Loading...
HomeMy WebLinkAboutAgenda_GVPID_04.25.2016Notice of Meeting for the Georgetown Village Public Improv ement District of the City of Georgetown April 25, 2016 at 6:00 PM at Public Safety Facility 3500 D.B. Wood Rd Georgetown, TX 78628 The City o f G eo rgeto wn is committed to comp lianc e with the Americans with Dis abilities Ac t (ADA). If yo u req uire as s is tanc e in participating at a p ublic meeting d ue to a disability, as d efined und er the ADA, reas onab le as s is tance, ad ap tatio ns , or acc o mmo d ations will b e provid ed up o n req uest. P leas e c o ntact the City at leas t fo ur (4) d ays prior to the sc heduled meeting d ate, at (512) 930-3652 or City Hall at 113 East 8th Street for ad d itional informatio n; TTY users ro ute thro ugh Relay Texas at 711. Legislativ e Regular Agenda A Co nsideration and possible actio n to approve the minutes fro m the Marc h 14, 2016 and Marc h 21, 2016 meetings - Karen Frost, Sec retary B Public wis hing to address the Georgetown Village P ublic Improvement Dis trict (GVPID) Advis o ry Board. C Co nsideration and possible actio n to reco mmend to the City Co uncil the re-ap p o intment of Melinda Marler for a s ec o nd two -year term to end in F eb ruary 2019 - Karen Fro s t, S ecretary, and Andreina Dávila- Quintero , P ro ject Co o rd inato r D Co nsideration and possible actio n to exec ute an Invitatio n to Bid for land s c ape s ervic es for the two roundabouts on Village Co mmo ns Bo ulevard, exclud ing reno vatio n o f the gazeb o - Jim Briggs , General Manager of Utilities E Dis cus s ion and pos s ible actio n relating to duties as part of the job d es c rip tion for s p ecific Board members - Melinda Marler, P res id ent F Dis cus s ion and pos s ible actio n regarding the p ro curement of s ervic es o f a c ertified Arborist to assess the exis ting co nditio ns o f the trees within Geo rgeto wn Village P ublic Impro vement District’s (GVPID) public areas, and rec ommend an ac tion plan to ad d res s immediate and long-term c oncerns - Steve Go o d man, Vic e-Presid ent G Dis cus s ion and pos s ible recommend ation to the City Co uncil o n the As s es s ment P lan Ord inance fo r the Georgetown Village P ublic Improvement Dis trict (GVPID) - Andreina Dávila-Quintero, P ro ject Co o rd inator, and Jim Briggs , General Manager o f Utilities H Pres entatio n o f the Geo rgeto wn Village Pub lic Imp ro vement District (G VP ID) mo nthly financ ial reports for the mo nth o f Marc h 2016 - Bill Weber, Treas urer I Pro ject Update R ep o rts - Jim Briggs, General Manager of Utilities Adjournment CERTIFICATE OF POSTING I, Shelley No wling, C ity S ecretary fo r the C ity of Geo rgeto wn, Texas , d o hereby c ertify that this Notice of Meeting was p o s ted at City Hall, 113 E. 8th Street, a p lace read ily acc es s ible to the general p ublic at all times , on the ______ d ay o f __________________, 2016, at __________, and remained so p o s ted fo r at leas t 72 Page 1 of 36 c o ntinuo us ho urs p receding the sc heduled time o f s aid meeting. ____________________________________ S helley No wling, City Sec retary Page 2 of 36 City of Georgetown, Texas Georgetown Village Improvement District April 25, 2016 SUBJECT: Cons id eration and p o s s ib le ac tion to approve the minutes from the Marc h 14, 2016 and March 21, 2016 meetings - Karen F ro s t, S ecretary ITEM SUMMARY: FINANCIAL IMPACT: None. SUBMITTED BY: Karen Fro s t, Sec retary ATTACHMENTS: Description Type Minutes of March 14, 2016 meeting Backup Material Minutes of March 21, 2016 Special Meeting Backup Material Page 3 of 36 Georgetown Village PID Page 1 of 5 Meeting: March 14, 2016 City of Georgetown, Texas Georgetown Village Public Improvement District Advisory Board Meeting Minutes Monday, March 14, 2016 at 6:00 p.m. Georgetown Public Safety Facility 3500 DB Wood Rd. Georgetown, TX 78628 Members present: Melinda Marler, President; Steve Goodman, Vice-President; Brian Ortego, Katie Porter and Bill Weber, Treasurer. Absent: Richard Harrison Staff present: Jim Briggs, General Manager of Utilities; Andreina Davila, Project Coordinator; and Karen Frost, Administrative Assistant. Call to Order by President Marler at 6:03 p.m. Legislative Regular Agenda A. Consideration and possible approval of minutes of the February 15, 2016 and March 1, 2016 meetings. Amendments were suggested by Goodman and Ortego. 2/15 minutes, item 3: change “transaction” to “transition”; item 8 change what Mr. Weber says; 3/1 minutes, item B add that the Board has been working in good faith to be in compliance; item D under Street Trees, add “possible” drip irrigation. Motion by Weber, second by Goodman to approve the minutes as amended. Approved 5 – 0 – 1. (Harrison absent.) B. Consideration and possible action to approve Merit invoice 122808 dated August 25, 2015 for June irrigation repairs per Work Order 50166. Motion by Goodman, second by Weber to approve payment. Approved 5 – 0 – 1. (Harrison absent.) C. Discussion and possible action pertaining to the specific services (scope of work) for future landscape maintenance contract. And possibly recommend to City Council award of a blanket order for landscaping services to a vendor from the former Invitation to Bid. President Marler opened the floor for discussion. The contractor that was awarded the bid withdrew their bid so a new contractor needs to be chosen. The bid was over 60 days old so the discussion was to whether to go with the second bidder, based on the best value method as before, or to put the contract out to bid again. The current contract for landscaping maintenance expires on March 31st. Even with putting the contract on the fast track for city council approval, the soonest the contract could be executed is May 1. There was also discussion of the removal of the tree trimming line item of the bid and the identification that the bidders did not all have the same understanding of what that involved, as indicated by the vast difference in bidding on that line item. It was agreed that tree trimming would be removed from the landscaping maintenance contract. Motion by Goodman, second by Weber to instruct Purchasing to contact ValleyCrest landscaping, the second in line of the bidders, then Red and White if necessary to see if they Page 4 of 36 Georgetown Village PID Page 2 of 5 Meeting: March 14, 2016 would accept the bid based on the pricing they submitted, minus the tree trimming element. Motion approved 5 – 0 – 1. (Harrison absent.) D. Consideration and possible action to replace the Georgetown Village entry roundabout directional sign. Motion by Goodman, second by Weber to approve replacing the sign. Board members discussed this and decided that a sign was not needed at this time at this location. The motion was withdrawn and no action was taken. E. Discussion and possible direction related to issues identified in the March 1, 2016 Georgetown Village Public Improvement District (GVPID) Advisory Board Workshop pertaining to the GVPID Advisory Board’s roles and responsibility – Jim Briggs, General Manager of Utilities, Andreina Dávila-Quintero, Project Coordinator, Karen Frost, Administrative Assistant/Secretary. These items were discussed out of order in an effort to move through the most critical items quickly. 1. Creation and function of the Board through Committees. The GVPID Advisory Board has created a number of committees to manage the public improvements authorized by the City Council, as well as perform other duties. The Board wishes to know if 1) the committee meetings must be posted and require a quorum to have the meeting, and 2) if the Board can operate with committees to complete their role and responsibility. Davila reported that the GVPID Advisory Board is a City board created and appointed by the City Council, and thus subject to all state and local requirements for City boards and commissions, to include the Open Meetings Act. This applies to all subcommittees created by the Board, as a subcommittee is a subsidiary of the Board who in turn is a subsidiary of the City Council. Because of this, subcommittees are subject to the Open Meetings Act and the City’s rules and regulations for meetings. This means that all subcommittee meetings must be posted; require a quorum of the subcommittee to be present to open the meeting (i.e. if a sub/committee consists of three (3) members, at least two (2) members must be present to open the meeting) and take action, if needed (i.e. recommendation to the full Board); and minutes taken of the subcommittee meeting. There was discussion of this statement. President Marler and other Board members disagreed that the members were actually subcommittees and that they were tasked with “oversight and administration of the maintenance and management of the approved improvements”. They stated that individuals would have to inspect and manage contractors to insure billing accuracy. Or they would research costs of a project individually and bring it back to the board for action to be taken. No action was ever taken by the individuals or subcommittees. The Board members agreed that they acted more like project coordinators or administrators, rather than subcommittees. There was much more discussion regarding how the Board is appointed and what constitutes a subcommittee versus project administrators. The Board has been working without the aid of specific staff members and has done what is needed to get the tasks accomplished to take care of the PID. It was stated that the board has had a lot of turnover of members due to burnout and that it should look at being run as all other city boards to avoid that in the future. It was agreed Page 5 of 36 Georgetown Village PID Page 3 of 5 Meeting: March 14, 2016 by all that there needs to be legal interpretation and identification by City Council on how operations should be carried forward. 2. Maintenance of water quality ponds and facilities. Since 2008, the GVPID Advisory Board has had discussions regarding the responsibility for the maintenance of the water quality ponds, to include conveyance procedure for water quality facilities. The Board wishes to know if the maintenance of water quality ponds falls within the responsibility and purview of the GVPID. Davila explained that the city does not require the ponds, but that TCEQ requires the ponds for the development of the subdivision. Briggs explained that that the PID was created to provide a higher level of maintenance than normal city maintenance, specifically for the special signs, lamp posts and improvements beyond the regular subdivision. Water quality ponds are not typically considered extra, but logistically in this situation, since the water quality pond, the detention pond, the park, the trails and the picnic tables are all in one location, the board can recommend to the City Council approval of payment for the maintenance of all the items. This would need to be added to the assessment plan. 3. GVPID as real property owners. It was discussed that several pocket parks and parcels of land have been deeded to the PID from the developer. Davila explained that the PID is not an entity that can accept these properties and therefore the deeds need to be rewritten. Weber asked for a process for these properties to be transferred in the future. 4. Definition of Amenities Davila explained that the GVPID is responsible for funding the public improvements identified in the Assessment Plan approved by City Council, which includes the administration and maintenance of: Parks less than 1 acre; Alleys (repair, maintenance and replacement); Recreational facilities (gazebo maintenance); Lighting (gazebo lighting and antique street lights - replacement and maintenance); Landscaping (landscape/open space areas and landscaped medians/roundabouts - general grounds maintenance, street trees, trails (walkways around perimeter, trails in park, pedestrian alleyways), hardscape, pet waste dispenser/bags, plant replacement); Signage (street and subdivision signs); and Related improvements (irrigation maintenance, water and electricity (rain sensor, gazebo and irrigation), administrative costs). There was discussion of the list and Weber stated that it was incomplete. There was also discussion of the governing rules and which document was to be used. The rules that were approved by the PID Board in 2014 but were never approved by City Council. The Board will need to recommend approval of new governing rules and those will be taken to City Council. 5. Maintenances of alleys and stormwater inlets/catch basins Briggs stated the city will maintain the drainage portion of the alleys, including the grate, the box and the apron, and the PID will maintain everything else in the alley. Weber and Briggs will talk more about the details. 6. Sidewalks. The Board discussed sidewalks and street trees as one item. Page 6 of 36 Georgetown Village PID Page 4 of 5 Meeting: March 14, 2016 Davila explained the sidewalks that are part of the trail system, as well as hardscape improvements of all landscaped areas are to be maintained by the GVPID. Goodman and Ortego disagree that the sidewalks should be maintained by the PID since the city approved the street trees and the city replaces sidewalks in other areas of town. It was discussed that street tree roots are causing problems with the sidewalks. 7. Street Trees All agreed that there is a problem with the current method of planting street trees. And everyone agreed that the street trees are part of the traditional neighborhood charm. No solution was reached. This item will need to be reviewed at a later date. 8. Budget and 5-year Service Plan Marler stated the Board had not done this in the past. Davila recommends having a discussion in the future to consider hiring a consultant that can help with the assessment plan and all legally required notifications, identifying the costs of the improvements and setting a tax rate for each year. Ortego and Porter agreed that no one has done anything wrong but the problems need to be fixed so the Board can move forward. 9. Administrative Fee Davila reported the latest approved City Council Budget for the GVPID included $11,935 to cover the cost of Administrative Fees. These Administrative Fees cover costs were incurred by Accounting, Controller, Purchasing and Legal staff for services provided specifically related to the operation of the PID. The amount allotted is based on projected time for the fiscal year and hourly rates. The Board asked for the breakdown of the total allocation. 10. Required City Permit for mailing Davila reported the city does not have a permit for bulk mailing. If a bulk mailing is required for notification of a GVPID project, then the city will be involved in helping with the project and can use their system. There are no special postage rates that are given to the city. 11. Automation and Communication Davila explained that all PID documents belong to the city and staff has started the process of collecting any documents that the board has been producing. All these records will be maintained in a records system held by Frost and Davila so that they can respond to any requests using the Freedom of Information Act standards. Board members were asked to send any documents regarding the PID to staff. It was restated that the point of all the work that is being done is to make the PID successful. F. Presentation and discussion of a schedule for the Georgetown Village Public Improvement District (GVPID) FY 2016/17 Budget. Briggs explained that the schedule provided is based on the City Council’s budget cycle. The City Council will meet on July 18th to discuss the budgets so the PID budget will need to be finalized by July 11th. There was discussion of the need to work on a plan to make the board more financially effective. Page 7 of 36 Georgetown Village PID Page 5 of 5 Meeting: March 14, 2016 Marler introduced Mary Drake, a previous board member that wanted to speak to the board. Ms. Drake stated this was her third time to come to the board in regards to replacing the landscaping under the oak tree at Madrid. She said the dirt was washing away and the area under the tree was getting worse. Marler agreed it was an issue and said it would be considered. Weber distributed financial reports. No discussion. Motion by Ortego to adjourn. Second by Goodman. The meeting was adjourned at 9:11 p.m. ______________________________ _______________________________ Approved, Melinda Marler, President Attest, Karen Frost, Secretary Page 8 of 36 Georgetown Village PID Special Page 1 of 1 Meeting: March 21, 2016 City of Georgetown, Texas Georgetown Village Public Improvement District Advisory Board Special Meeting Minutes Monday, March 21, 2016 at 5:00 p.m. Georgetown Public Safety Facility 3500 DB Wood Rd Georgetown, TX 78628 Members present: Melinda Marler, President; Steve Goodman, Vice-President; Richard Harrison; Brian Ortego, and Bill Weber, Treasurer. Absent: Katie Porter Staff present: Jim Briggs, General Manager of Utilities; Trina Bickford, Purchasing Manager; and Karen Frost, Administrative Assistant. Call to Order by President Marler at 5:02 p.m. Legislative Regular Agenda A. Consideration and recommendation regarding disposition of landscape maintenance contract for GVPID public areas. There was discussion of the options available to the board since the preferred bidder backed out and the contract for landscaping maintenance was ending on March 31. The biggest discrepancy among the bidders seemed to be on tree trimming. The Board agreed that tree trimming should be eliminated from the contract and handled as a separate contract. Motion by Marler to accept the 2nd bidder, minus the tree trimming item of the scope, unless this bidder will not honor their bid in which case the PID Board will accept the 3rd bidder if they will honor their bid minus the tree trimming item. And if neither bidder will honor their bid, a new revised bid will be drafted and reissued. In the interim the PID Board will work with the City staff to provide temporary landscape maintenance to Georgetown Village until a contract is accepted. Second by Weber. Approved 5 – 0 – 1 (Porter absent). Motion by Goodman to adjourn. Second by Harrison. The meeting was adjourned at 5:45 p.m. ______________________________ _______________________________ Approved, Melinda Marler, President Attest, Karen Frost, Secretary Page 9 of 36 City of Georgetown, Texas Georgetown Village Improvement District April 25, 2016 SUBJECT: Cons id eration and p o s s ib le ac tion to rec o mmend to the City Counc il the re-appointment o f Melind a Marler fo r a s econd two -year term to end in February 2019 - Karen Frost, Sec retary, and Andreina Dávila- Quintero, Projec t Coordinator ITEM SUMMARY: Purs uant to S ec tio n 2.115.030 of the City Code, members o f the Geo rgetown Village Pub lic Imp ro vement District (GVP ID) Ad vis ory Board s hall s erve a term p erio d of two (2) years . F urthermore, members may b e re-appointed once, for a c o nsec utive s ervic e p erio d of fo ur (4) years. Bas ed on previo us p ractices, Ms . Melinda Marler's firs t full term is sc heduled to end in Ap ril 2016, requiring a rec o mmendatio n fro m the Bo ard for a re-ap p o intment for a sec o nd full term. To b ring the GVPID Advis o ry Bo ard member terms c o nsistent with other C ity Boards and Commissions (March to February o f the fo llo wing year), should Ms . Melind a Marler b e re-ap p o inted by the City Counc il, a partial s econd term wo uld commenc e and be in p lace until February 2017. Ms. Marler's full s econd term would extend from March 2017 to F eb ruary 2019 in acc o rd anc e with the City’s rules and p o licies. FINANCIAL IMPACT: None. SUBMITTED BY: Karen Fro s t Page 10 of 36 City of Georgetown, Texas Georgetown Village Improvement District April 25, 2016 SUBJECT: Cons id eration and p o s s ib le ac tion to execute an Invitation to Bid fo r land s c ap e s ervices fo r the two ro und ab o uts o n Village Commons Boulevard , exc luding renovation of the gazebo - Jim Briggs, General Manager of Utilities ITEM SUMMARY: In Novemb er 2015, the Georgetown Village P ublic Improvement Dis tric t (GVPID) Advis o ry Bo ard exec uted an Invitatio n to Bid for s ervic es to renovate the two ro und ab o uts lo c ated at Village Co mmo ns Bo ulevard within S hell Ranch S ectio n 1 and Georgetown Village Planned Unit Development Sec tion 3-B, to inc lude reno vatio n o f the existing gazeb o. At this time, only o ne b id was rec eived . T he s o le bid was exc es s ive in pric e, and thus was not award ed. To d ate, no re-ad vertis ement has been issued; ho wever, there has b een d is c us s ion about red efining the s cope o f work to bring the projec t closer to the b udgeted amo unt. The original Invitation has been cancelled. If direc ted b y the Bo ard , a c o mp letely new Invitation to Bid will b e issued inc luding the new s cope o f work. Exhibits A and B (land s cape d rawings for the two ro und ab o uts ) have been includ ed for referenc e. FINANCIAL IMPACT: None at this time. SUBMITTED BY: Karen Fro s t ATTACHMENTS: Description Type Exhibit A - GV Entry Circle Exhibit Exhibit B - GV Gazebo Circle Exhibit Page 11 of 36 0 SCALE: feet102030 1" = 10' (2,722 sf)EXS (1)DP (3)PSG (3)SOT (3)TY (7)ART (5)KOR (11)MFG (422 sf)M (3)GMG (3)SPP (1)GWY (15)SPF (3)RR (3)SOT (7)PSG (261)MS (807 sf)NRC (1)SPP (3)TY (8)ART (5)KOR (10)MFG (3)GMG (4)RR (1)DP (15)SPF (1)GWY (409 sf)M (3)PSG (1)SOT (30)SPF (204 sf)M (1)SPP (1)GWY 1 1 1 1 1 2 2 2 2 2 2 2 AT GRADE 3' HIGH 3' HIGH AT GRADE AT GRADE 3' HIGH 2' HIGH AT GRADE 3' HIGH AT GRADE 3 3 3 3 KEEP 3 EXISTING CRAPE MYRTLE. CLEAR ALL OTHER EXISTING PLANT MATERIAL WITHIN INNER CIRCLE. SHRUBS CODE QTY COMMON NAME / BOTANICAL NAME CONT ART 15 Powis Castle Artemisia / Artemisia x `Powis Castle`5 gal DP 2 Dwarf Palmetto / Sabal minor 5 gal GMG 6 Gulf Muhly Grass / Muhlenbergia capillaris `Autumn Blush`5 gal GWY 3 Giant White Yucca / Hesperaloe funifera 5 gal KOR 10 Knock Out Rose / Rosa acicularis `Knock Out`5 gal MFG 21 Mexican Feather Grass / Stipa tenacissima 1 gal PSG 13 Purple Salvia Greggii / Salvia greggii `Purple`5 gal RR 7 Rock Rose / Pavonia lasiopetala 5 gal SOT 7 Sotol / Dasylirion texanum 5 gal SPP 5 Spineless Prickly Pear / Opuntia ellisiana 5 gal TY 6 Thompson`s Yucca / Yucca thompsoniana 15 gal 3+ Head, 5.5`+ Tall Trunk PLANT SCHEDULE GROUND COVERS CODE QTY COMMON NAME / BOTANICAL NAME CONT SPACING MS 261 Meadow Sedge / Carex perdentata `Meadow`1 gal 12" o.c. SPF 60 Silver Ponyfoot / Dichondra argentea 1 gal 24" o.c. BED MATERIAL CODE QTY COMMON NAME / BOTANICAL NAME CONT SPACING M 1,035 sf Organic Mulch / Shredded Hardwood mulch 3" deep with 3" of "Growers Mix" soil (40% compost, 40% loam, 10% sand) tilled at a depth of 6" in all areas of the bed. Weed barrier cloth beneath. Drip irrigation. NRC 807 sf River Cobble / Native River Cobble river cobble 1-3" (70%) Mixed with 3-6" (30%). Weed barrier cloth beneath. 3" of "Growers Mix" soil (40% compost, 40% loam, 10% sand) tilled at a depth of 6" in all areas of the bed. Drip irrigation. SOD/SEED CODE QTY COMMON NAME / BOTANICAL NAME CONT SPACING EXS 2,721 sf Existing Sod / Lawn sod Replace existing sod where disturbed. Check irrigation, and adjust/repair as needed. SYMBOL DESCRIPTION QTY 6WHHOHGJH´[´ODQGVFDSHHGJLQJDVPDQXIDFWXUHGE\5\HUVRQRU119 lf equal, brown and furnished with steel stakes. Install edging in smooth FXUYHVIUHHRINLQNV)LQDOKHLJKWRIHGJLQJWREH´DERYHKHLJKWRIVRLO level with top of mulch. Cut edging at an angle to be flush with top of concrete where they meet. Limestone boulders, large "two-man" boulders. Lean smaller boulders onto larger boulders. Stack groups to 3` height along perimeter border. Stone Border/Wall. Mortared 6" wide chop-block sandstone (to match sign stone at entry) with mortar base. Border is at grade where shown and steps up to a 3` height as located on the layout. Chop-block stone meets seamlessly with, and is mortared to limestone boulders. 1 2 3 REFERENCE NOTES SCHEDULE SYMBOL KEY -Existing Tree NOTES x Remove all existing plant material within the proposed inner circle except for the three existing Crape Myrtles x Convert existing bed irrigation to a drip system x Protect newly planted shrubs from freeze if planted within cool months Know what's R SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL Material Finish Electrical Lamp Watts Color Temp Lens Ballast Optics/Glare Mounting Options Well Light, FX Luminaire KG 9 Composite (BZ) Bronze Metallic 15V 9LED 50W 2900K Amber N/A N/A In-ground N/A Up Light, FX Luminaire CC 3 Brass (BZ) Bronze Metallic 15V 3LED 20W 2900K Amber N/A N/A (CDS) CapannaDiNoce N/A LIGHTING SCHEDULE .C P F U E C R G  2 N C P wi l l b l a i r )G Q T I G V Q Y P  8 K N N C I G 'P V T [  % K T E N G BL A I R L A N D S C A P E AR C H I T E C T U R E , L L C . L L A B I S A W ET S T A 1 2 O F 7 4 E T XA S L I M I R Page 12 of 36 0 SCALE: feet102030 1" = 10' 1 1 1 1 1 2 2 2 2 2 2 2 AT GRADE 3' HIGH 3' HIGH AT GRADE AT GRADE 3' HIGH 2' HIGH AT GRADE 3' HIGH AT GRADE 3 3 3 3 KEEP 3 EXISTING CRAPE MYRTLE. CLEAR ALL OTHER EXISTING PLANT MATERIAL WITHIN INNER CIRCLE. SYMBOL DESCRIPTION QTY 6WHHOHGJH´[´ODQGVFDSHHGJLQJDVPDQXIDFWXUHGE\5\HUVRQRU119 lf equal, brown and furnished with steel stakes. Install edging in smooth FXUYHVIUHHRINLQNV)LQDOKHLJKWRIHGJLQJWREH´DERYHKHLJKWRIVRLO level with top of mulch. Cut edging at an angle to be flush with top of concrete where they meet. Limestone boulders, large "two-man" boulders. Lean smaller boulders onto larger boulders. Stack groups to 3` height along perimeter border. Stone Border/Wall. Mortared 6" wide chop-block sandstone (to match sign stone at entry) with mortar base. Border is at grade where shown and steps up to a 3` height as located on the layout. Chop-block stone meets seamlessly with, and is mortared to limestone boulders. 1 2 3 REFERENCE NOTES SCHEDULE SYMBOL KEY -Existing Tree NOTES x Remove all existing plant material within the proposed inner circle except for the three existing Crape Myrtles x Convert existing bed irrigation to a drip system x Protect newly planted shrubs from freeze if planted within cool months Know what's R SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL Material Finish Electrical Lamp Watts Color Temp Lens Ballast Optics/Glare Mounting Options Well Light, FX Luminaire KG 9 Composite (BZ) Bronze Metallic 15V 9LED 50W 2900K Amber N/A N/A In-ground N/A Up Light, FX Luminaire CC 3 Brass (BZ) Bronze Metallic 15V 3LED 20W 2900K Amber N/A N/A (CDS) CapannaDiNoce N/A LIGHTING SCHEDULE .K I J V K P I  2 N C P wi l l b l a i r )G Q T I G V Q Y P  8 K N N C I G 'P V T [  % K T E N G BL A I R L A N D S C A P E AR C H I T E C T U R E , L L C . L L A B I S A W ET S T A 1 2 O F 7 4 E T XA S L I M I R Page 13 of 36 .C P F U E C R G  + T T K I C V K Q P 5R G E K H K E C V K Q P U wi l l b l a i r )G Q T I G V Q Y P  8 K N N C I G 'P V T [  % K T E N G 1" = 1'-0" SHRUB PLANTING LANDSCAPE PLANTING SPECIFICATIONS 1) Guarantee - All labor, materials and plants will be guaranteed for a period of twelve (12) months after the final acceptance of work by Owner. All plants that have died or are unhealthy shall be replaced no later than 30 days from the anniversary date of the final acceptance. This guarantee does not apply to plant material that dies due to abnormal freezes, hail, abnormal high winds, or other acts of God, vandalism or lack of normal maintenance and watering. This guarantee does not apply to annual plantings. 2) Contractor is to verify all site dimensions and layout prior to the commencement of landscape construction. Any discrepancies between the drawings and the actual site conditions shall be brought to the attention of WKHRZQHU¶VUHSUHVHQWDWLYHLPPHGLDWHO\ 3) Contractor is responsible for verification of the location of all underground utilities, repair to said utilities as a result of the work of the contractor shall be the responsibility of the contractor. Refer to the drawing for any additional information. 4) Contractor is responsible for maintaining positive drainage in all shrub and turf planting areas.  7UHHSLWVDUHWREHWKHVDPHGHSWKDVWKHURRWEDOODQG´ZLGHU3ULRU to planting the tree pit should be filled with water to check for good drainage. If water does not drain the Contractor should check with the Landscape Architect to relocate the tree. 6) Trees should be positioned in the center of the tree pits, back filled with soil that was excavated from the pit until the surface is level with the surrounding area and the crown of the plant is at the finished grade. Build a ZDWHUEDVLQDURXQGWKHWUHH ´GLD :DWHUXQWLOSODQWLQJSLWLVVRDNHG and soil has settled. Add soil necessary to bring soil level flush with surrounding ground. Fill the basin with three (3) inches of compost. 7) All plant material shall conform to the standards of the latest edition of ³$PHULFDQ6WDQGDUGIRU1XUVHU\6WRFN´E\7KH$PHULFDQ$VVRFLDWLRQRI 1XUVHU\PHQDQG³*UDGHVDQG6WDQGDUGV´E\7KH7H[DV$VVRFLDWLRQRI Nurserymen. A plant shall be dimensioned as it stands in its natural position. All plants shall be at least the minimum size indicated. Larger stock is acceptable at no additional cost, and providing that the larger plants will not be cut back to size indicated. 4) 120 VAC electrical power source at controller location shall be provided by others. The irrigation contractor shall make the final connection from the electrical source to the controller. 5) All sprinkler heads shall be set perpendicular to finish grade unless otherwise specified (N/A, drip irrigation only) 6) The irrigation contractor shall flush and adjust all sprinkler heads and valves for optimum coverage with minimal overspray onto walks, streets, walls, etc. 7) Head location is the responsibility of the irrigation contractor, with the understanding that all landscape areas will receive adequate water to provide for vigorous growth of vegetation. 8) Irrigation contractor will replace or repair all items damaged by his work. 9) All work shall be installed in accordance with applicable codes and ordinances for the City of Cedar Park, Texas and the National Electrical Code and all governing authorities. 10) The irrigation contractor is responsible for reporting any deficiency in water pressure that would affect the operation of the irrigation system. 11) The irrigation contractor shall be a Registered Licensed Irrigator in the State of Texas. Contractor must conform to all codes as stated in section 34 of the Texas Water Code and TNRCC. 12) All remote control valves, gate valves, quick couplers and control wire and computer cable pull pints shall be installed in approved valve boxes. 13) Irrigation Contractor shall procure all permits, licenses, and pay all charges and fees and give all necessary notices for the completion of work. 14) Contractor shall not disturb roots of existing trees. There shall be no machine trenching below the dripline of existing trees. 15) Extreme care shall be exercised in excavating and working near utilities. Contractor shall verify the location and condition of all utilities and be responsible for damage to any utilities. 16) Contractor shall clearly mark all exposed excavations, materials, and equipment. Cover or barricade trenches when the contractor is not on the site. Take all necessary precautions to protect and prevent injury to any persons on the site. 17) All automatic irrigation systems shall be equipped with a controller of dual or multiple programming. Controllers shall have multiple cycle start capacity and a flexible calendar program, including the capacity of being set to water every five days. All automatic irrigation systems shall be equipped with a rain sensor shutoff device. 18) Irrigation in Texas is regulated by the Texas Natural Resource Conservation Commission, P.O. Box 13087, Austin, Texas 78711-3087  ,WLVWKHODQGVFDSHFRQWUDFWRU¶VUHVSRQVLELOLW\WRSURYLGHSODQWVIUHH of disease or pests. 9) Space specified quantity of plant materials to evenly fill designated areas, adjusting spacing indicated on the drawings as required. Landscape architect or owner to have final approval of locations of all trees, shrubs and groundcover beds. 10) Contractor is responsible for removing all clods, rocks, concrete, trash and any other debris from beds prior to adding soil ix or plant material. 11) All planting beds should have three (3) inches of compost tilled into them to a depth of six (6) inches. A three (3) inch layer of shredded hardwood bark mulch should be applied to all beds after planting is completed. Four (4) inch pots and ground cover may be planted through the mulch. 12) Contractor is responsible for removal of trash and repair of hazardous conditions (tools, open holes, et.) on a daily basis by the end of the work day. 13) Water all plantings in bed areas thoroughly on a daily basis until final acceptance.  6WHHOHGJLQJVKDOOEH´[´ODQGVFDSHHGJLQJDVPDQXIDFWXUHG by Ryerson, or equal, brown and furnished with steel stakes. Install edging in smooth curves free of kinks. Final height of edging to be ´DERYHKHLJKWRIVRLO 15) To prepare turf areas treat them with a selective herbicide two weeks prior to sodding or seeding. Then rake area to remove stones, sticks and other debris. Add two (2) inches of topsoil to the turf area. 5DNHDUHDWRDILQLVKJUDGH ´EHORZZDONVDQGFXUEV  16) If sodding is to take place the sod should be gathered and planted within a 48 hour period. Lay the sod to form a solid mass with tight fitting joints. Butt ends and sides of sod and offset joints in adjacent courses. Roll sod to ensure good contact with soil. If planting on a slope be sure to lay courses parallel to the contours and secure sod with pins if necessary. Site preparation and maintenance will be the same for hydromulching. 17) Water sod daily so as to not allow turf blades to wilt. If necessary water twice per day. 18) Apply slow release fertilizer 15-15-15 or equal at a rate of 2 lbs. per 100 s.f. to all turf or planted areas. 19) Contractor shall keep all construction areas and public streets free from accumulation of waste material. Upon completion of construction and prior to final approval contractor shall thoroughly clean the site of all trash, spilled soil, and litter, etc. that has resulted from landscape construction operations. Repair all damage to finish grade including tailings from excavations, wheel ruts, etc. caused from construction. All debris, trash and excess materials and equipment shall be removed from the site prior to final acceptance. 20) Remove all tags, ribbons and wires from all newly installed plant material. LANDSCAPE MAINTENANCE REQUIREMENTS The owner shall be responsible for: 1) Regular maintenance of all required landscape areas and plant materials in a vigorous and healthy condition, free from diseases, pests, weeds, and litter. This maintenance shall include weeding, watering, fertilization, pruning, mowing, edging, mulching or other needed maintenance, in accordance with generally accepted horticultural practice. 2) The repair or replacement of required landscape structures (walls, fences, etc.) to a structurally sound condition. 3) The regular maintenance, repair, or replacement, where necessary, of any required screening or buffering. 4) All open space areas that are to be preserved as natural plant communities shall be trimmed, at least once a year, of all exotic vegetation, lawn grasses, trash, or other debris. Natural area should be mulched, pruned and otherwise maintained so that plants are vigorous. IRRIGATION SPECIFICATIONS 1) Irrigation contractor will provide pipes for sleeves and specify locations for placement of sleeves by general contractor prior to pouring concrete or laying asphalt. 2) Irrigation contractor will install all backflow prevention devices and all piping between the point of connection and the backflow preventer as per local governing authorities. 3) Find location of backflow preventer, and automatic controller location shall EHDSSURYHGE\WKHRZQHU¶VDXWKRUL]HGUHSUHVHQWDWLYH 1 BL A I R L A N D S C A P E AR C H I T E C T U R E , L L C . L L A B I S A W ET S T A 1 2 O F 7 4 E T XA S L I M I R Page 14 of 36 0 SCALE: feet102030 1" = 10' (5)RR (1)SOT (49)MS (116 sf)NRC (60)SPF (303 sf)M (1)SOT (7)RR (5)MFG (95 sf)NRC (42)SPF (9)PSG (3)GWY (741 sf)NRC (17)GMG (13)ART (5)KOR (3)DP (49)MS (89)MS (3)SPP (10)FAS (1)GWY (258 sf)M (13)SPF (36)MS (1)SOT (94 sf)NRC (5)RR (202 sf)M (65 sf)NRC (1)SOT (4)RR (3)MFG (15)PSG (54)SPF (486 sf)M (5)GWY (21)GMG (5)KOR (36)MS (3)SPP (13)ART (3)DP (1)GWY (12)SPF (76)MS (246 sf)M (749 sf)NRC (359 sf)M 1 1 1 1 1 1 1 1 1 1 1 (10)FAS 2 2 (25)MFG (20)MFG (43)SPF 2 2 2 2 2 1 SHRUBS CODE QTY COMMON NAME / BOTANICAL NAME CONT ART 26 Powis Castle Artemisia / Artemisia x `Powis Castle`5 gal DP 6 Dwarf Palmetto / Sabal minor 5 gal FAS 20 Fall Aster / Aster oblongifolius 5 gal GMG 38 Gulf Muhly Grass / Muhlenbergia capillaris `Autumn Blush`5 gal GWY 10 Giant White Yucca / Hesperaloe funifera 5 gal KOR 10 Knock Out Rose / Rosa acicularis `Knock Out`5 gal MFG 53 Mexican Feather Grass / Stipa tenacissima 1 gal PSG 24 Purple Salvia Greggii / Salvia greggii `Purple`5 gal RR 21 Rock Rose / Pavonia lasiopetala 5 gal SOT 4 Sotol / Dasylirion texanum 5 gal SPP 6 Spineless Prickly Pear / Opuntia ellisiana 5 gal PLANT SCHEDULE GROUND COVERS CODE QTY COMMON NAME / BOTANICAL NAME CONT MS 335 Meadow Sedge / Carex perdentata `Meadow`1 gal SPF 224 Silver Ponyfoot / Dichondra argentea 1 gal BED MATERIAL CODE QTY COMMON NAME / BOTANICAL NAME CONT M 1,854 sf Organic Mulch / Shredded Hardwood mulch 3" deep with 3" of "Growers Mix" soil (40% compost, 40% loam, 10% sand) tilled at a depth of 6" in all areas of the bed. Weed barrier cloth beneath. Drip irrigation. NRC 1,860 sf River Cobble / Native River Cobble river cobble 1-3" (70%) Mixed with 3-6" (30%). Weed barrier cloth beneath. 3" of "Growers Mix" soil (40% compost, 40% loam, 10% sand) tilled at a depth of 6" in all areas of the bed. Drip irrigation. SYMBOL DESCRIPTION QTY 6WHHOHGJH´[´ODQGVFDSHHGJLQJDVPDQXIDFWXUHGE\5\HUVRQRU241 lf equal, brown and furnished with steel stakes. Install edging in smooth FXUYHVIUHHRINLQNV)LQDOKHLJKWRIHGJLQJWREH´DERYHKHLJKWRIVRLO level with top of mulch. Cut edging at an angle to be flush with top of concrete where they meet. Limestone boulders, large "two-man" boulders. Lean smaller boulders onto larger boulders. 1 2 REFERENCE NOTES SCHEDULE SYMBOL KEY -Existing Tree NOTES -Remove all existing shrubs -Convert existing irrigation to a drip system -Protect newly planted shrubs from freeze Know what's R SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL Material Finish Electrical Lamp Watts Color Temp Lens Ballast Optics/Glare Mounting Options Well Light, FX Luminaire KG 4 Composite (BZ) Bronze Metallic 15V 9LED 50W 2900K Amber N/A N/A In-ground N/A Path Light, FX Luminaire FG 12 Brass (BZ) Bronze Metallic 15V 6LED 35W 2900K Amber N/A N/A (CDS) CapannaDiNoce N/A Up Light, FX Luminaire CC 10 Brass (BZ) Bronze Metallic 15V 3LED 20W 2900K Amber N/A N/A (CDS) CapannaDiNoce N/A Up Light-Tree, FX Luminaire NP 4 N/A (BZ) Bronze Metallic 15V 9LED 50W 2900K Color Amber N/A N/A TreeBox N/A LIGHTING SCHEDULE .C P F U E C R G  2 N C P wi l l )G Q T I G V Q Y P  8 K N N C I G )C \ G D Q  % K T E N G $. # + 4 Ä * + . . .# 0 & 5 % # 2 ' #4 % * + 6 ' % 6 5 . L L A B I S A W ET S T A 1 2 O F 7 4 E T XA S L I M I R Page 15 of 36 0 SCALE: feet102030 1" = 10' 1 1 1 1 1 1 1 1 1 1 1 2 2 2 2 2 2 2 1 SYMBOL DESCRIPTION QTY 6WHHOHGJH´[´ODQGVFDSHHGJLQJDVPDQXIDFWXUHGE\5\HUVRQRU241 lf equal, brown and furnished with steel stakes. Install edging in smooth FXUYHVIUHHRINLQNV)LQDOKHLJKWRIHGJLQJWREH´DERYHKHLJKWRIVRLO level with top of mulch. Cut edging at an angle to be flush with top of concrete where they meet. Limestone boulders, large "two-man" boulders. Lean smaller boulders onto larger boulders. 1 2 REFERENCE NOTES SCHEDULE SYMBOL KEY -Existing Tree NOTES -Remove all existing shrubs -Convert existing irrigation to a drip system -Protect newly planted shrubs from freeze Know what's R SYMBOL MANUFACTURER/MODEL/DESCRIPTION QTY DETAIL Material Finish Electrical Lamp Watts Color Temp Lens Ballast Optics/Glare Mounting Options Well Light, FX Luminaire KG 4 Composite (BZ) Bronze Metallic 15V 9LED 50W 2900K Amber N/A N/A In-ground N/A Path Light, FX Luminaire FG 12 Brass (BZ) Bronze Metallic 15V 6LED 35W 2900K Amber N/A N/A (CDS) CapannaDiNoce N/A Up Light, FX Luminaire CC 10 Brass (BZ) Bronze Metallic 15V 3LED 20W 2900K Amber N/A N/A (CDS) CapannaDiNoce N/A Up Light-Tree, FX Luminaire NP 4 N/A (BZ) Bronze Metallic 15V 9LED 50W 2900K Color Amber N/A N/A TreeBox N/A LIGHTING SCHEDULE .K I J V K P I  2 N C P wi l l )G Q T I G V Q Y P  8 K N N C I G )C \ G D Q  % K T E N G $. # + 4 Ä * + . . .# 0 & 5 % # 2 ' #4 % * + 6 ' % 6 5 . L L A B I S A W ET S T A 1 2 O F 7 4 E T XA S L I M I R Page 16 of 36 .C P F U E C R G  + T T K I C V K Q P 5R G E K H K E C V K Q P U $. # + 4 Ä * + . . .# 0 & 5 % # 2 ' #4 % * + 6 ' % 6 5 wi l l )G Q T I G V Q Y P  8 K N N C I G )C \ G D Q  % K T E N G . L L A B I S A W ET S T A 1 2 O F 7 4 E T XA S L I M I R 1" = 1'-0" SHRUB PLANTING LANDSCAPE PLANTING SPECIFICATIONS 1) Guarantee - All labor, materials and plants will be guaranteed for a period of twelve (12) months after the final acceptance of work by Owner. All plants that have died or are unhealthy shall be replaced no later than 30 days from the anniversary date of the final acceptance. This guarantee does not apply to plant material that dies due to abnormal freezes, hail, abnormal high winds, or other acts of God, vandalism or lack of normal maintenance and watering. This guarantee does not apply to annual plantings. 2) Contractor is to verify all site dimensions and layout prior to the commencement of landscape construction. Any discrepancies between the drawings and the actual site conditions shall be brought to the attention of WKHRZQHU¶VUHSUHVHQWDWLYHLPPHGLDWHO\ 3) Contractor is responsible for verification of the location of all underground utilities, repair to said utilities as a result of the work of the contractor shall be the responsibility of the contractor. Refer to the drawing for any additional information. 4) Contractor is responsible for maintaining positive drainage in all shrub and turf planting areas.  7UHHSLWVDUHWREHWKHVDPHGHSWKDVWKHURRWEDOODQG´ZLGHU3ULRU to planting the tree pit should be filled with water to check for good drainage. If water does not drain the Contractor should check with the Landscape Architect to relocate the tree. 6) Trees should be positioned in the center of the tree pits, back filled with soil that was excavated from the pit until the surface is level with the surrounding area and the crown of the plant is at the finished grade. Build a ZDWHUEDVLQDURXQGWKHWUHH ´GLD :DWHUXQWLOSODQWLQJSLWLVVRDNHG and soil has settled. Add soil necessary to bring soil level flush with surrounding ground. Fill the basin with three (3) inches of compost. 7) All plant material shall conform to the standards of the latest edition of ³$PHULFDQ6WDQGDUGIRU1XUVHU\6WRFN´E\7KH$PHULFDQ$VVRFLDWLRQRI 1XUVHU\PHQDQG³*UDGHVDQG6WDQGDUGV´E\7KH7H[DV$VVRFLDWLRQRI Nurserymen. A plant shall be dimensioned as it stands in its natural position. All plants shall be at least the minimum size indicated. Larger stock is acceptable at no additional cost, and providing that the larger plants will not be cut back to size indicated. 4) 120 VAC electrical power source at controller location shall be provided by others. The irrigation contractor shall make the final connection from the electrical source to the controller. 5) All sprinkler heads shall be set perpendicular to finish grade unless otherwise specified (N/A, drip irrigation only) 6) The irrigation contractor shall flush and adjust all sprinkler heads and valves for optimum coverage with minimal overspray onto walks, streets, walls, etc. 7) Head location is the responsibility of the irrigation contractor, with the understanding that all landscape areas will receive adequate water to provide for vigorous growth of vegetation. 8) Irrigation contractor will replace or repair all items damaged by his work. 9) All work shall be installed in accordance with applicable codes and ordinances for the City of Cedar Park, Texas and the National Electrical Code and all governing authorities. 10) The irrigation contractor is responsible for reporting any deficiency in water pressure that would affect the operation of the irrigation system. 11) The irrigation contractor shall be a Registered Licensed Irrigator in the State of Texas. Contractor must conform to all codes as stated in section 34 of the Texas Water Code and TNRCC. 12) All remote control valves, gate valves, quick couplers and control wire and computer cable pull pints shall be installed in approved valve boxes. 13) Irrigation Contractor shall procure all permits, licenses, and pay all charges and fees and give all necessary notices for the completion of work. 14) Contractor shall not disturb roots of existing trees. There shall be no machine trenching below the dripline of existing trees. 15) Extreme care shall be exercised in excavating and working near utilities. Contractor shall verify the location and condition of all utilities and be responsible for damage to any utilities. 16) Contractor shall clearly mark all exposed excavations, materials, and equipment. Cover or barricade trenches when the contractor is not on the site. Take all necessary precautions to protect and prevent injury to any persons on the site. 17) All automatic irrigation systems shall be equipped with a controller of dual or multiple programming. Controllers shall have multiple cycle start capacity and a flexible calendar program, including the capacity of being set to water every five days. All automatic irrigation systems shall be equipped with a rain sensor shutoff device. 18) Irrigation in Texas is regulated by the Texas Natural Resource Conservation Commission, P.O. Box 13087, Austin, Texas 78711-3087  ,WLVWKHODQGVFDSHFRQWUDFWRU¶VUHVSRQVLELOLW\WRSURYLGHSODQWVIUHH of disease or pests. 9) Space specified quantity of plant materials to evenly fill designated areas, adjusting spacing indicated on the drawings as required. Landscape architect or owner to have final approval of locations of all trees, shrubs and groundcover beds. 10) Contractor is responsible for removing all clods, rocks, concrete, trash and any other debris from beds prior to adding soil ix or plant material. 11) All planting beds should have three (3) inches of compost tilled into them to a depth of six (6) inches. A three (3) inch layer of shredded hardwood bark mulch should be applied to all beds after planting is completed. Four (4) inch pots and ground cover may be planted through the mulch. 12) Contractor is responsible for removal of trash and repair of hazardous conditions (tools, open holes, et.) on a daily basis by the end of the work day. 13) Water all plantings in bed areas thoroughly on a daily basis until final acceptance.  6WHHOHGJLQJVKDOOEH´[´ODQGVFDSHHGJLQJDVPDQXIDFWXUHG by Ryerson, or equal, brown and furnished with steel stakes. Install HGJLQJLQVPRRWKFXUYHVIUHHRINLQNV)LQDOKHLJKWRIHGJLQJWREH´ above height of soil. 15) To prepare turf areas treat them with a selective herbicide two weeks prior to sodding or seeding. Then rake area to remove stones, sticks and other debris. Add two (2) inches of topsoil to the turf area. 5DNHDUHDWRDILQLVKJUDGH ´EHORZZDONVDQGFXUEV  16) If sodding is to take place the sod should be gathered and planted within a 48 hour period. Lay the sod to form a solid mass with tight fitting joints. Butt ends and sides of sod and offset joints in adjacent courses. Roll sod to ensure good contact with soil. If planting on a slope be sure to lay courses parallel to the contours and secure sod with pins if necessary. Site preparation and maintenance will be the same for hydromulching. 17) Water sod daily so as to not allow turf blades to wilt. If necessary water twice per day. 18) Apply slow release fertilizer 15-15-15 or equal at a rate of 2 lbs. per 100 s.f. to all turf or planted areas. 19) Contractor shall keep all construction areas and public streets free from accumulation of waste material. Upon completion of construction and prior to final approval contractor shall thoroughly clean the site of all trash, spilled soil, and litter, etc. that has resulted from landscape construction operations. Repair all damage to finish grade including tailings from excavations, wheel ruts, etc. caused from construction. All debris, trash and excess materials and equipment shall be removed from the site prior to final acceptance. 20) Remove all tags, ribbons and wires from all newly installed plant material. LANDSCAPE MAINTENANCE REQUIREMENTS The owner shall be responsible for: 1) Regular maintenance of all required landscape areas and plant materials in a vigorous and healthy condition, free from diseases, pests, weeds, and litter. This maintenance shall include weeding, watering, fertilization, pruning, mowing, edging, mulching or other needed maintenance, in accordance with generally accepted horticultural practice. 2) The repair or replacement of required landscape structures (walls, fences, etc.) to a structurally sound condition. 3) The regular maintenance, repair, or replacement, where necessary, of any required screening or buffering. 4) All open space areas that are to be preserved as natural plant communities shall be trimmed, at least once a year, of all exotic vegetation, lawn grasses, trash, or other debris. Natural area should be mulched, pruned and otherwise maintained so that plants are vigorous. IRRIGATION SPECIFICATIONS 1) Irrigation contractor will provide pipes for sleeves and specify locations for placement of sleeves by general contractor prior to pouring concrete or laying asphalt. 2) Irrigation contractor will install all backflow prevention devices and all piping between the point of connection and the backflow preventer as per local governing authorities. 3) Find location of backflow preventer, and automatic controller location shall EHDSSURYHGE\WKHRZQHU¶VDXWKRUL]HGUHSUHVHQWDWLYH 1 Page 17 of 36 City of Georgetown, Texas Georgetown Village Improvement District April 25, 2016 SUBJECT: Disc ussion and p o s s ib le ac tion regard ing the proc urement o f services o f a c ertified Arb o ris t to as s es s the existing c o nditions of the trees within Geo rgetown Village Pub lic Imp ro vement Dis tric t’s (GVP ID) p ublic areas , and rec o mmend an actio n p lan to ad dres s immed iate and lo ng-term c o nc erns - S teve Goodman, Vice-Pres id ent ITEM SUMMARY: Currently, the GVP ID has not c o nducted an as s es s ment of all trees within the Dis trict’s pub lic areas to d etermine exis ting c o nditio ns and id entify trees that may have b een compro mis ed (pose a hazard situation). As the Dis tric t’s trees c o ntinue to gro w, there is a growing need to evaluate them to determine 1) which trees have a hazard s ituatio n that req uire immediate attention; 2) which trees req uire attentio n in the sho rt- term to avoid a future hazard s ituation; and 3) what ac tions (i.e. regular pruning, etc .) must be taken in the s hort and long terms to properly maintain and c are fo r the existing trees . The Bo ard may ap p ro ve p ro curement of thes e c ons ulting services fo r an amo unt not to exceed $3,000 without exec uting an Invitatio n to Bid in ac co rd anc e with the City’s Purchas ing Polic y. Sho uld es timates exc eed $3,000, an item to exec ute an Invitatio n to Bid for the sc o p e of s ervic es will b e presented to the Bo ard at a future meeting for ap p ro val. FINANCIAL IMPACT: The cost for the rep air and maintenanc e of parks , landsc ap ing and trees was ap p ro ved as part of the FY 2015/16 GVPID Bud get. SUBMITTED BY: And reina Davila-Quintero , Projec t Coordinato r Page 18 of 36 City of Georgetown, Texas Georgetown Village Improvement District April 25, 2016 SUBJECT: Disc ussion and p o s s ib le rec o mmendatio n to the City Counc il on the As s es s ment Plan Ordinanc e for the Geo rgeto wn Village Pub lic Imp ro vement Dis tric t (GVP ID) - And reina Dávila-Quintero , Projec t Coordinator, and Jim Briggs, General Manager of Utilities ITEM SUMMARY: In 1999, the City Counc il autho rized the creation of the Georgetown Village P ublic Improvement Dis tric t (GVPID) to fund c ertain p ublic improvements that b enefit the land within the Dis tric t. With the creatio n of the Dis tric t, the C ity C o uncil ap p ro ved an As s es s ment Plan to levy as s es s ments agains t the properties within the Dis tric t to maintain thes e pub lic improvements within the Dis tric t. T his As s es s ment P lan has b een amended over the years as new p ro p erty has b een inc o rp o rated into the Dis tric t, the las t o f whic h was ap p ro ved in 2014, when the Creeks id e Subd ivis ion was made p art o f the Dis tric t (Exhibit A). Currently, the p ublic improvements approved as part of the Assessment Plan inc lude: The operation, repair and maintenance of “non-City parks ”, rec reatio nal fac ilities, alleyways, lighting, and related improvements , mo re spec ific ally: P arks les s than 1 ac re, Rec reational fac ilities (gazebo maintenanc e), Alleys (rep air, maintenanc e and rep lacement), Lighting (gazebo lighting and antique s treet lights - replac ement and maintenance), Lands c ap ing (land s cape/o p en s pac e areas and landsc ap ed med ians /ro und ab o uts - general gro und s maintenanc e, s treet trees , trails (walkways aro und perimeter, trails in p ark, pedestrian alleyways ), hardsc ap e, p et waste d is p ens er/b ags, plant rep lacement), S ignage (s p ecial s treet signs and s ub d ivis ion signs), Irrigation maintenanc e, water and elec tricity (rain s ensor, gazeb o and irrigation); and The s ervic es needed fo r the ad ministratio n and o p eration of the Dis tric t, inc luding tho s e of the City. This item is to initiate d is cus s io n with the Bo ard on what pub lic imp ro vements s ho uld b e assessed and maintained by the GVP ID. Once a rec o mmend ed lis t of p ublic improvements is finalized , the recommend ed lis t may b e presented to City C o uncil fo r c o nsideratio n. FINANCIAL IMPACT: None. SUBMITTED BY: And reina Dávila-Quintero , Projec t Coordinato r ATTACHMENTS: Description Type Exhibit A - GVPID Boundary Map Exhibit Page 19 of 36 n n V ILLAGEPARKDR G V VROADE V IL L A G E C O M M O N S B L V D M A L A G A DR GVVROADC B I R C H D R FAIRMO NTDR SO N O RATRCE GREENSIDELN P E N N Y L N VERDE VISTA TASCATE ST P A L O D U R O C A N Y O N T R L NA R A N J O D R SLIPDR F A I R M O U N T L N GREENSIDELN ROWANDR H A NDELDR SUMM E R S GREEN TRAI L O F THE F L O W E R S DORTMUNDDR MADRIDDRHERITAGE OAKS BND H E R I T A G E O A K S B N D B I G S P R I N G S T A C K E R R D B O Q UILLA T R L HID D E N S P RIN G S TRL F O R T D A V I S S T J A Y D E E T E R W S E Q U O I ATRLROSEDALEBLVD INDIAN LODGEST C A N N O N D A L E D R L O G A N R A N C H R D MORALPASS O R O C T CEDARELMLN B RILEYST G V V R O A D J S H E E P SHANKDR C L OVEHITCHDR NA M B O C A W A Y S Q U A R E B N D CROWNANCH O R B N D SYCAMO RE ST A Z U L C T VILLAGE COMMONS BLVD L A V E R N E T E R ROSEBUD LN POPLAR DR BIG BENDTRL D A W A N A L N GVVR O A D G G L O R Y H I L L L N L O V I E L N V I L L AGE G L EN E S EQUOIASPUR B O WLINEDR MESA S P U R SP R INGCT HALFHITCH TRL W S E Q U O I A S P U R LOST CEDARS FAIRFIELDCT RAMADA TRL G OL D E N R O D W A Y HICKORYLN COREOPSIS WAY WIN E C U P W A Y BOXWO OD LOOP R I V ERWALK T RL B I G T HI C K E T S T BELLAI R E D R ENCHANTE D ROCKTRL GAILLA R D I AWAY BERET T ACIR CH ESTN U T CT GREEN GROVE S A N D H IL L S C V C A P R O C K C A N Y O N T R L C E D A R L A K E B L V D BLUE HAWDR RAIN LILYLN M E S A D R WESTBURY LN CORNE LIACT E S E Q U O I ATRL S I E R RA B L A N C O LO O P W ESTBURYLN L O ST M A P L E S TRL WILLIA M S D R ROSEDALE BLVD S H E L L R D MADRO N E DR VALVERDEDR SINUSO DRSEVILLA DR S E D R O T R L WILD W O O D DRWILLIA M S DR L O G A N R A N C H R D SHELL RD VILLAGEELEM. RAYE MCCOYELEMENTARY 0 410 820 1,230205Feet 5 Georgetown Village PID Boundary Map City of GeorgetownApril 11, 2016 Shell RoadCity Council District 5 1 inch = 700 feet LEGEND Georgetown V illage PID Res. 9 90223 -N/Ord. 99-22 Res. 0 508 01-A A-1/Or d. 2 001-42 Res. 0 3260 2-R/Ord . 200 2-3 0 Res. 0 4080 3-V -2 /Ord. 2003-37 Res. 0 11309-JJ/Ord. 2009 -12 Res. 0 62612 -M/Or d. 20 12-74 Res. 0 722 14-R/Or d. 2 014-48 Georgetown C ity Limits Georgetown ETJ Par cels Str eets ***For Informational Use Only*** Page 20 of 36 City of Georgetown, Texas Georgetown Village Improvement District April 25, 2016 SUBJECT: Presentatio n of the Georgetown Village Public Improvement Dis tric t (GVPID) monthly financial rep o rts for the month of Marc h 2016 - Bill Weber, Treas urer ITEM SUMMARY: For the Board 's review,attac hed are the Distric t's financial rep o rts fo r the month of March, 2016, inc luding: Financ ial Summary (Exhibit A) Detail Lis ting of the exp enses (Exhibit B) Utility Us age R ep o rt (Exhibit C) FINANCIAL IMPACT: None. SUBMITTED BY: And reina Dávila-Quintero , Projec t Coordinato r ATTACHMENTS: Description Type Exhibit A - Financial Summary March 2016 Exhibit Exhibit B - Detail Lis ting October 2015 - March 2016 Exhibit Exhibit C - Utility Us age Report October 2015-March 2016 Exhibit Page 21 of 36 15/16 Budget YTD Activity Variance Revenues: Ad Valorem Taxes 416,520$ 404,740$ (11,780)$ Interest Earned 1,500 1,012 (488) Total Revenues 418,020 405,752 (12,268) Expenditures: Administrative Fee 11,935 11,935 - Office Supplies 1,984 - 1,984 Insurance 1,742 - 1,742 Contracts & Leases, Primary 90,934 61,995 28,939 Contracts & Leases, Secondary 66,345 3,300 63,045 Special Services 4,133 - 4,133 Above Ground Improvements 94,241 48,142 46,099 Signs 5,167 525 4,642 Utilities/Irrigation 51,667 25,626 26,041 Maintenance, Alleys/Sidewalks 37,812 - 37,812 Maintenance, Irrigation 29,154 - 29,154 Maintenance, Ponds 16,659 - 16,659 Maintenance, Repairs 6,247 - 6,247 Total Expenditures 418,020 151,523 266,497 Current Year Variance - 254,229 254,229 Beginning Fund Balance 582,059 614,646 [A]32,587 Current Funds Available 582,059$ 868,875$ 286,816$ Notes: •The majority of property tax collections occur in January. •YTD activity includes encumbrances. •Year End YTD activity becomes audited activity each following January. •Fiscal year is from October 1 to September 30. •Unaudited financial statements prepared by the City of Georgetown, as of April 4, 2016. [A]Beginning fund balance from final 2015 year-end financial statements. Financial Statement Village PID March 31, 2016 Page 22 of 36 4-04-2016 04:47 PM C I T Y O F G E O R G E T O W N PAGE: 1 FINANCIAL STATEMENT (UNAUDITED) 234-VILLAGE PID AS OF: MARCH 31ST, 2016 ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET REVENUES BUDGET PERIOD ACTUAL BUDGET ENCUMB. BALANCE _____________________________________________________________________________________________________________________________ REVENUE ======= PRIMARY REVENUE 4-0001-40-100 AD VALOREM TAX 416,520.00 0.00 404,740.25 97.17 0.00 11,779.75 TOTAL PRIMARY REVENUE 416,520.00 0.00 404,740.25 97.17 0.00 11,779.75 INTEREST 4-0001-42-100 ALLOCATED INTEREST 1,500.00 0.00 837.41 55.83 0.00 662.59 4-0001-42-152 GISD TAX (PID) INTEREST 0.00 0.00 174.49 0.00 0.00 ( 174.49) TOTAL INTEREST 1,500.00 0.00 1,011.90 67.46 0.00 488.10 DEVELOPMENT FEE _____________ _____________ _____________ ______ ______________ _______________ ____________________________________________________________________________________ TOTAL REVENUE 418,020.00 0.00 405,752.15 97.07 0.00 12,267.85 VILLAGE PID =========== OTHER _____________ _____________ _____________ ______ ______________ _______________ ____________________________________________________________________________________ _____________________________________________________________________________________________________________________________ *** TOTAL REVENUES *** 418,020.00 0.00 405,752.15 97.07 0.00 12,267.85 ============= ============= ============= ====== ============== =============== _____________________________________________________________________________________________________________________________ Page 23 of 36 4-04-2016 04:47 PM C I T Y O F G E O R G E T O W N PAGE: 2 FINANCIAL STATEMENT (UNAUDITED) 234-VILLAGE PID AS OF: MARCH 31ST, 2016 COMMUNITY SERVICES VILLAGE PID ANNUAL CURRENT Y-T-D % OF Y-T-D BUDGET EXPENSES BUDGET PERIOD ACTUAL BUDGET ENCUMB. BALANCE _____________________________________________________________________________________________________________________________ OPERATIONS 5-0211-51-110 ADMINISTRATIVE CHARGES 11,935.00 0.00 11,935.00 100.00 0.00 0.00 5-0211-51-111 OFFICE SUPPLIES 1,984.00 0.00 0.00 0.00 0.00 1,984.00 5-0211-51-200 INSURANCE 1,742.00 0.00 0.00 0.00 0.00 1,742.00 5-0211-51-310 CONTRACT & LEASES, PRIMARY 90,934.00 0.00 31,420.70 68.18 30,574.78 28,938.52 5-0211-51-311 CONTRACT & LEASES, SECONDA 66,345.00 1,987.95 3,299.77 4.97 0.00 63,045.23 5-0211-51-330 SPECIAL SERVICES 4,133.00 0.00 0.00 0.00 0.00 4,133.00 5-0211-51-341 ABOVE GROUND IMPROVEMENTS 94,241.00 0.00 48,142.00 51.08 0.00 46,099.00 5-0211-51-342 SIGNS 5,167.00 0.00 525.00 10.16 0.00 4,642.00 5-0211-51-430 UTILITIES 51,667.00 0.00 25,625.95 49.60 0.00 26,041.05 5-0211-51-501 MAINT, ALLEYS/SIDEWALKS 37,812.00 0.00 0.00 0.00 0.00 37,812.00 5-0211-51-502 MAINT, IRRIGATION 29,154.00 0.00 0.00 0.00 0.00 29,154.00 5-0211-51-503 MAINT , PONDS 16,659.00 0.00 0.00 0.00 0.00 16,659.00 5-0211-51-504 MAINT, REPAIRS 6,247.00 0.00 0.00 0.00 0.00 6,247.00 TOTAL OPERATIONS 418,020.00 1,987.95 120,948.42 36.25 30,574.78 266,496.80 ____________________________________________________________________________________ TOTAL VILLAGE PID 418,020.00 1,987.95 120,948.42 36.25 30,574.78 266,496.80 _____________________________________________________________________________________________________________________________ TOTAL COMMUNITY SERVICES 418,020.00 1,987.95 120,948.42 36.25 30,574.78 266,496.80 _____________________________________________________________________________________________________________________________ *** TOTAL EXPENSES *** 418,020.00 1,987.95 120,948.42 36.25 30,574.78 266,496.80 ============= ============= ============= ====== ============== =============== *** REVENUES OVER/(UNDER) EXPENSES 0.00 ( 1,987.95 284,803.73 0.00 ( 30,574.78)( 254,228.95) *** END OF REPORT *** Page 24 of 36 4-04-2016 4:51 PM D E T A I L L I S T I N G PAGE: 1 FUN01100 : 234-VILLAGE PID PERIOD TO USE: Oct-2015 THRU Sep-2016 DEPT : N/A SUPPRESS ZEROS ACCOUNTS: 4-0001-40-100 THRU 5-0637-51-310 POST DATE TRAN # REFERENCE PACKET======DESCRIPTION======= VEND INV/JE # NOTE =====AMOUNT==== ====BALANCE==== ------------------------------------------------------------------------------------------------------------------------------------ 4-0001-40-100 AD VALOREM TAX B E G I N N I N G B A L A N C E 0.00 10/31/15 12/01 B69969 VILLAGE PID 26887 TAX DIST ACCRUAL OCT 2015 JE# 445365 6,607.93CR 6,607.93CR ============= OCTOBER ACTIVITY DB: 0.00 CR: 6,607.93CR 6,607.93CR 11/30/15 12/31 B70508 VILLAGE PID 27030 ACCRUAL OF TAX DIST NOV 2015 JE# 445713 17,600.87CR 24,208.80CR ============= NOVEMBER ACTIVITY DB: 0.00 CR: 17,600.87CR 17,600.87CR 12/31/15 1/22 B70911 VILLAGE PID 27101 ACCRUAL OF TAX DIST DEC 2015 JE# 445961 308,351.67CR 332,560.47CR ============= DECEMBER ACTIVITY DB: 0.00 CR: 308,351.67CR 308,351.67CR 1/31/16 2/17 B71483 JAN 16 VPID 27205 TAX DISTRIBUTION ACCRUAL JE# 446292 43,726.63CR 376,287.10CR ============= JANUARY ACTIVITY DB: 0.00 CR: 43,726.63CR 43,726.63CR 2/29/16 3/28 B72305 VILL PID 27352 ACCRUAL OF TAX DIST FEB 16 JE# 446743 28,453.15CR 404,740.25CR ============= FEBRUARY ACTIVITY DB: 0.00 CR: 28,453.15CR 28,453.15CR ============= ACCOUNT TOTAL DB: 0.00 CR: 404,740.25CR ------------------------------------------------------------------------------------------------------------------------------------ 4-0001-42-100 ALLOCATED INTEREST B E G I N N I N G B A L A N C E 0.00 10/31/15 12/02 B69998 26897 INTEREST DISTRIBUTION OCT 15 JE# 445392 106.21CR 106.21CR ============= OCTOBER ACTIVITY DB: 0.00 CR: 106.21CR 106.21CR 11/30/15 12/31 B70509 27031 INTEREST DIST FOR NOV 2015 JE# 445714 108.92CR 215.13CR ============= NOVEMBER ACTIVITY DB: 0.00 CR: 108.92CR 108.92CR 12/31/15 2/05 B71229 DEC 2015 27149 INTEREST DIST DECEMBER 2015 JE# 446122 422.82CR 637.95CR ============= DECEMBER ACTIVITY DB: 0.00 CR: 422.82CR 422.82CR 1/31/16 3/02 B71747 JAN 2016 27257 INTEREST DISTRIBUTION JAN 2016 JE# 446412 199.46CR 837.41CR ============= JANUARY ACTIVITY DB: 0.00 CR: 199.46CR 199.46CR ============= ACCOUNT TOTAL DB: 0.00 CR: 837.41CR ------------------------------------------------------------------------------------------------------------------------------------ 4-0001-42-152 GISD TAX (PID) INTEREST B E G I N N I N G B A L A N C E 0.00 10/31/15 12/01 B69969 VILLAGE PID IN 26887 TAX DIST ACCRUAL OCT 2015 JE# 445365 9.36CR 9.36CR ============= OCTOBER ACTIVITY DB: 0.00 CR: 9.36CR 9.36CR 11/30/15 12/31 B70508 VILLAGE PID IN 27030 ACCRUAL OF TAX DIST NOV 2015 JE# 445713 3.26CR 12.62CR ============= NOVEMBER ACTIVITY DB: 0.00 CR: 3.26CR 3.26CR Page 25 of 36 4-04-2016 4:51 PM D E T A I L L I S T I N G PAGE: 2 FUN01100 : 234-VILLAGE PID PERIOD TO USE: Oct-2015 THRU Sep-2016 DEPT : N/A SUPPRESS ZEROS ACCOUNTS: 4-0001-40-100 THRU 5-0637-51-310 POST DATE TRAN # REFERENCE PACKET======DESCRIPTION======= VEND INV/JE # NOTE =====AMOUNT==== ====BALANCE==== 12/31/15 1/22 B70911 VILLAGE PID IN 27101 ACCRUAL OF TAX DIST DEC 2015 JE# 445961 93.53CR 106.15CR ============= DECEMBER ACTIVITY DB: 0.00 CR: 93.53CR 93.53CR 2/29/16 3/28 B72305 VILL PID INT 27352 ACCRUAL OF TAX DIST FEB 16 JE# 446743 68.34CR 174.49CR ============= FEBRUARY ACTIVITY DB: 0.00 CR: 68.34CR 68.34CR ============= ACCOUNT TOTAL DB: 0.00 CR: 174.49CR ------------------------------------------------------------------------------------------------------------------------------------ 5-0211-51-110 ADMINISTRATIVE CHARGES B E G I N N I N G B A L A N C E 0.00 DEPT: 0211 VILLAGE PID 10/31/15 10/23 B69107 26622 15/16 ADMIN SVC VILLAGE PID JE# 444825 11,935.00 11,935.00 ============= OCTOBER ACTIVITY DB: 11,935.00 CR: 0.00 11,935.00 ============= ACCOUNT TOTAL DB: 11,935.00 CR: 0.00 ------------------------------------------------------------------------------------------------------------------------------------ 5-0211-51-310 CONTRACT & LEASES, PRIMARY LAN B E G I N N I N G B A L A N C E 0.00 10/31/15 11/19 A25175 CHK: 217679 84590 MOW,TRIM,EDGE,BLOW 115841 123377 5,906.14 5,906.14 10/31/15 11/19 A25175 CHK: 217679 84590 IRRIGATION WALK THRU 115841 123377 378.00 6,284.14 ============= OCTOBER ACTIVITY DB: 6,284.14 CR: 0.00 6,284.14 12/01/15 1/13 A30302 CHK: 218987 85203 MOW,TRIM,EDGE,BLOW 115841 124051 5,906.14 12,190.28 12/01/15 1/13 A30302 CHK: 218987 85203 IRRIGATION WALK THRU 115841 124051 378.00 12,568.28 12/31/15 1/13 A30303 CHK: 218987 85203 MOW,TRIM,EDGE,BLOW 115841 124866 5,906.14 18,474.42 12/31/15 1/13 A30303 CHK: 218987 85203 IRRIGATION WALK THRU 115841 124866 378.00 18,852.42 ============= DECEMBER ACTIVITY DB: 12,568.28 CR: 0.00 12,568.28 1/31/16 2/10 A33546 CHK: 219775 85647 MOW,TRIM,EDGE,BLOW 115841 125581 5,906.14 24,758.56 1/31/16 2/10 A33546 CHK: 219775 85647 IRRIGATION WALK THRU 115841 125581 378.00 25,136.56 ============= JANUARY ACTIVITY DB: 6,284.14 CR: 0.00 6,284.14 2/29/16 3/03 A35941 CHK: 220374 85942 MOW,TRIM,EDGE,BLOW 115841 126246 5,906.14 31,042.70 2/29/16 3/03 A35941 CHK: 220374 85942 IRRIGATION WALK THRU 115841 126246 378.00 31,420.70 ============= FEBRUARY ACTIVITY DB: 6,284.14 CR: 0.00 6,284.14 ============= ACCOUNT TOTAL DB: 31,420.70 CR: 0.00 ------------------------------------------------------------------------------------------------------------------------------------ 5-0211-51-311 CONTRACT & LEASES, SECONDARY L B E G I N N I N G B A L A N C E 0.00 Page 26 of 36 4-04-2016 4:51 PM D E T A I L L I S T I N G PAGE: 3 FUN01100 : 234-VILLAGE PID PERIOD TO USE: Oct-2015 THRU Sep-2016 DEPT : 0211 VILLAGE PID SUPPRESS ZEROS ACCOUNTS: 4-0001-40-100 THRU 5-0637-51-310 POST DATE TRAN # REFERENCE PACKET======DESCRIPTION======= VEND INV/JE # NOTE =====AMOUNT==== ====BALANCE==== 10/22/15 11/17 A24961 CHK: 217679 84557 MERIT SERVICE SOLUTIONS 115841 124295 216.67 216.67 ============= OCTOBER ACTIVITY DB: 216.67 CR: 0.00 216.67 2/23/16 3/03 A36102 CHK: 220374 85946 MERIT SERVICE SOLUTIONS 115841 127133 1,095.15 1,311.82 ============= FEBRUARY ACTIVITY DB: 1,095.15 CR: 0.00 1,095.15 3/01/16 3/31 A39252 CHK: 221100 86293 MERIT SERVICE SOLUTIONS 115841 122808 1,987.95 3,299.77 ============= MARCH ACTIVITY DB: 1,987.95 CR: 0.00 1,987.95 ============= ACCOUNT TOTAL DB: 3,299.77 CR: 0.00 ------------------------------------------------------------------------------------------------------------------------------------ 5-0211-51-341 ABOVE GROUND IMPROVEMENTS B E G I N N I N G B A L A N C E 0.00 12/07/15 12/10 A27356 CHK: 218195 84837 PICNIC TABLE 38081 12650 11,071.50 11,071.50 12/07/15 12/10 A27356 CHK: 218195 84837 GAME TABLES 38081 12650 2,473.50 13,545.00 12/07/15 12/10 A27356 CHK: 218195 84837 INSTALLATION 38081 12650 11,140.00 24,685.00 12/07/15 12/10 A27356 CHK: 218195 84837 2015 PICNIC & GAME TABLE 38081 12650 614.00CR 24,071.00 ============= DECEMBER ACTIVITY DB: 24,685.00 CR: 614.00CR 24,071.00 1/21/16 2/22 A34918 CHK: 220052 85802 PICNIC TABLE 38081 12682 11,071.50 35,142.50 1/21/16 2/22 A34918 CHK: 220052 85802 ITEM 100-68-1PL 38081 12682 614.00 35,756.50 1/21/16 2/22 A34918 CHK: 220052 85802 GAME TABLES 38081 12682 2,473.50 38,230.00 1/21/16 2/22 A34918 CHK: 220052 85802 INSTALLATION 38081 12682 11,140.00 49,370.00 1/21/16 2/22 A34918 CHK: 220052 85802 5% DISCOUNT 38081 12682 1,228.00CR 48,142.00 ============= JANUARY ACTIVITY DB: 25,299.00 CR: 1,228.00CR 24,071.00 ============= ACCOUNT TOTAL DB: 49,984.00 CR: 1,842.00CR ------------------------------------------------------------------------------------------------------------------------------------ 5-0211-51-342 SIGNS B E G I N N I N G B A L A N C E 0.00 10/01/15 10/15 A21315 CHK: 216673 84090 GRESHARE ENTERPRISES, IN 23371 38650 525.00 525.00 ============= OCTOBER ACTIVITY DB: 525.00 CR: 0.00 525.00 ============= ACCOUNT TOTAL DB: 525.00 CR: 0.00 ------------------------------------------------------------------------------------------------------------------------------------ 5-0211-51-430 UTILITIES B E G I N N I N G B A L A N C E 0.00 10/01/15 11/03 B69324 26701 CY 1 10/05 JE# 444941 5,830.50 5,830.50 ============= OCTOBER ACTIVITY DB: 5,830.50 CR: 0.00 5,830.50 11/05/15 12/02 B69985 CY 1 11/05 26888 CITY BILLS NOVEMBER 2015 JE# 445371 8,962.86 14,793.36 ============= NOVEMBER ACTIVITY DB: 8,962.86 CR: 0.00 8,962.86 Page 27 of 36 4-04-2016 4:51 PM D E T A I L L I S T I N G PAGE: 4 FUN01100 : 234-VILLAGE PID PERIOD TO USE: Oct-2015 THRU Sep-2016 DEPT : 0211 VILLAGE PID SUPPRESS ZEROS ACCOUNTS: 4-0001-40-100 THRU 5-0637-51-310 POST DATE TRAN # REFERENCE PACKET======DESCRIPTION======= VEND INV/JE # NOTE =====AMOUNT==== ====BALANCE==== 12/07/15 1/08 B70602 27034 CITY BILLS DEC-15 JE# 445719 7,403.53 22,196.89 ============= DECEMBER ACTIVITY DB: 7,403.53 CR: 0.00 7,403.53 1/05/16 2/05 B71232 CY 1 1/05 27166 CITY BILLS JAN 16 JE# 446155 1,746.50 23,943.39 ============= JANUARY ACTIVITY DB: 1,746.50 CR: 0.00 1,746.50 2/05/16 3/03 B71773 FEB 2016 27266 CITY BILLS CY 01 JE# 446427 1,682.56 25,625.95 ============= FEBRUARY ACTIVITY DB: 1,682.56 CR: 0.00 1,682.56 ============= ACCOUNT TOTAL DB: 25,625.95 CR: 0.00 *-*-*-*-*-*-*-*-*-*-*-*-*- 000 ERRORS IN THIS REPORT! *-*-*-*-*-*-*-*-*-*-*-*-*-* ** REPORT TOTALS ** --- DEBITS --- --- CREDITS --- BEGINNING BALANCES: 0.00 0.00 REPORTED ACTIVITY: 122,790.42 407,594.15CR ENDING BALANCES: 122,790.42 407,594.15CR TOTAL FUND ENDING BALANCE: 284,803.73CR Page 28 of 36 4-04-2016 4:51 PM D E T A I L L I S T I N G PAGE: 5 SELECTION CRITERIA ------------------------------------------------------------------------------------------------------------------------------------ FISCAL YEAR: Oct-2015 / Sep-2016 FUND: Include: 234 PERIOD TO USE: Oct-2015 THRU Sep-2016 TRANSACTIONS: BOTH ------------------------------------------------------------------------------------------------------------------------------------ ACCOUNT SELECTION ACCOUNT RANGE: 4-0001-40-100 THRU 5-0637-51-310 DEPARTMENT RANGE: - THRU - ACTIVE FUNDS ONLY: NO ACTIVE ACCOUNT ONLY: NO INCLUDE RESTRICTED ACCOUNTS: NO DIGIT SELECTION: ------------------------------------------------------------------------------------------------------------------------------------ PRINT OPTIONS DETAIL OMIT ACCOUNTS WITH NO ACTIVITY: YES PRINT ENCUMBRANCES: NO PRINT VENDOR NAME: NO PRINT PROJECTS: NO PRINT MONTHLY TOTALS: YES PRINT GRAND TOTALS: NO PRINT: INVOICE # PAGE BREAK BY: NONE ------------------------------------------------------------------------------------------------------------------------------------ *** END OF REPORT *** Page 29 of 36 PID Utility Usage Report 2015-2016 ACCOUNT #: 041-0700-02 COG PARKS VILLAGE PID Water meter 9609764 ADDRESS: 103 SYCAMORE ST (Sycamore Entrance-south; feeds north also)Electric meter R15063190 USAGE:Oct Nov Dec Jan Feb Mar TOTALS 3/4 In Irrigation (thousands of gallons)104.000 107.000 8.000 2.000 2.000 7.000 230.000 Electric Usage (non- irrigation) Municipal Small (kWh)1.000 - - - - - 1.000 CHARGES: Water $439.00 $451.00 $55.00 $31.00 $31.00 $51.00 $1,058.00 Electric (non-irrigation)$125.06 $125.00 $125.00 $125.00 $125.00 $125.00 $750.06 TOTAL CHARGES $564.06 $576.00 $180.00 $156.00 $156.00 $176.00 $1,808.06 ACCOUNT #: 041-0778-00 COG PARKS VILLAGE PID Water meter 23112828 ADDRESS: 714 WESTBURY LN (Cedar Elm Park)Electric Meter R15844500 USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)243.000 170.000 10.000 4.000 5.000 16.000 448.000 Electric Usage (non- irrigation) Municipal Small (kWh)1.000 1.000 - - - 1.000 3.000 CHARGES: Water $1,010.50 $718.50 $78.50 $54.50 $58.50 $102.50 $2,023.00 Electric (non-irrigation)$125.06 $125.06 $125.00 $125.00 $125.00 $125.06 $750.18 TOTAL CHARGES $1,135.56 $843.56 $203.50 $179.50 $183.50 $227.56 $2,773.18 ACCOUNT #: 048-0416-01 COG PARKS VILLAGE PID Water meter 8860987 ADDRESS: 4410 MADRID DR (Bedford Park) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)81.000 60.000 8.000 6.000 11.000 7.000 173.000 CHARGES: Water $362.50 $278.50 $70.50 $62.50 $82.50 $66.50 $923.00 Electric / irrigation $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $36.00 TOTAL CHARGES $368.50 $284.50 $76.50 $68.50 $88.50 $72.50 $959.00 ACCOUNT #: 048-1713-00 COG PARKS VILLAGE PID Water meter 9555260 ADDRESS: 4912 MADRID DR Electric meter R15803297 USAGE:Oct Nov Dec Jan Feb Mar TOTALS 3/4 In Irrigation (thousands of gallons)99.000 67.000 6.000 4.000 9.000 14.000 199.000 CHARGES:Credit Balance as of 10/1 Water $419.00 $291.00 $47.00 $39.00 $59.00 $79.00 $934.00 ($6,837.94) Electric (non-irrigation)$125.00 $125.00 $125.00 $125.00 $125.00 $125.00 $750.00 Credit Balance remaining ACCOUNT CREDIT ($544.00)($416.00)($172.00)($164.00)($184.00)($204.00)($1,684.00)($5,153.94) TOTAL CHARGES $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 3 2 1 4 Page 30 of 36 PID Utility Usage Report 2015-2016 ACCOUNT #: 048-1921-01 COG PARKS VILLAGE PID Water meter 8860997 ADDRESS: 1001 ELMWOOD DR (Rosedale Entrance-S+N) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)140.000 91.000 3.000 3.000 4.000 13.000 254.000 CHARGES: Water $598.50 $402.50 $50.50 $50.50 $54.50 $90.50 $1,247.00 TOTAL CHARGES $598.50 $402.50 $50.50 $50.50 $54.50 $90.50 $1,247.00 ACCOUNT #: 084-0421-01 COG PARKS VILLAGE PID Water meter 8351475 ADDRESS: 506 WESTBURY LN (Chestnut Park) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)15.000 56.000 2.000 1.000 1.000 4.000 79.000 CHARGES: Water $98.50 $262.50 $46.50 $42.50 $42.50 $54.50 $547.00 TOTAL CHARGES $98.50 $262.50 $46.50 $42.50 $42.50 $54.50 $547.00 ACCOUNT #: 084-0424-00 COG PARKS VILLAGE PID Water meter 8351361 ADDRESS: 100 WESTBURY LN (Westbury Entrance-north) (Water looped with 103 Westbury Ln & 100 Village Commons Blvd) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)199.000 170.000 6.000 2.000 4.000 27.000 408.000 CHARGES: Water $834.50 $718.50 $62.50 $46.50 $54.50 $146.50 $1,863.00 TOTAL CHARGES $834.50 $718.50 $62.50 $46.50 $54.50 $146.50 $1,863.00 ACCOUNT #: 084-0426-00 COG PARKS VILLAGE PID Water meter 8404600 ADDRESS: 103 WESTBURY LN (Westbury Entrance-south)Electric meter R15845171 (Water looped with 100 Westbury Ln & 100 Village Commons Blvd) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 1/2 In Irrigation (thousands of gallons) 299.000 245.000 7.000 3.000 5.000 10.000 569.000 CHARGES: Water $1,272.50 $1,056.50 $104.50 $88.50 $96.50 $116.50 $2,735.00 Electric (non-irrigation)$125.00 $125.00 $125.00 $125.00 $125.00 $125.00 $750.00 TOTAL CHARGES $1,397.50 $1,181.50 $229.50 $213.50 $221.50 $241.50 $3,485.00 8 7 6 5 Page 31 of 36 PID Utility Usage Report 2015-2016 ACCOUNT #: 084-0427-00 COG PARKS VILLAGE PID Water meter 8351362 ADDRESS: 107 WESTBURY LN (Fairfield Park) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)68.000 47.000 4.000 2.000 4.000 15.000 140.000 CHARGES: Water $310.50 $226.50 $54.50 $46.50 $54.50 $98.50 $791.00 Electric / irrigation $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $36.00 TOTAL CHARGES $316.50 $232.50 $60.50 $52.50 $60.50 $104.50 $827.00 ACCOUNT #: 084-0428-00 COG PARKS VILLAGE PID Water meter 8351301 ADDRESS: 219 WESTBURY LN (Shell Park & Westbury Park-batteries) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)36.000 64.000 3.000 1.000 1.000 3.000 108.000 CHARGES: Water $182.50 $294.50 $50.50 $42.50 $42.50 $50.50 $663.00 Electric / irrigation $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $36.00 TOTAL CHARGES $188.50 $300.50 $56.50 $48.50 $48.50 $56.50 $699.00 ACCOUNT #: 084-0429-00 COG PARKS VILLAGE PID Water meter 8351345 ADDRESS: 275 WESTBURY LN (Green Grove Park) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)152.000 102.000 5.000 2.000 2.000 5.000 268.000 CHARGES: Water $646.50 $446.50 $58.50 $46.50 $46.50 $58.50 $1,303.00 Electric / irrigation $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $36.00 TOTAL CHARGES $652.50 $452.50 $64.50 $52.50 $52.50 $64.50 $1,339.00 ACCOUNT #: 084-0431-00 COG PARKS VILLAGE PID Water meter 9660125 ADDRESS: 339 WESTBURY LN (round-about with tree) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 3/4 In Irrigation (thousands of gallons)6.000 4.000 - - - 1.000 11.000 CHARGES: Water $47.00 $39.00 $23.00 $23.00 $23.00 $27.00 $182.00 TOTAL CHARGES $47.00 $39.00 $23.00 $23.00 $23.00 $27.00 $182.00 10 12 11 9 Page 32 of 36 PID Utility Usage Report 2015-2016 ACCOUNT #: 084-0432-00 COG PARKS VILLAGE PID Water meter 8351363 ADDRESS: 395 WESTBURY LN (Village Glen Park) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)124.000 88.000 5.000 2.000 3.000 6.000 228.000 CHARGES: Water $534.50 $390.50 $58.50 $46.50 $50.50 $62.50 $1,143.00 Electric / irrigation $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $36.00 TOTAL CHARGES $540.50 $396.50 $64.50 $52.50 $56.50 $68.50 $1,179.00 ACCOUNT #: 084-0433-00 COG PARKS VILLAGE PID Water meter 8351364 ADDRESS: 376 WESTBURY LN (Spring Park) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)85.000 59.000 4.000 1.000 1.000 4.000 154.000 CHARGES: Water $378.50 $274.50 $54.50 $42.50 $42.50 $54.50 $847.00 Electric / irrigation $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $36.00 TOTAL CHARGES $384.50 $280.50 $60.50 $48.50 $48.50 $60.50 $883.00 ACCOUNT #: 084-0436-00 COG PARKS VILLAGE PID Water meter 9660021 ADDRESS: 340 VILLAGE COMMONS BLVD (median strip with tree) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 3/4 In Irrigation (thousands of gallons)9.000 - 1.000 - - 1.000 11.000 CHARGES: Water $59.00 $23.00 $27.00 $23.00 $23.00 $27.00 $182.00 Electric / irrigation $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $36.00 TOTAL CHARGES $65.00 $29.00 $33.00 $29.00 $29.00 $33.00 $218.00 ACCOUNT #: 084-0437-00 COG PARKS VILLAGE PID Water meter 9659998 ADDRESS: 380 VILLAGE COMMONS BLVD (gazebo)Electric meter R15844841 USAGE:Oct Nov Dec Jan Feb Mar TOTALS 3/4 In Irrigation (thousands of gallons) 26.000 26.000 2.000 1.000 - 1.000 56.000 Electric Usage (non- irrigation) Municipal Small (kWh)4.000 15.000 - 1.000 - - 20.000 CHARGES: Water $127.00 $127.00 $31.00 $27.00 $23.00 $27.00 $362.00 Electric (non-irrigation)$125.24 $125.91 $125.00 $125.06 $125.00 $125.00 $751.21 TOTAL CHARGES $252.24 $252.91 $156.00 $152.06 $148.00 $152.00 $1,113.21 16 15 14 13 Page 33 of 36 PID Utility Usage Report 2015-2016 ACCOUNT #: 084-0441-00 COG PARKS VILLAGE PID Water meter 8351458 ADDRESS: 105 VILLAGE COMMONS BLVD (Greenside Park) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)136.000 76.000 12.000 38.000 47.000 5.000 314.000 CHARGES: Water $582.50 $342.50 $86.50 $190.50 $226.50 $58.50 $1,487.00 Electric / irrigation $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $36.00 TOTAL CHARGES $588.50 $348.50 $92.50 $196.50 $232.50 $64.50 $1,523.00 ACCOUNT #: 084-0442-00 COG PARKS VILLAGE PID Water meter 8351473 ADDRESS: 160 VILLAGE COMMONS BLVD (median strip with tree) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)- 5.000 1.000 - - - 6.000 CHARGES: Water $38.50 $58.50 $42.50 $38.50 $38.50 $38.50 $255.00 Electric / irrigation $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $36.00 TOTAL CHARGES $44.50 $64.50 $48.50 $44.50 $44.50 $44.50 $291.00 ACCOUNT #: 084-0443-00 COG PARKS VILLAGE PID Water meter 8351474 ADDRESS: 176 VILLAGE COMMONS BLVD (Hanover Park) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)65.000 47.000 3.000 2.000 1.000 5.000 123.000 CHARGES: Water $298.50 $226.50 $50.50 $46.50 $42.50 $58.50 $723.00 Electric / irrigation $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $36.00 TOTAL CHARGES $304.50 $232.50 $56.50 $52.50 $48.50 $64.50 $759.00 ACCOUNT #: 084-0444-00 COG PARKS VILLAGE PID Water meter 8351429 ADDRESS: 100 VILLAGE COMMONS BLVD (Village Commons Blvd Entrance-S+N)Electric meter R15845170 (Water looped with 100 Westbury Ln & 103 Westbury Ln) USAGE:Oct Nov Dec Jan Feb Mar TOTALS 1 In Irrigation (thousands of gallons)103.000 84.000 3.000 1.000 1.000 2.000 194.000 Electric Usage (non- irrigation) Municipal Small (kWh)- 1.000 - - - - 1.000 CHARGES: Water $450.50 $374.50 $50.50 $42.50 $42.50 $46.50 $1,007.00 Electric (non-irrigation)$125.00 $125.06 $125.00 $125.00 $125.00 $125.00 $750.06 Electric / irrigation $6.00 $6.00 $6.00 $6.00 $6.00 $6.00 $36.00 TOTAL CHARGES $581.50 $505.56 $181.50 $173.50 $173.50 $177.50 $1,793.06 20 19 18 17 Page 34 of 36 PID Utility Usage Report 2015-2016 TOTAL USAGE:Oct Nov Dec Jan Feb Mar TOTALS Water Usage (thousands of gallons)1,990.000 1,568.000 93.000 75.000 101.000 146.000 3,973.000 Electric Usage (non- irrigation) Municipal Small (kWh)6.000 17.000 - 1.000 - 1.000 25.000 TOTAL CHARGES ($): Water $8,690.50 $7,002.50 $1,102.50 $1,030.50 $1,134.50 $1,314.50 $20,275.00 Electric (non-irrigation)$750.36 $751.03 $750.00 $750.06 $750.00 $750.06 $4,501.51 Electric / irrigation $66.00 $66.00 $66.00 $66.00 $66.00 $66.00 $396.00 Credit ($544.00)($416.00)($172.00)($164.00)($184.00)($204.00)($1,684.00) TOTAL CHARGES $8,962.86 $7,403.53 $1,746.50 $1,682.56 $1,766.50 $1,926.56 $23,488.51 TOTAL CHARGES Page 35 of 36 City of Georgetown, Texas Georgetown Village Improvement District April 25, 2016 SUBJECT: Projec t Update Reports - Jim Briggs , General Manager o f Utilities ITEM SUMMARY: Geo rgeto wn Village Pub lic Imp ro vement Dis tric t (GVP ID) Projec ts: Alley Paving and S id ewalks Land s c ap e, Parks and Open Sp aces Pond s Communic atio n Budget and 5-Year Service Plan FINANCIAL IMPACT: None. SUBMITTED BY: And reina Dávila-Quintero , Projec t Coordinato r Page 36 of 36