVENUE 390,128.00 0.00 9,545.53 2.45 0.00 380,582.47 VILLAGE PID =========== OTHER _____________ _____________ _____________ ______ ______________ _______________ ____________________________________________________________________________________ _____________________________________________________________________________________________________________________________ *** TOTAL REVENUES *** 390,128.00 0.00 9,545.53 2.45 0.00 380,582.47 ============= ============= ============= ====== ============== =============== _____________________________________________________________________________________________________________________________ Page 9 of 12 12-05-2017 03:30 PM C I T Y O F G E O R G E T O W N PAGE: 2 FINANCIAL STATEMENT (UNAUDITED) 234-VILLAGE PID AS OF: NOVEMBER 30TH, 2017 COMMUNITY SERVICES VILLAGE PID ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET EXPENSES BUDGET PERIOD ACTUAL BUDGET ENCUMB. BALANCE _____________________________________________________________________________________________________________________________ OPERATIONS 5-0211-51-110 GENERAL FUND ALLOCATION 47,858.00 3,988.00 7,976.00 16.67 0.00 39,882.00 5-0211-51-111 OFFICE SUPPLIES 500.00 0.00 0.00 0.00 0.00 500.00 5-0211-51-130 BROCHURES, ADVERTISING 3,000.00 0.00 0.00 0.00 0.00 3,000.00 5-0211-51-200 INSURANCE 2,000.00 0.00 0.00 0.00 0.00 2,000.00 5-0211-51-310 CONTRACT & LEASES, PRIMARY 90,160.00 608.25 8,207.79 99.95 81,903.78 48.43 5-0211-51-311 CONTRACT & LEASES, SECONDA 28,479.00 0.00 18,551.00 0.00 ( 18,551.00) 28,479.00 5-0211-51-315 PARK MASTER PLAN 70,000.00 0.00 0.00 0.00 0.00 70,000.00 5-0211-51-341 ABOVE GROUND IMPROVEMENTS 38,000.00 0.00 0.00 0.00 0.00 38,000.00 5-0211-51-342 SIGNS 4,813.00 0.00 0.00 0.00 0.00 4,813.00 5-0211-51-430 UTILITIES 36,000.00 5,207.64 10,819.21 30.05 0.00 25,180.79 5-0211-51-501 MAINT, ALLEYS/SIDEWALKS 42,164.00 0.00 0.00 0.00 0.00 42,164.00 5-0211-51-502 MAINT, IRRIGATION 10,900.00 0.00 0.00 0.00 0.00 10,900.00 5-0211-51-503 MAINT , PONDS 3,000.00 0.00 0.00 0.00 0.00 3,000.00 5-0211-51-506 MAINT, ALLEYS 20,000.00 0.00 4,434.13 4.74 ( 3,487.13) 19,053.00 5-0211-51-507 MAINT, STREET TREES 60,000.00 0.00 0.00 0.00 0.00 60,000.00 5-0211-51-950 JOINT SERVICES ALLOCATION 8,966.00 747.00 1,494.00 16.66 0.00 7,472.00 TOTAL OPERATIONS 465,840.00 10,550.89 51,482.13 23.90 59,865.65 354,492.22 ____________________________________________________________________________________ TOTAL VILLAGE PID 465,840.00 10,550.89 51,482.13 23.90 59,865.65 354,492.22 _____________________________________________________________________________________________________________________________ TOTAL COMMUNITY SERVICES 465,840.00 10,550.89 51,482.13 23.90 59,865.65 354,492.22 _____________________________________________________________________________________________________________________________ *** TOTAL EXPENSES *** 465,840.00 10,550.89 51,482.13 23.90 59,865.65 354,492.22 ============= ============= ============= ====== ============== =============== *** REVENUES OVER/(UNDER) EXPENSES( 75,712.00)( 10,550.8( 41,936.60) 134.46 ( 59,865.65) 26,090.25 *** END OF REPORT *** Page 10 of 12 City of Georgetown, Texas Georgetown Village Improvement District December 11, 2017 SUBJECT: Disc ussion regarding the Co ntracts Pro gress R ep o rt - Jim Briggs, General Manager of Utilities ITEM SUMMARY: Geo rgeto wn Village Pub lic Imp ro vement Dis tric t (GVP ID) Contrac ts Update (Exhibit): Land s c ap e Maintenanc e Parks and Land s cape Mas ter Plan Right-of-way Tree Pruning Roundab o ut Landsc ap e Renovation Sidewalk Maintenanc e and Rep air FINANCIAL IMPACT: None. SUBMITTED BY: And reina Dávila-Quintero , Current Planning Manager Page 11 of 12 City of Georgetown, Texas Georgetown Village Improvement District December 11, 2017 SUBJECT: Presentatio n and dis c us sion on Georgetown Village P ublic Improvement Dis tric t land s cape, amenity, and wayfinding s ignage mas terp lan. Eric Nuner, As s is tant P arks and Rec reation Direc tor ITEM SUMMARY: A tas k o rd er agreement with Kasberg, Patrick, and As s oc iates was p res ented to the Georgetown Village Pub lic Imp rovement Dis tric t Ad visory Board on No vember 13th to c o mp lete a lands c ap e, amenity, and wayfinding s ignage mas ter plan. The advis ory board unanimous ly recommend it b e forward ed to City Counc il for approval and it was approved by City Counc il during the November 28th meeting. The firs t area o f foc us fo r the mas ter p lan is wayfinding and s ignage. Covey Lands c ap e Arc hitects and Kasberg, Patric k have begun site analysis in the s hort period o f time available to d etermine exis ting cond itions . The c o ns ultants will p res ent wayfinding/s ignage lo catio ns and des ign concepts for feed b ack d uring the Dec emb er advis o ry b o ard meeting. This info rmation will be utilized to gather input and d evelop a proposed s ignage and wayfind ing c o nc ept to be utilized within the GVPID. FINANCIAL IMPACT: NA SUBMITTED BY: Eric Nuner, As s is tant Parks and Recreatio n Direc to r Page 12 of 12